Determination 237897

Failure to provide advice - Misleading information

FirmFinancial Firm (Unknown - Credit)
Decided2013-05-21
ProductCredit · Home loan
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants said the FSP understated the loan needed for their land and construction, and that it caused construction delays. AFCA found the FSP misled them about the loan amount but that they were not worse off than with the alternative lender, and found for the FSP.

Compensation for misleading conduct is limited to loss from acting differently, and the FSP loan cost less than the alternative lender's, so no loss was established.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Case No: 237897 Determination Page 1 of 12 Case number: 237897 Credit - Consumer Credit - Home Loans - Advice - Failure to provide advice – Misleading information 21 May 2013 Background 1. This dispute concerns loans the Applicants arranged with the FSP in 2010 to enable their purchase of land and construction of a house on that land. 2. The Applicants said the FSP misled them by: a. Not adequately explaining to them its lending processes and that a low valuation of their land purchase and construction project would increase the cost of lenders’ mortgage insurance (LMI); and b. Informing them that taking into account their savings of $26,000 and entitlement to the First Home Owners Grant (FHOG) of $20,000 they would need to obtain a loan of $315,000 inclusive of all costs and fees to meet the total expected cost of $353,500 required to purchase the land and build their house. It transpired that the sum of $315,000 was insufficient to meet all of the costs and the figure quoted to them should have been around $322,000. 3. The Applicants said that on 30 July 2010 they entered into a contract to purchase land for $191,900 on the basis of an anticipated loan amount of $315,000. They initially said that if the FSP had provided them with an accurate figure for the loan they required they would have obtained the funds from another lender they had made enquiries with (who I shall refer to as “the other lender”) . They later said that they would not have proceeded with the purchase of the land. 4. On 18 August 2010 they entered into a loan of $171,251 (the Land Loan) to purchase the land. 5. While they initially entered into a building contract with GB and paid a $3,000 deposit to that builder, they decided to change builders and on 30 October 2010 entered into a building contract for $164,632 with MH. 6. In early November 2010 they then entered into a loan contract for $312,062 (the Combined Loan) to pay out the Land Loan and provide funds for the construction of their house. They met the additional costs from their own resources but said this prevented them from buying a second car and meant that the male Applicant had to spend four hours each day commuting to and from work. Determination Case No: 237897 Determination Page 2 of 12 7. They said the construction of their house should have been completed by December 2010 but, because of delays by the FSP, construction did not commence until November 2010. 8. The Applicants also said the FSP did not appropriately respond to their complaints. Conclusions in Recommendation 9. The case manager provided the parties with a Recommendation on the issues in dispute. The Recommendation was in favour of the FSP in that it concluded that the FSP was not required to compensate the Applicants further than it had already in relation to the dispute. 10. In the Recommendation the case manager reached the following conclusions about the issues raised by the dispute: a. The Applicants were provided with information regarding the FSP’s lending process prior to them entering into both the Land Loan and the Combined Loan; b. The FSP’s estimate that the Applicants would need to borrow $315,000, inclusive of all fees and costs, to purchase the land and construct the house was inaccurate as it did not include the cost of LMI; c. If the Applicants had been informed of the correct amount of the contribution they would be required to make and had obtained the loan from the other lender they had made enquiries with, they would have paid $154.52 less in interest to the other lender up until August 2012. However, that ‘loss’ had been sufficiently compensated by the FSP’s refund of the LMI cost of $670.34 it was entitled to charge on the Combined Loan and the $250 annual fee it was entitled to charge on their credit card facility . Because the FSP’s interest rate was lower than the other lender ’s after August 2012, the Applicants did not suffer ‘loss’ going forward ; d. The case manager did not accept that the Applicants would not have proceeded with the land purchase and construction if they had been informed correctly of the amount they needed to borrow; e. The case manager was not satisfied that the FSP caused a delay in the construction of the Applicants’ residence; and f. While the FSP was outside the timeframes stipulated on the Code of Banking Practice in responding to the Applicants’ complaint, it nevertheless responded appropriately by offering the Applicants an explanation and a resolution to their dispute and ultimately referring them to FOS. 11. The FSP accepted the Recommendation but it was rejected by the Applicants. Case No: 237897 Determination Page 3 of 12 Further submissions 12. When rejecting the Recommendation, the Applicants made further submissions that can be summarised as follows: a. T heir complaint has been predominantly about the FSP’s misrepresentation to them at the outset regarding the total amount they would need to borrow; b. They entered into the contract to purchase the land as they believed they had arranged the finance to do so. They did not believe anything would affect the purchase unless they changed the figures by reducing or adding to their deposit; c. They entered into the Land Loan based on the FSP ’s advice of an incorrect loan amount which resulted in a loan that did not meet their objectives; d. The FSP did not explain why valuations were conducted and did not advise them of the possible ramifications a low valuation could have on the cost of LMI. The email exchange in this regard and on which the FSP relies was after settlement of the land purchase and was far too late; e. The other lender they had considered borrowing from disclosed that the LMI needed to be paid upfront and was not included in any figures or absorbed into the loan. That lender does not do valuations but goes off the contract price so they assume that lender’s figures would have been extremely accurate with no chance of fluctuations by thousands of dollars; f. If they had more money at the time and had been provided the correct loan amount by the FSP, they would not have requested finance from the FSP ahead of the other lender; g. However, if they known that the loan amount of $315,000 was incorrect and the true amount should have been in the vicinity of $322,000, they would not have purchased the land. They did not have any further funds that they were willing or able to contribute towards the purchase at that time. They had to find more money to finalise settlement and ensure the LMI did not sky-rocket because they needed to keep the LVR down to achieve this; h. They felt they had to proceed with the construction of the house as they were making repayments on the Land Loan and were paying rent. An officer from the FSP’s complaints departmen t suggested they get the construction up and running because she agreed that money was being wasted; i. They were informed they would have to pay an $8,000 LMI top up if they added the construction funding to the Land loan. They did not have the funds to pay that cost and, as a result: They decided to change builders in the hope that the new valuation would be higher than the initial valuation, given they were building a larger home for the same cost. A higher Case No: 237897 Determination Page 4 of 12 valuation would ensure they did not have to contribute more to a LMI top up; and They lost their place in the construction schedule and commencement of construction was delayed. That delay was contributed to by the FSP officer with whom they were dealing not forwarding on the construction contract for some time after they had delivered it to him; j. The email from the male Applicant to the FSP (regarding why they changed builders) was sent because the male Applicant felt they needed to supply a reason why they were changing builders and he did not want to offend the FSP’s officer because he felt that if he did the situation may worsen; k. The FSP then informed them the top up LMI figure was $3,700. After they questioned this the FSP realised an error had been made and the top up figure was reduced to $670.34, which comprised $100 for the top up amount and $570 for an administration fee; l. The FSP subsequently informed them that it would sort out the LVR issue by accepting a higher valuation in comparison to the valuer who had conducted the valuation of the property. If the FSP had informed them of its complaints process when they expressed their concerns the week after the land settlement, the delay could have been avoided because, potentially, the FSP could have honoured their contract price at that point and not some months later; m. They are unsure why the case manager reached a conclusion that they could have elected not to proceed with the construction of the house. Their only alternative would have been to sell the land at a substantially higher amount than they paid for it to cover their costs and they did not believe this was possible; n. It was the FSP’s officer who recorded the female Applicant’s marital status as “Mrs” in July 2010. It was, therefore, the FSP’s error not the Applicants’ that led to a la ter delay in having this error corrected in the documentation; o. They suffered stress because they had to meet mortgage payments and rental payments. Their plan to purchase another vehicle could not be achieved which meant that the male applicant suffered health issues from travelling four hours a day to and from work. They also suffered anxiety about how they were to obtain the additional money required to finish off the house when they were considering signing the construction contract; and p. Their loss is what they had to contribute over and above what they had originally agreed to contribute. They believe they should be placed in the same financial position they had committed to being in. They committed to spending $26,000 and, therefore, believe that at the very least the additional amount they paid over and above that amount should be reimbursed to them by the FSP. Case No: 237897 Determination Page 5 of 12 Ombudsman’s consideration 13. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. 14. I have carefully considered the case manager ’s Recommendation, together with the Applicants’ further submissions. 15. I am satisfied that the case manager’s Recommendation contains an accurate summary of the background to this dispute, the parties’ positions, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 16. I agree with the case manager’s reasons for the Recommendation and the recommended outcome. 17. Following my review of the Applicants’ response to the Recommendat ion, I will address the following issues in this Determination: a. Whether the Applicants suffered loss because they were misinformed by the FSP about the funds they would need to borrow or, alternatively, to contribute to enable their purchase of land and the construction of a house on that land; and b. Whether the FSP caused a delay in the construction of the house. Whether the Applicants suffered loss because of a misrepresentation by the FSP 18. The Applicants met with the FSP in July 2010. They were trying to work out how much they could borrow to purchase a block of land and then build a house. Following on from this discussion, there was a chain of emails between the FSP and the customer. 19. The parties have provided emails between the FSP’s officer Mr SC and the Applicants for the period 22 July 2010 to 8 October 2010. An email chain dated 22 July 2010, contains the following exchanges: a. At 14.41pm Mr SC sent the following email to Miss R: “As discussed, below are approximate cost[s] for construction. Also, I would only proceed with this loan if I can achieve a rate discount of .85% which based on the standard variable of 7.51% = 6.66%. In terms of Bank Fees in relation to the mortgage. $395 annual package fee $300 progress draw fee to cover the 5 payments to the builder. Based on a loan amount of $315,000 and security value of $353,500 the lenders mortgage insurance would be approximately $4,756.50 (this includes gov[ernment] stamp duty). Case No: 237897 Determination Page 6 of 12 Separate government fees will apply which I have already provided you with such as registration and stamp duty”. b. At 14.51pm, Miss R responded to Mr SC as follows: “Hi [Mr SC] Have you absorbed the stamp duty and the mortgage insurance into our loan?” c. At 15 .07pm, Mr SC replied saying, “ yes I have ”. d. At 15.18pm, Miss R responded: “So just confirming that total loan amount is $315,000”. e. At 15.25pm, Mr SC replied saying, “ That’s correct ”. 20. The parties agree that there would need to be a valuation and while the FSP says that it informed the Applicants of the likelihood of a low valuation, there is no record of it. 21. In cases where an FSP is giving ‘pre - approval’ for a loan, it needs to take great care in ensuring that their customers understand that the approval is subject to change. I would expect this to be communicated in the written pre- approval notification. For example, the written confirmation should include caveats to the effect that it is guaranteed and is subject to the FSP’s credit assessment and that the loan amount was dependent on a satisfactory valuation of a specified amount. The emails in this dispute did not contain any such caveat. 22. The FSP knew that the Applicants were seeking to buy land and build and it is reasonably foreseeable that having obtained the pre-approval, the Applicants would enter into contracts to purchase the land. In my view the FSP has misled the Applicants. 23. The next question is how much compensation, if any, the Applicants are entitled to. The aim of compensation for misleading conduct is not the make the promise come true. That is, it is not to put the Applicants in the position whereby they have a $315,000 loan and a house. It is often thought that this should be the remedy but the courts have not agreed with this approach. Rather the courts have said that the relevant question to be asked is what could the Applicant have done differently if they were not misled and if they are worse off because they effectively missed out on the opportunity to do something different, then they will be entitled to be compensated to the extent that they are worse off. 24. I appreciate that this is a difficult concept to understand but it is a relevant legal principle to which I must have regard. Case No: 237897 Determination Page 7 of 12 25. During the course of this dispute the Applicants have indicated that if they had known the correct information, they could have done one of two things differently. They could have decided not to proceed with the purchase or construction or, alternatively, they would have obtained funding from the other lender. In their most recent correspondence, the Applicants have indicated that they would not have proceeded, but it is my view that it is more likely than not that they would have proceeded using the other lender because I think they were keen to have their first home. I reach this view because: Their alternative was to continue paying rent; At the time they were entitled to a $20,000 FHOG. It was not known at that time how long that grant would remain available at that level. In my view the availability of the grant placed some pressure on first home buyers to commit to purchasing sooner rather than later; They were informed at the outset by the FSP that they had a borrowing capacity of $400,000. Therefore, they knew they could afford to repay a loan of $322,000; The Applicants decided to change builders in September 2010 thereby forfeiting the $3,000 deposit they paid to their first builder. This action is not consistent with a borrower who is concerned about increasing their liability by a relatively small amount; and They initially informed FOS that if they had been provided with accurate figures by the FSP they would have borrowed funds from the other lender rather than the FSP. 26. So the Applicant’s loss is worked out by comparing the position they were in with the FSP with the position they would have been in if they proceeded using the other lender. In making this comparison however, I will not take into account the $3,000 the Applicants lost when they moved to the other builder because I do not regard this cost as one that a person under an obligation to minimise their losses would reasonably incur. 27. I requested the assistance of the Financial Calculations Specialist in making this comparison. I note that during the investigation of this dispute the Applicants provided to this office a quotation that had been provided to them by the other lender on 21 July 2010. That quotation was for an amount of $318,000 rather than the $312,062 provided by the FSP. In these circumstances the Financial Calculations Specialist was asked to use the figure of $318,000 when calculating whether the Applicants would have been better or worse off moving to the other lender. 28. The FSP charged the following for Land Loan: Registration Charges $ 692.10 Stamping Charges $6,584.00 Bank Cheque $ 10.00 Case No: 237897 Determination Page 8 of 12 Annual Package Fee $ 395.00 LMI $3,869.73 $11,550.83 29. In addition the FSP charges for Combined Loan were: LMI $670.34 Bank Cheque $ 10.00 Progressive Drawdown $300.00 $ 980.30 $12,531.17 less Refund Stamp Duty 08/10/2010 $ 619.00 Refund LMI 16/12/10 $ 670.34 Net overall amount charged by FSP $11,241.83 30. If the Applicants had decided to proceed with the other lender, then the following charges would have been incurred: Stamp Duty $5,920.00 1 Registration Charges $ 792.20 Title Search $ 9.84 Annual Package Fee $ 395.00 Progressive Drawdown say $ 300.00 LMI (based on loan of $318,000) $4,495.22 $11,912.26 31. The App licants’ decision to proceed with the FSP resulted in lower charges and they saved $670.43. 32. The Banking Specialist also provided an updated table showing a comparison of the FSP interest rate actually charged on the loans and what the other lender may have charged , using the other lender’s standard variable rate less the discount of 0.07%. that the Applicants say they were offered by the other lender. 1 The other lender ’s calculation indicates a stamp duty on the Transfer of Land of $6,530. However based on the State Revenue Office calculator for the relevant State, an amount of $5,920 is due on a purchase price of $191,000. Case No: 237897 Determination Page 9 of 12 Date FSP Other Lender Change RBA CASH RATE MOVEMENTS Land Loan 05/05/2010 4.5 +0.25 27/08/2010 6.66 6. 54 15/11/2010 6.97 +0.43 03/11/2010 4.75 +0.25 16/11/2010 7.01 +0.35 Combined Loan 15/12/2010 7.01 6.97 07/11/2011 6.7 7 - 0.2 02/11/2011 4.5 - 0.25 14/11/2011 6.76 - 0.25 19/12/2011 6. 52 - 0.25 0712/2011 4.25 - 0.25 19/12/2011 6.51 - 0.25 20/2/2012 6.61 6.6 1 +0.1 / +0.09 14/5/2012 6.24 6.2 9 - 0.37 / - 0 .32 02/05/2012 3.75 - 0.5 18/06/2012 08/10/2012 10/12/2012 13/05/2013 20/05/2013 6.04 5.86 5.66 5.41 6.0 8 5.88 5.68 5.43 - 0.2 / - 0.21 - 0.18 / - 0.2 - 0.2 / - 0.2 - 0.25 - 0.25 06/06/2012 03/10/2012 05/12/2012 08/05/2013 3.5 3.25 3.00 2.75 - 0.25 - 0.25 - 0.25 - 0.25 33. Therefore, the overall position of the Applicants accepting the FSP loan compared to accepting the other lender’s loan can be summarised as follows: FSP loan Establishment charges $11,241.83 Estimated other lender charges $11,912.26 Benefit by choosing the FSP $ 670.43 Less Interest differential to February 2012 $ 154.52 Net benefit for choosing FSP $ 515.91 34. On a simple calculation basis, since February 2012, the difference between FSP and other lender’s interest rates is approximately 0.02%. Based on a loan amount of $318,000 this equates to $63.60 per annum Case No: 237897 Determination Page 10 of 12 35. In other words, if the Applicants had decided to proceed with the other lender in preference to the FSP then they would have been worse off. It follows that when assessing compensation for misleading conduct and having regard to the legal principle that you ask what would the Applicants have done differently if they were in possession of the correct information and how much better or worse off were they as a result, then the answer is that the Applicants have not in fact suffered any loss as a result of the misrepresentation. Whether the FSP caused a delay in the construction of the house 36. The Applicants say that they lost their place in the construction schedule after they were informed they would have to pay an $8,000 LMI top up when they added the construction funding to the Land Loan and they could not afford that cost. They say that it was because of the quoted cost of LMI they changed builders in an effort to increase the valuation of their property and, consequently reduce the cost of LMI. 37. I have reviewed the documentation and note the following sequence of events took place in relation to the Applicants ’ dealings with their new builder: The Applicants obtained a quotation for construction of the house from the new builder on 26 September 2010; On 30 September 2010 a $2,000 debit in favour of the new builder appears on their credit card; and On 30 October 2010 they entered into a contract with the new builder. 38. My review of the documentation in relation to a LMI cost of $8,000 discloses: On 7 October 2010 the female Applicant sent an email to the FSP’s officer with whom she had been dealing saying that she “had a call from [the FSP’s mortgage area] yesterday . . . they also said our mortgage insurance would be $8,000. That is not right.” In his response email on the same day the FSP’s officer said: “With regards to your conversation with the [mortgage area] y esterday, the total mortgage insurance premium was in fact approx $8000 however what they may not have told you was the actual Top Up premium was only approx just over $4000 (remember you have already paid approx $3750 )” . 39. These records indicate that the Applicants committed to the new builder by paying a $2,000 deposit prior to being quoted an LMI cost of $8,000. In these circumstances, I do not accept that they changed builders because they were informed they would be required to pay a top up premium of $8,000. 40. I am further persuaded in this view by the following: Case No: 237897 Determination Page 11 of 12 In the male Applicant’s email to the FSP on 7 October 2010 he stated that they had change builders because the first builder had “made variations to [their] initial agreement which [they] were unable to resolve”; In an email to the FSP on the same day the female Applicant said that the new valuation “should not come back lower than the valuation done for the [initial building contract]”. This comment does not indicate an expectation that the new valuation would be for a higher amount; and They forfeited a $3,000 deposit paid to their first builder without any basis for an expectation that the new valuation would be higher, particularly given the price of both building contracts was almost the same. 41. I also note in relation to LMI that on 22 October 2010 the FSP informed the Applicants in an email that the actual top up fee of $670.04 for LMI (which appears to have been revised down from the earlier figure quoted) would be refunded to them “as a gesture of goodwill ”. 42. The documentation indicates that the Applicants signed the contract with their new builder on 30 October 2010. It seems to me that the delay in commencement of construction arose primarily because of the Applicant’s decision to change builders. As indicated above, I am not satisfied that decision arose because of any errors made by the FSP. 43. In regard to the Applicants’ contention that the female Applicant was referred to in the initial documentation as ‘Mrs’ rather than ‘Miss’ and the need to have new documents prepared caused delay, I have reviewed the documents and note that on the application form the Applicants signed on 18 July 2010, the female Applicant was described as being ‘Mrs’. I also not that on the initial FHOG application the Applicants signed on 1 November, 2010. the female applicant crossed out and initialled where she had originally noted her status as ‘Miss’ and recorded her status as ‘Mrs’. In these circumstances, I consider that the Applicants must take responsibility for failing to correct any errors in the recording of the female A pplicant’s marital status and any delay that resulted from that. Conclusion 44. I have considered the further information, but it does not change my view that the case manager’s Recommendation was correct. Case No: 237897 Determination Page 12 of 12 Determination 45. I determine in favour of the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.