Home / Financial Firm (Unknown - Insurer) / Determination 238752
Determination 238752
Cash settlement amounts for storm roof leak repairs
Summary
The applicants disputed the FSP's cash settlement for ceiling, plaster and painting repairs after a storm leak, and claimed delays. AFCA accepted the FSP's plaster and painting settlements and ordered that a lounge ceiling top-up be paid only if the applicants could provide a laser-cut tile quotation, referring the handling complaints to the FSP's Code & Systemic Manager.
The policy requires the insurer to match damaged materials as near as reasonably practicable, not to replace undamaged items, and the insurer retains discretion over repair or cash settlement.
Issues
- Claim amount dispute primary · not upheld
“I accept the FSP's quotation in the sum of $812.18 as an appropriate settlement”
- Poor claim handling secondary · unclear
“the Applicants' complaints regarding the FSP's claims handling will be referred to the Code & Systemic Manager”
- Delay secondary · upheld
“The FSP has acknowledged that the claim was later delayed whilst it obtained a quotation for the repairs to the lounge-room”
Subjects and remedies
home or building damagenatural disasterpay claimreassess claim
Text of the determination
Case No: 238752 Determination Page 1 of 8
Case number: 238752
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
25 July 2011
Background
1. The Applicants hold a Home Building and Contents policy of insurance with the
Financial Services Provider (FSP). The policy covers the home building for
complete replacement and home contents for $213,950.
2. On 3 December 2010, the Applicants contacted the FSP to lodge a claim for
storm damage which had resulted in a leaking roof. The leak caused damage to
the ceiling, carpet, plaster and other items in the home.
3. The FSP accepted the claim and arranged for settlement. The FSP has offered
cash settlement of the following items which are still in dispute - lounge ceiling
repairs, plaster/painting repairs to the hall, study and lounge room walls , and
extra ceiling batten installation if required.
4. The Applicants dispute these outstanding amounts on the basis that the cash
settlement offered does not cover the repairs required.
Summary of Applicants ’ Position
5. The Applicants note the FSP delayed dealing with their claim, provided wrong
advice and offered incorrect settlement for items. In support of these
contentions, the Applicants have provided a detailed record of events. Further,
the FSP has failed to provide the written quotation for items or work that it relies
upon.
6. The Applicants were particularly dissatisfied with the time taken to obtain
quotations and a scope of works. Further, the Applicants informed the FSP of
their holiday leave and noted they would be available during that time for the
purpose of obtaining quotations. Due to the taking of annual leave , the
Applicants were then unable to take additional time off to accommodate the
requests to allow tradespersons and assessors access to the property.
7. The Applicants rely on the following policy terms and conditions:
“Damage to fixed wall or floor coverings
When we repair or replace damage to fixed wall, ceiling or floor coverings:
Determin ation
Case No: 238752 Determination Page 2 of 8
we also repair or replace undamaged coverings if this is reasonably required to
achieve a match with the repair or replacement of the damaged area,
the repair or replacement is limited to the room, passageway, stairwell or functional
area where the damage occurred.
Fixed wall and floor coverings are items such as tiles, floating floors, fixed cupboards
and shelving.”
8. The Applicants are dissatisfied with the offer of $8,488.07 for lounge ceiling
repairs. The Applicants submit that the works will not cover the ceiling tile
replacement like for like as required by the policy. The tiles can be replaced like
for like in size (but not pattern) although it would require laser cutting of the
tiles. The FSP‟s proposal includes smalle r tiles and additional battens to
accommodate same. Further, there was only one repairer in the Applicants‟
locale able to perform these works (“GCP”) .
9. The Applicants note the offer of $812.18 is an amount included within the
ceiling tile/plaster quote by a repairer. The Applicants had not been informed of
this amount previously and had not discussed the amount required with the
FSP for these works.
10. The Applicants have noted the amount of $3,025 offered for painting the hall,
study and lounge room walls bas ed on the quotation by “LPD” . However, as the
cheque has not been provided for this amount, the Applicants consider it
outstanding.
11. The Applicants dispute the figure of $500 offered for extra ceiling batten
installation because it would not result in a like for like replacement of ceiling
tiles. The Applicants have previously demonstrated that a like for like (except
for tile pattern) is achievable.
12. The Applicants contend the FSP is picking and choosing which quotes to
accept without consultation with the contractors. The FSP has only accepted
the Applicants‟ quotation for carpet.
13. The Applicants prefer a cash settlement for all items as this will allow them to
arrange all repairs in a sequential manner without reference to the FSP‟s
repairers.
Summary of FS P’s Position
14. The FSP relies on the following policy terms and conditions:
“Repairing or rebuilding your building
If your home building is damaged during the period of cover by an insured event, we
will decide if the damage:
can be properly repaired, or
is so severe that we reasonable believe your building will need to be rebuilt.
Repairing your building
When we establish that your home building can be properly repaired, we will decide to:
repair it, or
Case No: 238752 Determination Page 3 of 8
pay the cost of repairing it
When we repair your building, we will use new materials.
We will make reasonable endeavours to match materials. Where this does not achieve
an exact match, materials that in our opinion match the damaged or lost materials as
near as reasonably practicable will be used. We will not pay to replace undamaged
materials or any undamaged part of them to achieve a match.
...
Repairing or rebuilding your building
We ordinarily obtain independent, competitive quotes from repairers and suppliers
recommended by [FSP name}. If you want, you can choose a repairer and/or supplier
to provide one of the quotes. We review the quotes, including any quote from a
repairer and/or supplier your choose, and what is necessary to properly repair or
rebuild your building. We choose the repairer and/or supplier who submitted the more
competitive and complete quote and that will be the repairer and/or supplier who
repairs or rebuilds your building.
We will enter into any building contract with the selected repairer and/or supplier on
your behalf. We will ov ersee the repairs and keep you informed of their progress.”
15. The FSP submits that the policy requires it to make a near as possible match of
materials. Further, that the FSP may consider the quotations of the Applicant‟s
repairers but will choose the most competitive and complete quote.
16. The FSP has enclosed the Applicant ‟s quotation of $32,885.60 for the repairs to
the Applicants‟ lounge ceiling. The FSP notes that the quotation also includes
repair works for a previous claim and the quotation does not itemise each item
of repair.
17. The FSP reviewed this quotation and concluded it was not fair and reasonable.
This was based on its own repairer (“HR”) who advised the following:
“To the best of our knowledge the decorative ceiling tile is no longer
manufactured and is not available in marketplace.
...
We understand that also that the ceiling is being referred to as an “acoustic
ceiling ” and whilst the existing damaged decorative ceiling tiles would have some
acoustic properties we have been unable to establish what there (sic) acoustic
performance is.
...
Most ceiling tiles and or acoustic ceiling tiles commonly used today are in
commercial applications, manufactured from a wide variety of materials [usually
involving some form of suspended ceiling grid] of which there are many differing
aesthetic finished and levels of acoustic performance.”
HR provided a quotation in the sum of $8,488.07 for repairs to the ceiling that
would match as near as reasonably practical to the Applicants ‟ existing ceiling.
The HR quotation confirms the tile type to be used in the repair. The FSP has
also confirmed with its repairer that additional battens could be installed to
avoid the need to cut the tiles.
Case No: 238752 Determination Page 4 of 8
18. The FSP has also provided alternative quotation options for repair to the ceiling
from HR. HR has indicated replacement of solely six tiles and the repainting the
ceiling. Alternatively, HR recommends supplying and installing a new ceiling
grid and tiles for $10,311.60.
19. The FSP submits that 1x1 foot tiles are no longer manufactured and the GCP
does not include measurements of the tile they are offering or the specific type
of tile used for the proposed repair. The FSP contends that a comparison of the
HR and GCP quotations demonstrate it has fulfilled its obligations regarding
matching the tiles as near as reasonably practicable pursuant to policy terms.
In addition to this, the FSP argues that there is no evidence to suggest such
repairs would be unsatisfactory.
20. The FSP has now agreed to cash settle the Applicants for painting costs based
on the Applicants ‟ own quotation for $3,025.
21. The Applicants have requested cash settlement for the plaster repairs in the
amount of $6,041 for repairs to the hallway only. In contrast, the FSP has
obtained a quotation for $812.18 from HR to repair the hallway and study.
22. The FSP contends the Applicant‟s quotation is for the replacement of plaster to
the entire hallway which is excessive as only the damaged portion of the
hallway needs repairing. The FSP submits its quotation is fair and reasonable.
23. The FSP submits it has settled the Applicants‟ claim to the extent of its liability.
Issues
24. Whether the FSP has appropriately settled the Applicants‟ claim.
Reasons for Determination
25. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
26. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
27. The parties do not dispute the following:
The Applicants had an insured event which caused damage to their
property.
The FSP accepted the claim for damage caused by the leaking roof.
The Applicants seek a cash settlement for repairs.
28. I note that the current outstanding items are the lounge ceiling repairs,
plaster/painting repairs to the hall, study and lounge room walls and possible
extra ceiling batten installation. I shall deal with the ceiling room/batten and the
plaster repairs to the walls separately as I consider that each item raises a
Case No: 238752 Determination Page 5 of 8
discrete issue. I will also deal with the issue of delay and claims handling
separately.
29. I am aware that although the FSP‟s original position was that it could arrange
for repairs, it has now offered cash settlement for the items in dispute.
Accordingly, I will not address the issue of cash settlement as opposed to
arranging repairs as it is no longer an issue in dispute. However, it is important
for the Applicants to be aware that when the insured damage is repairable, that
the FSP has discretion over whether to arrange repairs or provide cash
settlement. The discretion belongs to the FSP and not to the Applicants.
Lounge Room Ceiling Repair and potential extra batten installation
30. The Applicants seek the replacement of the entire set of ceiling tiles of the
same original size to ensure a match. The Applicants acknowledge that an
exact match of the old tile pattern cannot be located.
31. In contrast, the FSP contends that as the ceiling tile is no longer manufactured,
that the HR quotation for ceiling repairs which provide a match as near as
reasonably practicable to the Applicants‟ existing ceiling is appropriate.
32. The FSP and Applicants have relied on separate clauses of the policy wording
to support their respective positions.
33. The FSP notes that it is required to make reasonable endeavours to match
materials but may utilise a match to the damaged materials as near as
reasonably practicable.
34. The Applicants have noted that the policy terms req uired the FSP to replaced
undamaged fixed ceiling coverings if reasonably required to achieve a match.
The replacement however is limited to the room where the damage occurred.
35. I have noted that the Applicants have continually stated their policy requires a
„like for like replacement‟. This is not precisely the case. The FSP is required to
attempt to match the damaged item, but only where reasonably practicable.
36. It appears accepted by the parties that the exact tile pattern is no longer
available.
37. According ly, the question before me is whether the FSP‟s proposed method of
repair is a close a match as reasonably practicable.
38. I have reviewed the Applicants‟ quotation for the works. The quotation from
GCP states it will remove the water damaged insulation and MFT (Mineral Fibre
Ceiling Tile) ceiling and reinstate with new insulation and MFT ceiling tiles to
match as close as possible. There is no confirmation from GCP regarding
whether it will source laser cut tiles to match the size specification of the tiles.
39. The FSP‟s quotation however indicates that the tiles would either be 12mm
acoustic ceiling panels or 19mm fine fissured ceiling panels to line the existing
battens. Further, additional battens may be required to be installed to
accommodate the new ceiling tile size. Accordingly, the FSP may be able to
match the acoustic quality of the tile but not the size or pattern of the tile.
Case No: 238752 Determination Page 6 of 8
40. The Applicants have not established that laser cut tiles can be sourced and
what the individual cost of re-tiling the lounge room ceiling would be.
41. I consider that if the FSP is able to arrange for the same size tiles by laser
cutting that this would be the closest practicable match. This would also avoid
the need to change the roofing battens.
42. I further note that the tile match is limited to the lounge room in accordance with
the policy terms and conditions.
Plaster and Painting Repairs to the Hall, study and Lounge Room Walls
43. I have reviewed both the LPD, GCP and HR quotations for repairs. I have also
reviewed a quote from GPD in the sum of $3,608 for plaster and painting
repairs.
44. There does not appear to be a dispute regarding the LPD quotation. The
Applicants only continued to dispute this quotation for painting of the Hall,
Study and Lounge-room walls until payment was received. I note that the
Applicants have now received a cheque for $3,025 in line with their own
quotation from LPD. Accordingly, I consider that as this item of repair has now
been paid it has been appropriately settled.
45. In relation to the plaster repairs to the hallway and study, the FSP has received
a quotation for $812.18 in writing - albeit by email. I am not troubled by the fact
the quotation was received by email given it is clear which company the quote
was provided by and the company‟s qualifications to quote for those works .
46. I also note that the GCP quotation appears to provide no reason why the entire
plaster needs to be replaced rather than repair. Plaster normally can be
repaired and it would be surprising if all the plaster sheets required a
replacement.
47. Further, LPD, GPD and HR have both indicated patching of the walls is
possible. Given GCP has provided no expert opinion as to why such a measure
of replacement is required I do not accept this quote.
48. Given that there is no alternative quotation itemising this work, I accept the
FSP‟s quotation in the sum of $812.18 as an appropriate settlement.
Delay and claims handling
49. The FSP has essentially argued that it authorised repairs on 10 January 2011
but the Appl icants‟ desire to provide their own quotations extended the time
frames.
Case No: 238752 Determination Page 7 of 8
50. The FSP has acknowledged that the claim was later delayed whilst it obtained
a quotation for the repairs to the lounge-room after the claims decision not to
cash settle was confirmed. The FSP has apologised for any distress caused to
the Applicant and notes this issue has been forwarded to its claims department
for future purposes. The FSP has failed to provide an explanation of what
training or procedures it has arranged to prevent this issue occurring again.
51. The Applicants have complained that the carpet would not have required
replacement had the carpet dryers been arranged in a timely manner. I have
noted the claims file records indicate that the party arranging such matters had
the work logged twice with it in the three days. The FSP made enquiries and
was informed that:
“...TECH CAN ONLY ATT AS FAST AS THEY CAN”
52. I note the Applicants were dis satisfied with the explanation of „catastrophic
event‟ making it difficult to obtain carp et driers because the Government had
not declared a state of natural disaster. The Applicants should be aware that
natural weather events such as strong storms can create a high volume of
claims as well as requests for assistance from the authorities such as the SES
without the Government being required to declare a state of natural disaster.
Each claim to an insurer of course is from a paying customer, such as the
Applicants, to whom the FSP must provide assistance based on the available
resources. Further, the Applicants have provided no documentary evidence to
the Service confirming the carpet driers were in fact available.
53. The Applicants further complained that on 7 December 2010 the FSP told them
it would only replace cut out section. In contrast, the FSP has noted in its
claims records it would only replace damaged sections. It is possible that a
miscommunication has occurred at this point and this should have been cleared
up on 15 December 2010 between the parties – according to their respective
notes.
54. The FSP has indicated that the Applicants also created difficulties by not
allowing repairers into the property or being unavailable. I note the Applicants
however have claimed they were at home on annual leave for six weeks and
believe the FSP was aware of same. However, I have been unable to locate
confirmation the FSP was aware of during the material time in the notations
from the parties.
55. It is clear from the materials that the FSP attempted to mitigate any incorrect
information provided by its preferred repairers to the Applicants as well.
However, it is concerning that this did occur and that the repairers have
provided advice in relation to the extent of payment, which is essentially a
matter for the claims department of the FSP.
56. Given the issues raised, the Applicants ‟ complaints regarding the FSP ‟s claims
handling will be referred to the Code & Systemic Manager to determine whether
investigation is required.
Case No: 238752 Determination Page 8 of 8
Determination
57. On the basis of the available information, I determine that if the following should
occur within 30 days of the Applicants‟ accepting this Determination:
(a) The Applicants shall provide the FSP with a written quotation for the
sourced tiles and repair to the tiled roof of the lounge- room (“the
quotation”).
(b) Within 14 days of receiving the quotation, the FSP determine the
difference in cost between the amount paid and the amount of the
quotation “the difference”.
(c) Within 21 days of receiving the quotation the FSP is to pay the difference
to the Applicants.
(d) If the Applicants are unable to demonstrate within the 30 day period that
the sourced tiles are laser cut 1 x 1 foot in size, then the FSP‟s previous
settlement of the lounge-room roof repair will be deemed sufficient.
58. I determine that the sum of $3,025 has been paid and this sum constitutes an
appropriate settlement in accordance with the LPD quotation for works for
painting the study, hallway and lounge-room.
59. I determine that the sum of $812.18 is an appropriate settlement for plaster
repairs.
60. This matter will be referred to the Code & Systemic Manager to determine
whether further investigation is required.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.