Settlement scope for storm damage to roof, ceiling, chimney flue and wood heater

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant disputed the FSP's storm damage settlement for roof, ceiling, flue and heater, and sought interest on an excess. AFCA ordered further roof payments and 50% of the flue and stove costs, but refused the ceiling claim, interest, and privacy or defamation complaints.

Storm-caused roof and flue damage is covered, but general age-related deterioration and pre-existing or wear-and-tear damage are not, so partial allowances were made.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 238868 Determination Page 1 of 14 Case number: 238868 General Insurance - Domestic Insurance - Home Building - Service - Service quality 08 February 2012 Background 1. The Applicant holds a Home Insurance policy with the Financial Services Provider (FSP) covering a residential premise. The policy covers the building up to $254,874 and is subject to a $100 excess. 2. The insured premise was damaged by a storm on 15 October 2010 and a claim was subsequently lodged for the storm damage to the insured building. 3. The FSP arranged for an assessment which resulted in the acceptance of the claim and payment based on a scope of works prepared by a preferred builder. The Applicant disputed the scope of works as adequate. 4. The FSP engaged further experts to review the scope of works and contends it has met its liability for storm damage. The FSP disputes the additional items claimed by the Applicant on the basis that these items were not damaged by storm. 5. The Applicant disputes the declinature of additional items stating that they are as a result of storm damage. Further, the Applicant holds the FSP responsible for the deterioration of items. 6. As a consequence of the disagreement between the parties, certain work which has been organised has not been attended to. Summary of Applicant’ s position 7. The Applicant relies on an assessment report from “G” dated 20 October 2010. I note the scope of works in this document include the following:  Roof Inspect roof tiles for damage to tiles/pointing, replace cowl, inspect [illegible]  Kitchen seal cornice and repaint  Intercom [Applicant first name] to have inspected and report and Determination Case No: 238868 Determination Page 2 of 14 quote 8. The Applicant notes he has been paid a total of $10,102 by the FSP and was told to hold the monies until repairs were completed. He has banked the cheque as instruc ted. The builder “CB” then withdrew from the contract and refused to reimburse $100 excess which the Applicant was instructed to pay to CB. 9. The Applicant states CB withdrew due to a dispute with the FSP and other parties. The Applicant seeks completion of the repairs. 10. The Applicant states that the tarpaulin which was placed over the damaged chimney flue has failed. The water has run down the chimney flue and has caused damage to the membrane and rusting to the stove. The Applicant notes that there has been no issue for 20 years with the chimney flue or roof. The Applicant contends that this damage has arisen from storm damage, lack of urgent repairs and the failure of CB to correctly fit the tarpaulin to the roof. 11. The rainwater running down the chimney seal caused damage to the cornice. 12. As repairs to the steel pipe which holds a sail cloth have not been carried out, damage has continued to occur. 13. The report by an expert “S” noted water stains were evident in the ceiling space at the flue location in the living room. Further, the scope of works for this item was endorsed. Further works suggested were to remove and reinstate dislodged cornice including kitchen of approximately 2 meters, clean seal and paint ceiling and cornice of 34m2, remove/replace 110mm steel water pipe sail post and centre eye bolt on sail and supply and install new flange around heater flue. 14. The Applicant points out that the FSP has excluded the re-bedding and re- pointing of the entire roof tiled surface, replacement of flange to flue or the wood heater, the replacement of the kitchen cornice, repainting of the kitchen ceiling or intercom system. 15. The Applicant considers that 60 roof tiles should be replaced not 40 tiles. The Applicant notes the assessor and S builders confirm this number of tiles require replacement as a result of the storm. The Applicant also claims that all the ridge capping was damaged and needs re-pointing and re-fixing. 16. The Applicant submits that the assessor, CB, S group and another expert “SG” all confirmed that water was leaking down the flue onto the fireplace as a result of storm damage. 17. The Applicant seeks the reimbursement of $100 excess plus interest. 18. The Applicant has confirmed that an employee of the FSP has attempted to settle this matter over the telephone. However, the Applicant does not consider this genuine as it would not be put in writing. Case No: 238868 Determination Page 3 of 14 19. The Applicant has claimed the remarks from the FSP regarding the production of the quotation for replacement of the intercom were defamatory. Further, he seeks that these defamatory remarks be removed from his record. 20. The Applicant considers his privacy has been breached by the FSP’s actions in obtaining information from the bank as to who had presented its cheque for repairs. The Applicant notes he presented the cheque which was made out to CB or “bearer”. The Applicant was told not to give the cheque to CB until the work is completed so he banked it for safe keeping. 21. The Applicant has taken issue with the allegation he pressured CB to repair items not included in the scope of works. He has requested CB should confirm this in writing. 22. The Applicant is dissatisfied that the Service informed him of his obligation to mitigate his loss and considers it a contention. Further, he believes this advice should have been given earlier by the Service or the FSP. Additionally he is 67 years old and does not intend to carry out repairs himself and will not organise repairs until the situation has been resolved. 23. The FSP failed to mitigate the Applicant’s loss by repairing the sail in a timely manner. Summary of FSP’s position 24. The FSP relies on the following policy terms and conditions: “ How we will settle your buildings claim 1. At our option, we will: a. repair or rebuild the damaged part of your building to the same condition as when it was new; or b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the same condition as when it was new; or c. pay you up to the amount of the sum insured. If we pay you the reasonable cost of repair or rebuilding, this means the cost of repairing or rebuilding less any discount available to us were we to repair or rebuild. ... When it is not possible to use original materials during the repair or rebuilding process, the nearest available equivalent to the original materials will be used. We will not pay to repair or rebuild property which has not been physically damaged. ... 9. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. Case No: 238868 Determination Page 4 of 14 “storm” means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. “rainwater” means rain falling naturally from the sky onto the buildings and/or ground. “run - off” means ra inwater that has collected on or has fl owed across normally dry ground or has overflowed from swimming pools or spas. ... We will not pay for loss or damage: ... f. to the external paintwork or other exterior coatings of the buildings caused by rainwater; g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of: • structural defects, • faulty design of the buildings, • faulty workmanship in the construction of the buildings, or • your failure to adequately maintain the buildings; h. caused by wind, rainwater, hail or snow entering the buildings through an open window or door or any opening not made by the storm, unless the loss or damage is caused by run-off; i. caused by water entering your buildings through an opening made for the purpose of alterations, extensions, renovations or repairs. ... When we will not pay a claim under your policy 1. This policy does not cover loss, liability, injury or damage: ... f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship; ... 2. Unless we state differently in your policy, we will not pay for: ... b. any loss or damage which is not caused directly by one of the insured events;” 25. The FSP relies on its assessment reports, from which I note the following:  The assessor believed that strong winds had sucked and lifted roof tiles as one unit and dropped them back in place causing some tiles to crack Case No: 238868 Determination Page 5 of 14 and chip. Further, the flexi point split away from the ridge tiles, and it was evident that this damage was all fresh.  The kitchen ceiling had separated from the cornice above the refrigerator and required re-sealing and re-painting of the affected area.  The internal intercom system has stopped working and the insured was to obtain a report from a suitable technician and forward it to the assessor.  The cowl was blown away during the claimed event.  Make safe works were undertaken.  The metal support post for the shade sail is bent at the base and this item was added to the scope of works.  40 tiles were identified as broken and 50 linear meters of ridge cap required repair.  The assessor has enclosed copies of the quotations from CB and S group. The report by S indicates information provided by the Applicant such as that water stains were evident in the ceiling space at the flue location in the living room. These items are noted as included under additional items. S noted 60 broken tiles in comparison to CB’s 40 broken tiles. There are further differences regarding the re-bedding and re-pointing of ridge caps (approximately 130 ridge caps) in comparison with CB who states a re-pointing of 50 linear meters. Both appear to agree that the sail cloth post and the cowl need replacement  A quotation for the intercom replacement was provided under the company’s letterhead and signed by a person apparently from that company.  The assessor was informed that CB wished to withdraw from the works as the Applicant continually requested repairs for additional items outside the scope of works and refused to sign a contract of works. Both CB and the assessor believed the scope of works was correct, and after experts “SG” have agreed.  The assessor noted that the Applicant wanted re-bedding of roof tiles which had only received minor damage to the pointing cement and cracked tiles. Any re-bedding would be due to the long term breakdown of the cement bedding.  The assessor indicated that the items which should be excluded were re-bedding and re-pointing of entire roof tiled surfaces, replacement of flexible flange to flue, replacement of wood heater, repairs and replacement of cornice to the kitchen and repainting of kitchen ceiling. 26. The FSP relies on a report by SG, from which I note the following:  SG noted corrosion staining to the upper and side surfaces of the heating unit and the minor water stains on the upper side of the lounge room ceiling were the result of water ingress that has occurred between the rubber flange and flue. The water has travelled vertically down the Case No: 238868 Determination Page 6 of 14 outside of the flue and onto the heater unit. SG was also of the opinion that the presence of duct tape at the junction of the flange and flue, and the absence of a tensioning device, indicates previous attempts to prevent water ingress at this location.  The disturbed flue cowling is the result of a storm event.  The cracking to the kitchen cornice is the result of minor movement that has occurred during seasonal changes. The absence of water staining to the surrounding areas above the kitchen cornice crack and intercom system penetration suggest no evidence of water related damage.  The damage to the mortar bedding and pointing across all roof elevations is the result of deterioration that has occurred over an extended period of time, possibly exacerbated by the recent storm event. The storm has contributed to dislodgment of the bedding and pointing. 27. The FSP relies on an email dated 13 July 2011 from CB confirming that the “insured was difficult to finalise contract and variation to same”. Further, the scope of works was not completed and the excess was refunded to the Applicant on 9 March 2011. 28. The FSP submits it attempted to settle this dispute prior to a review by the Service but the Applicant indicated he wanted the Service to review the entire matter. 29. The FSP has received no independent tiler’s report and the Applicant has not provided same. 30. The FSP issued a cheque for $6,456 on 23 November 2010 to CB and determined it was cashed on 6 December 2010. The FSP was informed by CB in writing on 13 July 2011 that they had not received payment. 31. The FSP accepted liability for the steel water pipe post and chimney flue. The FSP is awaiting the Applicant’s permission to attend and repair this item following resolution of the dispute. 32. The FSP has settled the intercom system but notes that the Applicant rather than the technician had prepared the document supporting that as part of the claim. Whilst it believes the Applicant was acting in good faith, the FSP has subsequently discovered there was no evidence of storm damage to the intercom system. The FSP does not seek a return of these monies or to dispute this item further. 33. The FSP notes the cause of damage to the flashing and waterproof membrane appears to be due to wear and tear and lack of maintenance. Accordingly, this item falls outside of the scope of cover provided by the policy. 34. The FSP agrees with the Applicant that the rusting to the stove/heater is due to the failure of the waterproof membrane. However, it considers that the failure of the waterproof membrane is not due to a storm event. This is Case No: 238868 Determination Page 7 of 14 particularly given the absence of water stain on the roof above the damaged wood heater. The water damage has occurred internal to the wood heater due to the failure of the membrane which is a maintenance issue. 35. Although the FSP later discovered the cornice movement was not the result of the storm, it has agreed to repair same and does not resile from this. The FSP is awaiting permission of the Applicant to attend and repair the kitchen and living room ceiling. The FSP disputes that the entire cornice requires replacement noting that it is not required and falls outside of the policy cover in any event. 36. There is no expert evidence supporting the Applicant’s contention that the entire roof needs re-pointing or that all tiles need replacing. Further, the damage to the mortar bedding and pointing across all roof elevations in the result of deterioration that has occurred over an extended period of time. The policy does not cover this type of damage. The FSP does agree that up to 60 tiles may require replacement. 37. The FSP considers that it has never suggested the Applicant has acted dishonestly and notes its comments were relating to the verification of documents. The FSP apologises if the wording caused any offence. 38. The tarpaulin should have been installed on the date of CB’s inspection or shortly after, around late October 2010. 39. The FSP followed up on the Applicant’s complaint regarding the failure to reimburse the excess and discovered CB had posted the cheque to the Applicant but it had not been presented. The FSP contacted the Applicant to arrange reimbursement but was hung up on by the Applicant. The FSP remains ready to reimburse the excess cheque once in receipt of the Applicant’s instructions. Additionally, the FSP denies that it owes the Applicant interest on this amount noting that the Applicant has held the sum of $6,456 which is capable of accruing interest. 40. The FSP further notes that it requires no authorisation from the Applicant to trace a cheque payment issued by it which has been cashed. It has not breached any privacy laws in order to do so and has not made banking details available to the public. 41. The FSP contends the Applicant has a responsibility to attend to necessary repairs to prevent ongoing damage including water running down the flue. Further, the Applicant was informed that the FSP would attend to repairs whilst the matter was at the Service. 42. The FSP denies that it or any of its assessors/experts have tampered with the documentation. The Applicant was provided with carbon copies of documents in some circumstances. 43. The FSP denies it has made any defamatory remarks in relation to the Applicant or his claim. Case No: 238868 Determination Page 8 of 14 44. The FSP has enclosed letters dated 25 November 2010 confirming payment of $10,102. I note that the assessed cost of building repairs to be paid to CB was $6,456. Issues 45. Whether the FSP has appropriately proposed a settlement of the roof and ceiling damage. 46. Whether the FSP has appropriately declined the damage to the heating unit and its flue. 47. Whether the FSP owes additional monies for ongoing damage or interest on the excess payment. 48. Whether the FSP has breached the Applicant’s privacy or made defamatory remarks about the Applicant. Reasons for decision 49. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 50. I have read each party’s submissions and materials and will only refer to the relevant submissions and materials raised. 51. I note there are a number of discrete issues (listed above) raised by the materials which I will deal with separately. 52. I consider that this dispute essentially relates to a ‘scope of works’ prepared by CB which the Applicant has not accepted. But although he has raised various objectives, he has not elicited any expert opinion that the scope of works is wrong or inadequate. 53. The parties have both agreed that the flue cowl and steel water pipe are covered by the policy under storm event. The FSP awaits the Applicant’s permission to attend and repair these items but the Applicant requires a delay of this matter until all items are resolved prior to undertaking repairs. Accordingly, I consider there is no dispute regarding the need to repair these items. 54. I note the intercom has been paid for and there is no dispute over payment. As such I consider there is no reason for me to consider whether this item has been settled appropriately, however I will consider it in terms of the claim of defamatory remarks. I consider that in the light of its discovery as to the “quote” for the intercom repairs, the FSP’s conduct as to the intercom system has been admirable. Case No: 238868 Determination Page 9 of 14 Whether the roof and ceiling damage have been appropriately settled Roof Damage 55. The Applicant seeks the replacement of approximately 60 tiles and the re- bedding and re-pointing of the entire roof surface. The FSP has indicated its agreement to repair up to 60 tiles but seeks to limit the re-bedding and re- pointing to the areas damaged by the storm. 56. I note the quotation from S is the only report which lists 60 tiles for replacement, with the other quotations/reports indicating 40-50 tiles require replacement. 57. I note that S’s quotation indicates that all 130 ridge caps should be re - bedded and re-pointed. In contrast CB describes the work required as the re- pointing of 50 linear meters of ridgecap. I note the length of edge protection to facilitate repairs is also approximately 50 meters according to S’s quotation. The report from SG states the motor bedding and pointing is the result of deterioration rather than storm and the storm has assisted the dislodgment of some sections of point and bedding. 58. I have no expert report from the Applicant providing a basis for the re- pointing and re-bedding o f the entire roof surface. The FSP’s expert reports simply do not support his case to have the entire roof re-pointed and re- bedded. 59. Given this, I consider that there is evidence indicating that up to 60 tiles may need replacement. However, the exact number of tiles to be replaced is uncertain. Neither repairer has provided an estimate of the tiles requiring replacement as indicated by words such as “approximately”. It does not appear that each repairer has conducted a thorough recording of each broken tile on the roof that requires replacement. Accordingly, it may be less than 60 tiles or even more than 60 tiles that require replacement. The FSP is required to replace the broken tiles and it does not appear that there is any dispute regarding this. 60. In relation to the re-bedding and re-pointing of the entire roof surface, I note there is no support within the reports provided suggesting that the FSP should be liable for this. The roof is in its original state and it would be surprising if there had been absolutely no deterioration of the bedding and pointing over approximately 20 plus years. 61. There is confirmation by S that approximately 130 ridge caps should be re- bedded and re-pointed. I am uncertain whether 130 ridge caps is equivalent to 50 linear meters. SG further indicates that the storm has dislodged portions of bedding and pointing. 62. I consider that the overall deterioration of the roof due to age is not the result of a storm event. The deterioration of the bedding and pointing is not an item covered by the policy as it does not cover wear and tear. However, some sections of the roof have been dislodged due to the storm. I would consider Case No: 238868 Determination Page 10 of 14 this is covered by the policy as the dislodgement is directly caused by an insured event. 63. Given this, I consider that the FSP is liable to provide payment for the re- bedding and re-pointing of 130 ridge caps together with any sections of bedding and pointing dislodged by the storm. Ceiling Damage 64. The Applicant seeks removal and reinstatement of the dislodged cornice including the kitchen of approximately 2 meters, cleaning, sealing and painting of the ceiling/cornice of approximately 34m2. 65. In contrast the FSP has relied on CB’s quotation to replace 3 linear meters of cornice in the lounge and patch and repair cornice in the kitchen. The quote also included painting of 46.2m2 for the lounge ceiling and 30m2 of the kitchen ceiling. The FSP notes that SG later identified the damage in the kitchen ceiling as been unrelated to the storm event but rather settlement which is excluded from cover. The FSP had already settled/agreed to settle the Applicant for these portions of loss and will not dispute the amount paid. 66. The Applicant has not provided evidence that the whole cornice requires replacement. S’s report only states remov al and reinstatement of the kitchen/dining room’s dislodged cornice. It does not state ‘replacement’ which would ordinarily indicate new materials whereas reinstatement usually indicates a repair with the same materials. 67. A review of the quotations relied upon by each party suggests that CB has provided the more complete quotation as it includes both kitchen and lounge room, a larger provision for the replacement of cornices and allows for more painting works to be completed. 68. I have also noted SG’s belief t hat the kitchen cornice was not the result of the storm damage but rather settlement of the property. 69. Based on the limited information before me, I consider a settlement based on CB’s quotation to be reasonable. Whether the declinature for damage to the heating unit and its flue was appropriate 70. I consider the following Terms of Reference relevant to consideration of this matter: 8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: legal principles; applicable industry codes or guidance as to practice; Case No: 238868 Determination Page 11 of 14 good industry practice; and previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these) 71. The SG report has indicated that the water ingress has occurred between the rubber flange and flue which travelled down the outside of the flue and onto the heater unit. SG considered that the duct tape at the junction of the flange and the flue and the absence of tensioning device, indicated previous attempts to prevent water ingress at this location. 72. I further note that the experts all agreed the cowl had become dislodged by the storm from the flue. I note the Applicant’s diagram indicates his belief the rainwater has run down roof tiles and penetrated the area running down the flue and onto the fireplace. 73. I cannot weigh the Applicant’s evidence as heavily as an expert. The Applicant has not listed any qualifications in this particular area and nor would he be considered independent. 74. The evidence suggests that the loss of the cowl has allowed significant water ingress but the evidence of previous repairs also suggests that there has been previous water ingress to the unit. Further, the Applicant provided no comment in relation to SG’s suggestion of previous repairs having been required. Accordingly it is unclear what damage resulted from the claimed for storm event and/or what damage was pre-existing. 75. Given this, it is difficult to confirm that all identified damage to the stove is a result of the one storm event or the damage caused by this particular storm event. 76. I will therefore employ 8.2 of the Service’s Terms of Reference to provide a definitive outcome on this matter. I consider it fair and reasonable in all the circumstance to make an allowance of 50% of the cost to rectify the chimney flue and stove but not the damaged flange or replacement tensioner as this damage is most likely wear and tear rather than directly caused by the storm. Additional monies for ongoing damage or interest on the excess payment Additional monies for ongoing damage 77. I note the Applicant has claimed for additional monies for ongoing damage. In contrast the FSP has noted the Applicant had received payment for repairs but chose not to apply these monies to repair the property until the dispute was resolved by FOS. Further, the FSP informed the Applicant he could apply these monies to repairs and continue to maintain the dispute at the Service. 78. I further note the FSP has confirmed many times that it is willing to undertake repairs once the Applicant provides permission for it to do so in Case No: 238868 Determination Page 12 of 14 writing. The Applicant in response has demanded to know who is responsible for any ongoing damage to certain items as those items had not been repaired. 79. I confirm the FOS Case Manager informed the Applicant in writing that he had a duty to mitigate his loss as an Applicant. The Case Manager was stating the Applicant’s general duty as a claimant at law. The law requires a claimant to minimise their loss, particularly in circumstances in which an Applicant has received a considerable sum to permit this to occur. Further, the policy terms and conditions state at page 51 that the Applicant has a duty to take all reasonable precautions to prevent further loss, damage or liability. Accordingly, the Applicant had a duty at law and under the policy terms and conditions to prevent further or ongoing loss. I consider that the App licant’s remarks to this Service on this topic do not aid his position. 80. The Applicant is therefore not entitled to require any additional monies for items damaged due to his failure to apply the settlement monies provided to him to commence repairs to his roof which would have minimised the overall damage to his property. I further do not consider the Applicant is entitled to claim for items which the FSP stated it would repair once the Applicant gave it permission to do so. Interest on the excess payment 81. I accept that CB believed it had reimbursed the excess and had made representations to the FSP that it had done so. 82. I further accept that the FSP has attempted to determine the Applicant’s preferences regarding the reimbursement of the excess but has not received instructions from the Applicant on this point. 83. Whilst I consider it would have been appropriate for the FSP to reimburse the excess regardless of instructions on the preferred payment option, I note the excess is required to be paid in any event. These monies will necessarily be applied to any repairs conducted to the property and as such is difficult to see where the Applicant has sustained a loss, particularly given his retention of the significantly greater amount of monies constituted by the settlement funds on which he would have earned interest. 84. I do not accept the Applicant is entitled to interest on the excess. Breach of privacy and defamatory remarks Breach of Privacy 85. The Applicant has alleged breach of privacy based on the FSP running a trace on a cheque made out to CB or bearer which CB had informed it that it not received. Case No: 238868 Determination Page 13 of 14 86. The Applicant should be aware that the FSP as the issuer of the cheque is entitled to ascertain whether the cheque has been presented (banked) and who banked the cheque. This is the sole information the FSP is entitled to as issuer of the cheque. 87. I note that reviewing whether a cheque has been presented and by whom are a part of good accounting practices and in no way allows the FSP to access private banking details of the Applicant. I consider therefore that there is no substance to this argument. 88. I confirm however that the Service is not the appropriate forum for complaints regarding privacy breaches. The Privacy Commissioner is the appropriate body to hear complaints regarding such an issue. Defamatory Remarks 89. The Applicant considers the remarks made about him in relation to the quote for the intercom were defamatory in nature. The Applicant has not specifically indicated which comments he considered defamatory. This Service does not have jurisdiction to deal with such a complaint. Determination 90. On the basis of the available information I determine that the FSP is liable to make payment for the following:  The items referred to in the scope of works referred to in paragraph 27; plus  Any difference between the number of broken tiles resulting from the storm allowed for in the quotation and the eventual repairs.  Any difference between the re-bedding and re-pointing of 130 ridges and the eventual repair costs.  The re-bedding and re-pointing of any areas of the roof dislodged due to the storm (if not already covered by the settlement provided to the Applicant).  50% of the cost to rectify the chimney flue and stove but not the damaged flange or replacement tensioner as this damage is most likely wear and tear rather than directly caused by the storm. 91. I determine the FSP is not liable to make additional payments for the ceiling and cornice. 92. I determine the FSP is not liable to pay any additional monies for items damag ed due to the Applicant’s failure to apply the settlement monies provided to him to commence repairs to his roof which would have minimised the overall damage to his property. I further do not consider the Applicant entitled to claim for additional damage to items which the FSP stated it would repair once the Applicant gave it permission to do so. Case No: 238868 Determination Page 14 of 14 93. I determine the Applicant is not entitled to interest on the excess.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.