Home / Financial Firm (Unknown - Insurer) / Determination 239456

Determination 239456

Water damage claim partly declined - gradual deterioration and rot exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2011-09-05
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$15,000
Non-financial loss—
Amount claimed$30,000
SourceAFCA PDF

Summary

A memorial hall committee claimed for floor damage from tank water escapes in 2010, and the FSP denied it as deterioration and rot. AFCA found the water escape was a covered cause but that long-term deterioration was also a proximate cause, and ordered the FSP to pay 50% of the repair cost.

Where a covered event and an excluded deterioration are consecutive proximate causes, the insurer is liable only for the share of loss attributable to the covered event.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 239456 Determination Page 1 of 8 Case Number: 239456 General Insurance – Business Insurance Policy – Water damage – Policy exclusions – wear, tear, gradual deterioration, mould, rotting Date: 19 August 2011 Background 1. The Applicant is acting on behalf of the Committee of a country area Memorial Hall. 2. The Applicant insured the Memorial Hall (hall) under a Business Insurance Policy against loss or damage caused by defined events for $100,000 with a policy excess of $100. The policy co mmenced on 8 May 2008 and had been renewed to 8 May 2011. The hall was approximately 60 years old with corrugated iron external walls. The floor of the hall was timber which was covered with chipboard approximately ten years ago. 3. On 15 August 2010, a claim was lodged on the Financial Services Provider (FSP) for damage to the timber floor of the hall following separate water events that occurred in February and March 2010. Water had escaped from the hall’s rainwater tanks and flowed under the floor of the hall. The cost of repairs has been estimated to be $30,000. 4. The Applicant also contends that extreme storm rainwater inundated the locality of the hall during the period 5 to 9 March 2010 and this also contributed to the damage. 5. The FSP appointed an external loss adjuster to report on the claim. The loss adjuster was unsure as to the FSP’s liability, if any, and recommended a consulting engineer be appointed to inspect and report on the damage. 6. The engineer concluded the damage to the floor was a result of deterioration over a number of years, poor construction including lack of ventilation and stated that the damage could not have been caused by the water leaking incidents in February and March 2010. 7. On the information submitted by the engineer, the FSP denied indemnity to the Applicant on the grounds that the damage to the floor was caused by wear, tear, gradual deterioration, mould or rot which are exclusions of the policy of insurance 8. The Applicant disagrees with the FSP’s decision and contends, although there may have been some gradual deterioration, the majority of the damage was caused by the water escaping from the water tanks and storm rainwater. Determination Case No: 239456 Determination Page 2 of 8 Summary of Applicant ’s Position 9. A claim was made for storm water damage to the flooring of the Memorial Hal l. The FSP denied the claim on the basis of the floor being too low to allow reasonable ventilation. 10. On 18 February 2010, an installation contractor was installing an air conditioning unit. Before the job was finished, the contractor failed to deactivate an electric pump and after the contractor had left for the day, the pump became active and as water was not connected to the air conditioning unit, water was pumped from a water tank onto an external wall. This resulted in 10,000 litres of water draining to the lowest point under the hall floor. 11. On 6 March, it was discovered that the over flow pipe on another water tank had dislodged during a rain storm. The storm water together with the water from the disconnected pipe drained under the floor of the hall. 12. In both instances, committee members took remedial action as soon as the problems were discovered. The hall is in an isolated location so any mishap would not be readily discovered. 13. The hall was built just after World War 1 and it was inspected by a FSP representative over a number of years the hall has been insured. The latest inspection was in 2010 prior to renewal of an application for ‘continuation insurance’. No comment was made by the FSP’s inspector regarding floor levels then or since. 14. The FSP contends that there is an issue of long term deterioration which the Applicant does not dispute. However, if the deterioration was the result of poor ventilation the FSP’s inspector, who made many inspections of the property prior to cover being accepted, should have accepted policy cover excluding ‘floor problems’. 15. The FSP states the committee did not take action to minimise the damage. This is not correct. The two contractors involved in the separate incidents repaired the faults while committee members turned off the flow of water immediately it was discovered. 16. The Applicant notes that the FSP’s consulting engineer’s report supports the issue of the floor level, but he also stated: “ The rainfall events earlier this year have shown that the moisture containment under the floor has caused damage to the sub stru cture and the flooring.” 17. The Applicant contends a claim can only be lodged when the damage comes to light, in this case, mid October 2010. Committee members are not structural engineers and the deterioration of the floor over a number of years can only be a matter of opinion by qualified persons. 18. Three months before the claim was submitted, dark discolouration of the flooring was noted on parts of the floor. Cursory inspection did not cause any alarm. While the discolouration was noted, committee members did not realise Case No: 239456 Determination Page 3 of 8 the extent of the problem until shoe heels began to penetrate the flooring in the discoloured areas. 19. An expert inspection confirmed the extent of the problem and a claim was lodged with the FSP. 20. The Applicant submits:  the damage to the floor was caused by water escaping from the water tanks and storm rainwater flowing under the floor of the hall;  the FSP should be directed to effect repairs to the floor or pay compensation for any monies used to repair the floor; and  if some portion of the damage has been caused by gradual deterioration, then the amount payable should not be less than 60% of the possible costs to repair the damage. Summary of FSP’s Position 21. Following the lodgement of the Applicant ’s claim, the FSP appointed a loss adjuster on 28 October 2010 to assess the damage. The loss adjuster reported there was no ventilation whatsoever underneath the floor of the hall and any moisture that did go under the floor had nowhere to go and there was no chance of it being dried in a rapid manner. 22. The loss adjuster also stated: “ My honest opinion is that even without the overflow of these two occasions, there would have been a problem with the floor due to the lack of ventilation, and now with regular moisture in the ground after the drought, it was only a matter of time before the moisture started to progress up through the original timber floor into the chipboard floor.” 23. On the recommendation of the loss adjuster, a consulting engineer was engaged to inspect the damage. In his report dated 28 November 2010, he stated: “ The sub floor has deteriorated over the years. The stumps will have rotted to a varying degree around the building which would cause the differential floor levels. The quality of the sub floor timbers by now would be structurally unsound. The rainfall events earlier this year have shown that the moisture containment under the floor has caused damage to the sub structure and the flooring. In particular, the choice of chipboard flooring over existing flooring boards has shown to be inappropriate.” 24. The loss adjuster’s report observed the engineer’s statement that the floor bearers had rotted over a long period of time and that damage could not have been caused by the incident of February 2010. The loss adjusted concluded that a long standing design fault resulting in gradual deterioration caused the damage. Case No: 239456 Determination Page 4 of 8 25. The FSP’s representative who visited the insured property would not have been inspecting the property for all latent faults or damage. To do otherwise would result in any fault or latent defect that existed at the time o f the visit, whether known or not to the representative, being covered under the policy despite it not being the subject of endorsements to the policy. 26. It contends the purpose of the representative’s visit would not have been to silently approve cover for any latent defects or faults. 27. The Applicant accepts that the balance of evidence indicates that the deterioration has occurred over an extended period of time. Both the loss adjuster and consulting engineer came to the same conclusion. 28. They also both agree the rainwater events could not be the main or driving cause of the damage claimed, which is gradual deterioration due to sub- standard construction (including lack of ventilation) of the subfloor. The rainwater event was but one of the events in a chain of events which eventually caused gradual damage to the flooring. 29. The loss adjuster also stated: “ ...it was only a matter of time before the moisture started to progress up through the original timber floor into the chipboard floor.” 30. Whether the Applicant was aware of the latent defect or gradual deterioration cannot form the basis of the decision of whether the claim is covered under the policy. 31. The FSP relies on the policy exclusion of ‘gradual deterioration’. The loss adjuster and engineer confirm that the floor has deteriorated over the years. The real cause of the damage cannot be the rainwater events. 32. The FSP also relies on the policy exclusion of ‘rotting’. The engineer reported: “ The stumps will have rotted to a varying degree around the building, which would cause the differential floor levels”. 33. The Applicant has not submitted any evidence in support of his claim. On the contrary, the evidence is that the exclusions apply to defeat the Applicant ’s claim. 34. The FSP relies on the following policy/contract provisions: 1 – BUSINESS INSURANCE Section A – Business Property Cover ... Defined Events Cover We cover you for loss or damage at the Business premises caused by the following Defined Events: 1. bursting, leaking, discharging or overflowing of fixed apparatus, fixed tanks or fixed pipes used to hold or carry liquid... Case No: 239456 Determination Page 5 of 8 ... 7. storm and rainwater, but we will not pay for loss or damage: . .. g. caused by water that does not enter the Building through an opening made by the storm. What you are not covered for 1. We will not pay for loss or damage caused by: ... e. mildew, mould, rotting, disease, contamination, Pollutants, or industrial fallout; ... h. wear, tear, fading or gradual deterioration; ... j. faulty work i. error in, omission of or wrong design; ii. fault y materials or faulty workmanship; ...” Issue 35. Whether the damage to the Applicant ’s building was caused by a defined event of the policy; whether the FSP is entitled to rely upon a policy exclusion to deny indemnity to the Applicant. Reasons for Decision The onus of proof is on the Applicant to establish, on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. 36. The insured building is a Memorial Hall which is approximately 60 years old and constructed of corrugated iron external walls and a chipboard floor laid over the original timber floor. 37. In February and March 2010, there were two events where water escaped from water tanks near the hall and flowed under the floor of the hall. In the first event, approximately 10,000 litres of water were accidentally pumped from a tank. In the second incident on or about 6 March 2010, water escaped from a Case No: 239456 Determination Page 6 of 8 water tank during extremely high rainfall. It is not known what quantity of water flowed under the hall 38. In about May 2010, it was noticed that dark discolouration of parts of the flooring had developed. Although the discolouration was noted, inspection of the floor did not raise any concerns. However, the committee did not realise the extent of the damage until shoe heels began to penetrate the flooring in the discoloured areas. 39. The Applicant sought an expert opinion which confirmed the problem and a claim was lodged on the FSP. 40. The FSP appointed a loss adjuster to investigate and report on the damage to the floor. The loss adjuster stated:  he could not see underneath the flooring as to what the cause of the moisture is;  there was no ventilation underneath the floor; any moisture underneath the flooring has nowhere to go and there is no chance of it being dried in a rapid manner;  it was extremely difficult for him to ascertain as to where the moisture was coming from, whether it was a build-up of water underneath the building or was just rising damp from the lack of ventilation; In view of his uncertainty as to the cause of the damage, the loss adjuster recommended a consulting engineer be appointed to inspect the building. 41. The engineer inspected the building on 23 November 2010. He reported:  the bearers would be very close to ground level;  the two water events resulted in the subfloor being flooded resulting in the moisture being absorbed by the particle board flooring causing it to discolour and become soft;  the sub-floor had deteriorated over the years;  the stumps will have rotted to a varying degree around the building;  the quality of the sub floor timbers would be structurally unsound;  the rainfall early in 2010 has shown that the moisture containment under the floor has caused damage to the sub structure and flooring;  the choice of chipboard over the existing floor boards has shown to be inappropriate; and  he is of the opinion the entire floor should be replaced. Case No: 239456 Determination Page 7 of 8 42. I note the reports of the loss adjuster and consulting engineer, however, I have concerns that their opinions have not been formed from actually viewing the foundation stumps of the building. In particular, the engineer offered the opinion that ‘The stumps will have (my emphasis) rotted to a varying degree around the building which would cause the differential floor levels.’ 43. The loss adjuster also suggested the Applicant ’s claim be denied because of lack of ventilation and the way the floor has been constructed. However, the building was constructed approximately 60 years ago and no evidence has been submitted as to the building standards that applied at that time. Further, he does not explain as to how the construction of the floor is a ground for denying the claim. 44. There are two aspects to this claim dispute. Firstly, the opinions that the sub floor timbers have rotted and, secondly, the actual water damage to the particle board flooring. 45. In respect to the sub floor timbers, I am persuaded by the engineer’s report and, on the balance of probabilities, the 60 years old timbers have gradually deteriorated over the years causing the differential movement in the floor. 46. However, I am also persuaded the damage to the floor of the insured building was caused by the defined event escape or discharge of water from the water tanks in February and March 2010 which resulted in a considerable quantity of water flowing under the building. 47. This was confirmed by the consulting engineer who stated the flooding of the sub floor resulted in the moisture being absorbed by the particle board flooring causing it to discolour and become soft. 48. The policy of insurance covers loss or damage caused by water leaking or discharging from fixed tanks. Therefore, I find that the damage to the flooring was caused by the leaking and/or discharging of water from the water tanks in February and March 2010. 49. In circumstances where more than one proximate cause has been established as responsible for the damage and one proximate cause is covered by the policy and the other is excluded, it is established law that the clause excluding the cover is dominant and the claim fails. 50. However, in the circumstances of this case, the deterioration of the sub floor structure occurred prior to the storm, which means that one proximate cause was followed by another, so that they were consecutive. 51. While the policy provides cover for damage caused by water damage, the policy also contains a clause which excludes cover when the loss or damage is caused by wear tear or gradual deterioration. 52. Because one proximate cause of the damage was the deteriorated condition of the sub floor timber foundations, I am satisfied the FSP should not be fully responsible for the claim. Case No: 239456 Determination Page 8 of 8 Determination 53. I therefore determine the FSP is liable for 50% of the cost of repairs the subject of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.