Roof replacement claim denied as poor workmanship and deterioration
Summary
After a 2009 storm claim was cash settled for $943.70, the roof continued to leak and the applicant sought full roof replacement. AFCA found the current damage was caused by poor workmanship on earlier repairs and gradual deterioration, both excluded, so the insurer need not indemnify.
The policy excludes wear and tear, poor workmanship and lack of maintenance, and the evidence showed the current damage fell within those exclusions rather than a covered storm event.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 238467 Determination Page 1 of 5
Case number: 238467
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 June 2011
Background
1. The Applicant insured her home for a sum insured of $476,000 under a home
insurance policy held by the Financial Services Provider (FSP).
2. In 2009, the Applicant contacted the FSP to lodge a claim for storm damage to
her roof. The FSP accepted liability for the claim and upon receipt of a
quotation from the Applicant; cash settled the claim for $943.70 having
deducted the $1,000 policy excess.
3. In March 2010, the Applicant contacted the FSP and advised that the roof was
still leaking and requested that a further inspectio n of the property be
undertaken.
4. The FSP arranged for a building consultant to attend the property, and the FSP
was advised that the roof continued to leak due to faulty workmanship and a
large number of broken tiles.
5. Having informed the Applicant that there was no evidence that the roof was
damaged as a result of a defined event, the FSP advised it would not indemnify
her for the damage.
6. The Applicant requested an additional inspection of the roof be undertaken and
the second building consultant confirmed the findings of the initial consultant.
7. The Applicant seeks review of the FSP’s decision to deny liability on the
grounds that she believes that as the damage is storm damage she is entitled
to be indemnified under the terms and conditions of the policy.
Summary of Applicant ’s Position
8. The Applicant states that her roof has extensive storm damage and therefore is
covered by the terms and conditions of the policy.
9. Further, the Applicant says that the roof has continued to leak and deteriorate
since the original claim was lodged, however she was unable to get the original
repairer out to provide a further inspection of the roof.
Determination
Case No: 238467 Determination Page 2 of 5
10. The Applicant says that she was not informed that the FSP would discharge its
liability once it paid a cash settlement and states tha t as the roof is still leaking
in the same areas as the original claim the FSP is required to rectify the
damage.
11. Accordingly, as it is clear the damage stems from the original claim and/or
ongoing storm damage, the Applicant says the FSP is required to indemnify her
for the cost to replace the roof under the terms and conditions of the policy.
Summary of FSP’s Position
12. The FSP accepts that the insured property suffered damage as a result of a
storm in 2009.
13. However, it states that it provided a cash settlement for the repairs based on a
quotation provided by the Applicant.
14. The FSP states that the current damage has been identified as being a direct
result of poor workmanship and ongoing deterioration which is specifically
excluded by the policy.
15. The FSP relies on the following policy provisions:
“ Your responsibilities
You have some important responsibilities both before you take out [FSP] Home
Insurance and once your insurance policy has commenced.
...
Take good care of your building and contents
Wear and tear, poor workmanship and lack of maintenance are not covered under this
policy, so it is important to always maintain your building and contents in good repair
and protect them b y always using any security devices installed on the building.
...
Glossary of words with special meaning
...
storm
A violent wind (including cyclones), sometimes combined with thunder, heavy
falls of rain, hail or snow; or
Thunderstorms or hailstorms, sometimes accompanied by heavy falls of rain or
snow.
...
The policy doesn’t cover everything
General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal liability
caused by:
...
Case No: 238467 Determination Page 3 of 5
wear and tear and lack of maintenance, including rust, corrosion, deterioration,
except in the case of escape of liquid (refer page 21), or legal liability claims;
gradual loss or damage of any kind;
structural defects and faulty workmanship in the construction of the building or
lack of maintenance to the building and/or contents;
...
Events you are covered for
...
Storm
You are covered for loss or damage as a result of storm.
You are not covered for storm damage to:
...
the building or contents as a result of water, wind or hail entering the building
due to a defect, structural or design fault that you knew about or should have
reasonably known about;
...”
Issue
16. Whether the FSP was entitled to deny liability to the Applicant on the basis that
damage to the property had not been caused as a result of an insured covered
contained in the terms and conditions of the policy.
Reasons for Decision
17. I am satisfied that a full exchange of information has occurred between the
parties and each party has had the opportunity to address all the issues raised.
18. Having thoroughly read the terms and conditions of the policy, I am satisfied
that the policy covers damage caused by storm, however, it excludes damage
caused by faulty workmanship and/or deterioration.
19. The Applicant has stated that the damage to the roof has been caused by
storm damage and therefore is covered by the terms and conditions of the
policy.
20. The Applicant relies on a report from a roofing specialist dated 13 November
2010 which states:
“It is my view the full extent of the roof tile damage had not been repo rted
correctly to the insurance company (19/09/09). Client [Applicant] also had a
builders report prior to buying residence and roof tiles were not a issue at the
time. It is difficult to say if storm damage is the total reason for damaged roof
tiles but the current situation is very urgent and the roof tiles must be replaced as
soon as possible.”
Case No: 238467 Determination Page 4 of 5
21. Whilst I accept that the builder suggests that the full extent of the damage was
not made known to the FSP during the original claim, I note that the report
concedes that initial repairs undertaken may not have been up to standard and
that it cannot be confirmed that all tiles were damage as a result of storm.
22. Likewise, the FSP reports state repairs which have been undertaken were of a
poor quality and further stated there was obvious deterioration to the roof over
a period of time.
23. Whilst the Applicant has stated that damage to the roof has occurred as a result
of storm damage, I note in correspondence to the FSP dated 20 December
2010, the Applicant commented:
“Since the initial claim I put in my roof has now deteriorated because it has not
been repaired properly as the job was major to begin with and shoddy
workmanship and time delay has made it worse...”
24. Having had close regard to the evidence provided, it is my opinion that damage
occurred to the roof as a result of a storm event which the Applicant notified the
FSP of in 2009.
25. I accept that the FSP at the time the claim was lodged accepted a quotation
provided by the Applicant from a repairer of her choice and provided a cash
settlement in full and final payment of the claim.
26. It is not disputed that the Applicant approved the repairer to commence the
repairs and paid him accordingly.
27. The Applicant has since attempted to have the repairer return to the property
for a further assessment of the roof and to undertake any rectification work
which may have been required.
28. Despite an accepted claim in 2009, the damage claimed for in this instance
based on the reports, has occurred on the balance of probabilities as a result of
a combination of reasons including poor workmanship on repairs and gradual
deterioration.
29. Whilst I accept that the Applicant, in good faith, had repairs undertaken to the
roof following a cash settlement of the claim in 2009, as the FSP did not
authorise the repairs, it is not liable for any rectification work that may be
required as a result of those repairs being carried out.
30. There is no substantive evidence in this instance that the current damage has
been caused as a result of an event listed in the terms and conditions of the
policy.
31. Whilst I sympathise with the Applicant with respect to poor workmanship on the
original repairs carried out, the Applicant needs to address these issues with
the repairer.
Case No: 238467 Determination Page 5 of 5
Determination
32. On the basis of the available information, I determine that the current damage
has occurred as a result of poor workmanship and/or gradual deterioration
which is specifically excluded under the terms and conditions of the policy.
33. Accordingly, I determine the FSP is not required to indemnify the Applicant for
the cost to replace the roof under the terms and conditions of the policy.