Determination 236992

Fire claim cash settlement method and amount disputed; deed of release

FirmFinancial Firm (Unknown - Insurer)
Decided2011-12-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$26,343
Non-financial loss—
Amount claimed$265,520
SourceAFCA PDF

Summary

After a fire the FSP cash settled the building claim under a deed of release. AFCA set aside the deed because the settlement methodology was wrongly calculated, and ordered an additional $26,342.77 plus interest and asbestos re-inspection.

The FSP had to pay the cost to repair or rebuild the damaged part of the home, and the deed was set aside because the parties were not ad idem on the settlement method.

Issues

Subjects and remedies

home or building damagepay claimpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 236992 Determination Page 1 of 14 Case Number: 236992 General Insurance - Home Building – Fire damage - Quantum – Deed of Release 16 December 2011 Background 1. The Applicant insured his home building under a Home Insurance Policy for $265,520, with a $300 policy excess, against loss or damage caused by insured events. The policy was current for the period 20 March 2010 to 20 March 2011. 2. On 16 May 2010 the building was severely damaged by fire. The Financial Services Provider (FSP) accepted liability for the Applic ant‟s claim under his policy of insurance. 3. The FSP arranged for a Scope of Works (SOW) to be prepared. Building consultant “TB” prepared a SOW dated 1 June 2010 which was submitted to two builders for quotations to reinstate the Applicant‟s house. Builder “S” quoted $218,154 and builder “P” $251,213. The FSP states that included in the quotes were costs for make safe works and removal of asbestos. Builder S quoted $42,447.16. 4. However, the actual cost incurred for the make safe works and removal of asbestos was $36,631.54. 5. The Applicant identified problems with water damage to the floor of the house as a result of water entry by the fire brigade and the ingress of water from rainfall entering through ill fitting tarpaulins. 6. The FSP engaged building consultant TB to inspect and report on the sub floor area. In his report dated 31 August 2010, TB stated: “ It is my opinion that the existing sub floor framing and the existing timber wall framing is generally sub standard in workmanship and does not meet current building codes. Rectification work would not be a financially viable option. It is my further opinion that the restoration works as proposed in my scope of works be not carried out on the sub standard floor structure or sub standard wall framing. I recommend that the remaining structure be demolished and a new building of similar size be erected.” Determination Case No: 236992 Determination Page 2 of 14 7. The Applicant disputed the FSP‟s decision to repair his house which he considered should have been demolished and rebuilt. He contends the FSP should have paid him the sum insured amount of $265,520 so that he could have rebuilt his house. 8. However, the FSP maintained its position to repair the house and eventually cash settled the Applicant for the amount of $196,430.07. 9. On 12 November 2010 the Applicant signed a Deed of Release (the Deed) for the amount of $196,430.07. Summary of Applicant’s Position 10. During the history of the claim the Applicant contends the following events occurred:  The amount paid for make safe and removal of asbestos was excessive and he was not provided with a breakdown of how the amount was arrived at;  The FSP‟s loss assessor made an unauthorised entry onto his property;  He did not sign off on the SOW as he considered it to be incomplete and inconclusive and not comprehensive enough to repair his house;  The Applicant appointed a consulting engineer (engineer) to inspect and report on the structural adequacy of the building and recommend remedial works/scope of works if applicable.  The engineer reported: Major damage to wall frames; o Insufficient fixing/bracing of wall frames where not fire damaged; o Insufficient connection between veneer wall and timber frame; o Inadequate support and tie down of sub -floor system; o Bearers too close to ground at western end of dwelling. o The cost of restoration not considered economically viable and recommended complete demolition and construction of a new dwelling.  The quality of the removal of asbestos from his property was of a poor standard as a quantity of broken asbestos had been left under his house which did not make his house fail safe;  He was bullied into signing the Deed of Release. The FSP was only required to pay 12 months for his temporary accommodation and it took five months to arrive at a settlement figure which he had to accept;  At the time of the settlement amount being arrived at, he had not had house plans drawn up so as to get a clearer idea whether he was going to be able to rebuild entirely or rebuild making use of what he could recover from the pre-existing house; Case No: 236992 Determination Page 3 of 14  The FSP deducted the amount of $42,447.16 from the quote to repair his house. This amount should have been paid from the „Other cover‟ section of his policy of insurance;  He should be paid the balance between the sum insured of $265,520 and the amount he was paid so that he can complete rebuilding his house. Summary of FSP’s Position 11. The FSP‟s Notice of Response has been prepared by its legal advisers who will be referred to as „the Applicant ‟. 12. The FSP and the Applicant have executed a Deed of Release with respect to the Applicant‟s claim for indemnity pursuant to which the FSP paid the Applicant the amount of $196,730.07 and the Applicant is precluded from making any further claims against it. The Make Safe/Asbestos Claim 13. The FSP accepted that the make safe and asbestos removal is covered by the policy under „Other cover‟. It also accepts that these costs are covered under „Demolishing and removing debris‟ cover under the policy. 14. However, the FSP disputes that the cost of the make safe and asbestos removal was arbitrarily taken from the Applicant‟s claim. The FSP obtained a quote from builder S and paid S directly as it is entitled to do under the terms and conditions of the policy. 15. With the agreement of the Applicant, the FSP arranged for its preferred builder to conduct the make safe and to remove the asbestos. The Applicant has not incurred any costs in relation to the make safe works and asbestos removal. Accordingly, there is no basis upon which the Applicant is entitled to be refunded these costs. 16. The quotes submitted by two builders included the cost of the make safe and removal of asbestos. In view of the FSP paying builder S directly, the Applicant has not been prejudiced in any way. 17. The reason why the FSP „deducted‟ the cost of asbestos removal and make safe from the settlement sum was because the FSP paid such sums directly to builder S under the terms of the policy. 18. The Applicant contends the make safe and asbestos removal cost was double the reasonable rate. However, the FSP obtained two quotes for this work and considered the quote from builder S to be fair and reasonable. 19. Further, the FSP obtained a Certificate of Clearance dated 4 August 2010 from an environmental monitoring service which details that the asbestos removal was completed satisfactorily. Case No: 236992 Determination Page 4 of 14 20. The Applicant states that the amount of $42,447.16 was deducted from the total claim amount. The FSP contends that the sum of $42,447.16 has not been taken from the claim. The amount of $42,447.16 was simply the amount of the quote provided by builder S. 21. The Applicant has been paid the amount $196,730.07 to repair the property and the FSP has paid $36,631.54 directly to S for the make safe and asbestos removal. The „deduction‟ of the quoted amount of $42,447.16 was simply a way of calculating the quoted amount to repair the property. Unauthorised Entry Onto the Property 22. The Applicant alleges that a representative of the FSP entered his property without the Applicant‟s consent. In a letter dated 5 November 2010, the FSP stated that access to his property was essential to ensure completeness of the SOW. However, the FSP acknowledges that it would have been courteous to consult with the Applicant regarding the timing of the additional inspection. Repair and Replace Claim 23. Building consultant TB provided a SOW which was submitted to builders S and P to provide quotations. Builder S quoted $218,154 and builder P $251, 213. The FSP selected builder S‟s quote. 24. On 9 July 2010, the Applicant reported that the floors of the house had deteriorated from rain entering through gaps in the roof. Building consultant TB attended the property for a second time and on 31 August 2010 he submitted a second report. 25. TB reported that the floor of the building had been damaged by water ingress that occurred through the tarp that was located over the remains of the roof structure and would need replacing. 26. TB also reported:  The existing sub floor framing and the existing timber wall framing is generally substandard in workmanship and did not meet current building codes.  The restoration works as proposed in the first SOW should not be carried out on the sub-standard floor structure and wall framing.  The property should be demolished and a new building erected. 27. The Applicant‟s engineer also reported that problems with the wall frames and sub-floor system has resulted in restoration not being considered to be economically viable and recommended complete demolition and construction of a new dwelling. 28. The FSP contends that the structural inadequacies in the dwelling were not caused as a result of the fire. Therefore , under an exclusion of the policy, the FSP is not required to indemnify the Applicant loss or damage arising from structural failure of an item. Case No: 236992 Determination Page 5 of 14 29. Pursuant to the terms and conditions of the policy, the FSP is only required to indemnify for the damage to the property caused by fire. The reports provided by TB and the Applicant‟s engineer confirm that the sub -standard floor structure or sub-standard wall framing of the property was not caused by fire. Therefore, the FSP is not required to provide indemnity fo r this damage. Method of Indemnification 30. As the FSP has agreed to indemnify the Applicant, it can elect how to settle the claim. In this instance it elected to pay the Applicant the reasonable cost to repair or rebuild the property. 31. In respect to „Other cover‟, the FSP can elect the method of settlement. It elected to pay the contractor direct for the make safe and asbestos removal. Amount to Repair property 32. The repairs to the property were calculated as follows: Repairs as per builder S $175,706.84 Building variations $2,428.80 Underground electrical work $7,199.61 2 combustion fires $1,600.00 Replace water damaged flooring $4,780.00 Bore water pump $1,200.00 Timber strip flooring $1,580.00 Total $194,495.25 33. The FSP has paid the Applicant $196,730.07 which is $2,234.83 above the amount which it is required to indemnify the Applicant. 34. Further, the payment of $196,730.07 to the Applicant was subject to the Deed of Release which precludes the Applicant from making any further claims from the FSP for damage to the property caused by fire or for the claim. Temporary Accommodation 35. The Applicant contends that he had to pay for temporary accommodation for a further two months after the 12 month policy limit. 36. The FSP is only required to pay for temporary accommodation in the property cannot be lived in and when it agrees to pay the temporary accommodation costs prior to their being incurred. 37. The FSP has agreed to pay for temporary accommodation for the Applicant for the 12 month period from the date of the fire. It submits that pursuant to the policy no further request for temporary accommodation was made and, accordingly, as there has been no agreement by the FSP to pay for further temporary accommodation, it is not required to pay for any further amounts of temporary accommodation. Case No: 236992 Determination Page 6 of 14 Deed of Release 38. On 12 November 2010, the Applicant and FSP executed a Deed of Release under which:  The FSP agreed to pay the Applicant $196,730.07 in settlement of the claim;  In consideration of the payment to the Applicant, the Applicant agreed to release and discharge the FSP from all actions and claims, including actions and claims for liabilities, losses, damages, costs and expenses (either actual or contingent) which the Applicant had or may in the future have against the FSP arising out of or in relation to the fire or the claim;  The Applicant agreed to that the deed could be pleaded by the FSP as a bar to any action, suit or proceedings commenced or to be commenced by the Applicant against the FSP arising out of or in relation to the fire or the claim. 39. Upon execution and delivery of a deed the party making the deed is absolutely bound by it and cannot thereafter resile from it or recall it. Hooker Developments Pty Ltd v Trustees of the Christian Brothers [1977] 2 NSWLR 109 at 118. 40. In the event that the Deed is found to be lacking in formalities or delivery, the FSP submits that it expresses an agreement between the FSP and the Applicant to be bound by the terms contained within it. Its terms are clear, it is supported by valid consideration, it is plainly entered into freely between the Applicant and the FSP, such that the Applicant agreed that he would not bring, amongst other things, the present application before FOS. 41. Accordingly, the FSP submits that the Applicant is barred from bringing any further actions against the FSP for damage to the property caused by the fire or arising from the claim. Promissory Estoppel 42. In the event that FOS determines there is no deed or agreement, the FSP submits that it can rely on the promise of the Applicant. The doctrine of promissory estoppels provides that if party changes his or her position substantially either by acting or forbearing from acting in reliance upon a gratuitous promise, then that party can enforce the promise although the essential elements of a contract or agreement are not present. 43. The FSP submits that the Applicant has made the FSP a promise, the FSP has acted on that promise to its detriment and accordingly, the injustice can only be avoided by enforcing the Applicant to make good its promise, In this case, by dismissing the application so that the position of the parties reverts to what it would have been had the application not resiled from its promise. 44. The FSP relies on the following policy/contract provisions: Case No: 236992 Determination Page 7 of 14 Table 1.1 – What we pay for your home or contents Type of policy What we pay Buildings ► cost to repair or rebuild the part of your home that was Insurance damaged ► other things we cover under „other cover‟... ... The events we cover We cover your home or contents when certain things happen. These are known as „listed events‟. You can make a claim if a listed event takes place and causes loss or damage to your home or contents in the period of insurance. Table 3.1 – Listed events This table shows the listed events we cover under Buildings or Contents Insurance. Listed events ... Fire ... The events we cover ... Fire If loss or damage is caused by a fire. Covered ► fire ... Other cover ... Covered under Buildings Insurance ► costs for temporary accommodation: - that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site - for the reasonable time we agree it should take to repair or rebuild your home ... We pay these costs for up to 12 months from when the listed event took place. We pay this on top of the buildings sum insured. Conditions ► ... ► we must agree to pay the costs before you make any arrangements. ... Demolishing and removing debris Case No: 236992 Determination Page 8 of 14 If a listed event causes loss or damage to your home and we agree you need to demolish part of your home or remove any debris Covered under Buildings Insurance ► costs to demolish and remove debris ► costs to make your site safe – for example, the costs to install a temporary fence around the damaged area. Conditions ► we must agree to pay the costs before you make any arrangements. ... General exclusions The exclusions shown in this section apply to all cover under the policy. ... What we don’t cover ► mechanical, structural or electrical failure of an item ... What we pay for – Buildings Insurance If we agree to cover your claim under Buildings Insurance, then we will: ► pay the cost to repair or rebuild the part of your home that was damaged – we pay the lower of the cost to repair or rebuild your home ► pay for other things we cover under „other cover‟ – see pages 26 to 33 The most we pay The most we pay is the buildings sum insured. We may also pay some costs on top of the buildings sum insured – see „other cover‟ in Table 6.1. Table 6.1 – Costs paid on top of the buildings sum insured other cover Temporary accommodation for home owners – see page 29 ... How we settle your buildings claim We will choose to settle your claim for loss or damage to your home or „other cover‟ in one of the following ways: 1. Arrange for repairers, builder or suppliers to repair or rebuild your home. If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home. 2. Pay you the reasonable cost to repair or rebuild your home. We can choose to: ► pay you ► pay your nominated repairer, supplier or builder, or ► provide you with store credits from one of our nominated suppliers. ... Case No: 236992 Determination Page 9 of 14 3. Pay you the buildings sum insured We may do this when we consider your home to be a total loss or when we choose to do so. ... 4. Paying for ‘other cover’ If we agree to pay you for other cover, we will choose the method of settlement ...” Issues 45. Whether the FSP has settled the Applicant‟s claim in accordance with the terms and conditions of the policy of insurance. 46. Whether the Deed of Release precludes the Applicant for any additional indemnity under the policy of insurance. Reasons for Decision 47. FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 48. This decision has been made by a Panel consisting of an Ombudsman, a Panel member with extensive experience in insurance industry matters and a Panel member with extensive experience in consumer claims. 49. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to go into all of this material in any great detail. Make safe and removal of asbestos 50. The Applicant maintains that the FSP paid an excessive amount for the cost of making the building site safe and the removal of asbestos. The FSP states that it obtained two quotes for the work and considered the quote from builder S to be satisfactory. The FSP‟s decision was within the terms and conditions of the policy of insurance. 51. The Applicant has submitted that the removal of asbestos was of a poor standard with a quantity of asbestos left on site. He has submitted photographs in support of his contention. 52. This issue was raised by the Applicant with the FSP on numerous occasions and in a letter dated 5 November 2010 to the Applicant the FSP stated: Case No: 236992 Determination Page 10 of 14 „However, we understand your concerns about the completeness of the asbestos removal and have shared your experience with [builder S]. We believe the asbestos removalist has now been requested to re-attend your property and address your concerns.‟ 53. The Applicant has stated that the asbestos removalist has not returned to his property to remove the asbestos left on the ground during the building works. 54. As the FSP elected to take direct responsibility for the make safe and asbestos removal, it has absolute responsibility to fully complete these activities; the evidence shows that the asbestos removal was incomplete. The Panel therefore determines that, with the Applicant‟s approval, the F SP is to direct builder S to re-inspect the site and ensure that all asbestos is removed in accordance with its original instructions. Unauthorised entry onto the Applicant’s property 55. The FSP‟s loss assessor inspected the fire damaged property without rece iving permission from the Applicant. The Panel agrees with the Applicant that the FSP and/or loss assessor should have arranged with the Applicant when it was convenient time to inspect the property. 56. However, the FSP has apologised to the Applicant for this oversight and the Panel finds that the Applicant has not been prejudiced by the loss assessor‟s actions. Repair and replace claim 57. The Applicant contends that the fire damaged building should have been demolished and he should have been cash settled for the total sum insured amount of $265,520. 58. The Applicant also contends that he did not sign off on the SOW and considered it to be incomplete and not comprehensive enough to repair his house. 59. In support of his contention he commissioned a consulting engineer to inspect and report on the structural adequacy of the building after the fire damage and recommend remedial works/SOW if applicable. The engineer reported:  Major damage to wall frames;  Insufficient fixing/bracing of wall frames where not fire damaged;  Insufficient connection between veneer wall and timber frame;  Inadequate support and tie down of sub -floor system;  Bearers too close to ground at western end of dwelling.  The cost of restoration not considered economically viable and recommended complete demolition and construction of a new dwelling. 60. The FSP‟s building consultant also reported: Case No: 236992 Determination Page 11 of 14  The existing sub floor framing and the existing timber wall framing was generally of substandard workmanship and did not meet current building codes;  The restoration works as proposed in first SOW should not be carried out on the sub-standard floor structure and wall framing; and  The property should be demolished and a new building erected. 61. It is clear from these comments that any attempt to repair the building was not economically effective due to the failure of the building to meet current building regulations. 62. In view of this the FSP held that the structural inadequacies of the dwelling were not caused as a result of the fire and it is therefore not liable for the cost of resolving these inadequacies. 63. The Panel disagrees. In the Panel‟s view, having accepted the claim the FSP was required to honour the terms of its policy, specifically: “pay the cost to repair or rebuild the part of your home that was damaged – we pay the lower of the cost to repair or rebuild your home”. 64. Of particular import, the Panel also notes from the FSP‟s PDS: “Table 3.2 Other cover Meeting building regulations Co sts paid as part of sum insured.” 65. The initial scope of work was based on the assumption that the building was capable of repair; however as advised by both the Applicant‟s engineer, and the FSP‟s building consultant, repair of the building was not recommen ded, rather both recommended that the building should be demolished and new building erected. 66. This advice effectively obviated the first-noted option of repairing the building due to the complexities and/or cost of meeting current building regulations. 67. Therefore the initial scope of works was no longer a sound basis on which the FSP could base a settlement; either the extra cost of work to meet current building requirements should have been included, or the FSP should have proceeded to cost its settlement on the basis of a demolition and new build. 68. In the Panel‟s view the FSP has failed to understand the application of the terms of its policy. 69. Nevertheless, the FSP and the Applicant agreed to enter into a settlement on the basis of the initial scope of works, a sum was ultimately agreed and a Deed of Release (the Deed) was executed. Case No: 236992 Determination Page 12 of 14 70. The Applicant now seeks to have the Deed set aside and this aspect will be considered later in this determination. Settlement amounts 71. The Applicant contends that the FSP incorrectly deducted the amount of $42,447.16 from the total cash settlement amount. 72. During the quotation process the FSP obtained quotes from two builders. The successful builder, S, quoted a base cost of repairs amount of $218,158.00. He then added in the amount of $38,588.33 plus GST $3858.83, that is, $42.447.16 for the make safe and removal of asbestos. 73. The actual cost for the make safe and removal of asbestos was $36,631.54. 74. However, the amount of $42,447.16 was an amount that was added onto the building repair costs. Irrespective of the amount paid by the FSP for the work, it was entitled to deduct the amount of $42,447.16 from its settlement because it had paid for the work separately to the costs of repairs. Further, the actual amount paid has no bearing on the quoted estimate for the make safe work. 75. If the FSP paid the Applicant the difference between the $42,447.16 and $36,632.83, the Applicant would be receiving a financial benefit he is not entitled to. 76. Therefore, the Panel finds the FSP was correct in deducting the amount of $42,447.16 from the total cash settlement. Temporary accommodation 77. The policy of insurance provides that the FSP will pay for temporary accommodation that is reasonably appropriate for the Applicant and limited to 12 months from the date when the fire occurred. The fire event occurred on 16 May 2010, therefore, the FSP‟s liability for temporary accommodation ceased on 16 May 2011. Deed of Release 78. The Applicant contends that the basis of settlement for the damaged building is ill-founded and as such submits that the Deed be set aside. 79. The Panel must first consider its power to set aside the Deed. 80. After careful examination of the facts, the Panel is of the view that the Applicant signed the Deed based on a misapprehension as to the methodology required to establish the cash settlement figure. 81. The Panel determines that it was the FSP‟s responsibility to correctly establish this methodology and that it inadvertently failed to do so. In legal terms this means that the parties to the Deed were not ad idem when it was executed. 82. Accordingly the Panel sets this Deed aside. Case No: 236992 Determination Page 13 of 14 83. It will now consider the correct basis, namely the total replacement cost of the risk property. 84. The total amount payable by the FSP was $239,177.23 less the excess of $300.00, being $238,877.23. This amount was paid in two parts - $42,447.16 was paid direct to the contractor; the amount of $196,430.07 was paid to the Applicant. 85. The Panel notes that the sum insured on the building was $265,520, of which $239,177.23 has already been agreed as payable (prior to excess). 86. The Applicant submits that he would require in excess of $265,000 to replace his home with a kit home, although he has not provided any evidence to support his contention. However, the Panel accepts that even to repair his home including the addition costs of complying with current building requirements would be significantly in excess of the original scope of works. It is also likely that there would be other additional costs such as demolition and debris removal costs. All of these would otherwise be payable out of the total sum insured. 87. Given that the sum insured is $265,520 and the extent of payments to date is $239,177.23 this leaves a potential balance payable of $26,342.77. 88. The Panel is mindful to bring this dispute to a conclusion without further delay, in the interests of all parties. In the Panel‟s view the extra costs which would be incurred in demolishing and rebuilding the Applicant‟s home would be well in excess of $26,342.77, being the potential balance payable. 89. Having considered the terms of the policy and the sum insured, the Panel is of the view that the total cost of fully indemnifying the Applicant would be well in excess of the sum insured. The Panel therefore determines that the FSP is required to pay the Applicant the unpaid balance of the sum insured, being $26,342.77. 90. Payment of this amount will fully discharge the FSP‟s obligations under the policy as follows: Site make-safe/clean up paid to contractor $ 42,447.16 Previously paid to Applicant $196,430.07 Additional Payment to Applicant $ 26,342.77 Excess $ 300.00 Total of claim $265,520.00 91. Payment of these amounts fully exhausts the sum insured under the policy. Determination 92. After examining the material presented, the Panel concludes the Deed of Release be set aside. Case No: 236992 Determination Page 14 of 14 93. Further the FSP is to make an additional cash settlement to the Applicant in the amount of $26,342.77. 94. The FSP to pay interest on this additional amount at the statutory rate with effect from 12 November 2010, being the date on which the original Deed was executed, until date of settlement. 95. As the FSP elected to take direct responsibility for the make safe and asbestos removal, it has absolute responsibility to fully complete these activities; the evidence shows that the asbestos removal was incomplete. The Panel therefore determines that, with the Applicant‟s approval, the FSP is to direct builder S to re-inspect the site and ensure that all asbestos is removed in accordance with its original instructions and in compliance with all statutory obligations.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.