Text of the determination
Case No: 236992 Determination Page 1 of 14
Case Number: 236992
General Insurance - Home Building – Fire damage - Quantum – Deed of
Release
16 December 2011
Background
1. The Applicant insured his home building under a Home Insurance Policy for
$265,520, with a $300 policy excess, against loss or damage caused by
insured events. The policy was current for the period 20 March 2010 to 20
March 2011.
2. On 16 May 2010 the building was severely damaged by fire. The Financial
Services Provider (FSP) accepted liability for the Applic ant‟s claim under his
policy of insurance.
3. The FSP arranged for a Scope of Works (SOW) to be prepared. Building
consultant “TB” prepared a SOW dated 1 June 2010 which was submitted to
two builders for quotations to reinstate the Applicant‟s house. Builder “S”
quoted $218,154 and builder “P” $251,213. The FSP states that included in the
quotes were costs for make safe works and removal of asbestos. Builder S
quoted $42,447.16.
4. However, the actual cost incurred for the make safe works and removal of
asbestos was $36,631.54.
5. The Applicant identified problems with water damage to the floor of the house
as a result of water entry by the fire brigade and the ingress of water from
rainfall entering through ill fitting tarpaulins.
6. The FSP engaged building consultant TB to inspect and report on the sub floor
area. In his report dated 31 August 2010, TB stated:
“ It is my opinion that the existing sub floor framing and the existing timber wall
framing is generally sub standard in workmanship and does not meet current
building codes.
Rectification work would not be a financially viable option.
It is my further opinion that the restoration works as proposed in my scope of works
be not carried out on the sub standard floor structure or sub standard wall framing.
I recommend that the remaining structure be demolished and a new building of
similar size be erected.”
Determination
Case No: 236992 Determination Page 2 of 14
7. The Applicant disputed the FSP‟s decision to repair his house which he
considered should have been demolished and rebuilt. He contends the FSP
should have paid him the sum insured amount of $265,520 so that he could
have rebuilt his house.
8. However, the FSP maintained its position to repair the house and eventually
cash settled the Applicant for the amount of $196,430.07.
9. On 12 November 2010 the Applicant signed a Deed of Release (the Deed) for
the amount of $196,430.07.
Summary of Applicant’s Position
10. During the history of the claim the Applicant contends the following events
occurred:
The amount paid for make safe and removal of asbestos was
excessive and he was not provided with a breakdown of how the
amount was arrived at;
The FSP‟s loss assessor made an unauthorised entry onto his
property;
He did not sign off on the SOW as he considered it to be incomplete
and inconclusive and not comprehensive enough to repair his house;
The Applicant appointed a consulting engineer (engineer) to inspect
and report on the structural adequacy of the building and recommend
remedial works/scope of works if applicable.
The engineer reported:
Major damage to wall frames;
o Insufficient fixing/bracing of wall frames where not fire damaged;
o Insufficient connection between veneer wall and timber frame;
o Inadequate support and tie down of sub -floor system;
o Bearers too close to ground at western end of dwelling.
o The cost of restoration not considered economically viable and
recommended complete demolition and construction of a new
dwelling.
The quality of the removal of asbestos from his property was of a poor
standard as a quantity of broken asbestos had been left under his house
which did not make his house fail safe;
He was bullied into signing the Deed of Release. The FSP was only
required to pay 12 months for his temporary accommodation and it took
five months to arrive at a settlement figure which he had to accept;
At the time of the settlement amount being arrived at, he had not had
house plans drawn up so as to get a clearer idea whether he was going to
be able to rebuild entirely or rebuild making use of what he could recover
from the pre-existing house;
Case No: 236992 Determination Page 3 of 14
The FSP deducted the amount of $42,447.16 from the quote to repair
his house. This amount should have been paid from the „Other cover‟
section of his policy of insurance;
He should be paid the balance between the sum insured of $265,520
and the amount he was paid so that he can complete rebuilding his
house.
Summary of FSP’s Position
11. The FSP‟s Notice of Response has been prepared by its legal advisers who will
be referred to as „the Applicant ‟.
12. The FSP and the Applicant have executed a Deed of Release with respect to
the Applicant‟s claim for indemnity pursuant to which the FSP paid the
Applicant the amount of $196,730.07 and the Applicant is precluded from
making any further claims against it.
The Make Safe/Asbestos Claim
13. The FSP accepted that the make safe and asbestos removal is covered by the
policy under „Other cover‟. It also accepts that these costs are covered under
„Demolishing and removing debris‟ cover under the policy.
14. However, the FSP disputes that the cost of the make safe and asbestos
removal was arbitrarily taken from the Applicant‟s claim. The FSP obtained a
quote from builder S and paid S directly as it is entitled to do under the terms
and conditions of the policy.
15. With the agreement of the Applicant, the FSP arranged for its preferred builder
to conduct the make safe and to remove the asbestos. The Applicant has not
incurred any costs in relation to the make safe works and asbestos removal.
Accordingly, there is no basis upon which the Applicant is entitled to be
refunded these costs.
16. The quotes submitted by two builders included the cost of the make safe and
removal of asbestos. In view of the FSP paying builder S directly, the Applicant
has not been prejudiced in any way.
17. The reason why the FSP „deducted‟ the cost of asbestos removal and make
safe from the settlement sum was because the FSP paid such sums directly to
builder S under the terms of the policy.
18. The Applicant contends the make safe and asbestos removal cost was double
the reasonable rate. However, the FSP obtained two quotes for this work and
considered the quote from builder S to be fair and reasonable.
19. Further, the FSP obtained a Certificate of Clearance dated 4 August 2010 from
an environmental monitoring service which details that the asbestos removal
was completed satisfactorily.
Case No: 236992 Determination Page 4 of 14
20. The Applicant states that the amount of $42,447.16 was deducted from the total
claim amount. The FSP contends that the sum of $42,447.16 has not been
taken from the claim. The amount of $42,447.16 was simply the amount of the
quote provided by builder S.
21. The Applicant has been paid the amount $196,730.07 to repair the property
and the FSP has paid $36,631.54 directly to S for the make safe and asbestos
removal. The „deduction‟ of the quoted amount of $42,447.16 was simply a way
of calculating the quoted amount to repair the property.
Unauthorised Entry Onto the Property
22. The Applicant alleges that a representative of the FSP entered his property
without the Applicant‟s consent. In a letter dated 5 November 2010, the FSP
stated that access to his property was essential to ensure completeness of the
SOW. However, the FSP acknowledges that it would have been courteous to
consult with the Applicant regarding the timing of the additional inspection.
Repair and Replace Claim
23. Building consultant TB provided a SOW which was submitted to builders S and
P to provide quotations. Builder S quoted $218,154 and builder P $251, 213.
The FSP selected builder S‟s quote.
24. On 9 July 2010, the Applicant reported that the floors of the house had
deteriorated from rain entering through gaps in the roof. Building consultant TB
attended the property for a second time and on 31 August 2010 he submitted a
second report.
25. TB reported that the floor of the building had been damaged by water ingress
that occurred through the tarp that was located over the remains of the roof
structure and would need replacing.
26. TB also reported:
The existing sub floor framing and the existing timber wall framing is
generally substandard in workmanship and did not meet current
building codes.
The restoration works as proposed in the first SOW should not be
carried out on the sub-standard floor structure and wall framing.
The property should be demolished and a new building erected.
27. The Applicant‟s engineer also reported that problems with the wall frames and
sub-floor system has resulted in restoration not being considered to be
economically viable and recommended complete demolition and construction of
a new dwelling.
28. The FSP contends that the structural inadequacies in the dwelling were not
caused as a result of the fire. Therefore , under an exclusion of the policy, the
FSP is not required to indemnify the Applicant loss or damage arising from
structural failure of an item.
Case No: 236992 Determination Page 5 of 14
29. Pursuant to the terms and conditions of the policy, the FSP is only required to
indemnify for the damage to the property caused by fire. The reports provided
by TB and the Applicant‟s engineer confirm that the sub -standard floor structure
or sub-standard wall framing of the property was not caused by fire. Therefore,
the FSP is not required to provide indemnity fo r this damage.
Method of Indemnification
30. As the FSP has agreed to indemnify the Applicant, it can elect how to settle the
claim. In this instance it elected to pay the Applicant the reasonable cost to
repair or rebuild the property.
31. In respect to „Other cover‟, the FSP can elect the method of settlement. It
elected to pay the contractor direct for the make safe and asbestos removal.
Amount to Repair property
32. The repairs to the property were calculated as follows:
Repairs as per builder S $175,706.84
Building variations $2,428.80
Underground electrical work $7,199.61
2 combustion fires $1,600.00
Replace water damaged flooring $4,780.00
Bore water pump $1,200.00
Timber strip flooring $1,580.00
Total $194,495.25
33. The FSP has paid the Applicant $196,730.07 which is $2,234.83 above the
amount which it is required to indemnify the Applicant.
34. Further, the payment of $196,730.07 to the Applicant was subject to the Deed
of Release which precludes the Applicant from making any further claims from
the FSP for damage to the property caused by fire or for the claim.
Temporary Accommodation
35. The Applicant contends that he had to pay for temporary accommodation for a
further two months after the 12 month policy limit.
36. The FSP is only required to pay for temporary accommodation in the property
cannot be lived in and when it agrees to pay the temporary accommodation
costs prior to their being incurred.
37. The FSP has agreed to pay for temporary accommodation for the Applicant for
the 12 month period from the date of the fire. It submits that pursuant to the
policy no further request for temporary accommodation was made and,
accordingly, as there has been no agreement by the FSP to pay for further
temporary accommodation, it is not required to pay for any further amounts of
temporary accommodation.
Case No: 236992 Determination Page 6 of 14
Deed of Release
38. On 12 November 2010, the Applicant and FSP executed a Deed of Release
under which:
The FSP agreed to pay the Applicant $196,730.07 in settlement of the
claim;
In consideration of the payment to the Applicant, the Applicant agreed
to release and discharge the FSP from all actions and claims, including
actions and claims for liabilities, losses, damages, costs and expenses
(either actual or contingent) which the Applicant had or may in the
future have against the FSP arising out of or in relation to the fire or the
claim;
The Applicant agreed to that the deed could be pleaded by the FSP as
a bar to any action, suit or proceedings commenced or to be
commenced by the Applicant against the FSP arising out of or in
relation to the fire or the claim.
39. Upon execution and delivery of a deed the party making the deed is absolutely
bound by it and cannot thereafter resile from it or recall it. Hooker
Developments Pty Ltd v Trustees of the Christian Brothers [1977] 2 NSWLR
109 at 118.
40. In the event that the Deed is found to be lacking in formalities or delivery, the
FSP submits that it expresses an agreement between the FSP and the
Applicant to be bound by the terms contained within it. Its terms are clear, it is
supported by valid consideration, it is plainly entered into freely between the
Applicant and the FSP, such that the Applicant agreed that he would not bring,
amongst other things, the present application before FOS.
41. Accordingly, the FSP submits that the Applicant is barred from bringing any
further actions against the FSP for damage to the property caused by the fire or
arising from the claim.
Promissory Estoppel
42. In the event that FOS determines there is no deed or agreement, the FSP
submits that it can rely on the promise of the Applicant. The doctrine of
promissory estoppels provides that if party changes his or her position
substantially either by acting or forbearing from acting in reliance upon a
gratuitous promise, then that party can enforce the promise although the
essential elements of a contract or agreement are not present.
43. The FSP submits that the Applicant has made the FSP a promise, the FSP has
acted on that promise to its detriment and accordingly, the injustice can only be
avoided by enforcing the Applicant to make good its promise, In this case, by
dismissing the application so that the position of the parties reverts to what it
would have been had the application not resiled from its promise.
44. The FSP relies on the following policy/contract provisions:
Case No: 236992 Determination Page 7 of 14
Table 1.1 – What we pay for your home or contents
Type of policy What we pay
Buildings ► cost to repair or rebuild the part of your home that was
Insurance damaged
► other things we cover under „other cover‟...
...
The events we cover
We cover your home or contents when certain things happen. These are known as
„listed events‟. You can make a claim if a listed event takes place and causes loss or
damage to your home or contents in the period of insurance.
Table 3.1 – Listed events
This table shows the listed events we cover under Buildings or Contents Insurance.
Listed events
...
Fire
...
The events we cover
...
Fire
If loss or damage is caused by a fire.
Covered
► fire
...
Other cover
...
Covered under Buildings Insurance
► costs for temporary accommodation:
- that we agree are reasonable and appropriate for you, your family and your pets
that you normally keep at your site
- for the reasonable time we agree it should take to repair or rebuild your home
...
We pay these costs for up to 12 months from when the listed event took place. We
pay this on top of the buildings sum insured.
Conditions
► ...
► we must agree to pay the costs before you make any arrangements.
...
Demolishing and removing debris
Case No: 236992 Determination Page 8 of 14
If a listed event causes loss or damage to your home and we agree you need to
demolish part of your home or remove any debris
Covered under Buildings Insurance
► costs to demolish and remove debris
► costs to make your site safe – for example, the costs to install a temporary fence
around the damaged area.
Conditions
► we must agree to pay the costs before you make any arrangements.
...
General exclusions
The exclusions shown in this section apply to all cover under the policy.
...
What we don’t cover
► mechanical, structural or electrical failure of an item
...
What we pay for – Buildings Insurance
If we agree to cover your claim under Buildings Insurance, then we will:
► pay the cost to repair or rebuild the part of your home that was damaged – we pay
the lower of the cost to repair or rebuild your home
► pay for other things we cover under „other cover‟ – see pages 26 to 33
The most we pay
The most we pay is the buildings sum insured. We may also pay some costs on top
of the buildings sum insured – see „other cover‟ in Table 6.1.
Table 6.1 – Costs paid on top of the buildings sum insured
other cover
Temporary accommodation for home owners – see page 29
...
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home or „other cover‟
in one of the following ways:
1. Arrange for repairers, builder or suppliers to repair or rebuild your home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to
repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
► pay you
► pay your nominated repairer, supplier or builder, or
► provide you with store credits from one of our nominated suppliers.
...
Case No: 236992 Determination Page 9 of 14
3. Pay you the buildings sum insured
We may do this when we consider your home to be a total loss or when we
choose to do so.
...
4. Paying for ‘other cover’
If we agree to pay you for other cover, we will choose the method of settlement
...”
Issues
45. Whether the FSP has settled the Applicant‟s claim in accordance with the terms
and conditions of the policy of insurance.
46. Whether the Deed of Release precludes the Applicant for any additional
indemnity under the policy of insurance.
Reasons for Decision
47. FOS has considered it appropriate to expedite the dispute in accordance with
the Operational Guidelines to the FOS Terms of Reference. This is because of
the complex nature of the issues. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
48. This decision has been made by a Panel consisting of an Ombudsman, a Panel
member with extensive experience in insurance industry matters and a Panel
member with extensive experience in consumer claims.
49. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material in any great detail.
Make safe and removal of asbestos
50. The Applicant maintains that the FSP paid an excessive amount for the cost of
making the building site safe and the removal of asbestos. The FSP states that
it obtained two quotes for the work and considered the quote from builder S to
be satisfactory. The FSP‟s decision was within the terms and conditions of the
policy of insurance.
51. The Applicant has submitted that the removal of asbestos was of a poor
standard with a quantity of asbestos left on site. He has submitted photographs
in support of his contention.
52. This issue was raised by the Applicant with the FSP on numerous occasions
and in a letter dated 5 November 2010 to the Applicant the FSP stated:
Case No: 236992 Determination Page 10 of 14
„However, we understand your concerns about the completeness of the asbestos
removal and have shared your experience with [builder S]. We believe the asbestos
removalist has now been requested to re-attend your property and address your
concerns.‟
53. The Applicant has stated that the asbestos removalist has not returned to his
property to remove the asbestos left on the ground during the building works.
54. As the FSP elected to take direct responsibility for the make safe and asbestos
removal, it has absolute responsibility to fully complete these activities; the
evidence shows that the asbestos removal was incomplete. The Panel
therefore determines that, with the Applicant‟s approval, the F SP is to direct
builder S to re-inspect the site and ensure that all asbestos is removed in
accordance with its original instructions.
Unauthorised entry onto the Applicant’s property
55. The FSP‟s loss assessor inspected the fire damaged property without rece iving
permission from the Applicant. The Panel agrees with the Applicant that the
FSP and/or loss assessor should have arranged with the Applicant when it was
convenient time to inspect the property.
56. However, the FSP has apologised to the Applicant for this oversight and the
Panel finds that the Applicant has not been prejudiced by the loss assessor‟s
actions.
Repair and replace claim
57. The Applicant contends that the fire damaged building should have been
demolished and he should have been cash settled for the total sum insured
amount of $265,520.
58. The Applicant also contends that he did not sign off on the SOW and
considered it to be incomplete and not comprehensive enough to repair his
house.
59. In support of his contention he commissioned a consulting engineer to inspect
and report on the structural adequacy of the building after the fire damage and
recommend remedial works/SOW if applicable. The engineer reported:
Major damage to wall frames;
Insufficient fixing/bracing of wall frames where not fire damaged;
Insufficient connection between veneer wall and timber frame;
Inadequate support and tie down of sub -floor system;
Bearers too close to ground at western end of dwelling.
The cost of restoration not considered economically viable and
recommended complete demolition and construction of a new dwelling.
60. The FSP‟s building consultant also reported:
Case No: 236992 Determination Page 11 of 14
The existing sub floor framing and the existing timber wall framing was
generally of substandard workmanship and did not meet current
building codes;
The restoration works as proposed in first SOW should not be carried
out on the sub-standard floor structure and wall framing; and
The property should be demolished and a new building erected.
61. It is clear from these comments that any attempt to repair the building was not
economically effective due to the failure of the building to meet current building
regulations.
62. In view of this the FSP held that the structural inadequacies of the dwelling
were not caused as a result of the fire and it is therefore not liable for the cost
of resolving these inadequacies.
63. The Panel disagrees. In the Panel‟s view, having accepted the claim the FSP
was required to honour the terms of its policy, specifically:
“pay the cost to repair or rebuild the part of your home that was damaged – we
pay the lower of the cost to repair or rebuild your home”.
64. Of particular import, the Panel also notes from the FSP‟s PDS:
“Table 3.2
Other cover
Meeting building regulations
Co sts paid as part of sum insured.”
65. The initial scope of work was based on the assumption that the building was
capable of repair; however as advised by both the Applicant‟s engineer, and the
FSP‟s building consultant, repair of the building was not recommen ded, rather
both recommended that the building should be demolished and new building
erected.
66. This advice effectively obviated the first-noted option of repairing the building
due to the complexities and/or cost of meeting current building regulations.
67. Therefore the initial scope of works was no longer a sound basis on which the
FSP could base a settlement; either the extra cost of work to meet current
building requirements should have been included, or the FSP should have
proceeded to cost its settlement on the basis of a demolition and new build.
68. In the Panel‟s view the FSP has failed to understand the application of the
terms of its policy.
69. Nevertheless, the FSP and the Applicant agreed to enter into a settlement on
the basis of the initial scope of works, a sum was ultimately agreed and a Deed
of Release (the Deed) was executed.
Case No: 236992 Determination Page 12 of 14
70. The Applicant now seeks to have the Deed set aside and this aspect will be
considered later in this determination.
Settlement amounts
71. The Applicant contends that the FSP incorrectly deducted the amount of
$42,447.16 from the total cash settlement amount.
72. During the quotation process the FSP obtained quotes from two builders. The
successful builder, S, quoted a base cost of repairs amount of $218,158.00. He
then added in the amount of $38,588.33 plus GST $3858.83, that is,
$42.447.16 for the make safe and removal of asbestos.
73. The actual cost for the make safe and removal of asbestos was $36,631.54.
74. However, the amount of $42,447.16 was an amount that was added onto the
building repair costs. Irrespective of the amount paid by the FSP for the work, it
was entitled to deduct the amount of $42,447.16 from its settlement because it
had paid for the work separately to the costs of repairs. Further, the actual
amount paid has no bearing on the quoted estimate for the make safe work.
75. If the FSP paid the Applicant the difference between the $42,447.16 and
$36,632.83, the Applicant would be receiving a financial benefit he is not
entitled to.
76. Therefore, the Panel finds the FSP was correct in deducting the amount of
$42,447.16 from the total cash settlement.
Temporary accommodation
77. The policy of insurance provides that the FSP will pay for temporary
accommodation that is reasonably appropriate for the Applicant and limited to
12 months from the date when the fire occurred. The fire event occurred on 16
May 2010, therefore, the FSP‟s liability for temporary accommodation ceased
on 16 May 2011.
Deed of Release
78. The Applicant contends that the basis of settlement for the damaged building is
ill-founded and as such submits that the Deed be set aside.
79. The Panel must first consider its power to set aside the Deed.
80. After careful examination of the facts, the Panel is of the view that the Applicant
signed the Deed based on a misapprehension as to the methodology required
to establish the cash settlement figure.
81. The Panel determines that it was the FSP‟s responsibility to correctly establish
this methodology and that it inadvertently failed to do so. In legal terms this
means that the parties to the Deed were not ad idem when it was executed.
82. Accordingly the Panel sets this Deed aside.
Case No: 236992 Determination Page 13 of 14
83. It will now consider the correct basis, namely the total replacement cost of the
risk property.
84. The total amount payable by the FSP was $239,177.23 less the excess of
$300.00, being $238,877.23. This amount was paid in two parts - $42,447.16
was paid direct to the contractor; the amount of $196,430.07 was paid to the
Applicant.
85. The Panel notes that the sum insured on the building was $265,520, of which
$239,177.23 has already been agreed as payable (prior to excess).
86. The Applicant submits that he would require in excess of $265,000 to replace
his home with a kit home, although he has not provided any evidence to
support his contention. However, the Panel accepts that even to repair his
home including the addition costs of complying with current building
requirements would be significantly in excess of the original scope of works. It
is also likely that there would be other additional costs such as demolition and
debris removal costs. All of these would otherwise be payable out of the total
sum insured.
87. Given that the sum insured is $265,520 and the extent of payments to date is
$239,177.23 this leaves a potential balance payable of $26,342.77.
88. The Panel is mindful to bring this dispute to a conclusion without further delay,
in the interests of all parties. In the Panel‟s view the extra costs which would be
incurred in demolishing and rebuilding the Applicant‟s home would be well in
excess of $26,342.77, being the potential balance payable.
89. Having considered the terms of the policy and the sum insured, the Panel is of
the view that the total cost of fully indemnifying the Applicant would be well in
excess of the sum insured. The Panel therefore determines that the FSP is
required to pay the Applicant the unpaid balance of the sum insured, being
$26,342.77.
90. Payment of this amount will fully discharge the FSP‟s obligations under the
policy as follows:
Site make-safe/clean up paid to contractor $ 42,447.16
Previously paid to Applicant $196,430.07
Additional Payment to Applicant $ 26,342.77
Excess $ 300.00
Total of claim $265,520.00
91. Payment of these amounts fully exhausts the sum insured under the policy.
Determination
92. After examining the material presented, the Panel concludes the Deed of
Release be set aside.
Case No: 236992 Determination Page 14 of 14
93. Further the FSP is to make an additional cash settlement to the Applicant in the
amount of $26,342.77.
94. The FSP to pay interest on this additional amount at the statutory rate with
effect from 12 November 2010, being the date on which the original Deed was
executed, until date of settlement.
95. As the FSP elected to take direct responsibility for the make safe and asbestos
removal, it has absolute responsibility to fully complete these activities; the
evidence shows that the asbestos removal was incomplete. The Panel
therefore determines that, with the Applicant‟s approval, the FSP is to direct
builder S to re-inspect the site and ensure that all asbestos is removed in
accordance with its original instructions and in compliance with all statutory
obligations.