Home / Financial Firm (Unknown - Insurer) / Determination 238488
Determination 238488
Flood exclusion applied to denial of $186,500 water damage claim
Summary
Investment property at Charlton, Victoria was damaged by water in January 2011 and the FSP denied the $186,500 claim as flood. AFCA found the initial stormwater inundation was covered, so the FSP must pay for damage to the flooring and skirting boards only, with interest from 30 May 2011.
Surface runoff that inundated the home before Avoca River floodwater arrived is not excluded flood, but damage from the later river flood is excluded.
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 238488 Determination Page 1 of 10
Case number: 238488
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 November 2012
Background
1. The Applicant‟s investment property at number H Street Charlton was
insured under a home insurance Essentials (defined events) policy with the
Financial Services Provider (FSP) for $150,000. An excess of $500 applies.
2. On 19 January 2011 the Applicant lodged a claim under the policy for
damage caused by water entering from the street on 12 January 2011
following heavy rain in the area. The cost of rectifying the damage was
quoted in the sum of $186,500.
3. The FSP denied the claim on the ground that the damage was caused by
flood as defined by the policy and excluded from the cover.
Summary of Appl icant‟s position
4. The Applicant appointed lawyers to present her case. Any reference to the
Applicant in this D etermination will include the Applicant‟s representative.
5. The Applicant submits that it was rainwater runoff associated with heavy
rainfall between 10 and 14 January 2011 which inundated her property and
caused damage to the buildings.
6. The Applicant relies substantially on a hydrological report provided by “M”.
The Applicant states that evidence provided by “M” unequivocally supports
the notion that rainwater runoff inundated her properties and therefore the
policy should respond.
Summary of FSP‟s position
7. The FSP relies on the following policy terms:
“Words with special meanings
“flood” means the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
Determination
Case No: 238488 Determination Page 2 of 10
lake or lagoon whether or not altered or modified, or from any reservoir, canal
or dam.
Note: This policy does not cover, loss, liability, injury or damage caused by or
arising from flood to buildings and/or contents.
...
9. Storm, rainwater or run-off
(applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
„storm‟ means violent wind (including cyclones and tornadoes),
thunderstorms and hail which may be accompanied by rain or snow.
„rainwater‟ means rain falling naturally from the sky onto the buildings
and/or ground.
„run - off „means rainwater that has collected on or has flowed across
normally dry ground or has overflowed from swimming pools or spas.
We will not pay for loss or damage:
a caused by:
flood, or
flood water combined with run-off and/or rainwater;
„flood‟ means the inundation of normally dry land by water that
has escaped or has been released from the normal confines of
any natural watercourse, lake or lagoon whether or not altered
or modified, or fr om any reservoir, canal or dam.”
8. The FSP relies substantially on reports provided by its loss adjuster and a
hydrologist who carried out site inspections on 24 January 2011, 1 February
2011, 10 February 2011 and 2 March 2011.
9. The FSP states the Applicant lives in a Melbourne suburb and it was unable
to speak to the tenant. It therefore based its determination of the actual date
of loss on the expert reports.
10. Based on the expert reports it concluded that the damage was caused by
flood as a result of the Avoca River breaching its banks on 14 January 2011.
11. The policy is clear and unambiguous that flood is not an insured peril. For
the claim to succeed the cause for the loss or damage needs to be the result
of an insured event.
Issues
12. Whether the damage to the Applicant‟s property was caused by flood as
defined by the policy.
Case No: 238488 Determination Page 3 of 10
Reasons for decision
13. Due to the complex nature of this dispute, FOS has considered it appropriate
to expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. The dispute has not been the subject of a FOS
Recommendation and has proceeded direct to Determination.
14. The decision had been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
16. Prior to arriving at a determination, the Panel has read and considered all
the material submitted by the parties to FOS. A site visit has also been
carried out by the Ombudsman and a Panel member.
17. The Panel has been provided with copies of hydrological reports obtained by
the FSP and the Applicant. As these documents have been exchanged it is
not intended to recite the details in full in this determination. The Panel will
however summarise the reports in relation to the information relevant to the
issues disputed in this matter.
Loss adjuster‟s report dated 28 January 2011
The property was inundated to a height of about 70cm above floor
level.
On 14 January 2011 the Avoca River breached its banks and flooded
through most of the town.
Flood water was fast moving, brown in colour and came directly from
the river.
The flood water reached a height of about 1 metre and did not subside
for about 2 days.
Hydrologist report dated 9 March 2011 commissioned by FSP „WT‟
Local flooding
Historically the town has been flooded from two directions in a north
south plane with an area remaining free though the town centre along
the St Arnaud-Charlton Road.
Heavy rain fell in the area between 10 and 14 January 2011. The
largest total fall was recorded at 9am on Friday 14 th January.
The most intense rainfall fell on the morning of 11 th and early morning
on 13 th as shown on charts (figure 7.3).
The peak flood level of 8.05m was reached early morning on 15 th being
at least 2 days after the most intense rainfall.
Case No: 238488 Determination Page 4 of 10
The volume of water suggests either the Yeungroon Creek transferred
flows across the flood plain upstream of Charlton or the Avoca River
pushed more water into the floodplain upstream of town.
Given the timing of flooding on the eastern edge of town was similar to
the gauged readings, suggests the Yeungroon Creek and Avoca River
flows merged to become one system.
Township summary
The general method of flooding for properties in Charlton was via
overflows of the Avoca River and Yeungroon Creek systems.
The Avoca River peaked at 8.05m resulting in widespread flooding of
the town and inundation of multiple properties. A large portion of the
town flooded about 12 hours after the last significant rainfall.
Any flooding after lunchtime can be directly attributable to the Avoca
River/Yeungroon Creek flooding
Floor inundation that occurred east of Armstrong Street early morning
on 14 January can be attributed to storm water.
Site flooding
The site is located about 150m from the Avoca River.
Site observations included:
i. Signs of water around the property,
ii. Signs of significant velocity and flow down the Applicant‟s street,
iii. Signs of significant depth of inundation.
Site summary
Based on site topography, synoptic information, discussion with residents of
the town and review of river gauge information the site ‟ s inundation was a
result of overflow from the Avoca River.
Hydrologist “M report dated 3 November 2011 commissioned by the Applicant
Rainfall
The highest rainfall was 15mm per hour from 1700 to 0800 on 13
January 2011. Rainfall rates were persistently high from 2300 hours on
13 January to 0600 on 14 January. No rain fell after 0800 on 14
January.
The radar data for Charlton indicates the rainfall was highly
concentrated in short duration bursts. The rainfall which produced the
15mm/hour actually occurred over a period of about 12 minutes.
This situation is similar for the rainfall over night on 13-14 January.
Case No: 238488 Determination Page 5 of 10
The rainfall intensities in these bursts are much bigger than the
recorded hourly rates.
Overflow from local drainage systems
Given the intensity of rainfall which was much more than hourly rainfall
rates overflow from local drainage systems and c ulverts was highly
likely. Especially given that the drainage system was already close to
capacity from earlier rainfall bursts.
The timing of overflow would correspond closely to the timing of the
rainfall.
The first possible incident of stormwater drainage overflow would have
occurred around 0700 on 13 January 2011. Any of the intense rainfall
periods recorded between 13 and 14 January could have been
responsible for overflow of stormwater drainage systems. The greater
probability being from midnight to 0400 on 14 January.
Direct overflow is less likely after this time.
Without augmentation from other sources stormwater drainage
overflow would be short lived.
Runoff from surrounding areas
There were two possible sources of runoff. Runoff was possible from
Charlton which does not enter the drainage systems and runoff from
surrounding rural areas.
During periods of heavy rainfall bursts, water would have overflowed
and contributed to surface runoff. Without augmentation from other
sources stormwater drainage overflow would have been short-lived.
It is highly likely that rainfall which fell on 13 and 14 January was
saturation overland flow and would have led to inundation of Charlton
on 13 and 14 before floodwater from the Avoca River entered the town.
Water falling south and east of Armstrong and High Streets will tend to
move east with water to the west and north tending to move to the river.
Water runoff as overland flow would concentrate water in the eastern
part of Charlton.
The combination of surface runoff from the surrounding area being
directed toward east Charlton combined with periodic overflow from
drainage systems in other parts of the town would lead to inundation by
stormwater and locally derived surface water on the morning of 14
January.
That inundation from locally derived rather than Avoca River water is
further supported by the changing sediment loads of water seen in
Charlton.
Case No: 238488 Determination Page 6 of 10
Clear water
When the Avoca River overtopped its banks and Charlton was
inundated by floodwater the source of that water can be clearly seen
because of its high sediment load.
Flooding from Avoca River
Minor flood level was reached at 0400 on 13 January. Moderate flood
levels were reached at 2045 on 13 January. Major flood level was
reached at 1715 on 14 January.
Significant inundation of Charlton from the Avoca River did not begin
until late afternoon on 14 January and became more severe through
the evening and night. Some outlying parts of Charlton would have
been inundated mid-afternoon.
Summary
Depending on the exact location of properties, they will have begun to
have been inundated from the Avoca River overflow sometime in the
afternoon and early evening of 14 January 2011.
Any inundation from runoff before this time particularly corresponding to
those time when periods of heavy rainfall occurred on 13 and early
morning on 14 January could not have been caused by inundation from
the Avoca River.
It is possible that flooding could have been caused by
stormwater/intense rainfall runoff on 13 and early on 14 January.
Inundation from stormwater accumulating in eastern and southern
Charlton is probable on the night of 13/14 and early morning/early
afternoon of 14 th .
Summary
18. The Panel Chair Ombudsman and Panel members have visited a number of
sites in Charlton on several occasion and observed first-hand many
properties (including the property subject of this dispute) and discussed the
event with policyholders, as well as FSP representatives, experts and a
range of local residents.
19. The peak level of inundation of the properties in Charlton was generally
accepted to be water from the Avoca River and/or a combination of water
from the Avoca River with surface runoff rainwater which could not drain
away and surface runoff from surrounding flood plains. This water is flood
water as defined by the policy.
20. Having considered all of the evidence, and based on its own discussions and
observations, the Panel is satisfied that ultimately the Applicant‟s property
was flooded by water from the Avoca River. Given the terms of the policy the
Panel accepts that water from the Avoca River is properly categorised as
Case No: 238488 Determination Page 7 of 10
flood water and damage arising from this water is excluded from cover
provided by the policy.
21. However in the Panel‟s experience the initial inundation of many homes was
caused by surface runoff rainwater which could not drain away through the
town‟s stormwater drainage systems and water which entered the town from
the surrounding landscape.
22. In these cases timing of the initial inundation, colour of the water and flow
path are matters which have some bearing on the source of the water.
23. According to the assessor the Applicant‟s premises were leased and the
tenant occupying the premises at the time of the inundation was unavailable.
The Panel therefore has no direct information relating to the time of the initial
inundation of the home.
24. However, during a site visit, the Ombudsman met with tenants occupying a
property across the road from the Applicant‟s property which had also been
inundated. The tenants provided photographs of clear water travelling
through their house early on 14 January 2011. The water had come from the
direction of Armstrong Street along Watson Street and entered the property
through the back garage. The tenants advised that at that time the river had
not breached its banks nor was water over the centre of the road.
25. Given the proximity of the two properties and the similar topographical
features, the Panel accepts it is likely inundation of the Applicant‟s home
would have occurred in a similar fashion to that of the house across the
road.
26. The WT report relies substantially on the flooding mechanisms of the Avoca
River stating the river peaked in the early hours of the morning of 15 January
2011. The report is silent in relation to time the river breached its banks in
Charlton.
27. The WT report suggests that due to the increased volume of water than that
experienced in the September 2010 flood, either the Yeungroon Creek
transferred flows across the flood plain upstream of Charlton or the Avoca
River pushed more water into the flood plain upstream of the town. However
the report has provided no data relating to breakouts of the river upstream
such as time and location of the breakout and the delay before that water
mixed with surface runoff from the Yeungroon Creek flood plains.
28. In the Panel‟s opinion without these specific details it is open to conjecture
when or if the Avoca River upstream of Charlton influenced the flow of water
across the flood plains south and east of the town.
29. Following a visit to the area by FOS Panel members, and based on
discussion with a number of parties, the Panel is of the opinion the
landscape over which the water flowed from the south and east of the town
cannot be regarded as a natural watercourse. Although the area from which
Case No: 238488 Determination Page 8 of 10
the water flowed is designated as “Yeungroon Creek”, that appellation alone
cannot be taken as evidence of a watercourse.
30. The following ruling was made by the High Court in Gartner v Kidman [1962]
HCA 27: 108 CLR 12 (30 May 1962):
“This distinction between wat ercourse and depression follows the language of
Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural watercourse. To constitute such a watercourse
as a matter of law, there must be a stream of water flowing in a defined
channel or between something in the nature of banks. The stream may be
very small and need not run, nor need the banks be clearly or sharply defined.
But there must be a course, marked on earth by visible signs, along which
water usually flows in order to constitute a watercourse such as creates
riparian rights (1899VLR at p485 (at p16)
31. The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows and further, water does
not usually flow along this stretch of land, which is only vaguely described by
a range of indentations and vegetation. The landscape may best be
described as a flood plain over which water flows in a direction determined
by the rise and fall of the land.
32. This view is further supported by the description given by M who observed
Yeungroon Creek has been infilled with flood deposits over many years. The
course of the creek to the south of the town is marked by linear depressions
and vegetation.
33. Accordingly the Panel accepts that water which came from the Yeungroon
Creek area to the south and south east of the town may not be regarded as
water which was from a natural watercourse.
34. The M report noted the Avoca River reached major flood level in Charlton at
5.15pm on 14 January 2011. The M report also addressed the issue of
surface runoff rainwater in the town, the ability of the town stormwater
systems to cope with the runoff and the influence of surface runoff from
Yeungroon Creek area.
35. Further, the M report discussed the flow of surface runoff from the
surrounding area south of Charlton being directed to east Charlton and
overloading the stormwater drainage system.
36. The Panel is aware that the Avoca River rose rapidly on 14 January 2011,
which in turn prevented water in the town stormwater drain system from
escaping thus adding to the flow of water through the town.
37. The M report also discussed the presence of clear water in Charlton which
suggested that prior to inundation by overflow from the river some of the
flood water was sourced locally from stormwater which either fell in town or
collected to the east of town and followed natural drainage lines to low points
to partially inundate low lying parts of Charlton.
Case No: 238488 Determination Page 9 of 10
38. M stated:
“Depending on the exact location of properties they will have begun to have
been inundated from the overbank flooding of the Avoca River sometime in
the afternoon or early evening of the 14 January. Any inundation or damage
from runoff before that time, particularly corresponding to those times when
periods of heavy rainfall were occurring (on 13 and early morning on the 14
January) could not have been caused by inundation from the Avoca River.”
39. The FOS representatives also observed the Applicant‟s property was about
150m above ground level with the floor of the property about the same
height as the crest of the road. The property is therefore at risk of any
inundation by low levels of water.
40. Given the information provided by residents occupying the property across
the road from the Applicant‟s property, in particular the time of inundation of
their home, the flow path and the clarity of the water at that time, the Panel is
satisfied on balance that the property was most likely initially inundated with
surface runoff rainwater prior to the arrival of the flood water.
41. Accordingly the Panel is persuaded that damage caused by the initial
inundation of water falls within the cover provided by the policy.
Extent of insured loss
42. According to the loss adjuster the home was inundated up to a level of 70cm
above floor level. There is also evidence that that as result the house has
been condemned.
43. Unfortunately the Panel has not been provided with any material to establish
the extent of damage which may have been caused by the initial inundation.
44. Given the absence of any actual observation as to the height of stormwater
runoff and; having regard to the timing and the height of the property and the
house thereon, the Panel concludes it is fair in the circumstances to
determine that stormwater to a height of 100mm above floor level would
have first inundated the property prior to inundation by floodwater.
45. The Panel has not been provided with any material to establish the extent of
the damage caused by water to that height. However the Panel considers it
likely that the wooden flooring and skirtings may have been damaged by the
initial inundation of stormwater.
46. The FSP is to have the damage assessed to establish the extent of damage
to flooring and skirting boards and the cost of rectifying this damage. If the
property has been repaired then the Applicant is to provide receipts for the
cost of repairs and the FSP is to cash settle the claim subject to the receipts
being fair and reasonable.
Case No: 238488 Determination Page 10 of 10
Determination
47. Based on the available material the Panel determines the FSP is not liable
for the total cost of rectifying all damage caused to the building by the
inundation of water on 14 January 2011.
48. The FSP is liable for the cost of rectifying water damage to the flooring and
skirting boards in the Applicant‟s home and is to settle the claim in
accordance with paragraph 46 above.
49. In the event the FSP settles the loss by cash payment to the Applicant the
FSP is to include interest pursuant to section 57 of the Act from 30 May 2011
being the date of the FSP‟s final decision denying the claim until the date of
payment.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.