Home / Financial Firm (Unknown - Insurer) / Determination 236957
Determination 236957
Repair quality to parquetry floor and billiard table damage after flood claim
Summary
The applicant disputed the quality of flood repairs to his parquetry floor and damage to his billiard table during removal. AFCA found the floor was not reinstated to its pre-existing condition and the removalist's handling caused the table damage, so the FSP must repair the floor and meet the billiard table repair cost, but no compensation for stress or delay was awarded.
The weight of the flooring experts' evidence showed the repairs did not reinstate the pre-existing finish, and the removalist should have dismantled the table before moving it, so the FSP is liable for the resulting damage.
Issues
- Repairs or contractors primary · upheld
“I am unable to find that the floor has been repaired and reinstated to its pre-existing condition.”
- Delay secondary · not upheld
“I do not believe the actions of the FSP have led to an unusual degree or extent of physical inconvenience or time taken.”
- Third-party or outsourcing failure secondary · upheld
“I am persuaded that the removalist has not conducted his work appropriately and accordingly the FSP is liable to attend to the cost of repair of the Applicant's billiard table.”
Subjects and remedies
pay compensationrepair or rectify
Text of the determination
Case No: 236957 Determination Page 1 of 10
Case number: 236957
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
30 September 2011
Background
1. The Applicant holds a Building and Contents policy of insurance with the
Financial Services Provider (FSP).
2. On 17 December 2009, the Applicant lodged a claim for water damage to
plaster walls and parquetry flooring arising from a storm on 5 December 2009.
3. Although the FSP has provided information to suggest that there was no
evidence of storm damage, the FSP after receiving two plumbers reports,
accepted the Applicant’s claim in good faith.
4. The FSP then proceeded to obtain quotations for the repairs but discovered a
significant variance and accordingly appointed an assessing company “C”.
5. C arranged for the repairs to the parquetry flooring and the billiard table
amongst other items. However, the Applicant was dissatisfied with the resulting
works to the floor and considered the works substandard. Further, the billiard
table now appeared to have a “roll’ caused by it no longer being level.
6. The FSP engaged a flooring expert “N C ” to view the repair work. N C concluded
the works were performed in accordance with the Australian Standards and
accordingly the FSP denies the repairs are substandard. Further, the FSP
denies there is evidence that the billiard table was damaged whilst in the care
of its agents.
7. The Applicant disputes the FSP’s refusal to rectify the repair works based on
his own flooring expert opinion. Further, the billiard table did not previously
have a roll and repairs were also required to the billiard table after it was
returned.
Summary of Applicant’s Position
8. The Applicant notes there was substantive delay and a failure to communicate
by C to arrange the repairs and then for repairs to occur.
Determination
Case No: 236957 Determination Page 2 of 10
9. The Applicant was informed by C that company “A” would attend to his billiard
table. The Applicant was pleased by this as A is a highly regarded compa ny.
10. After repairs were completed the Applicant attended his property at 9.30am on
29 October 2010. The Applicant viewed the parquetry boards and noted after
testing the boards that they had a hollow/drummy sound to them.
11. The Applicant attended the premises with NC and another repairer “G”. The
Applicant pointed out the hollow boards, areas of damage, incorrect
workmanship, popping boards and cracking glue.
12. The Applicant then discovered that A had never been engaged to perform
repairs to his billiard table. Accordingly the Applicant engaged A to perform
repairs.
13. The Applicant notes the FSP’s contention that the company which removed the
billiard table for the duration of works “AS” did not remove the cloth from the
bed of the table. The Applicant contends this is impossible as a three piece
slate table cannot be moved without taking it apart.
14. The Applicant has enclosed a copy of report from a building expert “LC”. I note
the following from the report:
A number of areas throughout have a dull and satin finish rather than a
gloss finish in the polyurethane coating. LC considered this was in areas
where sanding was missed between coatings.
Approx. 2.0m2 have raised filling protruding through the coatings.
Approx 1.0m2 has a fall of approx. 5mm over 500mm – which appears to
be the result of excess sanding in this area.
The doorway from the kitchen to the games room has a fall of approx.
10mm over 800mm due to excess sanding to the left side of the doorway.
Coating residue is evident throughout the kitchen cupboards and on much
of the skirting.
Gap between parquetry and skirting in living areas (it appears the skirting
was not removed during the sanding process and a three mm gap can be
seen from a normal viewing distance where the sanding process has
occurred).
A number of boards appear drummy or hollow; this indicates the boards
have not adhered to the concrete slab or have lifted as a result of
moisture. This may be a result of “.. flood damage prior to the repair works
being carried out or a failure to properly adhere the boards after the floods
and during the repair process. ” I note here that LC appears to be under an
impression that a flood occurred which is concerning given the lack of
cover in the policy for same.
Marks and indentations are evident from a normal viewing position
throughout the kitchen. This may be as a result of not using a two pack
coating system or the application of a third finishing coat.
Case No: 236957 Determination Page 3 of 10
15. The Applicant has enclosed a copy of a report from a building expert “TC” from
which I note the following:
TC notes the damage arose from flood in December 2009 and repairs
were carried out in October 2010.
The gloss polyurethane has been used which is not a durable two pack.
This is the reason why the boards are being marked by high heels.
TC considers two coats were used given the different shades of boards
which three coats would generally even out.
The difference in height on the floor opposite the fire seems to have
occurred due to overuse of the machine in one area. Similarly the height
difference at the door from the kitchen into the billiard room.
Clear lacquer is evident along most skirting boards and on kitchen
cupboards.
TC found 4 boards lifting with the filler starting to rise in other locations.
The cause of same is unknown until the boards are lifted.
The hollow sounds to the boards are evidence that insufficient adhesive
was applied to the boards and concrete slab. Further, it is doubtful these
boards were even repaired.
TC opined this job was not up to a workman like standard.
16. The Applicant has enclosed a further report from a flooring expert “DT” from
which I note the following:
The concerns with the floor were observed to be of an aesthetic nature as
the structural part of the repair was considered to be acceptable.
The concerns were relative to an appearance not considered to replicate
that which was originally present, a level of sanding scratching visible
through coating, a significant level of quilting, floor levels from sanding,
and filler or glue protruding from coated surface.
These concerns were of significance and require further works to re-
instate the flooring to an appearance considered to replicate the original
finish as best as possible, and to provide a quality finish. The works
should satisfy the criteria as outlined in Australian Standard AS4786.2
Timber Floors – sanding and finishing.
Moisture readings taken from the damaged area indicate a higher timber
moisture content compared to the remainder of the installation.
The report attaches photographs of undulation, uneven blocks, putty/glue
becoming raised from the gaps causing coating to delaminate and coarse
sanding marks.
17. The Applicant has obtained a quotation in the sum of $3,960 from A to perform
rectification works to the billiard table.
Case No: 236957 Determination Page 4 of 10
Summary of FSP’s Position
18. The FS P engaged C to oversee and arrange the repairs to the Applicant’s
property. The FSP received a report from C on 15 November 2010, that the
Applicant was dissatisfied with the repairs to the parquetry flooring.
19. The FSP subsequently engaged NC, a wood floori ng expert, to assess the
damage. However, a delay arose attempting to obtain a date when all parties
could attend the property.
20. The report by NC provided the following information:
The parquet blocks to the repaired area are bonded and adhered to the
concrete slab by 85-90% and well within Australian Standards.
The skirting gaps evident are as the original flooring installation and have
no relevance to the repairs in question.
On close inspection of the doorway levels & skirting marks, it was
revealed that these are also as per original installation.
Two indentations were observed in the polyurethane finish, these were
the result of high heel shoes and norma lly occur to such a finish.
21. The FSP further submits that TC and LC are not specialists in flooring and nor
have they reported on whether the flooring was within the Australian Standards.
In addition to this, TC’s report is not factually correct as noted by N C.
22. On 25 January 2011 NC provided an email noting the following points:
The finish used was three coats of single pack polyurethane which is
equivalent to three coats of two pack polyurethane. Further, the finish
would not have an effect on the damage by stiletto heels.
N attached a photograph indicating there was no gap at the architrave or
skirting at the same doorway. Further, it is not possible to sand 1” off a ¾”
block floor. The average sanding job will take one mm off the floor.
The lacquer on the skirting will be the original polyurethane as the fresh
coating will be clear whilst the original coating will be yellow with age.
There is no evidence that a hollow sound indicates insufficient adhesive.
A hollow sound can be caused by other means including uneven concrete
slab.
23. NC was requested to peruse and provide comment on DT’s report. I note the
following from NC ’s email dated 6 April 2011 :
The report relies on information provided by the Applicant as homeowner
and no contact was made with the contractor and/or builder.
The contractor is obliged to perform a like for like repairs. The undulation
in the repaired section is probably in the concrete slab and was pre -
existing.
Case No: 236957 Determination Page 5 of 10
If the repaired area now has quilting, raised putty and adhesive protruding
between the blocks then the flooring has altered since the time of NC ’s
inspection. NC considers it possible that the floor may have moved due to
high humidity or a further ingress of moisture.
The moisture reading taken by DT is within the normal range of 10-14%.
NC believes uneven sanding is not possible.
24. The FSP contends NC ’s report is more plausible and the repairs are consistent
with the damage with the flooring being reinstated to its pre -damage condition.
25. The FSP notes the Applicant was unsatisfied with the billiard table and believed
damage had occurred whilst being transported to or in storage. The company
responsible for the removal of the billiard table, AS, confirmed by letter dated
18 January 2011 that they did not remove the side edges or cloth on the bed
and their technicians noticed uneven slate joins prior to the move. AS considers
this su pported by A’s further separate quotation of $3,960 allowing for the
supply and fit of new bearers for extra slate support amongst other works.
26. The Applicant has commissioned A to fix the table and the FSP has accepted
the costs of $275 which included re-levelling and tightening of cushion rail
screw. The FSP spoke with A which advised the potential causes of table
unevenness may relate to normal wear and tear or inadequate original setting
or fittings. However it should be noted that in A’s email of 20 Jan uary 2011, it
declines to provide likely cause(s) as A does not have direct experience with
the history of the table. There is no evidence that AS is responsible for the
reported unevenness.
Issues
27. Whether the FSP is liable to provide rectification works to the parquetry
flooring.
28. Whether the FSP is liable for damage to the billiard table.
29. Whether the FSP is liable to make payment of compensation to the Applicant.
Reasons for Decision
30. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
31. I have read each party’s submissions and materials and will only refer to the
relevant submissions and materials raised.
32. I requested further information be obtained from the company responsible for
removing the billiard table and also further information from a building industry
expert.
Case No: 236957 Determination Page 6 of 10
33. A statutory declaration dated 31 August 2001, has been supplied by “ MA ” who
was employed with AS, the company that originally removed the billiard table. A
further statement was provided by “ GG ” who was the managing director of AS.
34. A report was also provided by GT who is the managing director of ATT, the
company that had quoted on the repair of the billiard table. That report has
described the table. GT also provided a letter dated 12 August 2011, as to the
appropriate method of moving billiard tables.
35. This information has been exchanged between the parties and each party has
had the opportunity of addressing all of the material exchanged and the issues
that arise from the material exchanged.
36. I consider that there are three discrete issues (as listed above) and I shall deal
with them separately.
Parquetry Flooring
37. There are several reports regarding the parquetry flooring. I am concerned by
some of the repairer statements claiming the damage was “ flood ” which
appears to be incorrect based on the facts as presented by the Applicant. I
consider that the reports of the flooring experts have the most evidential weight
due to their qualifications and experience.
38. At the time of NC ’s inspection there was no evidence of quilting, raised putty
and adhesive protruding between the blocks as noted by DT. However, NC did
note that the floor may have moved due to high humidity or further ingress of
moisture.
39. NC ’s did not re-inspect the flooring given the comments of DT. NC ’s
acknowledged that the flooring may have moved due to environmental
conditions. Accordingly, N C’s is unable to rebut the findings of DT regarding the
state of the flooring at the time of DT’s inspe ction.
40. The comments by NC regarding the lacquer colour changing with age are
important. However there is not only evidence from one of the builders of clear
lacquer but also there is no information regarding how long lacquer takes to
change from clear to a yellowed appearance.
41. Although NC expressed concern regarding the potential for original installation
problems affecting the repairs with respect to doorway levels, skirting marks
and undulation issues, there is no evidence that even with the pre-existing slab
issues, that the aesthetic appearance of the floor prior to the water damage
included the issues noted by DT. These being, quilting, raised putty and
adhesive protruding between the blocks.
42. The report from DT is detailed. He has considered each aspect of the complaint
made by the Applicant and has provided commentary together with coloured
photographs of his inspection of the flooring.
Case No: 236957 Determination Page 7 of 10
43. The Applicant has provided evidence that the repairs have not reinstated his
floor to pre-existing condition. There is no evidence before me to rebut the
Applicant’s direct observational evidence.
44. The Applicant has also provided reports from two building experts LC and TC,
who although not flooring experts support the Applicant’s claim that the repairs
had not been conducted to a workman like standard.
45. Although I do not dispute the credentials of the FSP’s expert, in this dispute I
am satisfied that the weight of the evidence supports the Applicant’s allegation
and I prefer the evidence of the Applicant’s expert DT.
46. Accordingly, I am unable to find that the floor has been repaired and reinstated
to its pre-existing condition.
47. The FSP is therefore liable to either undertake or provide cash settlement for
repairs to reinstate the floor to its pre-existing condition.
Billiard table
48. The Applicant has claimed that AS has damaged the billiard table and originally
claimed for $275 (inclusive of GST) for a re-levelling of the table and tightening
of cushion rails screw by A. The Applicant has since produced an invoice from
A which includes fitting new bearers for extra slate support, plane surfaces of
frame true to spirit level, grinding edge of slates true to spirit level, rectification
of lipping and levelling the base of legs.
49. GG the managing director of AS, the company th at removed the Applicant’s
table provided a detailed letter dated 1 September 2011. He confirmed that on
13 October 2010, they received instructions to remove an eight foot by four foot
billiard table from the Applicant’s residence to a shipping container which was
located outside the site. The table was in fact nine foot by four and a half foot,
which they discovered on attending the property. The initial move was carried
out on 15 October 2010, and the table returned to the residence on 26 October
2010. According to GG they were notified in mid January 2011, that the table
needed to be re-levelled. As for the method of movement, he noted that it may
be possible to move this type of table as a unit in one piece although noted
comments from “ ATT ” that this was inadvisable. According to AS the table was
moved using a specially designed trolley including a brace to help support any
table to the utmost. The table was noted to have slates that were screwed
down to lengths of timber to the underside perimeter of the slates and also
timber screwed and or glued to the three joins of the slate for added support.
According to GG their technician noted that there were two lines caused by
wear and tear on the table, which he showed and communicated to the person
in charge “ SR ” . SR is unable to recall that conversation.
50. According to a statutory declaration provided by MA who was the technician
employed by AS he established that the slate was not screwed down to the
frame as is normally done but underneath on the outside slate timber was
screwed to the slate and the slate joins were also screwed to the timber.
According to MA he notified SR of the “ worn ” marks and that the slate had
Case No: 236957 Determination Page 8 of 10
lifted. SR informed him that he would refer it to the owner. The Applicant denies
that any issue was referred to him.
51. I note MA states that he felt confident that the table could be moved without
distorting it further and confident enough that it could be returned in the same
condition as before. When the table was returned he checked the level by using
a ball from either a snooker set or a Kelly pool set and observed the ball rolling
to various areas of the table and the slate not being level, he found the timber
cushion edges to be very loose and maintains that he would not have picked
this fault previously. It is unclear why he would not have been able to pick up
this fault. I note with interest his comments that the timber supporting the slate
was not deep enough to carry the slate and that the joins of the slate should
also have deeper timber support constructed into the frame.
52. It is apparent from comments made in particular by MA, that they believe that
the table was not properly constructed.
53. In the correspondence from “ GT ” of ATT, he stated that tables manufactured
according to what is widely referred to as the traditional method of construction
should be completely or almost completely dismantled for removal and rebui lt
on site. Where the construction is a fixed or cottage table method, where the
slate bed has been screwed firmly into the surface of the frame, the table may
be removed in many instances by unbolting the legs of the table and removing
the remainder in one piece. This is provided the movement of the table is at
one level.
54. In his subsequent email GT described the Applicant’s table as a family table, it
is a nine foot table with a slate bed comprising three slates. He noted in this
particular instance the table did not have the slates screwed securely to the
surface of the frame but rather screwed to lengths of timber attached to the
underside perimeter of the slates, which he referred to as slate linings. Whilst
he considered it possible to move the top of the table as a unit in one piece he
regarded it as inadvisable to do so. In his opinion the top of the table of this
particular design should have been dismantled prior to attempting to move the
table and have been rebuilt when returned.
55. Having considered the additional information obtained, in particular the
statutory declaration of MA and the subsequent comments of GT, I am
persuaded that MA on arriving at the property and inspecting the table prior to it
being moved should have observed that the three slates where not screwed
securely to the surface of the frame and should, it rather than move the table as
one unit, dismantled it prior to attempting to move the table. I am persuaded to
this view given the comments of MA that it is not often that billiard tables where
placed for storage in shipping containers, the shipping container being
positioned outside the home and that he observed the worn line marks in the
cloth in the area of the slate joins and had confirmation that the slate had risen
at both joins. If he was concerned that the slate was not secure then it is
reasonable to believe he would have either dismantled the table or sought
further instructions in particular from the Applicant regarding the condition of the
table. I can only presume based on the information provided that he considered
the table sufficiently secure to be moved in one piece. I am persuaded by the
Case No: 236957 Determination Page 9 of 10
comments of GT that whilst it was possible to move it as one unit, it was
inadvisable to do so.
56. In the circumstances I am persuaded that the removalist has not conducted his
work appropriately and accordingly the FSP is liable to attend to the cost of
repair of the Applicant’s billiard table.
Claim for Compensation
57. The Applicant has sought compensation for stress, agitation and lack of service
as a result of issues arising from this claim.
58. Pursuant to 9.3(b) of the Terms of Reference (TOR) under which the Financial
Ombudsman Service (FOS) operates, where there is unusual degree or extent
of physical inconvenience, time taken to resolve the situation or interference
with the Applicant’s expectatio n of enjoyment or peace of mind, the Applicant
may be compensated to a maximum of $3,000 per claim in a dispute.
I have looked at all of the material including the significant exchange of emails
between the parties in this matter. I am satisfied that the initial declinature by
the FSP and subsequent acceptance of the claim upon production of the
plumber ’ s reports was reasonable and there was no unusual degree or extent
of physical inconvenience or time taken.
After production of the plumbers reports the FSP engaged a builder to provide a
report. The Applicant took issue with this builder and another builder was
consequently engaged. This resulted in a further delay.
On 8 September 2010 the repairer was engaged to quote on the work, the FSP
considered the Applicant was satisfied with this builder and works were
authorised.
Arrangements were then made for further inspection and the actual repairs. The
Applicant was required to move out for the period of repairs and the FSP
provided accommodation for him. The repairs to the flooring were commenced
on 14 October 2010 and finalised on 28 October 2010.
Accordingly, the time frame between a satisfactory quote of repairs and finalisation
of repairs is 60 days. I consider this a reasonable timeframe for the extent of
works undertaken.
After the Applicant notified C of issues with repairs on 29 October 2010, a delay
occurred due to the Applicant’s and N C ’s work schedules and the need to find a
mutually suitable date. It is after this point that a dispute arises.
Whilst I accept that there are delays in the claims process, I do not believe the
actions of the FSP have led to an unusual degree or extent of physical
inconvenience or time taken. Given the events as they have unfolded,
unfortunately some delays can be expected. I am satisfied that the FSP has
done everything reasonably in ord er to satisfy the Applicant’s position and
Case No: 236957 Determination Page 10 of 10
although I have determined the FSP is responsible to effect the further repairs,
the FSP was entitled based on the information that it had at the time to maintain
its decision. Accordingly I do not believe it is appropriate to make an award of
compensation pursuant to paragraph 9.3(b) of the TOR.
Determination
59. On the basis of the available information I determine that the FSP is liable for
the repairs to the parquetry floor to reinstate it to a proper finish.
60. I further determine that the FSP is liable to meet the costs of repair of the
billiard table.
61. I determine the FSP is not liable to make compensation payment to the
Applicant.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.