Shed inundation denied as flood damage under policy flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2011-11-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After January 2011 intense rain, the FSP denied the claim for water damage to the applicant's shed, relying on the flood exclusion. AFCA found the initial inundation was rainwater run-off that the FSP had not shown was excluded, and directed the FSP to indemnify the applicant for her loss.

The FSP bore the onus to prove the flood exclusion applied, and it could not rebut evidence that rainwater run-off first inundated the shed before any creek backwater.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 239186 Determination Page 1 of 6 Case number: 239186 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim 25 October 2011 Background 1. On 11 January 2011 the shed on the Applicant‟s property was inundated with water following intense rainfall in the area. 2. The Financial Services Provider (FSP) denied a claim under the Applicant‟s home insurance policy for damage arising from the event on the ground that the damage was caused by flood water and excluded from cover provided by the policy. Summary of Applicant’s Position 3. Her home is located about 400 metres from Western Creek. There is a main road between her property and creek which is about 1 metre higher than the base of her shed. The water did not come anywhere near the road from the creek side. In fact the creek only went 0.55 metres above the approaches. 4. A torrent of water came from the main street in town. Her property is in the lower part of Rosewood where the water will end up. There is no creek, river or the like at the top end of the town for the water to have come from. 5. There was raw sewage in the shed which came up from the stormwater drain, not from the creek. This would not have occurred had the water been back- water from the river. 6. Items were washed toward the culvert on the other side of the road from her property and not away from it. She contends this does not support the hydrologist‟s comment that the water was backwater from the culvert. Summary of FSP’s Position 7. The FSP relies on the following policy terms: “Lis ted Events cover ... Determination Case No: 239186 Determination Page 2 of 6 Storm, rainwater or wind Under Listed Events, we will cover your buildings or contents for loss or damage as result of storm, rainwater or wind. Water or liquid damage Under Listed Events cover, we will cover your buildings and contents for loss or damage caused by water or liquid ... We will ONLY cover loss or damage caused by water or liquid escaping from  a fixed pipe or an object attached to a pipe, fixed gutter, fix ed tank or a drain ... Exclusions to your cover Any cover we provide is subject to the following exclusions. ... We will NOT cover any loss or damage as result of or caused by  ...  flood ... Glossary of words with a special meaning flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam.” 8. The FSP relies on a hydrological report commissioned by it. The hydrologist concluded that the inundation of the Applicant‟s property was ultimately caused by the overflow of a watercourse, namely Western Creek. 9. The FSP states that the runoff from the intense rainfall would have exceeded the capacity of the local drainage systems and as a result of elevated levels in Western Creek, likely contributed to the peak flood level experienced. The inundation of the local area to the depth experienced likely led to a backwater through the sewage system causing the back flow observed by the Applicant. 10. The hydrologist confirmed that the rainfall exceeded the local drainage capacity and was unable to drain because the river was in flood. Any damage to the Applicant‟s property from this i s excluded as that water is defined as flood as found in K Sita Plastics v Cornhill Insurance (1982) 2NZLR 50(CA). 11. The FSP states that if it was a combination of storm and flood water which inundated the premises the damage is excluded on the basis of the Wayne Tank decision and the Petersen case in the event that storm water and flood water mixed or stormwater and flood water inundated the property contemporaneously. Case No: 239186 Determination Page 3 of 6 Issues 12. Whether the damage was caused by flood water as defined by the policy or run-off rainwater. Reasons for Decision 13. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 14. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 15. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity comment. 16. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 17. The FSP relies substantially on the report provided by the hydrologist dated 10 March 2011. Relevantly the report finds:  The Applicant‟s property is located on the southern edge of Rosewood. Western Creek is 400m south east of the property and discharged into the Bremer River about 1km downstream.  A drainage channel passes underneath the Ipswich-Rosewood Road approximately 100m east of the Applicant‟s property linking the Western Creek flood plain to the south of Ipswich-Rosewood Road with low ground to the north of the road on which the property is located.  The Ipswich-Rosewood Road is elevated above the Western Creek flood plain by about 1 to 1.5m.  Several large culverts exist relatively close to the Ap plicant‟s property allowing flow to pass beneath the elevated road providing drainage of the low area on which the property is located.  This also allows overflow from Western Creek to inundate the area on the north side of the Ipswich-Rosewood Road where the property is located.  Rainfall in the area began on 9 January. Moderate rainfall continued up to 10 January which would have elevated stream levels. An intense burst on 11 January would have overwhelmed the capacity of the local stormwater system.  River level data shows 7.78m was reached at about 10.15 on 11 January and reached an ultimate peak level of 7.83m just before 15.30 on the same day. Case No: 239186 Determination Page 4 of 6  Interpolating the water surface slope between Rosewood WWTP and Rosewood Alert gauge would indicate a peak water surface level experienced as a result of Western Creek overflow in the vicinity of the property at about 42.2m AHD.  This level would be sufficient to cause a backwater through the culverts beneath Ipswich-Rosewood Road inundating the property to the depth reported by the Applicant.  Runoff from the intense rainfall would have exceeded the capacity of local drainage systems and as a result of elevated levels in Western Creek likely contributed to the peak flood level experienced.  The inundation of the local area to the depth experienced likely led to a backwater through the sewerage system causing the back flow observed by the Applicant. 18. Captioned aerial photographs contained within the report provide a clear view of the proximity of the Applicant‟s proper ty to Western Creek, the flood plain and the drainage channel. 19. The Panel has also viewed captioned photographs submitted by the Applicant. These photographs depict brown water flowing through the shopping area from the top of the town. The water appears to be running quickly. A photograph taken in front of the Applicant‟s property shows water on the road side in front of her home with the crest of the road free of water. Additional photographs show the open ground opposite the Applicant‟s property with wate r in a culvert to the side of the road. 20. A local councillor commented that the water that affected the Applicant‟s property “... had nothing to do with creek or river water or the Western Creek”. The councillor does not explain his reasons for having this view. As such, his comments can only carry limited weight. 21. The Applicant‟s property is located at the lower end of the Western Creek flood plain. A drainage channel forming part of the local stormwater system is located within about 100 metres from the Appl icant‟s property. 22. According to the hydrologist, this channel is one of several whose primary purpose is to allow water from the low area on which the property is located to flow under the road towards the flood plain adjacent to Western Creek. However, he also states “ This also allows overflow from Western Creek to inundate the area on the north side of the Ipswich-Rosewood Road where the property is located”. 23. The Applicant states that water which had accumulated from the area of the main area of the town ran down to her low lying property, inundating her shed before passing to the channel adjacent to her property (she has provided a number of photographs showing the water build -up and run-off from the town). This appears consistent with the primary purpose of the channel. Case No: 239186 Determination Page 5 of 6 24. However, the Panel accepts that the drainage system also allows excess water in time of elevated levels in the creek to inundate areas of land on which the Applicant‟s property is located. Weston Creek is about 400 metres from the property. Based on the local topography, the Panel accepts that the location of the Applicant‟s property would make it susceptible to flooding when the creek overtops its banks. 25. The hydrologist relied on factual information in relation to rainfall events over the period from 9 to 11 January and the impact of those rainfall events on the level of Weston Creek. He also took into account the relative heights above ground level of the Applicant's property, the Ipswich-Rosewood Road in the vicinity of the Applicant‟s p roperty and peak water level in Weston Creek in the vicinity of the Applicant‟s property after allowing for water surface slope between the nearest gauges. 26. However he appears to apply this data to the „peak water level‟. The Panel has no issue with the accuracy of his findings; however these do not necessarily stand counter to the Applicant‟s claim that water flowing from the town first inundated her shed. 27. The hydrologist explained that the inundation to the depth experienced likely contributed to the sewerage system failing thus causing the back flow and the material observed by the Applicant and again, the Panel has no issue with this finding. 28. However, of particular interest is the rainfall data provided by the hydrologist which states that rain in the area began on 9 January, moderate rainfall continued up to 10 January and then an intense burst on 11 January would have overwhelmed the capacity of the local stormwater system. 29. In the Panel‟s view it is entirely logical and feasible that such an intense downpour would have led to water running down from the town and across the Applicant‟s property and towards the channel. That the water may not then have been able to run through the channel adjacent to her property does not negate that water running across the property (and inundating the shed) was in fact rainwater run-off. 30. Consistent with this, the Applicant has submitted that rainwater run-off and build up is a relatively common occurrence on her property. 31. Loss or damage by rainwater is covered by the policy, therefore for the FSP to reject the claim it has the onus of proving on the balance of probabilities that the flood exclusion operates to defeat the claim. 32. After analysis of the available material the Panel concludes that the FSP has not discharged the onus that rests with it to show that the claim does not fall within the terms of the policy, specifically there is no conclusive evidence that rainwater run- off did not first inundate the Applicant‟s shed. 33. Having carefully considered all of the evidence the Panel is persuaded that the water which first inundated the Applicant‟s shed was rainwater run -off. Although Case No: 239186 Determination Page 6 of 6 the Panel accepts that backwater from the creek and discharge from the sewage system would also have inundated the property at the peak of the flood, on balance, this would likely have been a consecutive cause rather than a concurrent one. 34. For these reasons the Panel is of the view that the cause of the initial inundation of the Applicant‟s property was due to rainwater run -off and the FSP is required to indemnify the Applicant for her loss. Determination 35. On the basis of the available information the Panel determines that the FSP was not entitled to deny liability for the claim and is required to indemnify her for her loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.