The applicants' tiled balcony leaked into the garage below and the FSP declined the balcony claim under exclusions for defects, workmanship and gradual deterioration. AFCA decided the FSP had not discharged its burden of proving the exclusion, so it must pay the balcony repairs, but not the vehicle damage or further deterioration.

The insurer bears the burden of proving an exclusion applies, and the evidence from the two builders was evenly balanced so the FSP failed to discharge that onus.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 238196 Determination Page 1 of 6 Case number: 238196 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Proximate (Dominant) cause – Insurance Contracts Act 1984, section 46 28 November 2011 Background 1. This is a review of a Recommendation by the Service dated 29 August 2011 in favour of the Financial Services Provider (FSP). The Applicants have rejected the Recommendation and in accordance with the Terms of Reference, the matter has been referred to me for Determination. The relevant background, summaries of the parties position and issues have been set out in the Recommendation and for the sake of completeness and clarity, I will restate same. 2. The Applicants’ home and contents were insured with the Financial Services Provider (FSP) under a home and contents policy. 3. They lodged a claim for a leak in their tiled balcony as well as for water damage to the garage situated underneath the balcony. They also claimed compensation for water damage to their vehicles on the basis the FSP had not processed their claim promptly. 4. The FSP accepted liability for the internal damage to the garage but declined liability for the leaking balcony on the basis the leak was due to faulty design or workmanship, structural defect and gradual deterioration. It also declined liability for the damage to the motor vehicles, contending that it had not delayed processing the claim. Summary of Applicant’s Position 5. The balcony cannot be structurally defective because an architect and registered builder were involved in designing and constructing the structure. 6. It is unreasonable for the FSP to say that the damage to the balcony was not caused by an insured event when it accepted that the internal damage to the garage was caused by an insured event. 7. The FSP did not process their claim within reasonable time. This resulted in water leaking into the garage and damaging their vehicles. Determination Case No: 238196 Determination Page 2 of 6 Summary of FSP’s Position 8. There was no delay in processing the Applicants’ claim. 9. Its builder and the Applicants’ builder have provided consistent evidence in that the leak was due to a structural defect or gradual deterioration. 10. The FSP relies on the following policy provisions: “ General Exclusions This policy does not cover: … Loss, damage, destruction, consequential loss or liability directly or indirectly caused by, contributed to by, resulting from, or arising out of or in connection with: …  gradual deterioration, wear and tear, fading, marking, scratching, denting, chipping or lack of upkeep or maintenance … We will settle losses resulting from: 9. Storm and/or rainwater including loss or damage from:  the escape of rainwater from any water pipe, drain or gutter  surface run-off rainwater from surrounding areas, or  flood. … We will not settle losses relating to: Loss or damage: …  from water seeping into or entering your home due to: poor attention to maintenance building additions and alterations structural defects, faulty design or faulty workmanship.” Issues 11. Whether the Applicants are entitled to indemnity for their leaking balcony. 12. Whether the FSP had delayed processing the claim and if so, are the Applicants entitled to compensation for water damage to their vehicles. 13. Whether the FSP is responsible for the further deterioration of the balcony/garage. Case No: 238196 Determination Page 3 of 6 Reasons for Decision 14. There has been a full exchange of information between the parties and I have carefully perused the submissions and accompanying documents. I have considered the submissions by the parties and in particular the further submissions by the Applicants dated 3 September 2011, 24 September 2011 and by the FSP dated 21 September 2011. 15. This is a vexed and difficult claim as can be seen from the detailed and considered reasons of the Case Manager in the Recommendation in paragraphs 13 to 41 inclusive. I intend to concentra te my attention on the primary issue that is whether the Applicants are entitled to indemnity for their leaking balcony. I have considered and thoroughly agree with the comments of the Case Manager in paragraphs 35 to 41 in respect of the Applicants’ vehic le damage and the claim in respect of further deterioration of the balcony or garage. 16. As noted by the Case Manager, the relevant policy covers loss for damage caused by storm or rain water. The obligation is on the Applicants to prove that damage was caused by such an event. 17. I note the FSP accepted liability for internal damage to the garage, apparently because the Applicants were unaware of the defects in respect of the balcony’s waterproofing capabilities. I do not wish to further complicate the matter b y reconsidering that issue and as the FSP has primarily chosen to rely upon exclusions from cover to deny the claim, I will concentrate my attention on that issue. 18. Having accepted that there is a prima facie claim in favour of the Applicant for damage caused by rainwater, it remains for the FSP to prove that such damage may be denied because of an exclusion or exclusions under the policy. In my view the issue of burden of proof is of crucial importance in the resolution of this matter. 19. I wish to deal with the question of whether or not section 46 of the Insurance Contracts Act is relevant to this claim. It applies in respect of a loss that occurs as a result of a defect or an imperfection in the thing that is the subject of a claim. Section 46(2) states: Pre-existing defect or imperfection 2. Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer's liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing (emphasis added). 20. As has been noted by the Case Manager, correctly, this section only relates to exclusions that have a temporal aspect. It only applies to defects or imperfections in the thing that existed before an insurance contract was entered Case No: 238196 Determination Page 4 of 6 into. It does not have general application to exclusion clauses (see Greg Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199: Justice Einstein). In this case the relevant exclusion relied on by the FSP and set out above i.e. “structural defects, faulty design or faulty workmanship” is not simply directed to pre-existing defects but applies generally. It follows that the Applicants lack of knowledge of any defect within the excluded matters be they structural, faulty design or faulty workmanship cannot assist the Applicants in this instance. 21. As stated above, I believe the primary issue is whether the FSP is entitled to rely upon the exclusion. 22. Both the Applicants and the FSP have made detailed submissions in support of the respective cases, each of which I have carefully considered. Each have relied upon a builder or building services report together with photographs that have been made available. The essence of those reports have been stated in paragraphs 17 and 18 of the Recommendation and because of the importance of that evidence I have set out below quotes from the relevant reports. 23. Before dealing in detail with those matters I note that in neither case has the so called expert stated his or her appropriate qualifications although I am prepared to accept that each of such persons is experienced in the building industry. I emphasize, particularly for the benefit of the FSP that in cases such as this where so much depends upon expert opinion, it is essential that the expert sets out details of their relevant qualifications, expertise and experience so that a decision maker can make a judgement as to the quality of the expert’s opinion. 24. The claim was lodged on 30 December 2010 and on 19 January 2011 after the attendance of loss adjustor and building consultant commissioned by the FSP, and the Applicants were informed on 19 January 2011 that the claim was to be denied. The Applicants employed a builder to provide a report and he attended the premises on 22 January 2011. 25. The relevant part of his report relied on by the Applicants state: “A site inspection confirms that the most likely cause of the ingress all relates to the fact that this area has suffered ingress through the gutter end area of the deck due to an unknown membrane fault which the insured would reasonably have been unaware of. The decking is timber framing covered with composite board substrate covered with cement sheet underlining and an approved type acrylic membrane over. This system has then been covered with sandstone paving and appears professionally constructed. The insured was first alerted to problems when water staining began to become evident in the timber framed areas underneath this area. Since then partial removal of the tiled covering has uncovered significant resultant damage due to the previously unrecognised ingress.” 26. The use of the word “ingress” by the Applicants’ builder clearly refers to water ingress. Case No: 238196 Determination Page 5 of 6 27. The FSP relies on reports by its claims assessor and, more importantly, its builder who gave a report on 11 January 2011. That builder expressed the opinion that the deterioration of the balcony was due to:  “ Firstly , it’s my belief that the deterioration has been gradual and not a “once off” incident.  The existing membrane appears sound and has been installed adequately and remains water-proof (it appears)  Particleboard is NOT suitable for external use.  The edge detail has been constructed with a “drip line” or flashing into the gutter. This is where; I believe water has penetrated the particle board substrate, causing the deterioration. Without the drip line, water has penetrated, along the edge of the tile line, and coupled with “capillary reaction,” water has been “sucked up” beneath the membrane.” 28. There is a clear and demonstrable difference as between the Applicants’ builder’s report and the FSP’s builder’s report. The Applicants’ builder’s report states that the likely ingress of water was caused by an unknown membrane fault. As noted in his report, the timber decking is covered with composite board substrate that is in turn covered with an underlining in this case, and an acrylic membrane. He noted that this appeared to have been professionally constructed so that aspect of the relevant exclusion i.e. design and workmanship appears to have been directly addressed and refuted. The builder had accepted that there was water ingress, which seems common ground, and that therefore, it must have occurred due to an unknown membrane fault. 29. The FSP’s builder’s report as stated above accepts that the existing membrane has been adequately installed and remains water-proof. It then goes on to state that “Particleboard is NOT suitable for external use.” 30. The service has conducted research in respect of Particleboard (see Wikipedia, the free Encyclopaedia) and I quote: “A major disadvantage of particleboard is that it is very prone to expansion a nd discoloration due to moisture, particularly when it is not covered with pain or another sealer. Therefore, it is rarely used outdoors or places that have high levels of moisture, with the exception of some bathrooms, kitchens and laundries, where it is commonly used as an underlayment beneath a continuous sheet of vinyl floor coverings.” 31. There is no evidence before me as to the state of knowledge of Particleboard as at the time of the construction of the balcony. Whilst it appears that Particleboard is not recommended for external use, the relevant information obtained from the above mentioned entry in Wikipedia seems to acknowledge that Particleboard may be used providing it is properly water-proofed. The FSP’s builder acknowledges that it was properly i nstalled and remains water- proof. In those circumstances, I do not accept that the use of Particleboard constituted faulty design or workmanship within the meaning of the exclusion. The FSP’s builder attributes the ingress of water to the failure on the pa rt of the architect/builder or both to provide “edge detail… constructed without a drip line” or flashing end of the gutter. Case No: 238196 Determination Page 6 of 6 33. There is a clear difference in view point on the part of the builders for advising the respective parties. I should mention that under cover of further submission by the male Applicant dated 3 September, he makes mention to the following: “Further contact with [the builder] has revealed that [the builder] does not support [FSP’s] statement that his report agrees with Property Maintenance Contractors report, regarding gradual deterioration, or that Particle board is unsuitable for outdoor use, or their Reference to structural defects.” A decision maker can only make very limited, if any, use of that type of hearsay evidence that is not supported by a further report. In any event, it seems to merely point out the difference between the respective builders. 34. There is no doubt I would have been assisted in this matter with the provision of a further report or reports from the respective builders addressing the differences as to the respective opinion. I am in the unsatisfactory position of having to make a decision as to which of those opinions I accept. If I accept the Applicants’ builder, the mere failure of the “membrane” does not in my view fall within the exclusion relied upon by the FSP. Unless one knew why the membrane failed, it would not be possible to say with any certainty that the exclusion should apply. By contrast, if I accept the FSP’s builder, the failure to construct a “drip line” or flashing end of the gutter would constitute, in my view, faulty design or workmanship. 35. Because the evidence hangs in the balance on the important issue of whose opinion I will accept, I am thrown back to the issue of burden of proof. As stated above, the FSP has the obligation to establish on the balance of probabilities that its evidence prevails on this issue. In the circumstances, I am unable to be satisfied by applying the relevant test that the FSP’s builder should be preferred to the Applicants’ builder. In those circumstances, the FSP has failed to carry the burden of proof. Determination 36. Accordingly, I determine:  The FSP is not entitled to deny the claim and must indemnify the Applicants for repairs to the balcony;  The FSP is not re sponsible for the damage to the Applicants’ vehicles;  The FSP is not responsible for the further deterioration of the balcony or garage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.