The applicant's home and garage contents in Charlton were damaged by water in January 2011, and the FSP declined the claim as floodwater beyond its flood cover limit. AFCA found initial stormwater damage covered up to about 200mm, but structural ground-movement damage was excluded and the flood sub-limit was exhausted, and ordered indemnity for the stormwater damage with interest.

The initial inundation was shown to be stormwater on the balance of probabilities, so it falls outside the flood exclusion, while later floodwater damage is limited to the flood cover sub-limit already paid.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 237298 Determination Page 1 of 13 Case number: 237298 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision – Flood- Denial of claim 24 September 2012 Background 1. The Applicant held a Private Plan Insurance Policy (the policy) with the Financial Services Provider (FSP) which provides cover for Accidental Damage subject to the relevant policy limitations. 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 January 2011 following the significant weathe r events experienced in Victoria in January 2011. 3. The FSP partially accepted the Applicant‟s claim in so far as the policy allows (applicable sub-limits) and has declined indemnity for a major portion of the Applicant‟s claim on the basis it is due to the event „flood‟. 4. The Applicant remains dissatisfied with the FSP‟s decision to decline to provide indemnity for a major portion of her loss. Summary of Applicant’s position 5. The Applicant in disputing the FSP‟s decision to decline the claim has sought the as sistance of legal representatives “M”. In the interest of brevity both the Applicant and “ M ” will be referred to as the “the Applicant” for the purpose of this determination.  The FSP has failed in its obligation to inform the Applicant of exclusions relati ng to loss or damage arising from the event „Storm‟.  The property was surrounded by clear stormwater runoff in the morning of 14 January 2011 after 7.30am.  The policy does not include any provision excluding from cover loss/damage arising from stormwater inundation. Further, the damage claimed is due to clear stormwater runoff as opposed to floodwaters which came later.  The Applicant witnessed the event unfolding and maintains that water surrounded the property and came up against the external walls from around 5.00pm on 14 January 2011. She evacuated the property at approximately 9.00pm at which point water had begun inundating the dwelling through the floorboards. Determination Case No: 237298 Determination Page 2 of 13  The Applicant maintains that the water inundation has damaged the foundations of the home resulting in the appearance of cracks within the walls.  The loss claimed by the Applicant as set out in the quotes submitted by “R” may well be disputed by the FSP however it cannot dispute the fact that the damage has occurred. The Applicant‟s personal obs ervations of the event and subsequent damage should be preferred over reports by individuals who were not there or did not even undertake a site visit.  The Applicant is dissatisfied with the consultant reports relied upon by the FSP and believes the information to be general and/or inaccurate. Further, she has expressed concerns regarding the management of this claim and also her previous claim relating to the September 2010 flood event.  The Applicant relies upon the hydrology reports submitted by her prefe rred consultant “PM”.  The Applicant has provided a CD with photographs starting around 7.00am (14 January) and all the way through to the late evening showing the build up of water and subsequent inundation of a property.  The Applicant has, on the balance or probabilities, established a prima facie claim under the policy, therefore the onus shifts to the FSP to establish an entitlement to decline indemnity for her loss under the policy. Summary of FSP’s position 6. The FSP maintains:  Based on the available evidence it is clear that the damage claimed is due to floodwater inundation, an event clearly excluded under the policy. However, the policy allows for limited cover up to $20,000 (buildings and contents combined arising from one event) under the „Flood Cover‟ additional benefit.  Further, in respect to the Applicant‟s claim regarding structural damage arising from the inundation of the home‟s foundation, this has not been established to be due to this event and/or stormwater runoff. The FSP has settled the claim in line with the benefits available under the policy.  Further, although the FSP continues to dispute that stormwater inundation occurred at the insured property, if the Service were to accept that stormwater inundation did initially occur the cracking or structural damage claimed is due to earth movement and such damage is excluded under the general exclusion relating to ground movement „no matter how caused‟.  There is no dispute the Product Disclosure Statement (PDS) was provided to the Applicant, and also the wording of the policy is clear and unambiguous in respect to the scope and limits of the cover. Case No: 237298 Determination Page 3 of 13  The Applicant does not dispute the inundation of the insured property above floor level was due to floodwaters having escaped the banks of Avoca River.  The FSP notes that PM has advised that the stormwater drainage system in Charlton was at capacity after the morning of 13 January 2011 with runoff unable to drain away due to the rising level of Avoca River. Such circumstances fall under the accepted position that such water (from that point on) is classified as floodwater.  Further, the timing of the inundation of the property as advised by the Applicant, and in line with the reports submitted by hydrologists “W” are consistent with the overflowing of the Avoca River, and accordingly would be classed as floodwater inundation.  Concerns raised by the Applicant in respect to the previous claim (September 2010) are not related to this current claim and/or dispute before the Service and are a separate matter.  Further, there was no dispute in respect to the cause of the loss in September 2010 being floodwater.  By paying the Applicant the full extent of cover available under the additional benefit the FSP had fulfilled its obligations under the policy in respect to both claims.  The FSP notes the Applicant‟s contention in respect to the contents items damaged whilst on the veranda at the insured property during the initial stormwater inundation. The FSP disputes stormwater inundation occurred at the property, however if it is to be accepted that such did occur, the FSP submits that the damaged contents (located on the veranda(s)) would be considered to be „outside the home‟ under the policy. There is no cover for contents whilst located outside the home.  The FSP reg rets the Applicant is dissatisfied with the FSP‟s management of the claim; however it maintains that all decisions and payments issued under the claim have been in line with the provisions of the policy. 7. The FSP relies on the following policy provisions: “ What you are insured against This policy insures You against accidental damage, burglary and theft occurring during the Period of Insurance. … What is not insured This policy does not insure You against: 1. damage directly caused by: - Rain, hail or snow to Contents unless they are in a Domestic Building when damaged - Flood, except as described under the additional benefit „Flood cover‟ - … Case No: 237298 Determination Page 4 of 13 - Earth movement (except earthquake) no matter how caused, including erosion, vibration, subsidence, seepage, saturation, creeping, landslip, mudslide, collapse, shrinkage, settling, expansion or heaving … Flood Cover If „Building‟ is shown on the certificate of insurance, We pay up to $20,000 for damage to Your Home directly caused by Flood during the Period of Insurance arsing out of one event. If „Contents‟ is shown on the certificate of insurance, We pay up to $10,000 for damage to Contents in Your Home directly caused by Flood during the Period of Insurance arsing out of one event.” Issues 8. Whether damage to the Applicant‟s p roperty was caused by flood water as defined by the policy. 9. Whether the FSP is entitled to decline indemnity to the Applicant under the claim. Reasons for decision 10. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 11. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 12. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 13. The Panel Chair Ombudsman attended on site with the Case Manager where they met with the Applicant and a representative of the FSP. 14. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 15. The Panel notes that the parties do not dispute the following:  The Applicant held an active home building and contents insurance policy with the FSP at the time of loss. Case No: 237298 Determination Page 5 of 13  The FSP provided and the Applicant received the relevant policy documentation including the Product Disclosure Statement (PDS).  The insured property suffered significant damage arising from the weather events experienced in the area during January 2011.  The insured property includes a garage to the rear of the property which was inundated during the event resulting in loss of contents insured under the policy.  The Applicant evacuated the property at approximately 9.00pm on 14 January 2011 at which time the water quickly begun to come up through the homes floorboards and inundate the dwelling. 16. The Panel having reviewed the available evidence is satisfied that the main issue in contention between the parties pertains to whether the insured property was initially inundated by stormwater which would give rise to a degree of indemnity under the policy. The Pane l is satisfied that the property was ultimately inundated by floodwater to the maximum level; however, consideration as to whether there was an extent of initial stormwater inundation has been detailed below. Cause of the Loss 17. The Panel has been provided with multiple consultants‟ reports obtained and relied upon by the parties. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to comment. Accordingly, in the interest of brevity, the Panel will only restate information from these reports if found necessary in providing this Determination. Consultant’s Reports PM’s Charlton Floods - January 2011 dated 3 November 2011  The town of Charlton experienced heavy rainfall between 10 January- 14 January with extensive flooding in the area from the Avoca River from 14 January onwards.  Total rainfall over this period was recorded at 168.6mm with 66.2mm falling between 9.00am on 13 January and 9.00am on 14 January.  The highest intensity rainfall recorded was 15mm/hr between 7.00am- 8.00am on 13 January. There was no rainfall recorded after 8.00am on 14 January.  Although the records calculate the rainfall intensity on an hourly basis, PM maintains that the rainfall periods at Charlton were highly concentrated in short duration bursts e.g. 10 to 12 minute intervals. Accordingly, if calculated on this basis it would represent 20-50 year ARI rainfall events as opposed to 1-2 year ARI events (based on hourly intervals). Case No: 237298 Determination Page 6 of 13  Accordingly, overflow from local drainage systems a nd culverts were highly likely as these systems are only designed to cope with 2-5 year ARI rainfall events.  Time of overflow would have to correspond closely with the timing of the intense rainfall periods and based on this the first stormwater drainage overflow event would have occurred at around 7.00am on 13 January.  There are two possible sources of rainwater run-off in Charlton, run-off in the town which does not enter the stormwater drainage system and run-off from surrounding rural areas.  All rainfall that fell on 13 January and 14 January would have become saturated overland flow and followed natural drainage lines into Charlton. This would have led to the inundation of Charlton on these dates prior to the arrival of floodwaters from the Avoca River.  Floodwaters from the Avoca River would be of high sediment loads (muddy/mucky) and would not be clear. Clear water inundation would support that prior to the arrival of floodwaters from the Avoca River there was water sourced from local stormwater.  Depending on the exact locations of the properties, they will have begun to have been inundated by floodwater sometime on the afternoon or early evening of 14 January. Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfall were occurring (13 January and early morning 14 January).  Evidence in respect to water inundation of properties which occurred particularly before 5.00pm on 14 January should be taken into account. PM’s additional report dated March 2011  Site visit (Charlton) undertaken on 2-3 March 2012, with interviews also carried out with the homeowners.  A survey revealed that the stormwater drainage system empties directly into the Avoca River close to the Calder Highway Bridge. The implication of this being as river levels rose in the Avoca River the stormwater outlet would have been inundated with river water. This would result in the drains being backfilled to capacity preventing stormwater on the surface from draining away.  A survey revealed that the upper height of the stormwater outlet pipe is 4.6m (relative to the river height records). This water level was reached early in the morning on 13 January [2011]. From this point on the stormwater drainage system in Charlton would not be able to drain away freely. Stormwater accumulation therefore becomes an issue in Charlton from mid-morning on 13 January.  Survey reveals that the eastern side of Charlton has a significant depression and occupies lower land than the western side of Charlton. The town slopes towards the north i.e. Armstrong Street is 35cm higher at the junction with Donald Street compared to High Street side, and Case No: 237298 Determination Page 7 of 13 Wilson Street is 45cm higher at the junction with Watson Street compared to High Street end.  Therefore, water moves through the to wn (high to low) until it is impeded by the train tracks that run parallel to Davies Street. Both topographical survey and new modelling indicate that property in the east of Charlton, especially those close to High Street were inundated by locally accumulating stormwater which followed a drainage line independent of any watercourses close to Charlton.  The witness accounts provide varied evidence in respect to the arrival of sediment laden water flows associated with the rapid rise in water levels. The likely explanation for this is that inundation from the river (in the afternoon of 14 January) was widespread, with water levels rising accordingly. However, the complete mixing of the two water bodies had not yet occurred in the central and high parts of town.  The mixing of clear water and muddy water was a gradual process and it is likely that it took some time for water sourced directly from the river to flow across the whole town and mix with locally sourced stormwater.  In this situation flooding in some ho uses was therefore controlled by the rise in the river level but the actual water at the site was stormwater.  Major flood level for Charlton is 7.5m at the gauging station near the bridge over the Avoca River, which was reached at 5.15pm on 14 January. It is possible that other parts of the riverbank to the south and west of Charlton had low points which allowed water to leave the river and inundate parts of the town somewhat earlier than 6.00pm. Flood modelling indicates earlier overtopping of the river played a part in inundating the west and southwest of Charlton.  The Applicant‟s property is on the north side of Watson Street in the centre of Charlton, approximately 580m from the drain running through the east side of Charlton.  The Applicant advised PM that:  At around 4.00pm (14 January) water moving from Learmonth Street came into Watson Street from the east.  At around 5.00pm the water moved over the lawn and came up against the dwelling, however was not enough to enter the dwelling.  Shortly before she evacuated the property at 9.30pm water entered the home and the water level rose quickly.  PM maintains that the position of the home would mean the inundation would have occurred later than houses to the east and west.  Despite it being clear water that inundated the home (as late as 9.30pm) the rise in the water level which caused the flooding was almost certainly caused by the Avoca River.  The inundation of the property (outside) between 5.00pm-6.00pm (14 January) would probably be due to local water and would have covered Case No: 237298 Determination Page 8 of 13 the slab and lower parts of the foundations, but not have entered the home. W’s Flood Assessment Report 31 January 2011  Multiple site inspections were undertaken on 24 January 2011.  The average rainfall records for the upper regions of the Avoca River catchment are about 600mm per annum.  The Avoca River has flooded the town of Charlton a number of times in the past due to high rainfalls.  The Avoca River catchment soaked from previous rainfalls resulted in a higher than average conversion of rainfall to runoff, increasing the water flowing directly into watercourses and resulting in flooding across Victoria.  Flood warnings were issued for a number of rivers including the Avoca River with the one of the towns affected by the flooding being Charlton.  Historically Charlton has been flooded from two directions in a north south plain with an area remaining flood free through the centre of town along the St Arnaud – Charlton Road.  The most intense rainfalls periods in Charlton were experienced in the morning of 11 January 2011 and early morning 13 January, with the maximum flood level in Avoca River reaching its peak early morning 15 January.  Flooding of the township was similar to the September 2010 event, however, a much greater volume of water has been experienced in the eastern end of town on this occasion (January 2011).  Given the timing of the flooding of the eastern edge is similar to that of the gauge readings it is suggested that the Yeurngoon Creek and Avoca River flows merged to become one s ystem.  Any flooding occurring after lunchtime (14 January) can be directly attributed to Avoca River/Yeurngoon Creek flooding.  Flood inundation that occurred east of Armstrong Street early morning (14 January) can be attributed to stormwater flooding.  The approximate inundation time for the insured property is 7.00pm on 14 January. W’s Flood Assessment Report dated 4 January 2012  Preliminary hydraulic modelling confirms the flow mechanism that occurred during the event. The Yeungroon Creek catchment responded more quickly to rainfall in the area on 13-14 January 2011, with the peak level of the creek reached at 8.00am on 14 January.  Flow depths of the creek are not expected to have impacted anywhere west of Kaye Street. In the areas east of Kaye Street water from the Case No: 237298 Determination Page 9 of 13 creek would have been up to 150mm deep and 0.5m-1m deep further east between there and Back St Arnaud Road.  The insured property floor level is 500mm above surrounding ground levels and this excludes any possibility of inundation solely by stormwater.  Water did not enter the house until around 7.00pm on 14 January, this being 12 hours after the last recorded rainfall in the township.  Any flooding occurring after lunchtime on 14 January can be directly attributed to Avoca River flooding, including the flooding of the Applicant‟s home. W’s Flood Assessment Report dated 5 July 2012  The report has been provided by W to describe the general rainfall and stream flow conditions local to Charlton during the January 2011 flood event. Also, to consider the general flooding mechanisms and to provide a response to PM‟s report.  The major tributary relevant to Charlton is Yeungroon Creek (the creek), located 1.5km east of the township within the broader Avoca River (the river) floodplain. Between the creek and the river are two unnamed tributaries or drainage lines.  The first crossing the Charlton – St Arnaud Road whilst the other flows through town under the Calder Highway and they are defined waterways on Vic maps (1:250,000).  There are two rainfall gauges located in Charlton that record daily totals. Data reveals Charlton received its largest rainfall total on 13 January with 66mm recorded to 9.00am on 14 January.  River levels at Charlton began to rise steeply from about midday on 12 January continuing to rise throughout the afternoon and reaching minor flood level of 5m at 4.00am on 13 January. Levels reached their peak of 8.05m at 1.15am on 15 January, after which there was a steady decline in the levels.  There is no separate stream flow data available for the creek, the Charlton-St Arnaud Road tributary or the Calder Highway tributary.  Terrain modelling shows the western and northern parts of the town would be expected to drain directly to the river while the main central and eastern parts would be expected to drain to the Calder Highway tributary and directly to the creek.  An analysis of the data shows that locally delivered stormwater flows could not have caused significant flooding in Charlton after 7.00am- 8.00am on 14 January.  The continuing flows in the tributaries and other depressions leading into Charlton from after 8.00am on 14 January would have been caused by overland flows resulting from breakouts from Charlton-St Case No: 237298 Determination Page 10 of 13 Arnaud Road tributary, the creek and later also from the river further upstream.  The Charlton-St Arnaud Road tributary would have contributed flows prior to flows from the creek and river.  Water from the creek and Charlton-St Arnaud Road tributary would have a much lower sediment load and appearing clear because upstream of Charlton the creek channel is poorly defined and surrounding areas are well vegetated. This combined with low velocities due to the flat terrain would have limited the flows picking up sediment.  W maintains that clear water is not necessarily an indicator of stormwater, more so of where the water has come from. W accepts that the inundation of the properties in the east began before the town was inundated by flows from the river, however that this was due to water escaping the creek and its minor tributaries. 18. In view of the issues arising in this dispute, the Panel Chair Ombudsman and a Case Manager of FOS conducted a site inspection of the property in the presence of the Applicant and a representative of the FSP on 27 June 2012. The Panel notes the following information from the site inspection:  The property was inundated later tha n most of the other properties visited on the day. However, it was noted that this may have been due to the fact it was approximately 1km west of the stormwater drain that runs through the township. Further, it would seem, on the balance of probabilities, that the dwelling above floor level was inundated by floodwaters from the Avoca River.  The Applicant advised that when she came out of the house on Friday morning (14 January) the stormwater around the house was knee deep.  The home was noted to be two steps (approximately 500mm) higher than the surrounding ground level at the front and rear and the Applicant advised that the water stayed in the yard all day. She noted that after 5.00pm the water started to flow in an east to west direction.  The Applicant evacuated the property at approximately 9.00pm on 14 January as the water came up from under the floorboards. A number of local footballers assisted her to evacuate and move her ill husband. The Applicant notes that once water started coming up through the floorboards it was like an explosion and within 15 minutes the water level was up to her armpits.  There was a garage at the rear of the property constructed at ground level and it was noted that there were contents stored in the garage which were damaged during the event and form part of the claim.  The street level was noted to be higher than the ground level of the property surrounding the dwelling (building structure). Case No: 237298 Determination Page 11 of 13  The Applicant advised that in the previous September 2010 flood event the water came from the west of her property (the Avoca River) however, during this event it came from the east of her property. 19. The Panel notes that the hydrology reports relied on do not seem to have considered the impact of the work undertaken at the Charlton-St Arnaud Road on the natural flow of the water from the floodplain to the Avoca River. The Ombudsman, Case Manager, FSP representative and a number of local residents visited the area as part of the site inspection. The road has been raised to allow access to the airport during floods. In doing so, it dissects the natural floodplain. Although, a number of pipes/culverts have been positioned under the road they are not sufficient to cope with the overland flow and according to locals the flow is diverted initially east of Armstrong Road and eventually through the town. When the road was dug up by machinery on 15 January 2012, the level of inundation within Charlton started to drop. 20. This information was provided by a number of local residents independently of the Applicant to the Ombudsman and Case Manager in the presence of the FSPs representatives. The site visits undertaken by the Panel representatives of the Charlton area and more specifically individual properties including the Applicant ‟s have assisted the Service in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 21. The Panel is concerned by the conflicting inundation timings provided within the evidence made available to the Service by the parties, however, on balance, the Panel is inclined to accept the Applicant‟s position in relation to the time of initial inundation of the home (approximately 9.00pm on 14 January), likely direction/source of that water and clarity of the water at different times of the day. 22. The surrounding area of the Applicant‟s home (ground level i.e. driveway, yards, garage etc) is approximately 50mm-100mm below the road surface. Having regard for the Applicant‟s recollection of how the event unfolded the Panel is satisfied that any early water flow in the area would follow the natural fall of the site towards the home and garage located at the rear of the property. The Panel is persuaded that such water would have been stormwater runoff. 23. The policy is an accidental damage contract and accordingly provides cover for accidental damage to the insured building and contents subject to the noted limitations/exclusions provided within the PDS. Having considered all the information, the Panel considers the Applicant has discharged the onus to show the damage caused by the initial inundation of her property was due to stormwater and accordingly any resultant damage falls within the scope of the policy. 24. Having considered the level of the property relative to the road surface and slope of the land the Panel is of the view that stormwater collecting on the property would have accumulated to a level of about 150-200mm; in the Case No: 237298 Determination Page 12 of 13 circumstances any damage caused by this water up to a level of 200mm would be covered by the policy. 25. The Panel determines that coverage in this regard is additional to any coverage provided under Flood Cover additional benefits. 26. Given the elevation of the building and timing of inundation it is unlikely the inundation of the Applicant‟s home above floor level was due to stormwater runoff alone. More likely the peak level of inundation was due to a combination of flood and stormwater runoff which would be excluded under the policy. The Panel notes it is not disputed that the home was subsequently inundated by floodwaters which had escaped from the Avoca River. 27. The Panel acknowledges the Applicant‟s position in respect to the listed contents items she believes fall within cover as they were damaged whilst located on the veranda‟s outside the insured home. There is limited information made available in respect to the cause and extent of this component of the claim, however, it is not in dispute that the damage occurred whilst the contents were located outside the domestic building. 28. Therefore, the Panel is satisfied that this component of the Applicant‟s claim falls outside the scope of cover available under the policy in line with the „ What is not insured ‟ section within the policy. 29. The Panel has also carefully considered the available evidence submitted by the parties in respect to the claimed damage (cracking/structural damage) alleged to have occurred to the insured building. However, it notes that the policy excluded from cover loss or damage arising from earth movement (except earthquakes) no matter how caused and which would include the circumstances of subsidence, settling, expansion, shrinkage etc. 30. Accordingly, the Panel is satisfied that the Applicant ‟ s claim for indemnity in respect to the structural damage arising due to ground movement arising from the introduction of moisture to the foundations is excluded from cover in line with the relevant provisions noted above. In any event, even had this damage been shown to have resulted solely from the inundation of the property, it is unlikely this would have been due to stormwater alone and would more likely constitute flood damage. Given the FSP has fully discharged its obligations for flood cover in line with the terms of the sub-limit in the policy, indemnity under this event was exhausted. 31. Further, the Panel is mindful of the fact that it has not been provided with sufficient information which would allow it to come to an informed decision as to the extent/degree (monetary) of the FSP‟s liability under the claim arising from the initial stormwater inundation of the garage. 32. Accordingly, the Panel urges the parties to act in a cooperative manner to reasonably establish the extent of damage to the insured property arising from the initial inundation including but not limited to contents stored in the sheds. Case No: 237298 Determination Page 13 of 13 Determination 33. On the basis of the available information the Panel determines that the FSP is liable under the policy to provide indemnity to the Applicant (within 30 days of receiving this determination) in line with the matters discussed above. 34. The FSP is to pay to the Applicant interest at the statutory rate, in line with the Insurance Contracts Act 1984, upon the final settlement figured agreed between the parties from 9 March 2011 (date claim declined) to final settlement of the claim.