Text of the determination
Case No: 237298 Determination Page 1 of 13
Case number: 237298
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision – Flood- Denial of claim
24 September 2012
Background
1. The Applicant held a Private Plan Insurance Policy (the policy) with the
Financial Services Provider (FSP) which provides cover for Accidental
Damage subject to the relevant policy limitations.
2. The insured property in Charlton sustained extensive damage when
inundated by water on 14 January 2011 following the significant weathe r
events experienced in Victoria in January 2011.
3. The FSP partially accepted the Applicant‟s claim in so far as the policy
allows (applicable sub-limits) and has declined indemnity for a major portion
of the Applicant‟s claim on the basis it is due to the event „flood‟.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline to
provide indemnity for a major portion of her loss.
Summary of Applicant’s position
5. The Applicant in disputing the FSP‟s decision to decline the claim has sought
the as sistance of legal representatives “M”. In the interest of brevity both the
Applicant and “ M ” will be referred to as the “the Applicant” for the purpose of
this determination.
The FSP has failed in its obligation to inform the Applicant of exclusions
relati ng to loss or damage arising from the event „Storm‟.
The property was surrounded by clear stormwater runoff in the morning
of 14 January 2011 after 7.30am.
The policy does not include any provision excluding from cover
loss/damage arising from stormwater inundation. Further, the damage
claimed is due to clear stormwater runoff as opposed to floodwaters
which came later.
The Applicant witnessed the event unfolding and maintains that water
surrounded the property and came up against the external walls from
around 5.00pm on 14 January 2011. She evacuated the property at
approximately 9.00pm at which point water had begun inundating the
dwelling through the floorboards.
Determination
Case No: 237298 Determination Page 2 of 13
The Applicant maintains that the water inundation has damaged the
foundations of the home resulting in the appearance of cracks within
the walls.
The loss claimed by the Applicant as set out in the quotes submitted by
“R” may well be disputed by the FSP however it cannot dispute the fact
that the damage has occurred. The Applicant‟s personal obs ervations
of the event and subsequent damage should be preferred over reports
by individuals who were not there or did not even undertake a site visit.
The Applicant is dissatisfied with the consultant reports relied upon by
the FSP and believes the information to be general and/or inaccurate.
Further, she has expressed concerns regarding the management of
this claim and also her previous claim relating to the September 2010
flood event.
The Applicant relies upon the hydrology reports submitted by her
prefe rred consultant “PM”.
The Applicant has provided a CD with photographs starting around
7.00am (14 January) and all the way through to the late evening
showing the build up of water and subsequent inundation of a property.
The Applicant has, on the balance or probabilities, established a prima
facie claim under the policy, therefore the onus shifts to the FSP to
establish an entitlement to decline indemnity for her loss under the
policy.
Summary of FSP’s position
6. The FSP maintains:
Based on the available evidence it is clear that the damage claimed is
due to floodwater inundation, an event clearly excluded under the
policy. However, the policy allows for limited cover up to $20,000
(buildings and contents combined arising from one event) under the
„Flood Cover‟ additional benefit.
Further, in respect to the Applicant‟s claim regarding structural damage
arising from the inundation of the home‟s foundation, this has not been
established to be due to this event and/or stormwater runoff. The FSP
has settled the claim in line with the benefits available under the policy.
Further, although the FSP continues to dispute that stormwater
inundation occurred at the insured property, if the Service were to
accept that stormwater inundation did initially occur the cracking or
structural damage claimed is due to earth movement and such damage
is excluded under the general exclusion relating to ground movement
„no matter how caused‟.
There is no dispute the Product Disclosure Statement (PDS) was
provided to the Applicant, and also the wording of the policy is clear
and unambiguous in respect to the scope and limits of the cover.
Case No: 237298 Determination Page 3 of 13
The Applicant does not dispute the inundation of the insured property
above floor level was due to floodwaters having escaped the banks of
Avoca River.
The FSP notes that PM has advised that the stormwater drainage
system in Charlton was at capacity after the morning of 13 January
2011 with runoff unable to drain away due to the rising level of Avoca
River. Such circumstances fall under the accepted position that such
water (from that point on) is classified as floodwater.
Further, the timing of the inundation of the property as advised by the
Applicant, and in line with the reports submitted by hydrologists “W” are
consistent with the overflowing of the Avoca River, and accordingly
would be classed as floodwater inundation.
Concerns raised by the Applicant in respect to the previous claim
(September 2010) are not related to this current claim and/or dispute
before the Service and are a separate matter.
Further, there was no dispute in respect to the cause of the loss in
September 2010 being floodwater.
By paying the Applicant the full extent of cover available under the
additional benefit the FSP had fulfilled its obligations under the policy in
respect to both claims.
The FSP notes the Applicant‟s contention in respect to the contents
items damaged whilst on the veranda at the insured property during the
initial stormwater inundation. The FSP disputes stormwater inundation
occurred at the property, however if it is to be accepted that such did
occur, the FSP submits that the damaged contents (located on the
veranda(s)) would be considered to be „outside the home‟ under the
policy. There is no cover for contents whilst located outside the home.
The FSP reg rets the Applicant is dissatisfied with the FSP‟s
management of the claim; however it maintains that all decisions and
payments issued under the claim have been in line with the provisions
of the policy.
7. The FSP relies on the following policy provisions:
“ What you are insured against
This policy insures You against accidental damage, burglary and theft
occurring during the Period of Insurance.
…
What is not insured
This policy does not insure You against:
1. damage directly caused by:
- Rain, hail or snow to Contents unless they are in a Domestic Building
when damaged
- Flood, except as described under the additional benefit „Flood cover‟
- …
Case No: 237298 Determination Page 4 of 13
- Earth movement (except earthquake) no matter how caused, including
erosion, vibration, subsidence, seepage, saturation, creeping, landslip,
mudslide, collapse, shrinkage, settling, expansion or heaving
…
Flood Cover
If „Building‟ is shown on the certificate of insurance, We pay up to $20,000 for
damage to Your Home directly caused by Flood during the Period of
Insurance arsing out of one event.
If „Contents‟ is shown on the certificate of insurance, We pay up to $10,000 for
damage to Contents in Your Home directly caused by Flood during the Period
of Insurance arsing out of one event.”
Issues
8. Whether damage to the Applicant‟s p roperty was caused by flood water as
defined by the policy.
9. Whether the FSP is entitled to decline indemnity to the Applicant under the
claim.
Reasons for decision
10. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to the Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. This is because of the complex nature of
the issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
11. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
12. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
13. The Panel Chair Ombudsman attended on site with the Case Manager
where they met with the Applicant and a representative of the FSP.
14. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
15. The Panel notes that the parties do not dispute the following:
The Applicant held an active home building and contents insurance
policy with the FSP at the time of loss.
Case No: 237298 Determination Page 5 of 13
The FSP provided and the Applicant received the relevant policy
documentation including the Product Disclosure Statement (PDS).
The insured property suffered significant damage arising from the
weather events experienced in the area during January 2011.
The insured property includes a garage to the rear of the property
which was inundated during the event resulting in loss of contents
insured under the policy.
The Applicant evacuated the property at approximately 9.00pm on 14
January 2011 at which time the water quickly begun to come up
through the homes floorboards and inundate the dwelling.
16. The Panel having reviewed the available evidence is satisfied that the main
issue in contention between the parties pertains to whether the insured
property was initially inundated by stormwater which would give rise to a
degree of indemnity under the policy. The Pane l is satisfied that the property
was ultimately inundated by floodwater to the maximum level; however,
consideration as to whether there was an extent of initial stormwater
inundation has been detailed below.
Cause of the Loss
17. The Panel has been provided with multiple consultants‟ reports obtained and
relied upon by the parties. The Panel notes that this information has been
exchanged between the parties, each having had the opportunity to
comment. Accordingly, in the interest of brevity, the Panel will only restate
information from these reports if found necessary in providing this
Determination.
Consultant’s Reports
PM’s Charlton Floods - January 2011 dated 3 November 2011
The town of Charlton experienced heavy rainfall between 10 January-
14 January with extensive flooding in the area from the Avoca River
from 14 January onwards.
Total rainfall over this period was recorded at 168.6mm with 66.2mm
falling between 9.00am on 13 January and 9.00am on 14 January.
The highest intensity rainfall recorded was 15mm/hr between 7.00am-
8.00am on 13 January. There was no rainfall recorded after 8.00am on
14 January.
Although the records calculate the rainfall intensity on an hourly basis,
PM maintains that the rainfall periods at Charlton were highly
concentrated in short duration bursts e.g. 10 to 12 minute intervals.
Accordingly, if calculated on this basis it would represent 20-50 year
ARI rainfall events as opposed to 1-2 year ARI events (based on hourly
intervals).
Case No: 237298 Determination Page 6 of 13
Accordingly, overflow from local drainage systems a nd culverts were
highly likely as these systems are only designed to cope with 2-5 year
ARI rainfall events.
Time of overflow would have to correspond closely with the timing of
the intense rainfall periods and based on this the first stormwater
drainage overflow event would have occurred at around 7.00am on 13
January.
There are two possible sources of rainwater run-off in Charlton, run-off
in the town which does not enter the stormwater drainage system and
run-off from surrounding rural areas.
All rainfall that fell on 13 January and 14 January would have become
saturated overland flow and followed natural drainage lines into
Charlton. This would have led to the inundation of Charlton on these
dates prior to the arrival of floodwaters from the Avoca River.
Floodwaters from the Avoca River would be of high sediment loads
(muddy/mucky) and would not be clear. Clear water inundation would
support that prior to the arrival of floodwaters from the Avoca River
there was water sourced from local stormwater.
Depending on the exact locations of the properties, they will have
begun to have been inundated by floodwater sometime on the
afternoon or early evening of 14 January. Any inundation before this
time would be from runoff particularly corresponding to times when
heavy rainfall were occurring (13 January and early morning 14
January).
Evidence in respect to water inundation of properties which occurred
particularly before 5.00pm on 14 January should be taken into account.
PM’s additional report dated March 2011
Site visit (Charlton) undertaken on 2-3 March 2012, with interviews also
carried out with the homeowners.
A survey revealed that the stormwater drainage system empties directly
into the Avoca River close to the Calder Highway Bridge. The
implication of this being as river levels rose in the Avoca River the
stormwater outlet would have been inundated with river water. This
would result in the drains being backfilled to capacity preventing
stormwater on the surface from draining away.
A survey revealed that the upper height of the stormwater outlet pipe is
4.6m (relative to the river height records). This water level was reached
early in the morning on 13 January [2011]. From this point on the
stormwater drainage system in Charlton would not be able to drain
away freely. Stormwater accumulation therefore becomes an issue in
Charlton from mid-morning on 13 January.
Survey reveals that the eastern side of Charlton has a significant
depression and occupies lower land than the western side of Charlton.
The town slopes towards the north i.e. Armstrong Street is 35cm higher
at the junction with Donald Street compared to High Street side, and
Case No: 237298 Determination Page 7 of 13
Wilson Street is 45cm higher at the junction with Watson Street
compared to High Street end.
Therefore, water moves through the to wn (high to low) until it is
impeded by the train tracks that run parallel to Davies Street. Both
topographical survey and new modelling indicate that property in the
east of Charlton, especially those close to High Street were inundated
by locally accumulating stormwater which followed a drainage line
independent of any watercourses close to Charlton.
The witness accounts provide varied evidence in respect to the arrival
of sediment laden water flows associated with the rapid rise in water
levels. The likely explanation for this is that inundation from the river (in
the afternoon of 14 January) was widespread, with water levels rising
accordingly. However, the complete mixing of the two water bodies had
not yet occurred in the central and high parts of town.
The mixing of clear water and muddy water was a gradual process and
it is likely that it took some time for water sourced directly from the river
to flow across the whole town and mix with locally sourced stormwater.
In this situation flooding in some ho uses was therefore controlled by the
rise in the river level but the actual water at the site was stormwater.
Major flood level for Charlton is 7.5m at the gauging station near the
bridge over the Avoca River, which was reached at 5.15pm on 14
January. It is possible that other parts of the riverbank to the south and
west of Charlton had low points which allowed water to leave the river
and inundate parts of the town somewhat earlier than 6.00pm. Flood
modelling indicates earlier overtopping of the river played a part in
inundating the west and southwest of Charlton.
The Applicant‟s property is on the north side of Watson Street in the
centre of Charlton, approximately 580m from the drain running through
the east side of Charlton.
The Applicant advised PM that:
At around 4.00pm (14 January) water moving from Learmonth
Street came into Watson Street from the east.
At around 5.00pm the water moved over the lawn and came up
against the dwelling, however was not enough to enter the
dwelling.
Shortly before she evacuated the property at 9.30pm water
entered the home and the water level rose quickly.
PM maintains that the position of the home would mean the inundation
would have occurred later than houses to the east and west.
Despite it being clear water that inundated the home (as late as
9.30pm) the rise in the water level which caused the flooding was
almost certainly caused by the Avoca River.
The inundation of the property (outside) between 5.00pm-6.00pm (14
January) would probably be due to local water and would have covered
Case No: 237298 Determination Page 8 of 13
the slab and lower parts of the foundations, but not have entered the
home.
W’s Flood Assessment Report 31 January 2011
Multiple site inspections were undertaken on 24 January 2011.
The average rainfall records for the upper regions of the Avoca River
catchment are about 600mm per annum.
The Avoca River has flooded the town of Charlton a number of times in
the past due to high rainfalls.
The Avoca River catchment soaked from previous rainfalls resulted in a
higher than average conversion of rainfall to runoff, increasing the
water flowing directly into watercourses and resulting in flooding across
Victoria.
Flood warnings were issued for a number of rivers including the Avoca
River with the one of the towns affected by the flooding being Charlton.
Historically Charlton has been flooded from two directions in a north
south plain with an area remaining flood free through the centre of town
along the St Arnaud – Charlton Road.
The most intense rainfalls periods in Charlton were experienced in the
morning of 11 January 2011 and early morning 13 January, with the
maximum flood level in Avoca River reaching its peak early morning 15
January.
Flooding of the township was similar to the September 2010 event,
however, a much greater volume of water has been experienced in the
eastern end of town on this occasion (January 2011).
Given the timing of the flooding of the eastern edge is similar to that of
the gauge readings it is suggested that the Yeurngoon Creek and
Avoca River flows merged to become one s ystem.
Any flooding occurring after lunchtime (14 January) can be directly
attributed to Avoca River/Yeurngoon Creek flooding.
Flood inundation that occurred east of Armstrong Street early morning
(14 January) can be attributed to stormwater flooding.
The approximate inundation time for the insured property is 7.00pm on
14 January.
W’s Flood Assessment Report dated 4 January 2012
Preliminary hydraulic modelling confirms the flow mechanism that
occurred during the event. The Yeungroon Creek catchment responded
more quickly to rainfall in the area on 13-14 January 2011, with the
peak level of the creek reached at 8.00am on 14 January.
Flow depths of the creek are not expected to have impacted anywhere
west of Kaye Street. In the areas east of Kaye Street water from the
Case No: 237298 Determination Page 9 of 13
creek would have been up to 150mm deep and 0.5m-1m deep further
east between there and Back St Arnaud Road.
The insured property floor level is 500mm above surrounding ground
levels and this excludes any possibility of inundation solely by
stormwater.
Water did not enter the house until around 7.00pm on 14 January, this
being 12 hours after the last recorded rainfall in the township.
Any flooding occurring after lunchtime on 14 January can be directly
attributed to Avoca River flooding, including the flooding of the
Applicant‟s home.
W’s Flood Assessment Report dated 5 July 2012
The report has been provided by W to describe the general rainfall and
stream flow conditions local to Charlton during the January 2011 flood
event. Also, to consider the general flooding mechanisms and to
provide a response to PM‟s report.
The major tributary relevant to Charlton is Yeungroon Creek (the
creek), located 1.5km east of the township within the broader Avoca
River (the river) floodplain. Between the creek and the river are two
unnamed tributaries or drainage lines.
The first crossing the Charlton – St Arnaud Road whilst the other flows
through town under the Calder Highway and they are defined
waterways on Vic maps (1:250,000).
There are two rainfall gauges located in Charlton that record daily
totals. Data reveals Charlton received its largest rainfall total on 13
January with 66mm recorded to 9.00am on 14 January.
River levels at Charlton began to rise steeply from about midday on 12
January continuing to rise throughout the afternoon and reaching minor
flood level of 5m at 4.00am on 13 January. Levels reached their peak
of 8.05m at 1.15am on 15 January, after which there was a steady
decline in the levels.
There is no separate stream flow data available for the creek, the
Charlton-St Arnaud Road tributary or the Calder Highway tributary.
Terrain modelling shows the western and northern parts of the town
would be expected to drain directly to the river while the main central
and eastern parts would be expected to drain to the Calder Highway
tributary and directly to the creek.
An analysis of the data shows that locally delivered stormwater flows
could not have caused significant flooding in Charlton after 7.00am-
8.00am on 14 January.
The continuing flows in the tributaries and other depressions leading
into Charlton from after 8.00am on 14 January would have been
caused by overland flows resulting from breakouts from Charlton-St
Case No: 237298 Determination Page 10 of 13
Arnaud Road tributary, the creek and later also from the river further
upstream.
The Charlton-St Arnaud Road tributary would have contributed flows
prior to flows from the creek and river.
Water from the creek and Charlton-St Arnaud Road tributary would
have a much lower sediment load and appearing clear because
upstream of Charlton the creek channel is poorly defined and
surrounding areas are well vegetated. This combined with low
velocities due to the flat terrain would have limited the flows picking up
sediment.
W maintains that clear water is not necessarily an indicator of
stormwater, more so of where the water has come from. W accepts that
the inundation of the properties in the east began before the town was
inundated by flows from the river, however that this was due to water
escaping the creek and its minor tributaries.
18. In view of the issues arising in this dispute, the Panel Chair Ombudsman and
a Case Manager of FOS conducted a site inspection of the property in the
presence of the Applicant and a representative of the FSP on 27 June 2012.
The Panel notes the following information from the site inspection:
The property was inundated later tha n most of the other properties
visited on the day. However, it was noted that this may have been due
to the fact it was approximately 1km west of the stormwater drain that
runs through the township. Further, it would seem, on the balance of
probabilities, that the dwelling above floor level was inundated by
floodwaters from the Avoca River.
The Applicant advised that when she came out of the house on Friday
morning (14 January) the stormwater around the house was knee
deep.
The home was noted to be two steps (approximately 500mm) higher
than the surrounding ground level at the front and rear and the
Applicant advised that the water stayed in the yard all day. She noted
that after 5.00pm the water started to flow in an east to west direction.
The Applicant evacuated the property at approximately 9.00pm on 14
January as the water came up from under the floorboards. A number of
local footballers assisted her to evacuate and move her ill husband.
The Applicant notes that once water started coming up through the
floorboards it was like an explosion and within 15 minutes the water
level was up to her armpits.
There was a garage at the rear of the property constructed at ground
level and it was noted that there were contents stored in the garage
which were damaged during the event and form part of the claim.
The street level was noted to be higher than the ground level of the
property surrounding the dwelling (building structure).
Case No: 237298 Determination Page 11 of 13
The Applicant advised that in the previous September 2010 flood event
the water came from the west of her property (the Avoca River)
however, during this event it came from the east of her property.
19. The Panel notes that the hydrology reports relied on do not seem to have
considered the impact of the work undertaken at the Charlton-St Arnaud
Road on the natural flow of the water from the floodplain to the Avoca River.
The Ombudsman, Case Manager, FSP representative and a number of local
residents visited the area as part of the site inspection. The road has been
raised to allow access to the airport during floods. In doing so, it dissects the
natural floodplain. Although, a number of pipes/culverts have been
positioned under the road they are not sufficient to cope with the overland
flow and according to locals the flow is diverted initially east of Armstrong
Road and eventually through the town. When the road was dug up by
machinery on 15 January 2012, the level of inundation within Charlton
started to drop.
20. This information was provided by a number of local residents independently
of the Applicant to the Ombudsman and Case Manager in the presence of
the FSPs representatives. The site visits undertaken by the Panel
representatives of the Charlton area and more specifically individual
properties including the Applicant ‟s have assisted the Service in gaining a
greater understanding of the topography and impact of the stormwater runoff
in the area prior to the arrival of floodwater from Avoca River.
21. The Panel is concerned by the conflicting inundation timings provided within
the evidence made available to the Service by the parties, however, on
balance, the Panel is inclined to accept the Applicant‟s position in relation to
the time of initial inundation of the home (approximately 9.00pm on 14
January), likely direction/source of that water and clarity of the water at
different times of the day.
22. The surrounding area of the Applicant‟s home (ground level i.e. driveway,
yards, garage etc) is approximately 50mm-100mm below the road surface.
Having regard for the Applicant‟s recollection of how the event unfolded the
Panel is satisfied that any early water flow in the area would follow the
natural fall of the site towards the home and garage located at the rear of the
property. The Panel is persuaded that such water would have been
stormwater runoff.
23. The policy is an accidental damage contract and accordingly provides cover
for accidental damage to the insured building and contents subject to the
noted limitations/exclusions provided within the PDS. Having considered all
the information, the Panel considers the Applicant has discharged the onus
to show the damage caused by the initial inundation of her property was due
to stormwater and accordingly any resultant damage falls within the scope of
the policy.
24. Having considered the level of the property relative to the road surface and
slope of the land the Panel is of the view that stormwater collecting on the
property would have accumulated to a level of about 150-200mm; in the
Case No: 237298 Determination Page 12 of 13
circumstances any damage caused by this water up to a level of 200mm
would be covered by the policy.
25. The Panel determines that coverage in this regard is additional to any
coverage provided under Flood Cover additional benefits.
26. Given the elevation of the building and timing of inundation it is unlikely the
inundation of the Applicant‟s home above floor level was due to stormwater
runoff alone. More likely the peak level of inundation was due to a
combination of flood and stormwater runoff which would be excluded under
the policy. The Panel notes it is not disputed that the home was
subsequently inundated by floodwaters which had escaped from the Avoca
River.
27. The Panel acknowledges the Applicant‟s position in respect to the listed
contents items she believes fall within cover as they were damaged whilst
located on the veranda‟s outside the insured home. There is limited
information made available in respect to the cause and extent of this
component of the claim, however, it is not in dispute that the damage
occurred whilst the contents were located outside the domestic building.
28. Therefore, the Panel is satisfied that this component of the Applicant‟s claim
falls outside the scope of cover available under the policy in line with the
„ What is not insured ‟ section within the policy.
29. The Panel has also carefully considered the available evidence submitted by
the parties in respect to the claimed damage (cracking/structural damage)
alleged to have occurred to the insured building. However, it notes that the
policy excluded from cover loss or damage arising from earth movement
(except earthquakes) no matter how caused and which would include the
circumstances of subsidence, settling, expansion, shrinkage etc.
30. Accordingly, the Panel is satisfied that the Applicant ‟ s claim for indemnity in
respect to the structural damage arising due to ground movement arising
from the introduction of moisture to the foundations is excluded from cover in
line with the relevant provisions noted above. In any event, even had this
damage been shown to have resulted solely from the inundation of the
property, it is unlikely this would have been due to stormwater alone and
would more likely constitute flood damage. Given the FSP has fully
discharged its obligations for flood cover in line with the terms of the sub-limit
in the policy, indemnity under this event was exhausted.
31. Further, the Panel is mindful of the fact that it has not been provided with
sufficient information which would allow it to come to an informed decision as
to the extent/degree (monetary) of the FSP‟s liability under the claim arising
from the initial stormwater inundation of the garage.
32. Accordingly, the Panel urges the parties to act in a cooperative manner to
reasonably establish the extent of damage to the insured property arising
from the initial inundation including but not limited to contents stored in the
sheds.
Case No: 237298 Determination Page 13 of 13
Determination
33. On the basis of the available information the Panel determines that the FSP
is liable under the policy to provide indemnity to the Applicant (within 30 days
of receiving this determination) in line with the matters discussed above.
34. The FSP is to pay to the Applicant interest at the statutory rate, in line with
the Insurance Contracts Act 1984, upon the final settlement figured agreed
between the parties from 9 March 2011 (date claim declined) to final
settlement of the claim.