Flood exclusion applied to denial of $186,500 water damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$186,500
SourceAFCA PDF

Summary

Investment property at Charlton, Victoria was damaged by water in January 2011 and the FSP denied the $186,500 claim as flood. AFCA found the initial stormwater inundation was covered, so the FSP must pay for damage to the flooring and skirting boards only, with interest from 30 May 2011.

Surface runoff that inundated the home before Avoca River floodwater arrived is not excluded flood, but damage from the later river flood is excluded.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 238488 Determination Page 1 of 10 Case number: 238488 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 29 November 2012 Background 1. The Applicant‟s investment property at number H Street Charlton was insured under a home insurance Essentials (defined events) policy with the Financial Services Provider (FSP) for $150,000. An excess of $500 applies. 2. On 19 January 2011 the Applicant lodged a claim under the policy for damage caused by water entering from the street on 12 January 2011 following heavy rain in the area. The cost of rectifying the damage was quoted in the sum of $186,500. 3. The FSP denied the claim on the ground that the damage was caused by flood as defined by the policy and excluded from the cover. Summary of Appl icant‟s position 4. The Applicant appointed lawyers to present her case. Any reference to the Applicant in this D etermination will include the Applicant‟s representative. 5. The Applicant submits that it was rainwater runoff associated with heavy rainfall between 10 and 14 January 2011 which inundated her property and caused damage to the buildings. 6. The Applicant relies substantially on a hydrological report provided by “M”. The Applicant states that evidence provided by “M” unequivocally supports the notion that rainwater runoff inundated her properties and therefore the policy should respond. Summary of FSP‟s position 7. The FSP relies on the following policy terms: “Words with special meanings “flood” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, Determination Case No: 238488 Determination Page 2 of 10 lake or lagoon whether or not altered or modified, or from any reservoir, canal or dam. Note: This policy does not cover, loss, liability, injury or damage caused by or arising from flood to buildings and/or contents. ... 9. Storm, rainwater or run-off (applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. „storm‟ means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. „rainwater‟ means rain falling naturally from the sky onto the buildings and/or ground. „run - off „means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: a caused by:  flood, or  flood water combined with run-off and/or rainwater; „flood‟ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified, or fr om any reservoir, canal or dam.” 8. The FSP relies substantially on reports provided by its loss adjuster and a hydrologist who carried out site inspections on 24 January 2011, 1 February 2011, 10 February 2011 and 2 March 2011. 9. The FSP states the Applicant lives in a Melbourne suburb and it was unable to speak to the tenant. It therefore based its determination of the actual date of loss on the expert reports. 10. Based on the expert reports it concluded that the damage was caused by flood as a result of the Avoca River breaching its banks on 14 January 2011. 11. The policy is clear and unambiguous that flood is not an insured peril. For the claim to succeed the cause for the loss or damage needs to be the result of an insured event. Issues 12. Whether the damage to the Applicant‟s property was caused by flood as defined by the policy. Case No: 238488 Determination Page 3 of 10 Reasons for decision 13. Due to the complex nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a FOS Recommendation and has proceeded direct to Determination. 14. The decision had been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 15. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to respond. 16. Prior to arriving at a determination, the Panel has read and considered all the material submitted by the parties to FOS. A site visit has also been carried out by the Ombudsman and a Panel member. 17. The Panel has been provided with copies of hydrological reports obtained by the FSP and the Applicant. As these documents have been exchanged it is not intended to recite the details in full in this determination. The Panel will however summarise the reports in relation to the information relevant to the issues disputed in this matter. Loss adjuster‟s report dated 28 January 2011  The property was inundated to a height of about 70cm above floor level.  On 14 January 2011 the Avoca River breached its banks and flooded through most of the town.  Flood water was fast moving, brown in colour and came directly from the river.  The flood water reached a height of about 1 metre and did not subside for about 2 days. Hydrologist report dated 9 March 2011 commissioned by FSP „WT‟ Local flooding  Historically the town has been flooded from two directions in a north south plane with an area remaining free though the town centre along the St Arnaud-Charlton Road.  Heavy rain fell in the area between 10 and 14 January 2011. The largest total fall was recorded at 9am on Friday 14 th January.  The most intense rainfall fell on the morning of 11 th and early morning on 13 th as shown on charts (figure 7.3).  The peak flood level of 8.05m was reached early morning on 15 th being at least 2 days after the most intense rainfall. Case No: 238488 Determination Page 4 of 10  The volume of water suggests either the Yeungroon Creek transferred flows across the flood plain upstream of Charlton or the Avoca River pushed more water into the floodplain upstream of town.  Given the timing of flooding on the eastern edge of town was similar to the gauged readings, suggests the Yeungroon Creek and Avoca River flows merged to become one system. Township summary  The general method of flooding for properties in Charlton was via overflows of the Avoca River and Yeungroon Creek systems.  The Avoca River peaked at 8.05m resulting in widespread flooding of the town and inundation of multiple properties. A large portion of the town flooded about 12 hours after the last significant rainfall.  Any flooding after lunchtime can be directly attributable to the Avoca River/Yeungroon Creek flooding  Floor inundation that occurred east of Armstrong Street early morning on 14 January can be attributed to storm water. Site flooding  The site is located about 150m from the Avoca River.  Site observations included: i. Signs of water around the property, ii. Signs of significant velocity and flow down the Applicant‟s street, iii. Signs of significant depth of inundation. Site summary Based on site topography, synoptic information, discussion with residents of the town and review of river gauge information the site ‟ s inundation was a result of overflow from the Avoca River. Hydrologist “M report dated 3 November 2011 commissioned by the Applicant Rainfall  The highest rainfall was 15mm per hour from 1700 to 0800 on 13 January 2011. Rainfall rates were persistently high from 2300 hours on 13 January to 0600 on 14 January. No rain fell after 0800 on 14 January.  The radar data for Charlton indicates the rainfall was highly concentrated in short duration bursts. The rainfall which produced the 15mm/hour actually occurred over a period of about 12 minutes.  This situation is similar for the rainfall over night on 13-14 January. Case No: 238488 Determination Page 5 of 10  The rainfall intensities in these bursts are much bigger than the recorded hourly rates. Overflow from local drainage systems  Given the intensity of rainfall which was much more than hourly rainfall rates overflow from local drainage systems and c ulverts was highly likely. Especially given that the drainage system was already close to capacity from earlier rainfall bursts.  The timing of overflow would correspond closely to the timing of the rainfall.  The first possible incident of stormwater drainage overflow would have occurred around 0700 on 13 January 2011. Any of the intense rainfall periods recorded between 13 and 14 January could have been responsible for overflow of stormwater drainage systems. The greater probability being from midnight to 0400 on 14 January.  Direct overflow is less likely after this time.  Without augmentation from other sources stormwater drainage overflow would be short lived. Runoff from surrounding areas  There were two possible sources of runoff. Runoff was possible from Charlton which does not enter the drainage systems and runoff from surrounding rural areas.  During periods of heavy rainfall bursts, water would have overflowed and contributed to surface runoff. Without augmentation from other sources stormwater drainage overflow would have been short-lived.  It is highly likely that rainfall which fell on 13 and 14 January was saturation overland flow and would have led to inundation of Charlton on 13 and 14 before floodwater from the Avoca River entered the town.  Water falling south and east of Armstrong and High Streets will tend to move east with water to the west and north tending to move to the river.  Water runoff as overland flow would concentrate water in the eastern part of Charlton.  The combination of surface runoff from the surrounding area being directed toward east Charlton combined with periodic overflow from drainage systems in other parts of the town would lead to inundation by stormwater and locally derived surface water on the morning of 14 January.  That inundation from locally derived rather than Avoca River water is further supported by the changing sediment loads of water seen in Charlton. Case No: 238488 Determination Page 6 of 10 Clear water  When the Avoca River overtopped its banks and Charlton was inundated by floodwater the source of that water can be clearly seen because of its high sediment load. Flooding from Avoca River  Minor flood level was reached at 0400 on 13 January. Moderate flood levels were reached at 2045 on 13 January. Major flood level was reached at 1715 on 14 January.  Significant inundation of Charlton from the Avoca River did not begin until late afternoon on 14 January and became more severe through the evening and night. Some outlying parts of Charlton would have been inundated mid-afternoon. Summary  Depending on the exact location of properties, they will have begun to have been inundated from the Avoca River overflow sometime in the afternoon and early evening of 14 January 2011.  Any inundation from runoff before this time particularly corresponding to those time when periods of heavy rainfall occurred on 13 and early morning on 14 January could not have been caused by inundation from the Avoca River.  It is possible that flooding could have been caused by stormwater/intense rainfall runoff on 13 and early on 14 January.  Inundation from stormwater accumulating in eastern and southern Charlton is probable on the night of 13/14 and early morning/early afternoon of 14 th . Summary 18. The Panel Chair Ombudsman and Panel members have visited a number of sites in Charlton on several occasion and observed first-hand many properties (including the property subject of this dispute) and discussed the event with policyholders, as well as FSP representatives, experts and a range of local residents. 19. The peak level of inundation of the properties in Charlton was generally accepted to be water from the Avoca River and/or a combination of water from the Avoca River with surface runoff rainwater which could not drain away and surface runoff from surrounding flood plains. This water is flood water as defined by the policy. 20. Having considered all of the evidence, and based on its own discussions and observations, the Panel is satisfied that ultimately the Applicant‟s property was flooded by water from the Avoca River. Given the terms of the policy the Panel accepts that water from the Avoca River is properly categorised as Case No: 238488 Determination Page 7 of 10 flood water and damage arising from this water is excluded from cover provided by the policy. 21. However in the Panel‟s experience the initial inundation of many homes was caused by surface runoff rainwater which could not drain away through the town‟s stormwater drainage systems and water which entered the town from the surrounding landscape. 22. In these cases timing of the initial inundation, colour of the water and flow path are matters which have some bearing on the source of the water. 23. According to the assessor the Applicant‟s premises were leased and the tenant occupying the premises at the time of the inundation was unavailable. The Panel therefore has no direct information relating to the time of the initial inundation of the home. 24. However, during a site visit, the Ombudsman met with tenants occupying a property across the road from the Applicant‟s property which had also been inundated. The tenants provided photographs of clear water travelling through their house early on 14 January 2011. The water had come from the direction of Armstrong Street along Watson Street and entered the property through the back garage. The tenants advised that at that time the river had not breached its banks nor was water over the centre of the road. 25. Given the proximity of the two properties and the similar topographical features, the Panel accepts it is likely inundation of the Applicant‟s home would have occurred in a similar fashion to that of the house across the road. 26. The WT report relies substantially on the flooding mechanisms of the Avoca River stating the river peaked in the early hours of the morning of 15 January 2011. The report is silent in relation to time the river breached its banks in Charlton. 27. The WT report suggests that due to the increased volume of water than that experienced in the September 2010 flood, either the Yeungroon Creek transferred flows across the flood plain upstream of Charlton or the Avoca River pushed more water into the flood plain upstream of the town. However the report has provided no data relating to breakouts of the river upstream such as time and location of the breakout and the delay before that water mixed with surface runoff from the Yeungroon Creek flood plains. 28. In the Panel‟s opinion without these specific details it is open to conjecture when or if the Avoca River upstream of Charlton influenced the flow of water across the flood plains south and east of the town. 29. Following a visit to the area by FOS Panel members, and based on discussion with a number of parties, the Panel is of the opinion the landscape over which the water flowed from the south and east of the town cannot be regarded as a natural watercourse. Although the area from which Case No: 238488 Determination Page 8 of 10 the water flowed is designated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. 30. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): “This distinction between wat ercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) 31. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows and further, water does not usually flow along this stretch of land, which is only vaguely described by a range of indentations and vegetation. The landscape may best be described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 32. This view is further supported by the description given by M who observed Yeungroon Creek has been infilled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. 33. Accordingly the Panel accepts that water which came from the Yeungroon Creek area to the south and south east of the town may not be regarded as water which was from a natural watercourse. 34. The M report noted the Avoca River reached major flood level in Charlton at 5.15pm on 14 January 2011. The M report also addressed the issue of surface runoff rainwater in the town, the ability of the town stormwater systems to cope with the runoff and the influence of surface runoff from Yeungroon Creek area. 35. Further, the M report discussed the flow of surface runoff from the surrounding area south of Charlton being directed to east Charlton and overloading the stormwater drainage system. 36. The Panel is aware that the Avoca River rose rapidly on 14 January 2011, which in turn prevented water in the town stormwater drain system from escaping thus adding to the flow of water through the town. 37. The M report also discussed the presence of clear water in Charlton which suggested that prior to inundation by overflow from the river some of the flood water was sourced locally from stormwater which either fell in town or collected to the east of town and followed natural drainage lines to low points to partially inundate low lying parts of Charlton. Case No: 238488 Determination Page 9 of 10 38. M stated: “Depending on the exact location of properties they will have begun to have been inundated from the overbank flooding of the Avoca River sometime in the afternoon or early evening of the 14 January. Any inundation or damage from runoff before that time, particularly corresponding to those times when periods of heavy rainfall were occurring (on 13 and early morning on the 14 January) could not have been caused by inundation from the Avoca River.” 39. The FOS representatives also observed the Applicant‟s property was about 150m above ground level with the floor of the property about the same height as the crest of the road. The property is therefore at risk of any inundation by low levels of water. 40. Given the information provided by residents occupying the property across the road from the Applicant‟s property, in particular the time of inundation of their home, the flow path and the clarity of the water at that time, the Panel is satisfied on balance that the property was most likely initially inundated with surface runoff rainwater prior to the arrival of the flood water. 41. Accordingly the Panel is persuaded that damage caused by the initial inundation of water falls within the cover provided by the policy. Extent of insured loss 42. According to the loss adjuster the home was inundated up to a level of 70cm above floor level. There is also evidence that that as result the house has been condemned. 43. Unfortunately the Panel has not been provided with any material to establish the extent of damage which may have been caused by the initial inundation. 44. Given the absence of any actual observation as to the height of stormwater runoff and; having regard to the timing and the height of the property and the house thereon, the Panel concludes it is fair in the circumstances to determine that stormwater to a height of 100mm above floor level would have first inundated the property prior to inundation by floodwater. 45. The Panel has not been provided with any material to establish the extent of the damage caused by water to that height. However the Panel considers it likely that the wooden flooring and skirtings may have been damaged by the initial inundation of stormwater. 46. The FSP is to have the damage assessed to establish the extent of damage to flooring and skirting boards and the cost of rectifying this damage. If the property has been repaired then the Applicant is to provide receipts for the cost of repairs and the FSP is to cash settle the claim subject to the receipts being fair and reasonable. Case No: 238488 Determination Page 10 of 10 Determination 47. Based on the available material the Panel determines the FSP is not liable for the total cost of rectifying all damage caused to the building by the inundation of water on 14 January 2011. 48. The FSP is liable for the cost of rectifying water damage to the flooring and skirting boards in the Applicant‟s home and is to settle the claim in accordance with paragraph 46 above. 49. In the event the FSP settles the loss by cash payment to the Applicant the FSP is to include interest pursuant to section 57 of the Act from 30 May 2011 being the date of the FSP‟s final decision denying the claim until the date of payment.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.