Home / Financial Firm (Unknown - Insurer) / Determination 238530
Determination 238530
Partial denial of inundation claim (flood exclusion versus stormwater)
Summary
The FSP accepted stormwater damage up to 1.6m above ground but declined the balance as flood damage. AFCA accepted that 125 mm of above-floor water was stormwater, ordered the FSP to pay that part, and left quantum to be agreed.
The Panel preferred the more site-specific hydrology evidence on whether above-floor inundation came from stormwater surcharge or overbank flooding.
Issues
- Claim denial primary · upheld“The Panel accepts that 125 mm of the flooding above floor level was caused by stormwater surcharge; the FSP is liable to pay the Applicant's claim caused by stormwater surcharge”
- Failure to disclose secondary · not upheld“The Panel therefore accepts that the policy documents were sent to the Applicant in accordance with sections 69 and 77 of the Act”
Subjects and remedies
natural disasterpay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 238530 Determination Page 1 of 10
Case number: 238530
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
21 November 2011
Background
1. The Applicant holds a Home Building and Contents policy of insurance with the
Financial Services Provider (FSP) covering her residential home.
2. Between 9 and 11January 2011, the Applicant‟s home was subject to intense
rainfalls.
3. In the evening of 11 January 2011, the locale of the Applicant‟s premises was
inundated by water causing damage to the insured building and contents.
4. After obtaining reports from an assessor “C” and hydrologist “W”, the FSP
partially accepted the claim up to 1.6m above ground level as it was caused by
escaping stormwater. However, it declined the balance of the claim o n the
basis the loss was caused by flood which is an excluded event under the policy.
5. The Applicant disputes the FSP‟s declinature on the basis she was not
informed of the policy exclusion for flood and that there is contrary expert
evidence that all the damage was caused by stormwater from the local drains.
Summary of Applicant’s Position
6. The Applicant relies on section 35 of the Insurance Contracts Act (1984) (“the
Act”). Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed event
in relation to the contract, an insurer may not refuse to pay an amount equal to
the minimum amount of cover set out in the regulations made pursuant to the
Act unless it can prove that before the contract was entered into, the insurer
clearly informed the insured in writing of the relevant provisions of the contract,
or that the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
7. The Applicant also relies on regulations 10 and 14 from the Insurance
Contracts Regulations (1985) (“the Regulations”). The Regulations provide
statutory cover for prescribed contracts, such as the Applicant‟s contract of
insurance, including flood cover to building and contents.
Determination
Case No: 238530 Determination Page 2 of 10
8. The Applicant contends that as section 35 was not complied with that the cover
reverts to the standard cover provided for in the Regulations which covers
flood.
9. The Applicant relies on her own hydrologist report by “O”. The Panel notes th e
following from O‟s report:
O has a Masters degree in engineering hydrology and 40 years
professional experience.
A substantial portion of the park is below 7m Australian Height Datum
(AHD) whereas the adjacent river bank is at about 9m AHD.
The Brisbane River Flood peak levels and times at the following locations
were:
- 17.67m AHD at Moggil at about 3pm on 12 January 2011.
- 12.9m AHD at Jindalee at about 7pm on 12 January 2011.
- 9.27m AHD at the mouth of Oxley Creek near midnight 12/13 January
2011.
- 4.46m AHD at the City Gauge at about 3am on 13 January 2011.
O makes reference to the Insurance Council of Australia Hydrology
Report 2011 (Vol 2) from which the Panel note the following:
- Floodwaters moving down the Brisbane River over the period 9 to 14
January 2011 were made up of releases from Wivenhoe Dam and
floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)
- Water level response to these „normal‟ flood events in the lower
Brisbane River was dwarfed by the subsequent water level rise
associated with the releases from Wivenhoe Dam over the period 0600
hours on 11 January and 0300 hours on 12 January. (page 1 para 3)
- Based on the recorded water level behaviour it was concluded that
releases from Wivenhoe Dam was the principal immediate cause for
flooding along the reach of the Brisbane River downstream of the Dam.
(page i para 4)
- Rain ceased over the Brisbane City area around 1800 hours on 11
January being about 24 -30 hours before flood levels in the Brisbane
River peaked. (page ii para 3)
- Given the rainfall across Brisbane City LGA ceased by 1800 hours on
11 January any flooding after this time will have been caused by water
flow inundation from the Brisbane River and its tributary creeks it being
noted that inundation along the tributaries was associated with
backwater flooding from the Brisbane River which in turn was
principally caused by the dam release flood from Wivenhoe Dam.
(page ii para 6)
The insured property is 7.5m AHD but has a floor level of 2.9m above
ground and a total of 10.4m AHD. The property was inundated to 0.43m
about the floor level. As the Brisbane City Council provides a flood level at
Case No: 238530 Determination Page 3 of 10
this location of 10.8AHD, this would mean that the floor level is 10.37m
AHD which correlates well with the assumed floor level of 10.4m AHD.
O has reviewed the placement of stormwater drains and direction of
stormwater runoff. The stormwater runoff enters the park from all
directions and there is only one major stormwater drain of 1650mm with a
smaller outlet of 600mm.
The park was flooded from local stormwater runoff after several days of
significant rainfalls.
The assertion by W that backflow flooding via the stormwater drains
ceased when the Brisbane River commenced to overflow at this location
is incorrect.
The hydrodynamic modelling has clearly shown that backflow flooding
continued throughout the whole period of overbank flooding from about
6.30am on 12 January 2011 to about 6.00am on 13 January 2011 and for
about a further 10 hours after that.
Based on a comparison of overbank and backflow volumes after the floor
level of the insured residence was exceeded, O concluded that at least
125mm of overfloor flooding can be attributable to the stormwater
drainage backflow.
10. The Applicant relies on an additional report by O responding to criticisms from
W from which the Panel note the following:
W‟s report only includes a single cross -section to represent the over bank
flow.
The cross section may not take into account additional hydraulic
resistance resulting from house footprints and fences.
The W report only includes a single stormwater pipe thereby limiting the
backflow to that pipe and not the other pipes in the local stormwater
drainage network or backflow through road gully inlets.
In contrast O‟s report does account for these above elements.
When O removed these additional elements and performed a re-run he
got similar results to W.
The house footprints and fences, some of which are solid besser block
fences, significantly restrict over bank flow capacity and results in delay in
the overbank flow extending through to the street location of the
Applicant‟s insured premise.
11. The Applicant relies on the policy definition of storm and rainwater as follows:
“Storm and rainwater including stormwater runoff from areas surround the site, or
water escap ing from any water main, drain, pipe, street gutter, guttering or surface.”
12. The Applicant argues that O‟s report clearly demonstrates that the loss was
caused by storm and rainwater as defined by the policy. The Applicant submits
that this event is an insured event under the policy and the FSP acknowledges
in its Notice of Response to the Service that it is covered.
Case No: 238530 Determination Page 4 of 10
13. In 2008, the Applicant changed policies over to the FSP because she believed
the policy would provide the same cover. She was not informed that the policy
did not cover her for flood.
14. The Applicant has indicated she did not view the inundation but was told the
pond in a park opposite the insured premises swelled and rose high enough to
inundate her 3m highset home.
15. The Applicant has enclosed C‟s report from which the Panel note the following
information:
Rainfall of 160mm in the upper reaches of the Brisbane River catchment
area from 9 January 2011 together with Wivenhoe dam releases caused
river levels downstream to rise rapidly from 10-13 January 2011. The river
peaked at a near record height of 4.46m on 13 January 2011.
The Applicant was evacuated on 11 January 2011 at approximately
2.00pm and received updates from the neighbours by text.
The Applicant was told flood waters reached her front yard on 12 January
2011 at 6.22am and by 3.18pm the flood waters had reached the
habitable floor level of the house.
The Applicant‟s property is 215m from the Brisbane River.
16. The Applicant has enclosed a Brisbane City Council FloodWise Report which
suggests t he Applicant‟s property ground levels range from 7.2 -8m.
Summary of FSP’s Position
17. The FSP relies on section 69 and 77 of the Act.
18. Section 69 provides that section 22 will be deemed to have been complied with
if it is not reasonably practicable to give the information in writing before the
contract is entered into but it is reasonably practical to give the information
orally. If the insurer gives the information orally, the insurer is deemed to have
complied with section 22 if the information is given in writing within 14 days
after the contract of insurance (including an interim contract) has been entered
into. Provided the oral information is confirmed in writing within 14 days,
compliance with section 22 will be established. Where a loss occurs after the
contract was entered into but before written confirmation of the duty of
disclosure has been provided, the insurer will only be able to avail itself of the
remedies set out in Section 28, if it can prove that the information was given
orally.
19. Section 77 of the Act provides that a notice or other document that is by the Act
required or permitted to be given, may be given to a body corporate in any way
in which documents may be served on that body corporate, and to a natural
person, personally or by post to that person at his last known address.
Case No: 238530 Determination Page 5 of 10
20. The FSP relies on the following policy terms and conditions:
[page 12-13 in the Building Policy and 18-20 in the Contents policy]
What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular insured events.
...
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
No
Damage or loss caused by flood. Flood means the inundation or covering of normally
dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
flood does not mean stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe street gutter, guttering or
surface.
The cost of cleaning or clearing debris from any pool or spa.
...
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or liability
caused by or arising from or involving:
...
flood”
21. The F SP relies on a statement from “B” who is employed by the parent
company of the FSP in Customer Communications. B has provided the
following information:
The policy was generated at 13 minutes and 45 seconds past midnight on
13 August 2008.
The policy was then sent to Customer Communications to process, print
and lodge with Australia Post.
Case No: 238530 Determination Page 6 of 10
There were 3 „Quantity Returns‟ ; the Applicant‟s policy was not included in
that list.
There are a number of business rules that identify and govern the type of
inserts which are included in the policy documents.
The insert usage report for the Applicant‟s policy included a building
policy, Customer Charter and contents policy.
B confirms that the request to provide the Applicant‟s policies to her was
commenced on 12 August 2008, sent and received by Customer
Communications on 13 August 2008 and posted on 13 August 2008.
The recorded date for Australia Post lodgement was 14 August 2008.
22. The FSP relies, for the purpose of establishing the excluded event „flood‟, on
W‟s repor t from which the Panel notes the following:
The insured home was inundated to a depth of about 0.43m above floor
level.
The Corinda High Alert rainfall station recorded totals of 62.1mm, 10.6mm
and 37mm from 9am on the 10, 11 and 12 January 2011 respective.
The peak 1 hour rainfall intensity of 14.8mm/hr occurred at 11am on 11
January 2011.
The gutter level in the street of the insured residence is 7m AHD. Based
on this level the flood water from the Brisbane River would have started
surcharging through the stormwater system into the street at
approximately 10pm on 11 January 2011.
The lowest point in the bank of the Brisbane River near the insured
residence was 8.8m AHD. Based on this level the River would have
broken its banks sometime around 6am on 12 January 2011.
The insured premise has ground levels ranging from 7.2-8m AHD. The
property would have been inundated to a maximum depth above ground
level of about 1.6m by floodwater surcharging through the stormwater
system prior to the River breaking its banks.
Based on the local flood peak level of 10.7mAHD and an approximate
depth of inundation above floor level at the house of 0.43m, the floor level
of the house is located at approximately 10.3AHD. Therefore, the house
would not have been inundated above floor level by floodwater
surcharging through the stormwater system prior to the River breaking its
banks in the vicinity of the insured property.
23. The FSP also relies on an additional report from W responding to O‟s report:
W reviewed O‟s report and the met hod/conclusions contained therein.
W considers that O‟s report contains errors in the modelling which are
apparent from Figure 10 of O‟s report. Figure 9 of O‟s report is similar to a
hydrograph derived independently by W.
Case No: 238530 Determination Page 7 of 10
The hydrograph shows that river levels at Fig Tree pocket reached the
overbank flow level of 8.8m AHD about 6am on 12 January 2011 and
hence overbank flow of floodwaters would have commenced about this
time. The text of O‟s report suggests that overbank flow commenced at
6.35am which is consistent.
Figure 10 however does not demonstrate overbank flow until 8 hours later
when the hydrograph indicates a river level of 10.2m AHD.
The Oxley Creek Mouth Alert gauge reached 8.8 AHD at about the time
that the model results show the commencement of overbank flow. W
opines that this implies the water levels at the Oxley Creek Mouth gauge
may have been incorrectly applied as the river level hydrograph (the
model boundary condition) at Fig Tree Pocket.
The failure to predict overbank flow should have commenced represents
a fundamental error that makes all of the conclusions of O‟s report invalid.
O‟s report misrepresents W‟s findings as the report did not assess
behaviour of flow through stormwater pipe system after the
commencement of overbank flooding.
W considers that the model configuration adopted by O would
underestimate the volume of overbank flow from the river and it would
have been higher than indicated by W‟s model.
The independent model developed by W demonstrates that the backflow
of floodwaters through the pipe into the park would have effectively
ceased at least 3 hours before the house at the subject property was
inundated above floor level. W considers these findings support the
original report that inundation of the property above floor level was caused
by overbank flooding from the Brisbane River.
24. The FSP submits that as it was not reasonably practicable to provide
contractual terms in writing to the Applicant prior to policy inception, the FSP
was entitled under 69 and 77 of the Act to post the policy documents to the
Applicant. The evidence provided by the FSP demonstrates that the documents
were posted to the same address listed on the policy within 5 working days of
purchasing the subject policy.
25. It was further not required to send out the PDS documentation each time at
renewal given the PDS had not materially changed.
26. The FSP contends that upon receiving the site specific report from W
(summarised above) it revised its initial denial and accepted liability for damage
to the insured property up to 1.6m above ground level. Further, that this
decision was appropriate.
27. The Applicant has not contended that the damage was caused by an insured
event and the FSP maintains the additional damage was caused by the
uninsured event of flood.
28. The FSP submits that based on the additional report from W, O‟s report cannot
be relied upon.
Case No: 238530 Determination Page 8 of 10
Issues
29. Whether the FSP is entitled to rely on the policy terms and conditions.
30. Whether the FSP has appropriately declined the Applicant‟s claim for loss
arising from the inundation of the property.
Reasons for Decision
31. There has been an exchange of material between each party, and the Panel is
satisfied each party has had an opportunity to reply to the issues raised.
32. This determination will be made by a Panel consisting of a Panel Chair
Ombudsman, a representative with extensive experience in the insurance
industry and a representative with extensive experience of consumer claims.
33. T he Panel has read each party‟s submissions and materials and will only refer
to the relevant submissions and materials raised.
34. The Panel Chair Ombudsman attended on a site and met with the Applicant
and a representative of the FSP. The FSP confirmed the details previously
provided to the Service.
35. The Panel considers there are two issues (as noted above) for it to consider
and it shall address each separately.
Whether policy terms and conditions apply
36. The Applicant has claimed that the FSP has breached its obligations under
section 35 of the Act and therefore the policy should revert to the standard
provisions contained under the Regulations. The Applicant has further alleged
that the FSP failed to provide the PDS.
37. The FSP has submitted that as it was not reasonably practicable to provide the
policy prior to inception that it was entitled to provide the policy under sections
69 and 77 of the Act by postal mail after the policy inception.
38. The Panel confirms that the FSP may mail out the policy documents within 14
days of inception under Section 69 and 77, and that once the Applicant is in
receipt of the policy documents the FSP is entitled to rely on the terms and
conditions contained in same.
39. The evidence before the Panel from B states that the notices and inserts for the
Applicant‟s policy were printed and dispatched through its mailing house on 13
August 2008. On 14 August 2008 a lodgement report notes that three items
were returned. The report which identifies the items returned shows the
Applicant‟s policy was not included as a return. The evidence also includes a
clear indication of what inserts (which include the policies) were included in the
mail out. Further, there is evidence regarding the date the postal mail was
Case No: 238530 Determination Page 9 of 10
lodged with Australia Post and the three Quantity Returns did not include the
Applicant‟s own documents.
40. The Panel therefore accepts that the policy documents were sent to the
Applicant in accordance with sections 69 and 77 of the Act and the FSP is
therefore entitled to rely upon the terms of its policy
Whether the FSP has appropriately declined the balance of the Applicant’s
claim
41. The Panel notes the first W report stated the property would have been
inundated to a maximum depth above ground level of about 1.6m by floodwater
surcharging through the stormwater system prior to the River breaking its
banks. Further, based on the local flood peak level of 10.7mAHD and an
approximate depth of inundation above floor level at the house of 0.43m, the
floor level of the house is located at approximately 10.3AHD. Therefore, the
house would have been inundated above floor level by floodwater surcharging
through the stormwater system prior to the River breaking its banks in the
vicinity of the insured property.
42. The Panel confirms that the FSP accepted liability for any damage to the
Applicant‟s property up to 1.6m above ground level.
43. The hydrodynamic modelling from O‟s report has clearly shown that backflow
flooding continued throughout the whole period of overbank flooding from about
6.30am on 12 January 2011 to about 6.00am on 13 January 2011 and for
about a further 10 hours after that. The report provided by O concluded that at
least 125mm of overfloor flooding can be attributable to the stormwater
drainage backflow.
44. An additional report by W dismisses O ‟s report claiming that the overbank flow
indicated by O would have occurred 8 hours earlier and that the stormwater
surcharge would have ceased 3 hour earlier. Accordingly, W considers that the
effect of the backflow would be negligible. The new report also sets the floor
level at 10.4m AHD.
45. In response, O criticises W‟s report for failing to take into account site specific
features which would affect stormwater drainage and overbank flow.
46. Based on the expert reports, it does not appear to be disputed that stormwater
surcharge was responsible for inundating the property up to 1.6m above ground
level. It is further not disputed that the policy covers stormwater surcharge
through the drainage.
47. The property however is set at a floor height of 10.3-10.4m AHD (depending on
the report relied on) and the floor level was inundated 0.43cm above floor level.
The question before the Panel is whether this above floor inundation was
caused by stormwater surcharge or overbank flooding from the Brisbane River.
Case No: 238530 Determination Page 10 of 10
48. Having care fully read each expert report in some detail including the Applicant‟s
further submission of 20 October 2011, W‟s response of 1 November 2011,
together with the final submissions from the FSP dated 2 November 2011 and
18 November 2011, the Panel is incline d to prefer the conclusions of O‟s report.
This report is significantly more site specific than W‟s report. O‟s original report
had considered the drainage sites, stormwater runoff and elements offering
hydrological resistance.
49. In contrast, it was not unt il W‟s second report that he appears to take into
account the stormwater drains (in a limited manner), provides a different floor
level to the original report (which is closer to the level listed by O), and provided
modelling in the second report. Further, he has not addressed the site specific
aspects of the location. The Panel also notes with interest that O is able to
generate similar modelling to W when the site specific details are removed.
50. Accordingly, the Panel accepts that 125 mm of the flooding above floor level
was caused by stormwater surcharge.
51. The Panel notes that neither party have provided a breakdown of the damage
caused by this particular level of flooding to the home. Accordingly, the Panel is
unable to make any definitive finding as to quantum.
Determination
52. On the basis of the available information, the Panel determines that the FSP is
liable to pay the Applicant‟s claim caused by stormwater surcharge. Once the
Applicant has indicated her acceptance of this Determination, the FSP is
directed to urgently enter into discussions/assessment as to the final quantum.
Pursuant to its fair and reasonable mandate, recognising the elapse of time
since the flash flood, the Panel further determines the Applicants are to be cash
settled, as soon as a final figure has been mutually agreed.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.