Text of the determination
Case No: 238299 Determination Page 1 of 10
Case number: 238299
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
18 October 2011
Background
1. The Applicants insure their investment property under a Landlord Insurance
policy held by the Financial Services Provider (FSP).
2. Following the eviction of tenants, the Applicants lodged a claim against the
policy for loss of rent and malicious damage caused by the tenants.
3. The FSP arranged for its adjuster to attend the property and assess the nature
and extent of the damage.
4. Following receipt of the adjuster’s report, the FSP advised the Applicants of the
following:
a. It would provide loss of rent for up to 10 weeks under the terms and
conditions of the policy.
b. It would pay to replace the damaged doors and the painting of the doors.
c. It would pay to replace the range hood and cook top.
d. It would pay for the replacement of door furnishings.
e. It would pay the costs incurred to evict the tenants.
f. It would pay the cost to change the locks and keys.
5. However, the FSP advised the Applicants that it would not pay for:
a. The remainder of the painting as the damage to the walls and ceilings had
not been caused maliciously.
b. The remaining invoices for cleaning, mowing and so forth would not be
covered as the policy does not cover tenant neglect and carelessness.
c. The invoices for the purchase of plumbing hardware would not be covered
as it was not established that the tenants maliciously damaged the pipes.
Determination
Case No: 238299 Determination Page 2 of 10
d. That the remaining invoices may relate to instances of malicious damage,
however each was a separate event and therefore a $250 excess applies
to each incident and as the total spent was less than the excess it would
not provide payment in this instance.
6. The Applicants are dissatisfied with the decision of the FSP and seek additional
loss of rent under the terms and conditions of the policy and a decision binding
the FSP to accept liability for all outstanding invoices.
7. Further, the Applicants seek compensation in the amount of $3,000 for what
they state was th e unconscionable behaviour and delays caused by the FSP’s
adjuster.
Summary of Applicant’s Position
8. The Applicants state that the FSP has made an incorrect decision in limiting its
liability under the terms and conditions of the policy.
9. The Applicants state that they are entitled to the additional loss of rent as
invoices have confirmed that the repairs continued until the date they are
claiming for.
10. In relation to the additional costs, the Applicants state that they have provided
evidence that the damage was malicious and that they are entitled to indemnity
under the terms and conditions of the policy.
Summary of FSP’s Position
11. The FSP does not deny that the Applicants have suffered a loss that is covered
by the terms and conditions of the policy.
12. However, the FSP states that it has discharged its obligation to the Applicants
in providing a cash settlement for loss of rent and other damage that was
caused maliciously.
13. The FSP states that the additional damage claimed by the Applicants has been
as a result of tenant neglect and not malicious damage.
14. Further, the FSP states that in relation to isolated incidents of damage, as the
Applicants are required to lodge a separate claim for each incident and as the
excess is more than the repair cost, it is not required to indemnify the
Applicants in this instance.
15. Finally, the FSP states that it has been fair and reasonable in relation to loss of
rent and that it is not required to indemnify the Applicants for further loss of rent
due to repairs being undertaken for te nant neglect and/or fact that the new
tenants were unable to move into the property due to having to give notice
where they were living prior to signing the lease.
Case No: 238299 Determination Page 3 of 10
16. The FSP relies on the following policy provisions:
“ When your buildings are protected
...
Loss or damage by a tenant or their visitors .”
Issue
17. Whether the FSP has discharged its obligation to the Applicants under the
terms and conditions of the policy in providing a cash settlement based on the
terms and conditions of the policy.
Reasons for Decisions
18. I am satisfied that a full exchange of information has occurred between the
parties and each party has had the opportunity to address all the issues raised.
19. Having carefully read the terms and conditions of the policy, I accept that the
policy in certain instances provides cover for loss of rent and cover for damage
where it is considered malicious.
20. A useful definition of “malicious damage” is “the deliberate and intentional
harming of property, damage caused due to personal grouse or ill will”.
21. It will thus be seen that the definition includes “acts of commission” rather than
“acts of omission”.
22. I accept that the policy does not provide cover for damage caused by tenant
neglect and that where damage is considered malicious a separate claim must
be lodged for the damage and an excess of $250 applies.
23. The Applicants have stated that the FSP has erred in its decision to limit its
liability in this instance.
Loss of Rent
24. The Applicants have stated that ten weeks of loss of rent is fair and reasonable
in this instance and that invoices provided confirm that it took ten weeks for the
repairs to be completed.
25. Conversely, the FSP has stated that based on what damage was covered by
the terms and conditions of the policy, eight weeks loss of rent which has been
paid is fair and reasonable.
26. The policy specifically states that cover is provided for loss of rent in instances
where the damage is caused as a result of an event covered by the policy.
27. The Applicants have provided invoices which they state confirm that it took
approximately ten weeks to have the damage repaired.
Case No: 238299 Determination Page 4 of 10
28. Further, the Applicants’ have also noted that initially there were delays in
compiling quotations for the repairs and locating tradesmen to complete the
work at short notice.
29. Based on the policy, I accept that the Applicants are entitled to loss of rent
whilst repairs were being undertaken to the property.
30. However, I concur with the FSP that the Applicants are not entitled to loss of
rent due to the tenants not being able to vacate their previous property as soon
as the lease was signed, nor are they entitled to loss of rent for repairs to the
property which was not covered by the terms and conditions of the policy.
Repairs undertaken to the property
31. The Applicants have provided invoices for repairs that were undertaken to the
property which they state is covered under the terms and conditions of the
policy.
32. I accept that the policy provides cover for malicious damage; however it
excludes damage caused by tenant neglect or carelessness.
33. The Applicants have provided the following invoices:
a. Garden invoice in the amount of $195
b. Cleaning service invoice in the amount of $200
c. Rubbish removal invoice in the amount of $105
d. Television antenna invoice in the amount of $120
34. The above invoices were incurred due to the general condition of the property
such as the gardens not being maintained and rubbish being left at the
property.
35. Whilst it may be that the former tenants made an informed decision not to clean
the property, maintain the garden or remove their rubbish during the tenancy
this alone does not constitute malicious damage.
36. Whilst I sympathise with the Applicants that the property was left in this
condition, the invoices in my opinion have been incurred as a result of the
carelessness and neglect of the former tenants as opposed to malicious
damage as alleged by the Applicants.
37. Therefore I accept that the FSP was not liable for the costs incurred to clean
the property and garden and remove rubbish under the terms and conditions of
the policy.
38. The Applicants have provided further invoices that relate to plumbing which are
as follows:
a. Plumbing repairs for damage to plumbing in the bathroom and kitchen.
Case No: 238299 Determination Page 5 of 10
b. Costs incurred for installing the new oven in the kitchen following the
malicious damage of the old oven.
c. Gas invoices for the repair of a heater in the property.
39. I note that the Applicants have stated that they have provided invoices which
clearly indicate that the above repairs were required as a result of malicious
damage.
40. The FSP has noted on numerous occasions through its submissions that the
Applicants have not provided any evidence that the damage has been caused
maliciously and has relied on the report from its adjuster in denying liability for
the damage.
41. In my opinion, the invoices provided for by the Applicants are substantive
evidence that in the opinion of the repairers the damage to the property was
indeed malicious.
42. In my opinion, the FSP, aside from its adjuster’s report, has not provided any
evidence to refute the assertions from the repairers.
43. I accept that the invoices provided by qualified repairers in this instance are
persuasive.
44. Further, with respect to the fitting of a new oven, regardless as to whether the
Applicants switched from gas to electric cook tops, the FSP has accepted at
first instance that the damage to the oven was malicious. Therefore it is
reasonable for the Applicants to expect that the FSP would pay for the cost to
install the new oven, or at the very least incorporate the cost to install a new
oven into the settlement amount.
45. Based on the evidence before me, I am satisfied on the balance of probabilities
that the above invoices for the plumbing, repair of heater and installation of the
oven are covered by the terms and conditions of the policy as the damage was
caused maliciously by the tenants.
46. The final invoice within this section of the dispute is the invoice provided by the
painter in the amount of $2,900.
47. The Applicants have provided a Statutory Declaration from the painting
contractor which outlines the repairs undertaken and the cause of the damage.
48. The contractor has noted that there was nail damage in the walls from where
pictures had been hung, damage caused by adhesive tape to walls , graffiti and
the like.
49. Whilst I accept that the property may have had to be painted, I am of the
opinion that damage caused by adhesive tape, children drawing on walls and
nail damage does not constitute malicious damage. The insertion of a nail into
a wall, in order to hang a picture, is not a malicious act.
Case No: 238299 Determination Page 6 of 10
50. Such damage constitutes tenant neglect, poor housekeeping and carelessness.
I accept that the FSP was correct in determining that such damage was not
covered by the policy.
51. I note that the FSP has provided partial payment for the painting invoice for the
damage to the doors in the amount of $600.
52. In this instance I think that is fair and reasonable and I accept that the FSP has
discharged its obligation to the Applicants under the terms and conditions of the
policy with respect to the painting invoice.
Cost to repair the kitchen sink mixer tap and the water bill
53. The Applicants have provided invoices for the amount to repair the kitchen
mixer tap and shower mixer tap and a water bill invoice.
54. I have read the submissions of both parties and I note that I have no evidence
that the taps have had to be replaced due to malicious damage.
55. The onus is on the Applicants to establish on the balance of probabilities that
the damage falls within the terms and conditions of the policy.
56. Whilst I accept that the Applicants have a genuine belief that the damage is
malicious in nature, without any evidence to substantiate it I am unable to
conclude that this is the case.
57. Further, there is no provision under the terms and conditions of the policy for
bills to be covered.
58. The purpose for requesting a bond at the commencement of a tenancy is to
protect landlords from costs incurred which are not paid by the tenant or to
conduct repairs at the conclusion of the tenancy.
59. Whilst I accept that the bond would not have covered all costs incurred by the
Applicants, I do not accept that therefore the policy is required to cover all
outstanding costs.
60. I accept therefore in this instance that the FSP was entitled to refuse indemnity
to the Applicants for the cost to replace the taps and for the cost of the water
bill.
Reimbursement for cost to repair glass window, garage door, pipe
61. The Applicants have submitted that the damage to the above items is malicious
in nature and therefore covered under the terms and conditions of the policy.
62. Whilst the FSP has not disagreed that the damage is malicious in nature, it has
stated that as each item is an individual incident, the Applicants have to lodge
each claim separately and pay an excess for each incident.
Case No: 238299 Determination Page 7 of 10
63. Having carefully read the material provided by both parties, I accept that on the
balance of probabilities the damage to the property as outlined by the
Applicants was malicious in nature.
64. However, the FSP is correct in noting that each item noted by the Applicants is
an isolated incident and therefore each item would need to be lodged as a
separate claim against the policy and an excess paid.
65. As the excess for malicious damage under the terms and conditions of the
policy exceeds the cost for the repairs, I accept that the FSP in this instance
has made the correct decision in stating it is not required to reimburse the
Applicants for the cost of the repairs in this instance.
Request for compensation in the amount of $3,000
66. The Applicants have stated that they are entitled to compensation due to the
unconscionable conduct of the FSP’s loss adjuster.
67. The Applicants submit that the loss adjuster deliberately and maliciously
delayed submitting the claim to the FSP which caused significant delays in the
repair process and caused financial stress to them.
68. Further, the Applicants have stated that they have acted in good faith at all
times and that both the FSP and the adjuster have failed to act reasonably and
in good faith.
69. The FSP has noted that considerable delays in the claim were as a result of the
adjuster awaiting documentation from the Applicants.
70. The FSP notes that the adjuster did not receive the documentation until 14
September 2010.
71. I have had regard to both submissions. There are matters which have given
rise to concern, although, I find no evidence that the FSP and the loss adjuster
maliciously delayed the matter.
72. On 13 September 2011, I wrote to the FSP including the following:
“I note, as to the suggestion of gross delay, and after the Applicant supplied full
details of expenses incurred, to your assessor, on 14 September 2010, it was not
until 5 November 2010 that he reported to you. It was, then, not until 24
November 2010 that an offer was made. Is this correct?”
73. I also refer to the following:
“Earlier, according to the Applicant, Mr C on 2/3/10 advised the Applicant that he
would send in writing “a detailed list” of items/damages which he considered
were due to tenant vandalism and/or malicious damages for further discussion
by 5 March 2010. According to Applicant no such list was ever received from Mr
C notwithstanding repeated recalls by Applicant to Mr C on 9 March, 12, 17, and
22 March.
As a consequence, Applicant claims he was obliged to go ahead and attend to
all items which needed attention, whether those items were due to malicious
Case No: 238299 Determination Page 8 of 10
damage or merely a failure to properly maintain by the tenants, without knowing
the position of Mr C or (FSP). Would you please let me have your comments as
to this. If the facts are, as alleged, is it reasonable for the Applicant to be placed
in this position whilst repairs are being carried out? If an Applicant knows that
certain items may be disputed, he may, more readily, ask the tradesman carrying
out work to comment as to the reason why the work is neces sary.”
74. The FSP was asked to respond not later than 16 September 2011. However, as
at the time of this Determination, no further submission has been made from
the FSP, so I therefore consider that the points made by the Applicant, and
which are encapsulated in the matters which I referred to the FSP, are correct.
75. In these circumstances, I consider that attention has to be given to this
Service’s Terms of Reference and particularly paragraph 9.3 which is in the
following terms:
9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial
Services Provider compensate the Applicant for consequential financial loss or
damage up to a maximum amount of $3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial
Services Provider compensate the Applicant for non-financial loss but only
where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant’s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy rights - injury
has occurred to the Applicant’s feelings or humiliation has been suffered
by the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
In a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS’s
ability to make an interest award under paragraph 9.5.
76. Having regard to the matters set out in the preceding paragraphs, I do consider
that the handling of this matter by the FSP fell well short of normal standards.
There are two aspects to this. First, the Applicant was not supplied with a
response by Mr C, the adjuster appointed by the FSP, either in a timely manner
or at all as to the matters which Mr C considered were, or were not instances of
malicious damage.
77. I also consider that ultimately there was excessive delay. It is true that the
Applicants took a considerable time to furnish all the receipts to the FSP,
apparently because certain correspondence had been forwarded to the
Applicants’ previous agents who had closed their business. I do not hold the
FSP in any way responsible for the delay up until, say, 30 September 2010. By
Case No: 238299 Determination Page 9 of 10
that date, Mr C had been supplied with full details of all expenses incurred by
the Applicant, but for some reason which has not been made plain, he did not
make any Recommendation to the FSP until 5 November 2010 and it was then
nearly three weeks before an offer was made.
78. I consider that a time interval of two and a half months after the details had
been supplied to the adjustor, before any offer is made to the Applicant is
excessive.
79. Further, I consider that the Applicants’ position has been prejudiced by the
failure of Mr C to indicate, at least in general terms, which items he considered
might not be classified as malicious damage. I think there is no doubt that in his
classifications, Mr C may well have been correct as to a number of items which
plainly amounted to neglect by a bad tenant, rather than malicious actions. But
there were several matters which could have been considered either way, and
had the Applicants been aware that they were likely to be disputed, they could
readily have obtained opinions from the tradesman whom they called in to
attend to them.
80. The matter is not capable of precise financial definition, and I therefore do not
consider it appropriate to make a decision pursuant to 9.3(a) (financial loss).
81. However, I do consider that it is appropriate that the Applicants be
compensated pursuant to paragraph 9.3(b)(i).
82. I should add that before I have considered this question, I have noted that the
Applicants have specifically made a claim for compensation as a consequence
of the delays which have occurred. It is not an item which can have taken the
FSP by surprise, and I consider that the FSP has had every opportunity to
respond to the Applicants’ contentions generally, or to the matters which I have
submitted to the FSP as set out above. It is a matter of concern that no
response has been received from the FSP to the queries from this Service.
Determination
83. Accordingly, on the basis of the above I determine that the Applicants are
entitled to be indemnified for:
a. Plumbing invoices in the amount of $99 and $300
b. Invoice for the installation of the oven in the amount of $104
84. However, I determine that the FSP was entitled to refuse indemnity for the
following invoices:
a. Remainder of the painting invoice
b. Cleaning service invoice
c. Rubbish removal invoice
Case No: 238299 Determination Page 10 of 10
d. Invoice for the antenna
e. Invoices for the replacement of the taps in the kitchen and bathroom
f. Invoice for the unpaid water bill.
85. I further determine that the FSP is not required to reimburse the Applicants for
the following invoices on the basis that each incident was separate and repair
costs were less than the excess for malicious damage attached to the policy:
a. Glass invoice
b. Shopping centre invoices
c. Plumbing invoice
d. Maintenance invoice
e. Garage door invoice.
86. In relation to loss of rent I accept that eight weeks loss of rent is fair and
reasonable in relation to repairs undertaken that are covered by the terms and
conditions of the policy. Accordingly I determine that the FSP is not required to
provide further payment to the Applicants in this instance.
87. I determine that it has been established in this instance that the Applicants are
entitled to compensation under the Terms of Reference and I determine that
the FSP shall pay to the Applicants the sum of $1,500 pursuant to paragraph
9.3(b)(i).