Home / Financial Firm (Unknown - Insurer) / Determination 237257

Determination 237257

Denial of contents claim as flood damage

FirmFinancial Firm (Unknown - Insurer)
Decided2011-12-15
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord's contents claim after the January 2011 Brisbane flooding was declined as flood damage. AFCA found the FSP proved the water was flood water, including rainwater backing up from drains when the river was full, so the flood exclusion applied.

Rainwater or river water that cannot discharge because a watercourse is full is flood water, which the policy excludes.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 237257 Determination Page 1 of 6 Case number: 237257 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim - Flood 15 December 2011 Background 1. Water inundated the Applicant’s property late on the night of 11 January 2011 as a result of intense rainfall in the area. 2. The Applicant’s claim under his landlord insurance policy for damage to the contents of his property was denied by the Financial Services provider (FSP) on the ground that the damage was caused by flood water and as such was excluded from cover provided by the policy. Summary of Applicant’s Position 3. The rejection of his claim was based on interpretation of the flood definition in the policy. 4. A municipal grate is located in the street outside the unit. He contends that water entered the unit from overland flow and from the stormwater grate overflowing. 5. He considers that no consideration has been given by the FSP to the extra- ordinary circumstances surrounding the cause for the damage and the consequences thereof. 6. The experts relied on by the FSP have defined the water-flow to suit the terms of the policy, but regardless of storm or flood, water entered the property and caused substantial damage and loss through no fault of his. Summary of FSP’s Position 7. The FSP relies on an assessor’s report, a regional hydrological report a site specific hydrologist report and a hydrological report commissioned by the Insurance Council of Australia (ICA). 8. The FSP refers to the following relevant policy terms: “What you are covered for Determination Case No: 237257 Determination Page 2 of 6 Storm If your Landlord buildings or Landlords contents suffer loss or damage caused by  a violent wind, cyclone or tornado  thunderstorm or hail which may be accompanied by rain or snow, or  a sudden, excessive run-off of water as a direct result of a storm in your local area. ... we will under contents insurance - replace or repair your damaged Landlord contents ... However ... - we will NOT cover loss or damage caused by flood unless: you have chosen the option for Flood Cover in SA or WA. ... What you are not covered for – general exclusions we will NOT cover ...  loss or damage caused by flood ... ... Glossary flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified, Flood also means water scaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this policy” 9. The hydrological report commissioned by the ICA leaves little doubt that severe flooding occurred in the Paddington area on and around 11 January 2011 being the date of the claimed loss. 10. The regional hydrological report finds that between 9 and 12 January 2011, the Brisbane area received noticeably less rainfall than areas in the upper catchment areas of the Brisbane River. This report supports the findings in the ICA report that significant flooding of the Brisbane River occurred over 11 and 12 January 2011 which caused significant property damage in the Brisbane area. 11. Photographic evidence obtained depicts water overflowing from the Brisbane River and north towards the Paddington area with the water reaching and covering the ground surrounding the Applicant’s property. Case No: 237257 Determination Page 3 of 6 12. The FSP submits that the photographic evidence shows catastrophic flood damage rather than storm damage or the overflowing of a municipal grate. The FSP argues that it should not be accepted that the overflowing of a grate could give rise to the widespread inundation shown in the photographs. 13. The assessor reported that silty brown water entered the property from both the front and rear. This is not consistent with the source of water from the grate located in the street. Water could not have entered the property from both directions as a result of the grate overflowing. 14. The ICA report and the hydrology report confirm that at the time the property was inundated, the Paddington region was undergoing a severe flooding. 15. Moreover the rainfall statistics indicate that rainfall was subsiding at the time of the inundation. 16. The site specific hydrologist report noted the rainfall experienced at the property would not have been sufficient to inundate the first floor of the property and that the stormwater infrastructure surrounding the property would have been sufficient to handle the level of rainfall at that time. In addition the overflow of the Brisbane River would cause floodwater to travel into the open drain and across the low-lying surrounding areas. These flows would have entered the piped drainage system around the property causing stormwater systems to overflow. 17. Pursuant to the Wayne Tank principle, if the escape of water from the stormwater systems was a cause for the damage, then that damage is not covered by the policy even if some other insured event was also a cause of the damage. Issues 18. Whether the FSP was entitled to deny liability for the claim on the basis that the damage was caused by floodwater. Reasons for Decision 19. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 20. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with experience in consumer claims. 21. The Panel Chair Ombudsman attended on site where he met with a representative of the FSP. The Applicant was unable to attend on this occasion. Case No: 237257 Determination Page 4 of 6 22. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 23. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 24. When making a claim under an insurance policy the responsibility rests with the policyholder to establish on the balance of probabilities the cause for the loss claimed falls within the terms of cover provided by the policy. An FSP relying on a clause in the policy to deny the claim has the responsibility to establish on the balance of probabilities the terms of the relevant exclusion clause apply to defeat the claim. 25. A copy of the hydrological reports relied on by the FSP have been made available to the Applicant. Accordingly the contents of those reports will not be recited in this determination except where considered relevant. 26. It is a matter of public knowledge that Southeast Queensland experienced intense rainfall between about 9 January 2011 and 13 January 2011. As a result of this intense rainfall, the Brisbane River and its tributaries over topped its banks causing widespread flooding and major property damage. 27. According to the loss assessor’s report, water entered the property late on the night of 11 January 2011. The water level inside the property was at a height of 920mm and externally at 1m. The water entered the premises from both the front and rear. It was noted as stormwater and was brown and silty. 28. The hydrologist report commissioned by the ICA titled “Flooding in Brisbane City LGA” dated 20 February 2011 provides a detailed study and analysis of the weather patterns, rainfall data and the resultant effect on the river systems. 29. The ICA report provided the following information.  There were three distinct and significant rainfall periods from 9 to 13 January across the Brisbane City LGA. (page i)  The first occurred from around 0900 hours to 2100 hours on 9 January  The second from around 0600 to 1000 hours on 10 January.  The third from around 0600 to 1600 hours on 11 January.  Releases were made from Wivenhoe Dam over the period from 0600 hours on 11 January to 0300 hours on 12 January  Releases from the Wivenhoe Dam caused a floodwave in the Brisbane River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the dam and through the Brisbane City LGA. (9.3 para 2)  Given the rainfall across the Brisbane City LGA ceased by 1800 hours on 11 January, any flooding after this time will have been caused by water flow inundation from the Brisbane River and its tributaries. (pii) Case No: 237257 Determination Page 5 of 6 30. The regional hydrologist report dated 17 February 2011 largely supports the information provided in the ICA report. 31. It is therefore evident that the majority of damage caused by water inundation to properties located within the vicinity of the river system during the period commencing from 11 January was a result of flooding from the Brisbane River which had been significantly influenced by releases from Wivenhoe Dam. 32. A hydrologist was appointed to ascertain whether the inundatio n of the Applicant’s property was a result of the Brisbane River overtopping its banks or from storm water. 33. The hydrologist’s report noted:  Rainfall data at Toowong, about 3km north of the Applicant’s property, shows a moderate intensity continuous rainfall falling from 0900 on 9 January resulting in 100mm of rainfall over a period of 24 hours.  A further 50mm was accumulated between 10.00 and 15.00 on 11 January. The peak intensity was estimated to have an ARI of 1 year.  Given the small catchment size drai ning into the site there would not have been sufficient runoff from the local area to inundate the first floor of the building.  The surrounding stormwater infrastructure was adequate for the flows generated by rainfall with an estimated ARI of 1 year. The report concluded: “in our opinion the inundation at [Applicants’ property] was caused by flood water escaping from the normal confines of the Brisbane River as well as backing up through the open channel located south east of the site.” 34. Significantly, the hydrologist noted: “it is noted that as the water level in the Brisbane River began to rise, river water would have begun to flow up the open channel located south east of the property. ... With the river level continuing to rise, river water would have discharged from the open channel to inundate the low lying areas. Flows from the open channel have also potentially entered piped drainage systems, causing the overflow of stormwater inlets prior to direct inundation from the Brisbane River 35. It has been es tablished that rainfall recorded in the region of the Applicant’s property on 11 January was 50mm being significantly less than that recorded for the previous period. 36. According to the hydrologist, the extent of rainfall in the region of the Applicant’s pro perty on 11 January was consistent with an ARI (Average Recurrence Interval) of one year. The stormwater infrastructure surrounding the Applicant’s property was considered capable of dispersing this level of rainfall given the small catchment area draining into the stormwater drains. Case No: 237257 Determination Page 6 of 6 37. The evidence therefore does not support a finding that water which may have backed up from the grate in the street near the Applicant’s property was surface runoff rainwater that the drainage system was incapable of accommodating. 38. Further, it is established law that rainwater which backs up from stormwater drains/pipes as it cannot discharge into a river system because the river water level was above the stormwater pipe outlet is deemed to be flood water. The authority for this is found in K. Sita Plastics v Cornhill Insurance (1982) 2NZLR 50(CA) in which it was stated (in part) “ ... In ordinary and natural language I think that a watercourse is said to overflow its normal banks when all the water that would otherwise drain or fall into it cannot be contained in it because it is full. All surplus water is then overflow, no matter whether or not some of it has at one time been within the banks and then forced out.” 39. It follows that in the event rainwater backed up from the grate in front of the Applicant’s pr operty as it could not discharge into the river system, that water is deemed to be flood water. Any resultant damage to the Applicant’s property from this source is captured by the flood exclusion in the policy. 40. Irrespective of whether the water which dama ged the Applicant’s property was escaping river water which had backed up through the drainage system, or whether it was rainwater which could not discharge into the river system because the river was full, all such water is deemed to be floodwater. 41. Therefore, having regard to the available material, the Panel concludes on the balance of probabilities that the FSP has discharged the onus that rests with it to show that the damage claimed was caused by flood water as defined by the policy. 42. The policy does not cover loss or damage caused by flood. Determination 43. On the basis of the available information the Panel determines that the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.