Home / Financial Firm (Unknown - Insurer) / Determination 238987
Determination 238987
Asbestos contamination during builder and clean-up work on hail claim
Summary
The applicants' hail damage claim was accepted, but the FSP-appointed builder and clean-up contractors contaminated the property and tenant's contents with asbestos. AFCA found the FSP liable for the contamination and further damage, and ordered repairs, replacement, reimbursement and provision of reports, without stating a sum.
The FSP authorised the contractor's work and is responsible for contractors it appointed, so it cannot rely on policy exclusions for consequential loss or asbestos.
Issues
- Repairs or contractors primary · upheld
“the FSP is liable to indemnify the Applicants in relation to the contamination and it may seek recourse against K's business.”
- Claim denial secondary · upheld
“In my view, the FSP is prevented from repudiating liability by relying on its policy exclusions.”
- Poor communication secondary · upheld
“the FSP informed the Applicants the property was habitable (based on a verbal confirmation from H) when it was actually not so habitable.”
- Third-party or outsourcing failure secondary · upheld
“I am not satisfied the FSP appointed H, a company which is not specialised in work involving the decontamination of asbestos particles.”
Subjects and remedies
home or building damagenatural disasterpay compensationprovide documentsrepair or rectify
Text of the determination
Case No: 238987 Determination Page 1 of 7
Case number: 238987
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount - Asbestos Contamination
19 January 2012
Background
1. The Applicants held a home building insurance policy with the Financial
Services Provider (FSP) from 1 June 2009 and the policy was current at the
time of the loss.
2. The Applicants lodged a claim with the FSP for damage sustained to the
garden shed, gazebo and eaves as a result of the hail storms in March 2010.
3. The FSP accepted the Applicants ’ claim. However, during the repair
process, the property was contaminated with asbestos dust and fibres
released from the sheeting of the eaves.
4. The FSP denied liability to parts of the claim relating to contamination by
asbestos on the grounds that this damage was caused by the builder
appointed by the Applicants.
5. The Applicants expect the FSP to honour the claim as the repair was
authorised by the FSP.
Summary of Applicants ’ position
6. The Applicants say the FSP provided the contact details of Builder (K) when
they were unable to get a builder to quote on the damage to their property
after the catastrophic event in March 2010.
7. The Applicants requested a quote from K but were unaware of the progress
thereafter, until K informed them he had performed various jobs for the FSP
and his quote was approved by the FSP to commence work.
8. The Applicants express their dissatisfaction with the FSP’s claims process
and how it has changed its decision regarding cover for the damage caused
by contamination.
9. The Applicants have raised many issues in relation to the damage and
contamination to the building and the contents (contents belong to the
tenant).
Determination
Case No: 238987 Determination Page 2 of 7
10. The Applicants expect the FSP to accept liability to damage caused by K
who was appointed by the FSP.
Summary of FSP’s position
11. Subsequent to the lodgement of the claim, the FSP requested the Applicants
obtain quotes to repair the damage sustained to the eaves.
12. The FSP says the Applicants selected and appointed K to attend to the
repair work and it only accepted the quote and agreed to reimburse K once
the work was completed.
13. The FSP believes the Applicants should have recourse against the builder
and the policy excludes liability for damage caused by asbestos.
14. Further, the FSP says it is not liable to indemnify the tenant for the damage
caused to her contents as she is not a party to the insurance contract.
15. The FSP relies on the following policy provisions:
“ Section XX You are not insured
...
“You have no insurance under this policy for financial or consequential loss.
...
Section XX Legal Liability To Another Person
There is no insurance under this Section for any claim for legal liability:
...
for financial or consequential loss.
...
arising from or connected with the existence of asbestos”
16. The FSP is not responsible for the damage caused by K ( Applicants’ builder )
and the policy excludes cover for consequential loss and liability arising from
the existence of asbestos.
Issues
17. Whether the FSP appointed K.
18. Whether the FSP is liable for damage caused to the building and contents by
K.
Case No: 238987 Determination Page 3 of 7
Reasons for decision
19. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
20. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
Dispute within FOS Terms of Reference
21. I consider the FOS Terms of Reference relevant to this dispute are:
“ 4.2 Types of Disputes that can be considered by FOS
FOS may only consider a Dispute between a Financial Services Provider and an
Applicant:
a) that arises from a contract or obligation arising under Australian law; and
b) that arises from or relates to:
(i) the provision of a Financial Service by the Financial Services Provider to
the Applicant; ”
Appointment of K
22. The Applicants say that the FSP organised the decontamination of the
property and contents and the issues arose regarding liability only when they
informed the FSP that K was uninsured.
23. The Applicants say that K’s reference was provided by one of FSP’s
employees. Even though they requested K to attend the property and
prepare a quote, they never sighted a copy of the quote and were only
informed by K that the FSP had authorised repairs to commence work.
24. The FSP rejects this assertion on the grounds that K is not in its authorised
repairer list and there is no file note indicating such advice was provided to
the Applicants.
25. There is no evidence as to how and why K was chosen to submit a quote on
the repairs.
26. Therefore, the issue remains as to how the FSP received the quote and who
appointed and authorised repairs to the property.
27. I have carefully reviewed the material submitted by the Applicants and the
FSP and note the following from the FSP’s file notes:
“01/10/2010 14.22 LET: Repairer Authority (User: xxx)
rec’d quote from [K]
Sent repair authority
Case No: 238987 Determination Page 4 of 7
01/10/2010 14.23 CASE NOTE-CM (User:xxx)
Pend for inv”
28. The file notes indicate the FSP received the quote directly from K. The FSP
has not provided any other evidence to substantiate the quote was received
through the Applicants. The letter of repair authority clearly indicates that the
FSP authorised K to proceed with the repairs.
29. The Applicants have always maintained that K advised them that the repair
was authorised by the FSP and based on the above file notes and the letter
of repair authority, I am satisfied the FSP authorised K to proceed with the
repairs.
30. I am of the opinion that the FSP has failed to ensure (prior to appointment)
that K was appropriately licensed, insured and qualified to undertake repairs
at the Applicants ’ property.
31. The FSP is responsible if work by K is not completed in accordance with the
Australian building code of conduct and meets the industry standards and
damage is caused thereby.
32. In my view, the FSP is prevented from repudiating liability by relying on its
policy exclusions.
33. The FSP is liable to bring the Applicants ’ property to its pre-loss condition by
repair or replacement. However, in this case, K has caused further damage
by contaminatin g the Applicants’ property and tenant’s contents with
asbestos particles and fibres by not properly attending to the repairs.
34. Therefore, the FSP is liable to indemnify the Applicants in relation to the
contamination and it may seek recourse against K’s bus iness even if K was
not duly insured at the time of causing damage.
35. I do not agree this liability arises out of the policy cover but as a result of the
appointment of an incompetent and unqualified builder to attend to the
repairs for which the FSP is liable under the policy.
36. Further, I do not consider this damage as consequential loss as it directly
relates to the work performed by K who was appointed by the FSP.
FOS jurisdiction over the tenant’s claim
37. I note the FSP has raised the issue whether the Service has jurisdiction over
the tenant’s claim.
38. The tenant’s contents were contaminated as a result of the FSP authorising
K to proceed with repairs at the Applicants ’ property.
Case No: 238987 Determination Page 5 of 7
39. I am satisfied the damage to the tenant’s contents relates to the fin ancial
service provided by the FSP to the Applicants and thereby, the Service has
jurisdiction over the tenant’s claim.
Damage caused by H and A
40. The Local Council identified the property and contents were contaminated
with asbestos particles and fibres and as a result the FSP organised a
hygiene risk protection company (H) to attend to the clean up on a without
admission of liability basis.
41. Subsequent to the clean up by H, the FSP informed the Applicants and the
tenant the property was habitable and safe to live in.
42. However, an independent analyst Q appointed by the Applicants found
asbestos particles and fibres in the property and advised that H’s method of
cleaning was not appropriate to eliminate the asbestos particles.
43. As a result, the FSP appointed A to attend to a further clean up. The FSP
organised for the tenant ’s contents to be moved to A’s warehouse where
they would be tape tested or hard surface cleaned and returned.
44. Since then it was noted that some of the fixtures and fittings of the
Applicants ’ property (fans, flyscreens, etc) and various contents belonging to
the tenant were missing, damaged, rusted, scratched chipped, unaligned,
discoloured and had parts missing as a result of the clean up by H and A.
45. Furthermore, some items were discarded by the cleaning companies and
since the contents were not packed in an orderly fashion, the tenant is
unaware of the location and condition of many of the contents.
46. I am not satisfied the FSP appointed H, a company which is not specialised
in work involving the decontamination of asbestos particles from the property
which poses a great health hazard to the habitants. The FSP also informed
the Applicants the property was habitable (based on a verbal confirmation
from H) when it was actually not so habitable.
47. Furthermore, there is no dispute the FSP appointed and authorised H and A
to attend to the clean up. Since the Applicants’ property and the tenant’s
contents sustained additional damage whilst under the custody and care of
the FSP ’ s authorised representatives, I am of the opinion that the FSP is
liable to repair or replace the items damaged with items of similar quality
(e.g. vertical blinds to be replaced with similar quality).
48. The FSP may have recourse against H and A for the damage sustained to
the property whilst under their care.
49. The FSP is also required to return the tenant’s contents to their current
residential address.
Case No: 238987 Determination Page 6 of 7
50. The FSP is also required to reimburse any expenses relating to the
appointment, investigation and reports of Q.
51. The FSP may deduct any payments made toward the purchase of essential
items from the final settlement to the Applicants and tenants.
Items which cannot be decontaminated
52. I note from the parties’ submissions there is no safe way to clean the
refrigerators, air conditioners, heaters and other electrical appliances as the
asbestos particles and fibres cannot be removed from the internal parts of
these appliances. Therefore, the FSP is required to replace these items
53. Furthermore, I note the mixing of hard surface items with fabric has rendered
it costly to clean and economical to replace. The FSP may choose to
completely decontaminate them or replace them.
54. Further, in relation to the hire of white goods, I am of the view the FSP is
liable to reimburse this cost until such time the white goods are completely
decontaminated or replaced.
Loss of Rent
55. I note the FSP is of the view the Applicants property was habitable since
May 2011 when a clearance certificate was obtained from Q.
56. However, I am not satisfied that is the case as the Applicants’ property was
never returned to its pre-loss condition as the FSP is yet to complete storm
damage repairs to the property.
57. I also find the dishwasher, wall oven, wall heater, gas heater and air
conditioner which were removed from the property are yet to be completely
decontaminated and returned or replaced (if internal
spaces/voices/components could not be cleaned, they are to be replaced).
58. I am of the opinion that it is not reasonable to suggest the property could be
let without these items and when the FSP has not duly completed the repair
relating to the storm damage. The condition of the property may also not
gain a fair rental market for the Applicants.
59. Further, I understand the Applicants are of the view that a payment towards
the tenant’s temporary accommodation for which cover was confirmed by the
FSP still remains unpaid.
60. I recommend the FSP list all the payments made to the Applicants so that
the balance amounts due can be duly reconciled.
61. I am satisfied that Applicants are entitled to be reimbursed for either the loss
of rent or temporary accommodation.
Case No: 238987 Determination Page 7 of 7
Copy of all reports
62. The FSP is required to provide a copy of all reports relating to the damage,
clean up, and certificate of assurance regarding the clean up to the
Applicants ’ property and tenant’s contents .
Remaining storm damage claim
63. The FSP is to expedite the completion of repairs relating to the initial
storm/hail damage to the property.
Neighbour’s claim
64. The Applicants and the FSP raise a potential claim from the neighbours.
65. Since the Applicants’ neighbour has not made any formal submissions to the
Service regarding his dispute, I will refrain from making any comments or
recommendations regarding the FSP’s l iability towards the neighbour if any.
66. Finally I am of the opinion the FSP has not acted in a socially responsible
manner as the Applicants were specifically advised not to notify persons who
may have been exposed to asbestos which is reflected in this file note and in
the Applicants’ submissions:
File note
16/11/2010 09:35 CASE NOTE – Enq (User:xx)
“...
Adv cleanup has been authorised for the exterior and interior of the home and
at this stage we do not wish to notify people that may have been exposed”
67. I a m also not satisfied with the following correspondence within the FSP’s
various departments where one department is seeking advice on how to
avoid liability towards the tenant’s contents which were placed under the
FSP’s authorised supplier A’s care:
“Given that we don’t expect an outcome from FOS in the near future, and we
need to look to remove the contents I was hoping for some advice in regards
to what options we have available to shift the responsibility to the tenant in
dealing with their contents.”
68. These matters will be raised with the Code Compliance Manager for further
investigation.
Determination
69. On the basis of the available information, I determine the FSP is required to
indemnify the Applicants and the tenant for their loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.