Home / Financial Firm (Unknown - Insurer) / Determination 236910
Determination 236910
Denial of water inundation claim under flood exclusion
Summary
A homeowner's inundation claim was declined under the flood exclusion. AFCA found the PDS was sent within the statutory period and the water was riverine flood, so the FSP was entitled to rely on its terms and refuse the claim.
Water from a river, or drains surcharged by riverine flood, is flood under the policy and is excluded, and a PDS provided within 14 days satisfies s69 Insurance Contracts Act.
Issues
- Claim denial primary · not upheld“the FSP was entitled to decline the claim on the basis that the inundation occurred from the excluded event of flood”
- Failure to disclose secondary · not upheld“the PDS was sent to the Applicant consistent with section 77 and 69 of the Insurance Contracts Act”
Subjects and remedies
natural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 236910 Determination Page 1 of 10
Case number: 236910
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
08 February 2012
Background
1. The Applicant holds a Home Contents Insurance Policy with the Financial
Services Provider (FSP).
2. The Applicant lodged a claim on 14 January 2011 for damage caused by
water inundation over the period 11-12 January 2011.
3. The FSP declined the claim on the basis the damage arose from flood which
is an excluded cause of loss under the policy.
4. The Applicant disputes the declinature on the basis of failure to inform of the
flood exclusion and the inundation arose from stormwater run-off which is
covered by the policy.
Summary of Applicant’s position
5. The Applicant relies on the following policy terms and conditions:
“What you are not covered for – general exclusions
We will NOT cover
- Loss, damage, injury or death that occurs as a result of
- flood
...
Flood
Is the covering of normally dry land by water escaping or released from the
normally confines of a water course or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy
...
Storm
Is a violent wind, cyclone, tornado, thunderstorm or hail which may be
accompanied by rain or snow, or a sudden, excessive run-off of water as a
direct result of a storm in your local area. It does not include persistent rain by
itself.”
Determination
Case No: 236910 Determination Page 2 of 10
6. The Applicant relies on sections 35 and 69 of the Insurance Contracts Act
(1984) (“the Act”) which the Panel has summarised as follows:
Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation
to the contract, an insurer may not refuse to pay an amount equal to the
minimum amount of cover set out in the regulations made pursuant to the Act
unless it can prove that before the contract was entered into, the insurer
clearly informed the insured in writing of the relevant provisions of the
contract, or that the insured knew or a reasonable person in the
circumstances could be expected to have known of such provision.
Section 69 provides that section 22 will be deemed to have been complied
with if it is not reasonably practicable to give the information in writing before
the contract is entered into but it is reasonably practical to give the information
orally. If the insurer gives the information orally, the insurer is deemed to have
complied with section 22 if the information is given in writing within 14 days
after the contract of insurance (including an interim contract) has been
entered into. Provided the oral information is confirmed in writing within 14
days, compliance with section 22 will be established. Where a loss occurs
after the contract was entered into but before written confirmation of the duty
of disclosure has been provided, the insurer will only be able to avail itself of
the remedies set out in Section 28, if it can prove that the information was
given orally.
7. The Applicant relies on section 14 of the Insurance Contracts Regulations
(1985) (“the Regulations”). Section 14 of the Regulations provides the
prescribed events of cover which includes flood.
8. The Applicant contends he incepted and paid for the policy over the
telephone. He does not recall receiving a Product Disclosure Statement
(PDS) prior to making the payment. At the time of incepting the policy he
was not aware that flood was an excluded event. Accordingly, the Applicant
submits that the policy he accepted included all the prescribed events which
includes flood under section 14 of the Regulations.
9. The Applicant believes it was reasonably practicable to notify him of the
flood exclusion over the telephone. Further, the FSP ought to have been
aware his property was located near a River and the high relevance of the
flood exclusion to him. The Applicant notes ASIC has recommended insurers
prompt consumers to consider the risk of flood prior to taking out home and
contents insurance, particularly if the consumer resides in a flood prone
area.
10. The Applicant contends that the FSP is therefore unable to rely on section
69 of the Act as the FSP‟s duty of good faith required an oral disclosure.
11. The Applicant does not recall receiving a copy of the PDS document prior to
making payment for the policy.
12. The Applicant submits that the damage sustained to his property first
occurred from sudden, excessive run-off of water as a direct result of a storm
and is therefore covered by the policy. The Applicant notes there is little
doubt that storms occurred across Brisbane on Tuesday 11 January 2011.
Case No: 236910 Determination Page 3 of 10
13. The Applicant criticises the FSP‟s reliance on a hydrology report entitled
“Impact of January 2011 South -east Queensland Weather Event at Brisbane
and Ipswich ” as being too general to be applied to his particular property.
14. The Applicant further notes the ICA Hydrology Report for the Brisbane City
LGA stated there were uncertainties as to whether properties flooded by
waterflows also suffered initial inundation from overland flow flooding.
Further, that investigation of local factors and hydraulic modelling of the
storm event and local stormwater drainage systems to determine the issue
was appropriate. Further, the reports were not meant to be used to ascer tain
flooding behaviour at individual property level.
15. Storm activity over 9-10 January 2011 resulted in saturation of the ground.
Given this, the Applicant submits it is likely his property was first inundated
with stormwater run-off on 11 January 2011 and then subsequently
inundated by the Brisbane River.
16. The Applicant has confirmed that he was house -sitting in Montville in early
January 2011 when a neighbour contacted him and encouraged him to
return due to flood warnings. The Applicant returned on 11 January 2011
and moved items to the upstairs neighbour‟s apartment to mitigate his loss.
That evening the Applicant was evacuated from his property and is unable to
give an eye witness account of how water entered his property.
17. The Applicant contends that his property is in a small valley between a
series of hills. The stormwater drains near the Applicant‟s residence have in
the past been blocked and affected by heavy storms which caused overflow.
A witness, “C”, stated that the water never entered the propert y from the
River side but rather the Street side.
Summary of FSP’s position
18. The FSP relies on the following additional policy terms and conditions:
“What you are covered for
...
Storm
If your home or contents suffer loss or damage caused by
- A violent wind, cyclone or tornado
- Thunderstorm or hail which may be accompanied by rain or snow, or
- A sudden, excessive run-off of water as a result of a storm in your local
area.
...
However
- We will NOT cover loss or damage cause by flood.
...
Accidental damage is damage caused unintentionally and he cover is in
addition to the cover for the incidents described on page 6 to 17.
Case No: 236910 Determination Page 4 of 10
19. The FSP relies on the following additional sections of the Insurance
Contracts Act (1984) which the Panel has summarised as follows:
Section 11(10) provides that at the time of renewal of a contract of
insurance, the insurer has given information to the insured as required
by section 35, the requirement by that section to give information to the
insured will be deemed to be satisfied at or before any subsequent
renewal.
Section 77 of the Act provides that a notice or other document that is by
the Act required or permitted to be given, may be given to a body
corporate in any way in which documents may be served on that body
corporate, and to a natural person, personally or by post to that person
at his last known address.
20. The FSP relies on a photograph of flood mapping data. The photograph
indicates the Applicant‟s residence is directly adjacent to the Brisbane River
and would appear to be within the flood extent of the Brisbane River.
21. The FSP relies on a Statutory Declaration by an employee of its „Print
Development Team‟ “JN”. The Panel notes the following from this Statutory
Declaration:
The Print Development Team is responsible for ensuring that a
customer of the FSP is sent a Certificate of Insurance and PDS.
The record document shows that the FSP requested a mail- house “S”
print the PDS and send it to the Applicant‟s mailing address on 15
August 2007.
The report document confirms that on the processing date, “ S ”
processed the request from the FSP, printed the PDS and placed it into
the Applicant‟s envelope.
“ S ” confirms that the Applicant‟s envelope was mailed by Australia Post
on16 August 2007 to the mailing address. Australia Post received the
envelope at its Strathfield lodging facility on 16 August 2007.
22. The FSP relies on Statutory Declaration from its „Customer and Channel
Support‟ team “GW”. The Panel notes the following from this Statutory
Declaration:
The Customer Channel Support team is responsible for reviewing and
taking appropriate action in relation to mail received by the FSP that is
marked or noted „return to sender‟.
GW has checked the records to determine whether the FSP ever
received a return to sender in relation to the Applicant‟s PDS and
Certificate of Insurance.
The PDS and Certificate of Insurance sent to the Applicant with respect
to the policy have never been received by the FSP marked or noted as
returned to sender.
23. The FSP relies on Bureau of Meteorology rainfall data for Brisbane during
January 2011. The rainfall to 9.00am on 10 January 2011 was recorded as
110.8mm; 15.4mm was recorded to 9.00am on 11 January 2011 and
Case No: 236910 Determination Page 5 of 10
40.0mm was recorded to 9.00am on 12 January 2011. The pluviograph at
Brisbane‟s RPA Hospital indi cates 103.4mm to 9.00am on 10 January 2011,
13.4mm to 9.00am on 11 January 2011 and 38.8 to 9.00am on 12 January
2011. These rainfall recording stations are in the geographic locale of the
Applicant‟s residence.
24. The FSP relies on the hydrology report by WP from which the Panel notes
the following:
The property is a ground level flat located in the north-western corner of
a three story block of flats located on “D Street” in a Brisbane Suburb of
“H”. D Street is surrounded to the northwest, north and east by high
ground rising to between 40 and 60mADH. The western end of D Street
lies within a distinct area of lower ground that runs from the Brisbane
River at the southern end of “B Street” 180m northeast towards “A
Street”. This area of lower ground lies at t he lowest point of local run-off
catchment that covers an area of approximately 0.12 square
kilometres. The north and north-western sections of the site lies within
this area of low ground; the elevation of the site adjacent to D Street is
approximately 5 to 5.3mADH.
A ridge of higher ground runs along the southern boundary of the
property on the banks of the Brisbane River. Elevations along this ridge
are approximately 9.0 to 10mAHD.
The Brisbane River flows from east to west along the boundary of the
property before turning sharply some 1500m downstream.
The property is considered to reside within the lower reaches of the
Brisbane River Catchment, with the mouth of the Brisbane River
located some 32kms downstream.
At the time of WP‟s inspection the Appli cant was not present. C was on
site and discussed the matter with WP. C stated that the peak level of
inundation on the front gates of the property along D Street was
approximately 2.4-2.7 meters above ground level. C also noted that
one-way valves had been installed by the Council between D Street
and the Brisbane River in order to prevent inundation of low-lying areas
during times when the levels in the Brisbane River was elevated. C
concluded that the inundation at the property was a result of an
accumulation of run-off generated in the local catchment.
According to the Brisbane City Council the gates lie on land that has an
approximately elevation of 4.4mAHD. This would mean, based on C‟s
observations, that the peak level of inundation was between 6.8 -
7.1mAHD.
WP reviewed the contour mapping on the Brisbane City Council‟s
website and noted that debris marks on the mapping corresponds to an
approximate elevation of 6.9mAHD.
The river gauge information indicates that levels in the Brisbane River
were first affected by catchment inflows from as early as Sunday 9
January 2011, with gradual but steady rise in levels until 6.00am on
Tuesday 11 January 2011. From this time the gauges show steeper
rises in flood levels with eventual peaks of 9.27m around 23:40 on
Case No: 236910 Determination Page 6 of 10
Wednesday 12 January 2011 at the Oxley Creek gauge and 4.46m at
around 3.00am on Thursday 13 January 2011 at the City gauge.
Interpolation indicates that the peak level of inundation at the site would
have been approximately 6.9mAHD which corresponds with C‟s
observations.
As water levels rose in the Brisbane River, river water is likely to have
begun to flow up any open drainage channels and stormwater
infrastructure in the vicinity of the insured site. As the stormwater
infrastructure in D Street lies at an elevation lower than the higher
ground at the rear of the site, occupants may have witnessed the
surcharging of stormwater inlets within the area prior to direct
inundation from the River, although non-return values may have
prevented this.
It is unlikely the inundation would have occurred due to stormwater run-
off resulting from the low intensity rainfall. Surrounding stormwater
infrastructure would be adequately designed to handle such flows.
Based on the rainfall recorded in the vicinity of the property on 11
January 2011 and the topography, if the non-return valves on the
stormwater outlet to the Brisbane River were closed and unable to
drain run-off from the local catchment, the low lying land in the vicinity
of the property would have filled to a le vel of approximately 4.6mAHD.
This being insufficient to inundate the property. It is unlikely that the
property would have been inundated by an accumulation of run-off from
the local catchment.
The aerial mapping depicts a continuous body of water between the
river and the properties along D Street during the event. As such, the
functionality of the local drainage network was not a dominating factor
in the inundation that occurred.
The inundation of the insured premise was caused by water escaping
the normal confines of a natural watercourse, namely the Brisbane
River and travelling upstream through the low lying area near the
southern end of B Street and the western end of D Street and on
towards the site.
25. The FSP also relies on the information regarding rainfall and elevated river
levels contained in the ICA Hydrology Report for the Brisbane LGA.
26. The policy covers the event of storm and accidental damage but a specific
exclusion under storm cover and the general exclusion of flood would apply
to both of these covers.
27. Based on the rainfall and expert hydrology reports the FSP contends that the
inundation was caused by the excluded event of flood.
28. The Applicant has provided no objective evidence that the loss was caused
by an insured event. The Applicant‟s own evidence is that there was no
actual inundation when he left the property and by 6pm on 11 January the
reports confirm that the minor rainfall that day had already ceased. If the
property had been susceptible to rainfall run-off due to the terrain it would
Case No: 236910 Determination Page 7 of 10
have occurred the previous day on 10 January 2011 when there were higher
rainfalls. Instead the inundation occurred at the same time the river levels
experienced a steep rise which eventuated in flooding events. Furthermore,
even if rainfall run-off was responsible for some local flooding, the
hydrologist clearly states it was insufficient to inundate the level of the
Applicant‟s property.
29. The FSP notes that even if the Applicant could establish that rainfall
contributed to the damage that the Wayne Ta nk principle would apply. That
is, where damage is caused by a peril which is insured and a peril which is
excluded, that the whole damage is excluded.
30. The FSP contends that the evidence provided demonstrates the clearly
worded PDS was posted to the Applicant on 16 August 2007 and the FSP
contends that the Applicant would have received it on 22 August 2007.
31. The Applicant‟s submission fails to appreciate that each 12 month renewal of
the policy is a new contract and the PDS provided in 2007 meant each
renewal retained the same terms and conditions. The PDS was therefore
provided prior to the renewal of the policy for the relevant period. Under
section 11 of the Act, the earlier provision of the PDS means that section 35
was already satisfied.
32. The Applicant has not denied receiving the Certificate of Insurance for the
policy as noted in the Statutory Declarations of JN and GW. Further the
Certificate of Insurance refers the Applicant to the PDS.
33. The Applicant does not categorically state he did not receive a PDS at all but
rather he did not recall receiving the PDS prior to making his premium
payment. The evidence of JN is that the Applicant received the PDS within
14 days of policy inception in 2007 which is permissible under the Insurance
Contracts Act (1984). Further, the Applicant has made premium payments
each year which is consistent with receiving his policy documents.
Issues
34. Whether the FSP is entitled to rely on the policy terms and conditions.
35. Whether the FSP was entitled to decline the claim on the basis that the
inundation occurred from the excluded event of flood.
Reasons for decision
36. Due to the nature and urgency of the dispute, it has been directly referred to
the Panel for Determination in accordance with the Operational Guidelines to
the Financ ial Ombudsman Service‟s (FOS) Terms of Reference.
37. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
Case No: 236910 Determination Page 8 of 10
38. There has been an exchange of material between each party, and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
39. The Panel considers there are two discrete issues (as stated above) and it
will address each issue separately.
Whether the FSP is entitled to rely on the policy terms and conditions
40. The Panel has reviewed the material from the parties in relation to whether
the PDS and Certificate of Insurance were sent to the Applicant.
41. The Panel is satisfied that at the time of the 2007 policy inception the
Applicant did not receive the opportunity to review the PDS and Certificate of
Insurance prior to entering the contract of insurance.
42. However, under section 69 of the Act, the FSP may provide the PDS and
other policy documentation within 14 days after the date on which the
contract was entered into if it is not reasonably practicable to provide the
information prior.
43. The Panel accepts the documentary evidence before it that the PDS and
other policy documents were forwarded to the Applicant within the 14 day
period as required by section 69 of the Act.
44. The Panel notes the submissions regarding the resources of the FSP and
the allegation that the FSP should have been able to determine the Applicant
was near the river and should have advised of the flood exclusion. The
Panel has not received any evidence regarding what resources the
employees responsible for incepting the policy would have access to. There
is further no evidence that the Applicant alerted the FSP as to his location
and the specific importance of the flood exclusion to his circumstances.
45. The Panel also notes that the FSP is not generally required to provide
specific advice to a potential insured. Specific advice regarding whether a
policy is right for a particular individual requires particular licensing. The FSP
can only provide information regarding its policy and respond to queries on
coverage. There is no evidence the Applicant actually sought information
regarding whether the FSP covered flood.
46. The Panel is satisfied that the PDS was sent to the Applicant consistent with
section 77 and 69 of the Insurance Contracts Act.
47. The Panel notes that once the PDS was sent in the postal mail to the
Applicant, the FSP was also entitled to rely on the PDS for future renewals
contingent on there being no changes to the PDS.
48. The Panel accepts that the PDS clearly informs the Applicant of the flood
exclusion. The PDS is indexed, identifies the events covered and the
exclusions. At page 15, it identifies the flood exclusion, again at page 35. At
page 70 und er the definition, „flood‟ is clearly defined.
49. Accordingly, the FSP had actually complied with section 35 prior to the
renewal of the insurance contract for the relevant period of cover. Therefore
Case No: 236910 Determination Page 9 of 10
the Panel accepts that the FSP was entitled to rely on the policy terms and
conditions.
Whether the FSP was entitled to decline the claim
50. The Panel notes the following policy terms and conditions”
“Water – leaking or escaping
If your home or contents suffer loss or damage caused by water leaking or
escaping from
- Pipes
- Road gutters or curbing
- House gutters or drainpipes
...
However
- We will NOT cover loss or damage caused by water leaking or escaping
from a
...
- stormwater channel or canal
- stormwater pipe off site”
51. The policy provides cover for storm and accidental damage but this cover is
subject to conditions. In particular the policy provides no cover under either
insured event if the damage arose from flood. Accordingly, if the Panel
accepts the damage arose from an insured event such as stormwater run-off
prior to flood inundation then it would be covered. If however the Panel
accepts the damage arose from the excluded event of flood then it is entitled
to refuse the claim.
52. The Panel notes the Applicant‟s position is that stormwater run -off inundated
t he property prior to the inundation by flood. The hydrologist evidence („W‟)
is that although rainfall was recorded in the area, given the size of the
catchment and low lying land in the vicinity of the property, the low lying area
would have filled to a level of RL 4.6m AHD, which is below the level of the
home. Therefore, it is unlikely that the property would have been inundated
due to an accumulation of run-off from the local catchment.
53. The Panel also confirms that if the stormwater run-off was mixed with
riverine water prior to entering the home, the Wayne Tank principle would
exclude the total damage.
54. The only witness evidence regarding the inundation is from C. The Panel
notes that both parties have provided information regarding C‟s observations
on the date of inundation. However, neither party has arranged a full
statement regarding what C witnessed.
55. The Applicant states C noted water coming from the street side rather than
the river side. However, there is no information regarding whether the water
was from rainfall run-off or from water surcharging from the drains.
Case No: 236910 Determination Page 10 of 10
56. WP recorded some of C‟s observations regarding water levels, the existence
of one way valves installed by the Council and his belief the accumulated
water was run-off generated in the local catchment. However, there is no
detail regarding the basis of C‟s belief in this regard.
57. The Panel considers that the reliance on C‟s evidence is limited given the
lack of relevant detail regarding the source of the water coming from the
street and why C believed the water was run-off. This is particularly so given
the relatively low level of rainfall on 11 January 2011.
58. Hydrologist „W‟ notes that rainfall data collected at Toowong (the closest site
most indicative of local rainfall) shows that 50mm of rain accumulated in the
hours between 10.00am and 3.00pm on 11 January 2011. He estimates this
to be equivalent to an ARI of one year and as such is insufficient to inundate
the site.
59. The hydrologist has indicated that even if this rainfall could not drain then the
low lying land in the vicinity of the insured premise would have filled to a
level of 4.6mAHD which is insufficient to inundate the property.
60. The hydrologist has confirmed that the stormwater drains may have
surcharged, although non-return values may have prevented this.
61. The Panel notes that if the stormwater drains did surcharge and was the
cause of water inundation to the home that this would be excluded by the
policy which excludes water escaping from stormwater pipes and channels.
Further, there is a body of substantive common law which would indicate
that drains surcharging with riverine water is deemed flood water rather than
stormwater run-off.
62. The Panel concludes on the basis of the evidence before it that the damage
arose from riverine flooding rather than stormwater run-off.
Determination
63. On the basis of the available information the Panel determines the FSP is
entitled to rely on the policy terms and conditions.
64. On the basis of the available information the Panel determines the FSP was
entitled to decline the claim on the basis that the inundation occurred from
the excluded event of flood.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.