Home / Financial Firm (Unknown - Insurer) / Determination 238530

Determination 238530

Partial denial of inundation claim (flood exclusion versus stormwater)

FirmFinancial Firm (Unknown - Insurer)
Decided2011-12-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The FSP accepted stormwater damage up to 1.6m above ground but declined the balance as flood damage. AFCA accepted that 125 mm of above-floor water was stormwater, ordered the FSP to pay that part, and left quantum to be agreed.

The Panel preferred the more site-specific hydrology evidence on whether above-floor inundation came from stormwater surcharge or overbank flooding.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 238530 Determination Page 1 of 10 Case number: 238530 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 21 November 2011 Background 1. The Applicant holds a Home Building and Contents policy of insurance with the Financial Services Provider (FSP) covering her residential home. 2. Between 9 and 11January 2011, the Applicant‟s home was subject to intense rainfalls. 3. In the evening of 11 January 2011, the locale of the Applicant‟s premises was inundated by water causing damage to the insured building and contents. 4. After obtaining reports from an assessor “C” and hydrologist “W”, the FSP partially accepted the claim up to 1.6m above ground level as it was caused by escaping stormwater. However, it declined the balance of the claim o n the basis the loss was caused by flood which is an excluded event under the policy. 5. The Applicant disputes the FSP‟s declinature on the basis she was not informed of the policy exclusion for flood and that there is contrary expert evidence that all the damage was caused by stormwater from the local drains. Summary of Applicant’s Position 6. The Applicant relies on section 35 of the Insurance Contracts Act (1984) (“the Act”). Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 7. The Applicant also relies on regulations 10 and 14 from the Insurance Contracts Regulations (1985) (“the Regulations”). The Regulations provide statutory cover for prescribed contracts, such as the Applicant‟s contract of insurance, including flood cover to building and contents. Determination Case No: 238530 Determination Page 2 of 10 8. The Applicant contends that as section 35 was not complied with that the cover reverts to the standard cover provided for in the Regulations which covers flood. 9. The Applicant relies on her own hydrologist report by “O”. The Panel notes th e following from O‟s report:  O has a Masters degree in engineering hydrology and 40 years professional experience.  A substantial portion of the park is below 7m Australian Height Datum (AHD) whereas the adjacent river bank is at about 9m AHD.  The Brisbane River Flood peak levels and times at the following locations were: - 17.67m AHD at Moggil at about 3pm on 12 January 2011. - 12.9m AHD at Jindalee at about 7pm on 12 January 2011. - 9.27m AHD at the mouth of Oxley Creek near midnight 12/13 January 2011. - 4.46m AHD at the City Gauge at about 3am on 13 January 2011.  O makes reference to the Insurance Council of Australia Hydrology Report 2011 (Vol 2) from which the Panel note the following: - Floodwaters moving down the Brisbane River over the period 9 to 14 January 2011 were made up of releases from Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3) - Water level response to these „normal‟ flood events in the lower Brisbane River was dwarfed by the subsequent water level rise associated with the releases from Wivenhoe Dam over the period 0600 hours on 11 January and 0300 hours on 12 January. (page 1 para 3) - Based on the recorded water level behaviour it was concluded that releases from Wivenhoe Dam was the principal immediate cause for flooding along the reach of the Brisbane River downstream of the Dam. (page i para 4) - Rain ceased over the Brisbane City area around 1800 hours on 11 January being about 24 -30 hours before flood levels in the Brisbane River peaked. (page ii para 3) - Given the rainfall across Brisbane City LGA ceased by 1800 hours on 11 January any flooding after this time will have been caused by water flow inundation from the Brisbane River and its tributary creeks it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River which in turn was principally caused by the dam release flood from Wivenhoe Dam. (page ii para 6)  The insured property is 7.5m AHD but has a floor level of 2.9m above ground and a total of 10.4m AHD. The property was inundated to 0.43m about the floor level. As the Brisbane City Council provides a flood level at Case No: 238530 Determination Page 3 of 10 this location of 10.8AHD, this would mean that the floor level is 10.37m AHD which correlates well with the assumed floor level of 10.4m AHD.  O has reviewed the placement of stormwater drains and direction of stormwater runoff. The stormwater runoff enters the park from all directions and there is only one major stormwater drain of 1650mm with a smaller outlet of 600mm.  The park was flooded from local stormwater runoff after several days of significant rainfalls.  The assertion by W that backflow flooding via the stormwater drains ceased when the Brisbane River commenced to overflow at this location is incorrect.  The hydrodynamic modelling has clearly shown that backflow flooding continued throughout the whole period of overbank flooding from about 6.30am on 12 January 2011 to about 6.00am on 13 January 2011 and for about a further 10 hours after that.  Based on a comparison of overbank and backflow volumes after the floor level of the insured residence was exceeded, O concluded that at least 125mm of overfloor flooding can be attributable to the stormwater drainage backflow. 10. The Applicant relies on an additional report by O responding to criticisms from W from which the Panel note the following:  W‟s report only includes a single cross -section to represent the over bank flow.  The cross section may not take into account additional hydraulic resistance resulting from house footprints and fences.  The W report only includes a single stormwater pipe thereby limiting the backflow to that pipe and not the other pipes in the local stormwater drainage network or backflow through road gully inlets.  In contrast O‟s report does account for these above elements.  When O removed these additional elements and performed a re-run he got similar results to W.  The house footprints and fences, some of which are solid besser block fences, significantly restrict over bank flow capacity and results in delay in the overbank flow extending through to the street location of the Applicant‟s insured premise. 11. The Applicant relies on the policy definition of storm and rainwater as follows: “Storm and rainwater including stormwater runoff from areas surround the site, or water escap ing from any water main, drain, pipe, street gutter, guttering or surface.” 12. The Applicant argues that O‟s report clearly demonstrates that the loss was caused by storm and rainwater as defined by the policy. The Applicant submits that this event is an insured event under the policy and the FSP acknowledges in its Notice of Response to the Service that it is covered. Case No: 238530 Determination Page 4 of 10 13. In 2008, the Applicant changed policies over to the FSP because she believed the policy would provide the same cover. She was not informed that the policy did not cover her for flood. 14. The Applicant has indicated she did not view the inundation but was told the pond in a park opposite the insured premises swelled and rose high enough to inundate her 3m highset home. 15. The Applicant has enclosed C‟s report from which the Panel note the following information:  Rainfall of 160mm in the upper reaches of the Brisbane River catchment area from 9 January 2011 together with Wivenhoe dam releases caused river levels downstream to rise rapidly from 10-13 January 2011. The river peaked at a near record height of 4.46m on 13 January 2011.  The Applicant was evacuated on 11 January 2011 at approximately 2.00pm and received updates from the neighbours by text.  The Applicant was told flood waters reached her front yard on 12 January 2011 at 6.22am and by 3.18pm the flood waters had reached the habitable floor level of the house.  The Applicant‟s property is 215m from the Brisbane River. 16. The Applicant has enclosed a Brisbane City Council FloodWise Report which suggests t he Applicant‟s property ground levels range from 7.2 -8m. Summary of FSP’s Position 17. The FSP relies on section 69 and 77 of the Act. 18. Section 69 provides that section 22 will be deemed to have been complied with if it is not reasonably practicable to give the information in writing before the contract is entered into but it is reasonably practical to give the information orally. If the insurer gives the information orally, the insurer is deemed to have complied with section 22 if the information is given in writing within 14 days after the contract of insurance (including an interim contract) has been entered into. Provided the oral information is confirmed in writing within 14 days, compliance with section 22 will be established. Where a loss occurs after the contract was entered into but before written confirmation of the duty of disclosure has been provided, the insurer will only be able to avail itself of the remedies set out in Section 28, if it can prove that the information was given orally. 19. Section 77 of the Act provides that a notice or other document that is by the Act required or permitted to be given, may be given to a body corporate in any way in which documents may be served on that body corporate, and to a natural person, personally or by post to that person at his last known address. Case No: 238530 Determination Page 5 of 10 20. The FSP relies on the following policy terms and conditions: [page 12-13 in the Building Policy and 18-20 in the Contents policy] What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. No Damage or loss caused by flood. Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe street gutter, guttering or surface. The cost of cleaning or clearing debris from any pool or spa. ... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood” 21. The F SP relies on a statement from “B” who is employed by the parent company of the FSP in Customer Communications. B has provided the following information:  The policy was generated at 13 minutes and 45 seconds past midnight on 13 August 2008.  The policy was then sent to Customer Communications to process, print and lodge with Australia Post. Case No: 238530 Determination Page 6 of 10  There were 3 „Quantity Returns‟ ; the Applicant‟s policy was not included in that list.  There are a number of business rules that identify and govern the type of inserts which are included in the policy documents.  The insert usage report for the Applicant‟s policy included a building policy, Customer Charter and contents policy.  B confirms that the request to provide the Applicant‟s policies to her was commenced on 12 August 2008, sent and received by Customer Communications on 13 August 2008 and posted on 13 August 2008.  The recorded date for Australia Post lodgement was 14 August 2008. 22. The FSP relies, for the purpose of establishing the excluded event „flood‟, on W‟s repor t from which the Panel notes the following:  The insured home was inundated to a depth of about 0.43m above floor level.  The Corinda High Alert rainfall station recorded totals of 62.1mm, 10.6mm and 37mm from 9am on the 10, 11 and 12 January 2011 respective.  The peak 1 hour rainfall intensity of 14.8mm/hr occurred at 11am on 11 January 2011.  The gutter level in the street of the insured residence is 7m AHD. Based on this level the flood water from the Brisbane River would have started surcharging through the stormwater system into the street at approximately 10pm on 11 January 2011.  The lowest point in the bank of the Brisbane River near the insured residence was 8.8m AHD. Based on this level the River would have broken its banks sometime around 6am on 12 January 2011.  The insured premise has ground levels ranging from 7.2-8m AHD. The property would have been inundated to a maximum depth above ground level of about 1.6m by floodwater surcharging through the stormwater system prior to the River breaking its banks.  Based on the local flood peak level of 10.7mAHD and an approximate depth of inundation above floor level at the house of 0.43m, the floor level of the house is located at approximately 10.3AHD. Therefore, the house would not have been inundated above floor level by floodwater surcharging through the stormwater system prior to the River breaking its banks in the vicinity of the insured property. 23. The FSP also relies on an additional report from W responding to O‟s report:  W reviewed O‟s report and the met hod/conclusions contained therein.  W considers that O‟s report contains errors in the modelling which are apparent from Figure 10 of O‟s report. Figure 9 of O‟s report is similar to a hydrograph derived independently by W. Case No: 238530 Determination Page 7 of 10  The hydrograph shows that river levels at Fig Tree pocket reached the overbank flow level of 8.8m AHD about 6am on 12 January 2011 and hence overbank flow of floodwaters would have commenced about this time. The text of O‟s report suggests that overbank flow commenced at 6.35am which is consistent.  Figure 10 however does not demonstrate overbank flow until 8 hours later when the hydrograph indicates a river level of 10.2m AHD.  The Oxley Creek Mouth Alert gauge reached 8.8 AHD at about the time that the model results show the commencement of overbank flow. W opines that this implies the water levels at the Oxley Creek Mouth gauge may have been incorrectly applied as the river level hydrograph (the model boundary condition) at Fig Tree Pocket.  The failure to predict overbank flow should have commenced represents a fundamental error that makes all of the conclusions of O‟s report invalid.  O‟s report misrepresents W‟s findings as the report did not assess behaviour of flow through stormwater pipe system after the commencement of overbank flooding.  W considers that the model configuration adopted by O would underestimate the volume of overbank flow from the river and it would have been higher than indicated by W‟s model.  The independent model developed by W demonstrates that the backflow of floodwaters through the pipe into the park would have effectively ceased at least 3 hours before the house at the subject property was inundated above floor level. W considers these findings support the original report that inundation of the property above floor level was caused by overbank flooding from the Brisbane River. 24. The FSP submits that as it was not reasonably practicable to provide contractual terms in writing to the Applicant prior to policy inception, the FSP was entitled under 69 and 77 of the Act to post the policy documents to the Applicant. The evidence provided by the FSP demonstrates that the documents were posted to the same address listed on the policy within 5 working days of purchasing the subject policy. 25. It was further not required to send out the PDS documentation each time at renewal given the PDS had not materially changed. 26. The FSP contends that upon receiving the site specific report from W (summarised above) it revised its initial denial and accepted liability for damage to the insured property up to 1.6m above ground level. Further, that this decision was appropriate. 27. The Applicant has not contended that the damage was caused by an insured event and the FSP maintains the additional damage was caused by the uninsured event of flood. 28. The FSP submits that based on the additional report from W, O‟s report cannot be relied upon. Case No: 238530 Determination Page 8 of 10 Issues 29. Whether the FSP is entitled to rely on the policy terms and conditions. 30. Whether the FSP has appropriately declined the Applicant‟s claim for loss arising from the inundation of the property. Reasons for Decision 31. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 32. This determination will be made by a Panel consisting of a Panel Chair Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience of consumer claims. 33. T he Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 34. The Panel Chair Ombudsman attended on a site and met with the Applicant and a representative of the FSP. The FSP confirmed the details previously provided to the Service. 35. The Panel considers there are two issues (as noted above) for it to consider and it shall address each separately. Whether policy terms and conditions apply 36. The Applicant has claimed that the FSP has breached its obligations under section 35 of the Act and therefore the policy should revert to the standard provisions contained under the Regulations. The Applicant has further alleged that the FSP failed to provide the PDS. 37. The FSP has submitted that as it was not reasonably practicable to provide the policy prior to inception that it was entitled to provide the policy under sections 69 and 77 of the Act by postal mail after the policy inception. 38. The Panel confirms that the FSP may mail out the policy documents within 14 days of inception under Section 69 and 77, and that once the Applicant is in receipt of the policy documents the FSP is entitled to rely on the terms and conditions contained in same. 39. The evidence before the Panel from B states that the notices and inserts for the Applicant‟s policy were printed and dispatched through its mailing house on 13 August 2008. On 14 August 2008 a lodgement report notes that three items were returned. The report which identifies the items returned shows the Applicant‟s policy was not included as a return. The evidence also includes a clear indication of what inserts (which include the policies) were included in the mail out. Further, there is evidence regarding the date the postal mail was Case No: 238530 Determination Page 9 of 10 lodged with Australia Post and the three Quantity Returns did not include the Applicant‟s own documents. 40. The Panel therefore accepts that the policy documents were sent to the Applicant in accordance with sections 69 and 77 of the Act and the FSP is therefore entitled to rely upon the terms of its policy Whether the FSP has appropriately declined the balance of the Applicant’s claim 41. The Panel notes the first W report stated the property would have been inundated to a maximum depth above ground level of about 1.6m by floodwater surcharging through the stormwater system prior to the River breaking its banks. Further, based on the local flood peak level of 10.7mAHD and an approximate depth of inundation above floor level at the house of 0.43m, the floor level of the house is located at approximately 10.3AHD. Therefore, the house would have been inundated above floor level by floodwater surcharging through the stormwater system prior to the River breaking its banks in the vicinity of the insured property. 42. The Panel confirms that the FSP accepted liability for any damage to the Applicant‟s property up to 1.6m above ground level. 43. The hydrodynamic modelling from O‟s report has clearly shown that backflow flooding continued throughout the whole period of overbank flooding from about 6.30am on 12 January 2011 to about 6.00am on 13 January 2011 and for about a further 10 hours after that. The report provided by O concluded that at least 125mm of overfloor flooding can be attributable to the stormwater drainage backflow. 44. An additional report by W dismisses O ‟s report claiming that the overbank flow indicated by O would have occurred 8 hours earlier and that the stormwater surcharge would have ceased 3 hour earlier. Accordingly, W considers that the effect of the backflow would be negligible. The new report also sets the floor level at 10.4m AHD. 45. In response, O criticises W‟s report for failing to take into account site specific features which would affect stormwater drainage and overbank flow. 46. Based on the expert reports, it does not appear to be disputed that stormwater surcharge was responsible for inundating the property up to 1.6m above ground level. It is further not disputed that the policy covers stormwater surcharge through the drainage. 47. The property however is set at a floor height of 10.3-10.4m AHD (depending on the report relied on) and the floor level was inundated 0.43cm above floor level. The question before the Panel is whether this above floor inundation was caused by stormwater surcharge or overbank flooding from the Brisbane River. Case No: 238530 Determination Page 10 of 10 48. Having care fully read each expert report in some detail including the Applicant‟s further submission of 20 October 2011, W‟s response of 1 November 2011, together with the final submissions from the FSP dated 2 November 2011 and 18 November 2011, the Panel is incline d to prefer the conclusions of O‟s report. This report is significantly more site specific than W‟s report. O‟s original report had considered the drainage sites, stormwater runoff and elements offering hydrological resistance. 49. In contrast, it was not unt il W‟s second report that he appears to take into account the stormwater drains (in a limited manner), provides a different floor level to the original report (which is closer to the level listed by O), and provided modelling in the second report. Further, he has not addressed the site specific aspects of the location. The Panel also notes with interest that O is able to generate similar modelling to W when the site specific details are removed. 50. Accordingly, the Panel accepts that 125 mm of the flooding above floor level was caused by stormwater surcharge. 51. The Panel notes that neither party have provided a breakdown of the damage caused by this particular level of flooding to the home. Accordingly, the Panel is unable to make any definitive finding as to quantum. Determination 52. On the basis of the available information, the Panel determines that the FSP is liable to pay the Applicant‟s claim caused by stormwater surcharge. Once the Applicant has indicated her acceptance of this Determination, the FSP is directed to urgently enter into discussions/assessment as to the final quantum. Pursuant to its fair and reasonable mandate, recognising the elapse of time since the flash flood, the Panel further determines the Applicants are to be cash settled, as soon as a final figure has been mutually agreed.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.