Home / Financial Firm (Unknown - Insurer) / Determination 238492
Determination 238492
Denial of investment property flood damage claim under flood exclusion
Summary
The owner of an investment property at Charlton claimed $151,900 for flood damage in September 2010. The FSP denied the claim under the flood exclusion, and AFCA found the inundation came from the Avoca River and was excluded flood.
Overtopping of a named watercourse is flood as defined in the policy, and the applicant's counter-evidence related to a different flood event.
Issues
- Claim denial primary · not upheld“the Panel determines the FSP was entitled to deny liability for the claim.”
- Failure to disclose secondary · not upheld“the Panel accepts that the Applicant was clearly informed of the relevant terms of the policy and that the FSP is entitled to rely on them.”
Subjects and remedies
natural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 238492 Determination Page 1 of 5
Case number: 238492
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 November 2012
Background
1. The Applicant‟s investment property at in Charlton was insured under a
home and contents policy issued by the Financial Services Provider (FSP).
The policy insured the building for $119,000; no contents cover was in place
2. On 6 September 2010 the building was inundated by water and suffered
extensive damage. A quotation in the sum of $151,900 had been obtained to
rectify the damage.
3. A claim under the Applicant‟s policy was denied by the FSP on the ground
the damage was caused by flood and excluded from co ver under the policy.
Summary of Applicant’s position
4. The Applicant argues that the river flooded because of large amounts of
water caused by heavy rain which is covered by the policy.
5. The Applicant submitted a quotation dated 15 May 2011 for repairs to the
dwelling in the sum of $151,900.
Summary of FSP’s position
6. The FSP relies on the following policy terms:
“The Policy provides:
(a) Cover for your home and contents up to their sums insured at the site,
during the period of insurance, caused directly by any of the following
inured events:
...
storm or rainwater (but not flood)
“flood” means the inundation of normally dry land by water from any
watercourse, lake, canal, dam or reservoir.
...
Determination
Case No: 238492 Determination Page 2 of 5
This policy does not cover certain things:
The policy will not cover loss or damage:
...
(b) resulting from or caused by:
...
flood”
7. The FSP relies substantially on a hydrologist report.
8. The FSP states:
The dominant cause for the loss was the escape of water from the local
waterway and not the preceding rainfall.
The Applicant‟s home was inundated b y overflow from the Avoca River.
Overflow from the Avoca River falls within the policy definition of „flood”
and therefore is excluded from the cover.
Issues
9. Whether the damage to the Applicant‟s home was caused by flood as
defined by the policy.
Reasons for decision
10. Due to the complex nature of this dispute, FOS has considered it appropriate
to refer this dispute directly to the Panel in accordance with the Operational
Guidelines to the FOS Terms of Reference. The dispute has not been the
subject of a FOS Recommendation and has proceeded direct to
Determination.
11. The decision had been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
12. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
13. Prior to arriving at a determination, the Panel has read and considered all
the material submitted by the parties to FOS. In addition the Panel Chair
Ombudsman and a Panel member carried out a site visit.
Terms of the policy
14. The Applicant asserts her policy does not specifically state that flood claims
are not covered.
Case No: 238492 Determination Page 3 of 5
15. The Applicant does not dispute that she was provided with a policy
document.
16. Examination of the contract reveals pages 4- 5 under the heading “The Policy
provides” set out the cover provided. Included in the insured events is cover
for “storm or rainwater (but not flood)”. The insured event goes on to provide
a definition for „flood‟.
17. Pages 6- 7 of the contract states “This policy does not cover certain things.”
Following under this heading the policy states cover for loss or damage
caused by flood is not covered.
18. Further, at pages 24 and 25 of the contract under the heading “What you are
insured against, and what you are NOT” states the policy does not insure
against loss or damage from flood. The mean ing of „flood‟ is again
expressed at this point.
19. After carefully reviewing the policy terms the Panel is satisfied the policy
contains terms which clearly state that loss or damage caused by flood is not
covered and provided a definition for „flood”.
20. Accordingly the Panel accepts that the Applicant was clearly informed of the
relevant terms of the policy and that the FSP is entitled to rely on them.
Source of inundation of the Applicant’s property
21. The FSP commissioned a hydrologist WT to report on the source of
inundation of the Applicant‟s property. The following are relevant matters
contained in the report.
A site inspection was carried out on 28 September 2010.
The Applicant‟s property is located about 500m east of the Avoca
River.
By 3 September 2010 h eavy rain began to fall in Victoria‟s western
region. By nightfall heavy rain had hit the central regions of Victoria.
Rain fall eased across most of the state from 6 September 2010.
Widespread rainfall resulted in rapidly rising rivers including the Avoca
River.
Flooding at Charlton
A moderately large rainfall was experienced on Friday night (3
September 2010) through to Saturday morning with a peak of 47.2mm
recorded on Saturday morning.
Light showers fell throughout Saturday and Sunday (4/5 September
2010). Rainfall intensity had dropped considerably by Monday with only
minor falls recorded.
Almost no rainfall was recorded on Monday 6 September.
Case No: 238492 Determination Page 4 of 5
The flood peak hit Charlton on Monday 6 September. The rain gauge
showed very little rain on Monday suggesting the river was the
predominant cause of flooding in Charlton.
Floodwaters in the Avoca River reached approximately 7.91m causing
river banks to spill and flood the main street.
Charlton floods from two directions in a north-south plane with an area
remaining flood free through the centre of the town along the St
Arnaud – Charlton Road.
Flood waters left the Avoca River in numerous locations on the
outskirts of town about 1km upstream of High Street.
Water initially inundated the lowest flow paths. As the wa ter continued
to rise in the Avoca River, the western parts of the town became active
flood plains with significant overland flow.
As the event peaked Monday afternoon (6 September 2010) and
evening, the eastern parts of the town started to experience relatively
inactive floodplain flows giving a flat water level throughout the town.
Flooding at the site
22. The St Arnaud Road/Armstrong Street became part of the floodplain during
the peak on Monday 6 September. Flows in this area began Monday
morning, peaked towards Monday afternoon and receded late Monday night.
23. [Applicant‟s address] is slightly lower than t he surrounding properties and
experienced flow from the southern, western and eastern directions.
24. Based on the site inspection and summary of flooding mechanisms the
flooding at the Applicant‟s property resulted from flooding of the Avoca River.
Hydrologists report 1 June 2011
As there was no rainfall the day before the inundation, he assumed that
up to 20mm of the 47mm which was recorded on Saturday morning (4
September 2010) may have been lost to antecedent conditions.
In this case the rainfall depth came down to less than 30mm and as
such would not have created a significant overland flow.
25. Lawyers representing the Applicant early in the dispute provided a
hydrological report dated 3 November 2011 provided by M. However the
report provides information in relation to the flood events which occurred in
Charlton on 14 January 2011. As the inundation giving rise to this dispute
occurred in September 2010, the hydrological report by M is not relevant to
this dispute.
26. Accordingly the Panel has not been provided with relevant evidence which
counterbalances the FSP ‟s hydrologist report.
Case No: 238492 Determination Page 5 of 5
Summary
27. This matter relates to damage arising from floods which occurred in
September 2010. The Panel is aware the property was again damaged by
flood water in January 2011. The Applicant submitted a separate claim for
this damage with another FSP which is the subject of a separate dispute
brought the Service. The Panel will consider the issues arising from the
January 2011 events separately from the September 2010 events.
28. The FSP has relied on a report of a hydrologist. The Panel is satisfied that
the hydrologist was qualified to provide expert evidence. The hydrologist
report was based on a site inspection of the Applicant‟s property, a review of
synoptic rainfall and flow data relating to the flood event, and discussions
with owners of property.
29. He came to the conclusion that the water which inundated the Applicant‟s
premises was water which came from the Avoca River.
30. It is a generally accepted hydrological principle that stormwater runoff
usually occurs contemporaneously with, or temporally close to peak rainfall
levels.
31. In the Panel‟s view, given that rainfall throughout 4 September 2010 and 5
September had dropped in intensity with only minor falls recorded on 6
September, on the balance of probabilities it is unlikely that sufficient
stormwater runoff would have been generated such as to inundate the
Applicant‟s property on 6 September 2010.
32. The policy defines „flood‟ to mean the inundation of normally dry land by
water from any watercourse. The Avoca River is a named watercourse. As
such any water which overtopped the river banks and entered the
Applicant‟s property falls within the meaning of „flood‟ as defined by the
policy.
33. In these circumstances the Panel concludes the FSP has established the
cause for the inundation was excluded from cover provided by the policy and
the claim fails.
Determination
34. Having regard to the available material the Panel determines the FSP was
entitled to deny liability for the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.