Home and contents damaged by water in January 2011 were declined by the FSP as river flood. AFCA found the FSP's evidence inconsistent and inconclusive, did not accept the river flood exclusion applied, and ordered indemnity for the home and contents, with interest if settled in cash.
The insurer bears the onus of establishing an exclusion, and its assessor and hydrology evidence did not show that river flood first caused the inundation rather than covered rainwater runoff.
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 239353 Determination Page 1 of 8
Case number: 239353
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
15 November 2011
Background
1. The Applicants’ home building and contents were insured with the Financial
Services Provider (FSP) under separate home building and contents policies.
2. They claimed for damage to their property caused by water inundation into their
home.
3. The FSP declined liability on the basis the damage was caused by “flood”,
which it contends is excluded by the policies.
4. The Applicants maintain that the damage was caused by storm or rain water
runoff or flash flood which is covered by their policies.
Summary of Applicants ’ Position
5. The FSP’s assessor is a motor mechanic by trade. He is unqualified to
determine whether their property had been damaged by stormwater runoff or
creek inundation.
6. Stormwater runoff must first occur before water in a creek can accumulate and
break its banks.
7. The water which first entered their house was from “Storm, Rain and Flash
Flood” a nd drained from their home within an hour.
8. The FSP declined the claim without considering hydrology evidence.
9. The hydrology report that was subsequently obtained contains factual errors.
Their home is not on flat ground as claimed. There is a fall of some 2.4
metres between the creek and their home.
The creek is not 15 metres from their home as claimed. It is 54.8 metres
away.
10. The hydrologist refused to view the relevant creek.
Determination
Case No: 239353 Determination Page 2 of 8
11. Section J of the hydrologist report states:
“The time of the event could be per ceived as being normally consistent with the
definition of a flash flood event”
12. The policy wordings are misleading. On one hand, it says they were covered for
flash flood which is heavy rain fall that collects and flows into their home. On
the other, the policy excludes loss or damage caused by storm or rain if water
did not enter the home through a storm created opening.
13. A “flash flood” will practically never occur if the FSP’s definition of the term is
accepted.
Summary of FSP’s Position
14. The damage to the Applicants’ property was caused by flood which is excluded
by the policy.
15. Its assessor reported:
The Applicants said torrential rains on 10 January 2011 caused Sugarloaf
Creek (located directly in front of their home) to burst its banks and flood
their home.
The damage was caused by water inundation from Sugarloaf Creek.
The home was inundated by flood water from Sugarloaf Creek before any
stormwater inundation occurred.
16. Its hydrologist reported:
The Applicants’ property is located on low lying land adjace nt to Sugarloaf
Creek which was 15 metres away.
The property is prone to flooding.
Rainfall in excess of 100 year ARI occurred over the Sugarloaf Creek
catchment in the 24 hours up to 9.00am on 11 January 2011.
Dalcouth and Storm King Dam HW alert stations are closest to the
Applicants’ home and they recorded rainfall intensities in excess of 10
year ARI in three to four hours.
The rainfall resulted in large volumes of water travelling down the
Sugarloaf Creek system, causing the creek to break its banks and
inundate the Applicants’ home.
“The source of water which inundated the Applicants’ property can be
determined by considering the relative timing of local rainfalls and water
level rises in areas of interest”.
Rainwater falling on the site clearly mixed with flood water from the
Sugarloaf Creek catchment system.
Case No: 239353 Determination Page 3 of 8
The catchment and slope around the Applicants’ home site was small and
only caused stormwater runoff to a depth of approximately 5cm. This did
not cause any inundation into their home.
The water that caused damage to the property was a river flood.
Sugarloaf Creek had overflowed its bank “some hours after initial
inundation of the land around the residence from run-off caused by
rainwater on the site on the morning of 10 January 2011”.
The water th at caused damage to the property was a mixture of “river
flood waters” from the “Sugarloaf Creek catchment system” and rainwater
on the site.
17. The FSP relies on the following policy provisions contained in its building and
contents product disclosure statements (PDS):
“ What you are not covered for
There are certain events when this insurance we may not provide cover.
Some events we may not cover include:
Damage caused by the seas or tidal wave or river flood (see Section 1.12)
…
Definitions (The Meaning Of Some Words)
Some words and expressions in this policy have a specific meaning which is given
below. Each word is printed in bold where it appears.
...
“ flash flood ” means what occurs when there are heavy, intense burst of rainfall,
usually during thunderstorms where so much water falls in a very short time that it
cannot get away quickly enough and collects and flows into your home .
but does not include when rainwater on the site :
cannot run off into a water catchment system , because it is overflowing in
flood; and
mixes with the flood water coming from the water catchment system and then
flows into your home .
...
“ rain ” means water that has fallen from the sky on to your home and the site but not
water from flash flood .
“ river flood ” means when water that is normally contained in a water catchment
syste m increases because of rainfall or snow (whether in the immediate region or
elsewhere) or is deliberately released by an authority, and the water overflows onto
land that is not normally covered by water into your home .
For example water may be deliberately released by an authority from a dam or
reservoir.
...
“ water catchment system ” means:
Case No: 239353 Determination Page 4 of 8
a river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally dry
that only run during periods of rain;
a dam, reservoir, storm water channel or canal.
...
1.12 Storm, Rain Or Flash Flood
You are insured for damage to your home [ your contents ] caused by storm , rain or
flash flood .
...
We will not pay for damage caused by:
…
river flood ;
…
INDEX
…
Flood, River (you are not insured) ”
Issues
18. Whether the Applicants’ property was damaged by storm/rain water runoff,
flash flood and/or river flood.
Reasons for Decision
19. Due to the nature and urgency of the dispute, it has been directly referred to the
Panel for Determination in accordance with the Operational Guidelines to the
Financial Ombudsman Service’s (FOS) Terms of Reference.
20. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
21. There has been an exchange of all relevant material and each party has had
the opportunity to respond to the issues raised.
22. There is no dispute that the Applicants received the policy.
23. The policy defines what it considers river flood, flash flood, rain and storm.
24. Whilst the Panel is satisfied the policy clearly excludes river flood, it is equally
clear that cover is provided for flash flood, rain or storm.
FSP’s evidence
Case No: 239353 Determination Page 5 of 8
25. The Panel notes that the FSP relies on the evidence of its assessor, a
hydrologist and the ICA hydrology report for the Brisbane area.
26. The FSP has not shown, and the Panel is unclear, which part of the ICA
hydrolog y report supports a finding that the Applicants’ home was inundated by
“river flood” as defined or by a mixture of rainwater and water from Sugarloaf
Creek.
27. In relation to the evidence of the assessor and hydrologist, the Panel makes the
following observations:
The assessor’s conclusion appears to have been derived from some
photographs and statements provided by unidentified persons: “…other
people we have interviewed…”.
The assessor has not identified which particular photographs shows that
the home was first inundated by flood water (let alone “river flood”). In any
case, the Panel is of the view that photographs do not necessarily tell a
full and complete story.
Furthermore, the assessor’s evidence is plainly hearsay since it relies on
unidentified statements made by unidentified people. While the Panel is
not constrained by the rules of evidence nevertheless such statements will
always be treated with caution and are of limited worth given it is
impossible to identify the parties or determine the accuracy of the
statement attributed to them.
In the Panel’s view, the evidence of eye witnesses would be particularly
important in a dispute like this so it does not understand why such
statements have not been provided in the material exchanged.
The assessor states that the Applicants’ home “would already have been
inundated by flood water that had escaped the confines of Sugarloaf
Creek by the time any runoff occurred ”.
He has not explained (and the Panel is unclear) how he formed this view.
The Applicants’ h ome is located about 55 metres from the creek, and not
15 metres as initially claimed. There is also a fall of some 2.4 metres
between the home and the creek.
Such information suggests that Sugarloaf Creek must significantly rise
and spread before it can r each the Applicants’ home.
The hydrologist has not also explained (and the Panel is unclear) how he
could misstate such information by suggesting that the home was only 15
metres away from the creek. This also casts some doubt whether the rest
of the hydr ologist’s report could safely be relied upon as accurate.
There is no evidence suggesting that the Applicants’ home has had a
history of flooding during heavy rains.
The Panel is therefore unclear what forms the basis of the hydrologist’s
belief that it was prone to flooding.
Apart from supporting a suggestion that the Applicants’ area was likely to
have been affected by significant rainfall on 10 January 2011, rainfall
Case No: 239353 Determination Page 6 of 8
records from the Dalcouth and Storm King Dam stations appears to be of
limited assistance.
Photographs supplied show that these stations are located some distance
northwest and southwest of the Applicant’s property respectively. More
importantly, there is no explanation as to whether, or in what way these
stations actually cover or connect with the Sugarloaf Creek catchment
area.
Whilst the Panel accepts that the Applicants’ property was likely to have
been subjected to heavy rains on 10 January 2011, the Panel is unsure if
the hydrologist’s comment – that rainfall in excess of 100 year ARI had
“occurred across the Sugarloaf Creek catchment in the 24 hours up to
9.00am on 11 January 2011” – is necessarily accurate.
Records of rainfall intensities at the Dalcouth and Storm King Dam
stations show that these locations were themselves subjected to different
rain intensities at different periods of time. If this was the case, the Panel
is unsure if it can be reasonably concluded that the whole Sugarloaf
Creek catchment area had rainfall in excess of 100 year ARI in the 24
hours up to 9.00am on 11 January 2011, in the absence of evidence
specific to the catchment area.
The Applicants’ evidence before the Service is that heavy rains ov er two
nights and one day caused rainwater to stream down the hill, over a
stormwater channel and into their home. They have provided a diagram
depicting this.
Their direct statement to the Service is inconsistent with the versions the
assessor and the hydrologist claim the Applicants had provided them. The
version provided by the assessor is also inconsistent with the version
provided by the hydrologist.
The assessor claims the Applicants had said their home was inundated
after Sugarloaf Creek broke its banks. He also claims that rainwater runoff
struck the home after it had already been inundated by water from
Sugarloaf Cr eek. That is to say, the home was inundated by “river flood”
first and then by rainwater runoff.
On the other hand, the hydrologist claims the Applicant had said that their
home site was affected by local runoff (that did not inundate the home) on
the morn ing of 10 January 2011 and was only inundated by “river flood” in
the afternoon. That is to say, the home site was affected by local runoff
(which did not inundate the property) first and then by “river flood” (which
inundated the property).
There is no reliable record as to what the Applicants purportedly said to
the assessor and the hydrologist. There are also no statements from the
eyewitnesses the assessor refers to in his report.
Furthermore, there is also no reliable record of the sequence of events
that actually occurred on 10 January 2011.
On the whole, the Panel finds the FSP’s evidence – as to what the
Applicants have purportedly said or what actually occurred – inherently
inconsistent.
Case No: 239353 Determination Page 7 of 8
The hydrologist has not explained (and the Panel is unclear) how an
embankment obstruction adjacent to the Applicants’ property had
exacerbated the flooding.
The hydrologist’s conclusion is somewhat inconsistent, if not confusing
altogether.
On one hand, he suggests that the Applicants’ property was damaged by
“river flood”. On the other, he also says “the timing of the event could be
perceived as being normally consistent with the definition of a flash flood
event”.
On other occasions, he also said that rainwater had “clearly mixed” with
water from Sugarloaf Creek without explaining how he had reached this
conclusion.
The hydrologist also did not explain how he came to conclude the slope
around the Applicants’ property was “small” and only caused stormwater
runoff to a depth of 5cm.
There is no information as to the gradient of the hill the Applicants’ home
sits on; nor is there anything to suggest the hydrologist had actually
properly investigated the topography in the area.
Whilst the hydrologist is correct in that – “the source of water which
inundated the Applican ts’ property can be determined by considering the
relative timings of local rainfalls and water level rises in areas of interest”
– he has either not provided or provided unclear evidence of such
matters.
It is unclear to the Panel:
When Sugarloaf Creek broke its banks.
When rainfall activity was particularly intense in the Applicants’
area.
When the Applicants first said water began to inundate their home.
28. On the whole, the Panel finds the FSP’s evidence inconclusive and unclear as
to what actually occurred on 10 January 2011.
29. What is not disputed is that the Applicants’ home was subjected to heavy rains
on 10 January 2011 and there is sufficient evidence (even in the FSP’s
material) to support a suggestion that their home was inundated by rainwater
runoff.
30. The FSP has the onus to show that the home was first inundated (and
damaged) by “river flood” as defined, or by a mixture of rainwater runoff and
“river flood” at the very least.
31. On the basis of the material presented, the Panel is not satisfied that the FSP
has been able to meet the onus to establish on the balance of probabilities that
the flood exclusion applies. The Panel is satisfied the Applicants are entitled to
be indemnified for their loss.
Case No: 239353 Determination Page 8 of 8
Determination
32. The Panel determines that the FSP is to indemnify the Applicants for the
damage to their home and contents under their policies.
33. In the event the FSP elects to settle any part of the Applicants’ claim in cash,
the Panel determines that the FSP is to pay interest on such amount at the
statutory rate from 31 March 2011, the date it first declined the claim, until such
amount has been paid in full.