Text of the determination
Case No: 239116 Determination Page 1 of 11
Case number: 239116
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim – Flood
15 November 2011
Background
1. The Applicant held a Business Insurance Policy (the policy) with the Financial
Services Provider (FSP).
2. During a significant weather event experienced in Brisbane from 9 – 13 January
2011, the insured property suffered significant damage resulting from the floods
experienced in the Brisbane.
3. The Applicant lodged a claim with the FSP seeking indemnity under the policy
for damage to stock in trade, equipment used in running of daily business and
business interruption. The FSP having considered the claim informed the
Applicant that the claim was not one for acceptance as “Flood” was not an
insured peril under the policy.
4. The Applicant remains dissatisfied with the outcome of the claim and is seeking
an independent review of the FSP’s decision to decline the claim by the
Service.
Summary of Applicant’s Position
5. The Applicant submitted a claim under the policy on 14 January 2011 seeking
indemnity for loss or damage to 75% of stock and equipment located at the
insured address on the date of loss.
6. An assessor was appointed by the FSP and when he visited the insured
property the Applicant took him throughout the premises showing him the
resultant damage, also providing him with photographs of the loss.
7. The assessor was informed that the water inundation was due to water coming
up through the water drains prior to the river flood inundating the premises.
8. The Applicant received a letter from the FSP notifying him that the claim had
not been accepted as his policy did not cover loss or damage arising directly or
indirectly from flood.
Determination
Case No: 239116 Determination Page 2 of 11
9. The Applicant believes a fair resolution would be for the FSP to cover him for
his loss including stock, business interruption and equipment damage. It is
quite difficult when informed you are not covered for significant losses when it
was thought that the policy did cover such circumstances.
10. The Applicant as part of his claim is also seeking cover for costs associated
with the repair of a forklift in addition to the cost of having to hire a forklift in the
absence of the damaged company forklift.
Summary of FSP’s Position
11. The Applicant’s policy provides cover for loss or damage arising from “Listed
Events” noted in the policy and limited “Accidental Damage” to contents and
stock in trade.
12. The policy excludes from cover, loss or damage arising from flood and in
considering the Applicant’s claim the FSP has relied upon information provided
by the Applicant, the location of the property, hydrology reports, legal precedent
and other information available on the FSP’s files.
13. The FSP maintains the policy wording is clear and unambiguous in its meaning
and as such the Applicant is not entitled to indemnity for the claimed loss as it
arose from the excluded peril “flood”.
14. Due to the disruption caused by the flood event, the FSP had to close its local
office in the area until 21 January 2011 and immediate resources were limited.
The F SP’s Senior Management decided those cases about which it could be
clearly identified that the loss was due solely to flood. Then in such instances a
physical inspection of the damage would not be required before the claim was
declined.
15. There is an onus on the Applicant to establish that he has suffered a loss,
which is the result of a peril insured under the policy. The Applicant has not
made available any evidence to establish that the cause for the damage is
anything other than inundation by flood water.
16. The FSP relies upon Section 1.5 “Specific Exclusions” provided in the Product
Disclosure Statement (PDS) which states:
“(3) Flood – We will not pay for loss, destruction, or damage caused directly or
indirectly by Flood, unless you have Option Cover under Section 1.6 (1).”
17. The FSP notes that the two main issues in dispute are the Applicant’s concerns
regarding his belief the water that inundated the insured property in West End
was initially storm water back flowing from drains as opposed to flood water.
Secondly, the fact the Applicant was not given the option of taking flood cover
at the time the policy was established.
18. The evidence made available by the hydrologist “W” and the Bureau of
Meteorology (BoM) is that the peak rainfall had ceased prior to the inundation
of the suburb of West End.
Case No: 239116 Determination Page 3 of 11
19. The findings of the hydrologist concur with details obtained from the Applicant,
insofar as the water rose on 11 January 2011, after which it was necessary to
evacuate the property.
20. When storm or rain water is the cause of inundation of a property, the
inundation occurs at around the same time as the peak in the rainfall. The data
in relation to rainfall in the area over the relevant period shows there was a
delay of 24 hours between the peak rainfall and subsequent inundation of the
property.
21. It is evident that the damage to the property resulted from flood which is an
excluded peril under the policy.
22. The FSP has checked the insurance quote and proposal documentation for the
policy in question and not es to the question “ Do you require flood cover? ” the
Applicant’s response was “ No ”.
23. The FSP acknowledges the Applicant’s contention that storm water had
contributed to the resultant flooding of the property as a result of water coming
up from the drains.
24. Despite the possible mixing of storm water with flood water, the flood exclusion
legally extends to encompass the mixture of rainwater with flood water. If storm
water cannot drain or flow into the river or watercourse (as defined under the
policy) because it is in flood, any resultant inundation or damage is still
considered to be the consequence of flood.
25. In the case of drain water which back flows, this can occur when the water level
of the river, which the drain normally flows into, rises above the level of the inlet
gullies of the drain. This results in the drain back flowing up the piped drainage
system and discharging water back into the area it was designed to drain.
26. Therefore, the damage caused by the back flow is flood as it is river water
discharging through the drainage system or a mixture of rain and flood water.
27. Where more than one circumstance contributes to the loss, and one of these
causes is excluded under the policy, the FSP is entitled to rely upon the
excluded circumstances to refuse the claim. Notwithstanding , there may have
been contributions by rain water, the drain water (unable to escape) or the
releases from the Wivenhoe Dam, resulted in damage to the insured property,
which has been demonstrated to be the result of flood as defined by the policy.
28. Insurance policies are legal contracts and previous disputes decided by Courts,
creating legal precedents, make it clear that the source of inundation as
claimed by the Applicant to be storm water is in fact flood.
29. In respect to the release of water from Wivenhoe Dam, the FSP maintains that
these waters are still flood water. The water was released from the dam into the
river and subsequently the river system flooded, inundating the surrounding
properties. It is only when storm water independent of flood water results in loss
or damage that the policy responds to such loss.
Case No: 239116 Determination Page 4 of 11
30. The FSP notes that the flood map made available by the Brisbane City Council
(BCC) shows that the property was inundated by flood water from the Brisbane
River.
31. The FSP maintains there is nothing unusual in the manner in which flood is
defined under the policy. There is no responsibility on the insurer to provide an
explanation of legal precedents as they apply to exclude or include perils within
the policy. This has been established in the case of Hams & Anor v CGU
Insurance Ltd (2002) 12 ANZ Insurance Case 61-525.
32. In the absence of any hydrological or independent observer evidence to
contradict the findings of the hydrologist reports relied upon by the FSP, it is its
submission that the proximate or effective cause of the loss was damage by
flood as defined by the policy.
33. The FSP relies on the following policy provisions:
“Page 6 Section 1 Fire and Other Defined Events
1.2 Defined Events
If your Certificate of Insurance indicates that you have taken out insurance under
Section 1, we insure you against the Property at the Premises being lost, destroyed or
damaged by one or more of the Defined Events listed below occurring during the
Period of Insurance except as stated under We Will Not Pay.
…
(10) Storm or Rainwater
…
Page 11 Section 1 Fire and Other Defined Events (continued)
1.5 Specific Exclusions
We do not insure you under Section 1 for the following circumstances.
Excluded Circumstances
…
(3) Flood
We will not pay loss, destruction, or damage caused directly or indirectly by Flood,
unless you have Option Cover under Section 1.6(1).
….
Page 12 Section 1 Fire and Other Defined Events (continued)
1.6 Optional Covers
If selected by you and specified in the Certificate of Insurance, the Optional Cover as
indicated below will apply.
Details of Cover
(1) Flood
We insure you against the Property at the Premises being lost, destroyed, or
damaged during the Period of Insurance by the additional Defined Event – Flood.
…
Case No: 239116 Determination Page 5 of 11
Page 12 Accident Damage
(a) We insure you against the Property at the Premises being unintentionally and
unexpectedly lost, destroyed, or damaged during the Period of Insurance by the
additional Defined Event – Accidental Damage.
(b) …
(c) We will not pay for loss, destruction, or damage caused by or resulting from:
(i) any Defined Event in Section 1.2, or the Optional Cover Section 1.6(1); ”
Issues
34. Whether water overflowing/back flowing from drains is considered to be storm
or flood water.
35. Whether the FSP is entitled to decline indemnity to the Applicant for the loss
claimed under the policy.
Reasons for Decision
36. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
37. This decision has been made by a Panel consisting of an Ombudsman, a Panel
member with extensive experience in the insurance industry and a Panel
member with extensive experience in consumer claims.
38. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity comment. In these
circumstances the details contained in the relevant hydrological reports will not
be recited in this determination except where considered relevant.
39. Prior to arriving at a determination the Panel has read and considered all t he
material submitted by the parties to FOS.
40. The Applicant has been informed and accepts that the business interruption
portion of his claim against the FSP falls outside the Service’s jurisdiction in line
with the Terms of Reference, and as such will not form part of this
Determination.
41. The Panel Chair Ombudsman conducted a site visit at which the Applicant and
FSP were present. Relevant information from that visit is as follows:
The Applicant moved to the premises on or about 24 December 2010.
Case No: 239116 Determination Page 6 of 11
The Applicant sought to transfer his existing insurance policy to the new
premises at some time after 24 December 2010. The Applicant’s stock
was mostly on the ground and had not been put into shelves.
When the Applicant spoke to the insurer’s agent GC he was advised that
the agent could not inspect the new premises (as would normally occur)
because of heavy rains and road closures.
The only changes to the policy were to the amounts insured.
42. The Applicant has subsequently provided telephone records that identify a cal l
to the agent on 10 January 2011. As the policy documentation has the
inception from 10 January 2011, then this is the likely inception date.
43. The FSP seeks to rely on a clause in the policy to deny liability for the claim
and therefore has the burden of establishing on the balance of probabilities that
the terms of the relevant clause applies to defeat the claim.
44. It is not in dispute that the Applicant was provided with the terms of the policy
and as such, the onus was on him to ensure they read and understood the
scope of cover.
45. The Panel has reviewed the available hydrological evidence and notes that the
hydrologists’ reports confirm:
W ’s Hydrology Report
46. The FSP has submitted a hydrological report (not specific to the insured
property) from W in relation to the floods experienced in the Brisbane Area. In
addition to the information relating to the flooding of the affected areas as a
whole, this report also focuses on the flooding of the Brisbane Catchment –
Region C (region covering the suburb of West End).
47. The Panel has reviewed W’s report and notes that it states in summary:
The report summarises the meteorology conditions, rainfall and river
responses within the Brisbane River catchment due to the January 2011
South East Queensland weather event. It also provides an interpretation
of areas inundated according to the Storm versus Flood Categorisation
System and available flood data.
Flooding of the Brisbane River and Bremer River occurred over the period
between 11-12 January 2011, leading to inundation of low lying areas of
Ipswich and Brisbane.
Moderate intensity rainfall was experienced across the region with the
greatest concentration centred around the coastal sections of Brisbane
and Caboolture River catchments.
The peak rainfall Average Recurrence Interval (ARI) for lower Brisbane
catchment was between one and two years, which is not particularly
unusual. Therefore the upper catchment rainfall would have been the
primary cause of overflows of large sized streams in this region such as
the Brisbane River.
Case No: 239116 Determination Page 7 of 11
Over the period of 9-12 January 2011, the recorded rainfall accumulation
of 120mm, 170mm and 165mm was recorded at Archerfield, Brisbane and
Redcliffe respectively with peak rainfall intensities that did not exceed an
ARI of 2 years.
Rainfall intensity and its regional recurrence interval are most significantly
linked to the generation of run-off. In other words, the run-off derived from
rainfall is dependant on how “usual” or “unusual” the rainfall intensity was
for a given catchment.
Flooding in the Brisbane City can also be caused by flooding of local
creeks such as Oxley and Bulimba Creeks on the south side.
Rainfall gauges located in the lower catchment at Archerfield, Brisbane
and Redcliffe indicate that rainfall was less intense in the lower
catchments and smaller accumulations occurred compared with those
recorded in the upper catchment areas.
Rainfall in the lower catchment began at approximately 9.00am on 9
January 2011 with relatively minor intensities and accumulations occurring
until 4.00pm on 11 January 2011.
While some local drainage systems may have been overwhelmed by the
run-off that was generated, it is unlikely that a significant number of
properties downstream along Brisbane River would have been affected
directly by run-off or overland flow.
The hydrograph shows a clear change at approximately 9.00am on 11
January 2011 when levels begin to more rapidly increase, most likely as a
result of the arrival of inflows derived in the upper Lockyer Catchment.
A gauge located on Brisbane River at Brisbane City recorded a largely
tidal hydrograph up to the 10 January 2011 which was progressively
dampened on 11 January 2011in response to the arrival of flows derived
from the upper catchment. Levels surpassed the BOM’s:
Minor designation of 1.7 meters at approximately 12.00 on 11
January 2011.
Moderate designation of 2.60 meters at approximately 2.00am on
12 January 2011.
Major designation of 3.50 meters at approximately 8.00am on 12
January 2011.
Peak designation of close to 4.5 meters at approximately 2.00am
on 13 January 2011.
ICA Hydrology Report
48. The ICA hydrology report contains the following relevant information:
there were three generally distinct and significant rainfall periods between
9 – 11 January 2011 across the Brisbane City Local Government Area
(Brisbane LGA). The first event occurred over the period from around
9:00am to 9:00pm on Sunday, 9 January 2011. The second event
Case No: 239116 Determination Page 8 of 11
occurred from around 6:00am to 10:00am on Monday, 10 January 2011.
The third event occurred from 6:00am to 4:00pm on Tuesday, 11 January
2011. (see 7.2.3)
the most significant rainfall across the Brisbane LGA occurred from
approximately 6:00am to 4:00pm on 11 January 2011; (see 9.1)
after about 6:00pm on 11 January 2011, there was little or no rainfall
across the Brisbane LGA; (see 9.1)
the Brisbane River water levels through the city peaked about 24-30 hours
after rainfall had ceased, that is, from the late hours of Wednesday, 12
January 2011 to the early hours of Thursday, 13 January 2011; (see 9.1)
any area that was inundated after 6:00pm on 11 January 2011 will have
been water flow inundation from the Brisbane River and its tributary
creeks. The inundation along the tributaries was associated with
backwater flooding from the Brisbane River, which in turn was principally
caused by the dam release flood from the Wivenhoe Dam; (see Summary
of Findings)
overland flow inundation is generally associated with intense rainfalls of
short duration. In general, such rainfalls did not occur across the Brisbane
City LGA in January 2011. It is expected that overland flow inundation
would generally not have occurred in the Brisbane City LGA; (see 9.2)
uncertainties exist on whether properties flooded by water flows also
suffered initial inundation from overland flow flooding. Investigation of
local factors such as local topography and the area and characteristics of
overland flow, hydrologic/hydraulic modelling of the storm event and local
stormwater drainage system is required to resolve this issue. (see 9.5)
Brisbane City Council Floodwise Property Report
49. The BCC report states in part:
The insured property has ground levels of 5.7 m AHD (minimum) and 5.9
m AHD (maximum).
The flood level at the insured property was 6.9m AHD.
The flooding level source for the property is the river.
Mapping indicates that the property is in an overland flow path. Overland
flow is the excess runoff during high rainfall that travels overland following
low-lying, natural drainage paths. Such flooding commonly occurs when
underground drainage exceeds capacity.
Cause for flooding of the insured property
50. The Applicant maintains the water damage to the insured property occurred
due to storm water overflowing from drains at the insured property.
51. The Panel notes that the Applicant was not present at the time of the loss as
the property was evacuated late on 11 January 2011.
Case No: 239116 Determination Page 9 of 11
52. The FSP on the basis of the evidence collected, submits that rainfall levels in
the West End between 9 January 2011 and 12 January 2011, independent of
the flood water from Brisbane River were too low to cause inundation of the
Applicant’s property due to stormwater. It asserts the damage claimed is due to
flood water overflowing from Brisbane River sometime between the late hours
of 11 January 2011 (after the evacuation of the property) and 12 January 2011.
53. In reviewing this information, the Panel notes the Applicant reports the insured
property was evacuated on 11 January 2011.
54. The FSP has referred to the ICA Hydrology Reports. The FSP notes Figure
8.14 on page 51 of Volume 2, reveals there was little rain after 6:00pm on 11
January 2011.
55. In reviewing the evidence, the Panel notes the heaviest rain occurred in the
Brisbane area in the early part of the 11 January 2011. The graph reveals less
than 3mm of rain in any hour after 6:00pm on 11 January 2011.
56. Had stormwater been the single contributing factor, the Panel would have
expected the inundation to have occurred in the immediate hours after the most
significant period of rain. The BoM records little rain after 6.00pm on 11
January 2011, with the heaviest rain on 11 January 2011 falling in the morning.
57. In these circumstances, the Panel would have expected the inundation, if due
solely to stormwater, to have occurred in the early to mid afternoon.
58. It is likely the water from the river as it continued to rise, back flowed through
the drainage system and also prevented the storm water runoff from draining
away.
59. This is further supported by the available evidence which indicates the
Applicant informed the FSP’s assessor that the wate r that inundated the
property was dirty and the pictures of the loss support the same (presence of
muddy residue in photocopiers). The Panel is aware that this in itself may not
be considered definitive evidence to establish flood water inundation, however
it is an indication of the nature of the source of the water responsible for
inundating a property.
60. It appears any backflow water either came from the Brisbane River via the
drainage system, or water build up that could not drain into the Brisbane River
because it was already flooding. In either situation, the water would be
considered floodwater. It is established law that water that cannot enter or
drain into a watercourse because that watercourse is already flooded, is
considered floodwater (K Sika Plastics v Conhill Insurance (1982) 2NZLR 50
(CA) .
61. There is little evidence to indicate rainwater by itself inundated the property.
Had this been the case, the Panel would have expected to see the inundation
early on 11 January 2011, when it is reported the most significant rain fell in the
area.
Case No: 239116 Determination Page 10 of 11
62. The Panel has reviewed flood mapping and it is most likely that the West End
area was inundated by floodwater. The Panel has also viewed aerial
photographs of the area and notes that the location of the property is in very
close proximity to the Brisbane River.
63. Based on the information available, it would seem likely that inundation
occurring on the night of 11 January 2011 or early on 12 January 2011 was
backflow from the Brisbane River or either overland floodwater or a
combination of both.
64. On that basis, the Panel is satisfied on the balance of probabilities that the loss
was caused by floodwater.
Cover under the policy
65. Having established that the inundation of the insured property on the balance of
probabilities did occur as a result of flood water, the question before the Panel
is whether the policy provides cover for loss or damage arising from flood.
66. The Panel notes the Applicant at the time of establishing the policy selected the
below noted cover to be included upon the policy:
Section 1Fire and Other Defined Events
Other events include Lightning and Thunderbolt, Explosion -
Earthquake, Subterranean Fire, or Volcanic Eruption - Riots,
Strikes and Civil Commotion - Escape of Liquids - Impact -
Vandalism, Malicious Damage or Damage by Burglars and Storm
or Rainwater.
Section 2 Business Interruption.
Section 3 Burglary.
Section 5 Glass.
67. The above noted cover is subject to specific exclusions noted on page 11 of the
policy. Loss or damage arising from flood is specifically excluded from cover in
line with the applicable policy exclusions.
68. The Panel notes the policy under Section 1.6 “Optional Covers” does offer
cover for loss or damage arising from flood, however this option has to be
specifically selected by an insurance applicant at the time of establishing a
policy and as such will be noted on the Certificate of Insurance (COI).
69. The Applicant has alleged that at the time of establishing the policy, the FSP
failed to offer him the option to include cover for loss or damage arising from
flood upon the policy.
70. The FSP has made available documentary evidence in respect to the inception
of the policy. The Panel notes this documentation established that there were
Case No: 239116 Determination Page 11 of 11
available multiple options of cover which could be selected. Also, identified
within this documentation were the responses to these options by the Applicant.
In respect to cover for loss or damage arising from flood the question and
response (selection indicated by “X”) provided are:
“Do you require Fl ood cover? Yes No X”
71. The Panel is satisfied that whilst establishing the policy the Applicant was
provided with the option to select the optional cover covering loss or damage
arising from flood however this option was not taken nor is such cover noted on
the COI.
72. The Panel is also satisfied that the Applicant when notifying the agent GC on
10 January 2011 that he needed to change the insured address, was aware of
the significant rain event and possibility of flooding from the Brisbane River.
The Applicant admits he did not ask the agent or request the optional cover be
provided at that time.
73. Therefore, in the absence of any contrary evidence in this regard the Panel is
satisfied that the policy did not cover loss or damage arising from flood.
Having considered the evidence made available by the parties to this dispute, the
Panel is satisfied that, on the balance of probabilities, the inundation of the
Applicant’s property was due to backwater flooding due to the rising level of the
Brisbane River and as such is excluded under the terms of the policy.
The Panel has considered possible indemnity under the optional cover “Accidental
Damage”, however this does not come to the assistance of the Applicant on
this occasion. Accidental Damage cover excludes loss or damage arising from
the “Defined Events in section 1.2 and or Flood as provided in section 1.6(1)” of
the policy.
Determination
74. On the basis of the available information the Panel determines that the FSP is
entitled to refuse the claim on the basis of the exclusion in the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.