Home / Financial Firm (Unknown - Insurer) / Determination 236910

Determination 236910

Denial of water inundation claim under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner's inundation claim was declined under the flood exclusion. AFCA found the PDS was sent within the statutory period and the water was riverine flood, so the FSP was entitled to rely on its terms and refuse the claim.

Water from a river, or drains surcharged by riverine flood, is flood under the policy and is excluded, and a PDS provided within 14 days satisfies s69 Insurance Contracts Act.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 236910 Determination Page 1 of 10 Case number: 236910 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition 08 February 2012 Background 1. The Applicant holds a Home Contents Insurance Policy with the Financial Services Provider (FSP). 2. The Applicant lodged a claim on 14 January 2011 for damage caused by water inundation over the period 11-12 January 2011. 3. The FSP declined the claim on the basis the damage arose from flood which is an excluded cause of loss under the policy. 4. The Applicant disputes the declinature on the basis of failure to inform of the flood exclusion and the inundation arose from stormwater run-off which is covered by the policy. Summary of Applicant’s position 5. The Applicant relies on the following policy terms and conditions: “What you are not covered for – general exclusions We will NOT cover - Loss, damage, injury or death that occurs as a result of - flood ... Flood Is the covering of normally dry land by water escaping or released from the normally confines of a water course or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this Policy ... Storm Is a violent wind, cyclone, tornado, thunderstorm or hail which may be accompanied by rain or snow, or a sudden, excessive run-off of water as a direct result of a storm in your local area. It does not include persistent rain by itself.” Determination Case No: 236910 Determination Page 2 of 10 6. The Applicant relies on sections 35 and 69 of the Insurance Contracts Act (1984) (“the Act”) which the Panel has summarised as follows:  Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision.  Section 69 provides that section 22 will be deemed to have been complied with if it is not reasonably practicable to give the information in writing before the contract is entered into but it is reasonably practical to give the information orally. If the insurer gives the information orally, the insurer is deemed to have complied with section 22 if the information is given in writing within 14 days after the contract of insurance (including an interim contract) has been entered into. Provided the oral information is confirmed in writing within 14 days, compliance with section 22 will be established. Where a loss occurs after the contract was entered into but before written confirmation of the duty of disclosure has been provided, the insurer will only be able to avail itself of the remedies set out in Section 28, if it can prove that the information was given orally. 7. The Applicant relies on section 14 of the Insurance Contracts Regulations (1985) (“the Regulations”). Section 14 of the Regulations provides the prescribed events of cover which includes flood. 8. The Applicant contends he incepted and paid for the policy over the telephone. He does not recall receiving a Product Disclosure Statement (PDS) prior to making the payment. At the time of incepting the policy he was not aware that flood was an excluded event. Accordingly, the Applicant submits that the policy he accepted included all the prescribed events which includes flood under section 14 of the Regulations. 9. The Applicant believes it was reasonably practicable to notify him of the flood exclusion over the telephone. Further, the FSP ought to have been aware his property was located near a River and the high relevance of the flood exclusion to him. The Applicant notes ASIC has recommended insurers prompt consumers to consider the risk of flood prior to taking out home and contents insurance, particularly if the consumer resides in a flood prone area. 10. The Applicant contends that the FSP is therefore unable to rely on section 69 of the Act as the FSP‟s duty of good faith required an oral disclosure. 11. The Applicant does not recall receiving a copy of the PDS document prior to making payment for the policy. 12. The Applicant submits that the damage sustained to his property first occurred from sudden, excessive run-off of water as a direct result of a storm and is therefore covered by the policy. The Applicant notes there is little doubt that storms occurred across Brisbane on Tuesday 11 January 2011. Case No: 236910 Determination Page 3 of 10 13. The Applicant criticises the FSP‟s reliance on a hydrology report entitled “Impact of January 2011 South -east Queensland Weather Event at Brisbane and Ipswich ” as being too general to be applied to his particular property. 14. The Applicant further notes the ICA Hydrology Report for the Brisbane City LGA stated there were uncertainties as to whether properties flooded by waterflows also suffered initial inundation from overland flow flooding. Further, that investigation of local factors and hydraulic modelling of the storm event and local stormwater drainage systems to determine the issue was appropriate. Further, the reports were not meant to be used to ascer tain flooding behaviour at individual property level. 15. Storm activity over 9-10 January 2011 resulted in saturation of the ground. Given this, the Applicant submits it is likely his property was first inundated with stormwater run-off on 11 January 2011 and then subsequently inundated by the Brisbane River. 16. The Applicant has confirmed that he was house -sitting in Montville in early January 2011 when a neighbour contacted him and encouraged him to return due to flood warnings. The Applicant returned on 11 January 2011 and moved items to the upstairs neighbour‟s apartment to mitigate his loss. That evening the Applicant was evacuated from his property and is unable to give an eye witness account of how water entered his property. 17. The Applicant contends that his property is in a small valley between a series of hills. The stormwater drains near the Applicant‟s residence have in the past been blocked and affected by heavy storms which caused overflow. A witness, “C”, stated that the water never entered the propert y from the River side but rather the Street side. Summary of FSP’s position 18. The FSP relies on the following additional policy terms and conditions: “What you are covered for ... Storm If your home or contents suffer loss or damage caused by - A violent wind, cyclone or tornado - Thunderstorm or hail which may be accompanied by rain or snow, or - A sudden, excessive run-off of water as a result of a storm in your local area. ... However - We will NOT cover loss or damage cause by flood. ... Accidental damage is damage caused unintentionally and he cover is in addition to the cover for the incidents described on page 6 to 17. Case No: 236910 Determination Page 4 of 10 19. The FSP relies on the following additional sections of the Insurance Contracts Act (1984) which the Panel has summarised as follows:  Section 11(10) provides that at the time of renewal of a contract of insurance, the insurer has given information to the insured as required by section 35, the requirement by that section to give information to the insured will be deemed to be satisfied at or before any subsequent renewal.  Section 77 of the Act provides that a notice or other document that is by the Act required or permitted to be given, may be given to a body corporate in any way in which documents may be served on that body corporate, and to a natural person, personally or by post to that person at his last known address. 20. The FSP relies on a photograph of flood mapping data. The photograph indicates the Applicant‟s residence is directly adjacent to the Brisbane River and would appear to be within the flood extent of the Brisbane River. 21. The FSP relies on a Statutory Declaration by an employee of its „Print Development Team‟ “JN”. The Panel notes the following from this Statutory Declaration:  The Print Development Team is responsible for ensuring that a customer of the FSP is sent a Certificate of Insurance and PDS.  The record document shows that the FSP requested a mail- house “S” print the PDS and send it to the Applicant‟s mailing address on 15 August 2007.  The report document confirms that on the processing date, “ S ” processed the request from the FSP, printed the PDS and placed it into the Applicant‟s envelope.  “ S ” confirms that the Applicant‟s envelope was mailed by Australia Post on16 August 2007 to the mailing address. Australia Post received the envelope at its Strathfield lodging facility on 16 August 2007. 22. The FSP relies on Statutory Declaration from its „Customer and Channel Support‟ team “GW”. The Panel notes the following from this Statutory Declaration:  The Customer Channel Support team is responsible for reviewing and taking appropriate action in relation to mail received by the FSP that is marked or noted „return to sender‟.  GW has checked the records to determine whether the FSP ever received a return to sender in relation to the Applicant‟s PDS and Certificate of Insurance.  The PDS and Certificate of Insurance sent to the Applicant with respect to the policy have never been received by the FSP marked or noted as returned to sender. 23. The FSP relies on Bureau of Meteorology rainfall data for Brisbane during January 2011. The rainfall to 9.00am on 10 January 2011 was recorded as 110.8mm; 15.4mm was recorded to 9.00am on 11 January 2011 and Case No: 236910 Determination Page 5 of 10 40.0mm was recorded to 9.00am on 12 January 2011. The pluviograph at Brisbane‟s RPA Hospital indi cates 103.4mm to 9.00am on 10 January 2011, 13.4mm to 9.00am on 11 January 2011 and 38.8 to 9.00am on 12 January 2011. These rainfall recording stations are in the geographic locale of the Applicant‟s residence. 24. The FSP relies on the hydrology report by WP from which the Panel notes the following:  The property is a ground level flat located in the north-western corner of a three story block of flats located on “D Street” in a Brisbane Suburb of “H”. D Street is surrounded to the northwest, north and east by high ground rising to between 40 and 60mADH. The western end of D Street lies within a distinct area of lower ground that runs from the Brisbane River at the southern end of “B Street” 180m northeast towards “A Street”. This area of lower ground lies at t he lowest point of local run-off catchment that covers an area of approximately 0.12 square kilometres. The north and north-western sections of the site lies within this area of low ground; the elevation of the site adjacent to D Street is approximately 5 to 5.3mADH.  A ridge of higher ground runs along the southern boundary of the property on the banks of the Brisbane River. Elevations along this ridge are approximately 9.0 to 10mAHD.  The Brisbane River flows from east to west along the boundary of the property before turning sharply some 1500m downstream.  The property is considered to reside within the lower reaches of the Brisbane River Catchment, with the mouth of the Brisbane River located some 32kms downstream.  At the time of WP‟s inspection the Appli cant was not present. C was on site and discussed the matter with WP. C stated that the peak level of inundation on the front gates of the property along D Street was approximately 2.4-2.7 meters above ground level. C also noted that one-way valves had been installed by the Council between D Street and the Brisbane River in order to prevent inundation of low-lying areas during times when the levels in the Brisbane River was elevated. C concluded that the inundation at the property was a result of an accumulation of run-off generated in the local catchment.  According to the Brisbane City Council the gates lie on land that has an approximately elevation of 4.4mAHD. This would mean, based on C‟s observations, that the peak level of inundation was between 6.8 - 7.1mAHD.  WP reviewed the contour mapping on the Brisbane City Council‟s website and noted that debris marks on the mapping corresponds to an approximate elevation of 6.9mAHD.  The river gauge information indicates that levels in the Brisbane River were first affected by catchment inflows from as early as Sunday 9 January 2011, with gradual but steady rise in levels until 6.00am on Tuesday 11 January 2011. From this time the gauges show steeper rises in flood levels with eventual peaks of 9.27m around 23:40 on Case No: 236910 Determination Page 6 of 10 Wednesday 12 January 2011 at the Oxley Creek gauge and 4.46m at around 3.00am on Thursday 13 January 2011 at the City gauge.  Interpolation indicates that the peak level of inundation at the site would have been approximately 6.9mAHD which corresponds with C‟s observations.  As water levels rose in the Brisbane River, river water is likely to have begun to flow up any open drainage channels and stormwater infrastructure in the vicinity of the insured site. As the stormwater infrastructure in D Street lies at an elevation lower than the higher ground at the rear of the site, occupants may have witnessed the surcharging of stormwater inlets within the area prior to direct inundation from the River, although non-return values may have prevented this.  It is unlikely the inundation would have occurred due to stormwater run- off resulting from the low intensity rainfall. Surrounding stormwater infrastructure would be adequately designed to handle such flows.  Based on the rainfall recorded in the vicinity of the property on 11 January 2011 and the topography, if the non-return valves on the stormwater outlet to the Brisbane River were closed and unable to drain run-off from the local catchment, the low lying land in the vicinity of the property would have filled to a le vel of approximately 4.6mAHD. This being insufficient to inundate the property. It is unlikely that the property would have been inundated by an accumulation of run-off from the local catchment.  The aerial mapping depicts a continuous body of water between the river and the properties along D Street during the event. As such, the functionality of the local drainage network was not a dominating factor in the inundation that occurred.  The inundation of the insured premise was caused by water escaping the normal confines of a natural watercourse, namely the Brisbane River and travelling upstream through the low lying area near the southern end of B Street and the western end of D Street and on towards the site. 25. The FSP also relies on the information regarding rainfall and elevated river levels contained in the ICA Hydrology Report for the Brisbane LGA. 26. The policy covers the event of storm and accidental damage but a specific exclusion under storm cover and the general exclusion of flood would apply to both of these covers. 27. Based on the rainfall and expert hydrology reports the FSP contends that the inundation was caused by the excluded event of flood. 28. The Applicant has provided no objective evidence that the loss was caused by an insured event. The Applicant‟s own evidence is that there was no actual inundation when he left the property and by 6pm on 11 January the reports confirm that the minor rainfall that day had already ceased. If the property had been susceptible to rainfall run-off due to the terrain it would Case No: 236910 Determination Page 7 of 10 have occurred the previous day on 10 January 2011 when there were higher rainfalls. Instead the inundation occurred at the same time the river levels experienced a steep rise which eventuated in flooding events. Furthermore, even if rainfall run-off was responsible for some local flooding, the hydrologist clearly states it was insufficient to inundate the level of the Applicant‟s property. 29. The FSP notes that even if the Applicant could establish that rainfall contributed to the damage that the Wayne Ta nk principle would apply. That is, where damage is caused by a peril which is insured and a peril which is excluded, that the whole damage is excluded. 30. The FSP contends that the evidence provided demonstrates the clearly worded PDS was posted to the Applicant on 16 August 2007 and the FSP contends that the Applicant would have received it on 22 August 2007. 31. The Applicant‟s submission fails to appreciate that each 12 month renewal of the policy is a new contract and the PDS provided in 2007 meant each renewal retained the same terms and conditions. The PDS was therefore provided prior to the renewal of the policy for the relevant period. Under section 11 of the Act, the earlier provision of the PDS means that section 35 was already satisfied. 32. The Applicant has not denied receiving the Certificate of Insurance for the policy as noted in the Statutory Declarations of JN and GW. Further the Certificate of Insurance refers the Applicant to the PDS. 33. The Applicant does not categorically state he did not receive a PDS at all but rather he did not recall receiving the PDS prior to making his premium payment. The evidence of JN is that the Applicant received the PDS within 14 days of policy inception in 2007 which is permissible under the Insurance Contracts Act (1984). Further, the Applicant has made premium payments each year which is consistent with receiving his policy documents. Issues 34. Whether the FSP is entitled to rely on the policy terms and conditions. 35. Whether the FSP was entitled to decline the claim on the basis that the inundation occurred from the excluded event of flood. Reasons for decision 36. Due to the nature and urgency of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financ ial Ombudsman Service‟s (FOS) Terms of Reference. 37. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. Case No: 236910 Determination Page 8 of 10 38. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 39. The Panel considers there are two discrete issues (as stated above) and it will address each issue separately. Whether the FSP is entitled to rely on the policy terms and conditions 40. The Panel has reviewed the material from the parties in relation to whether the PDS and Certificate of Insurance were sent to the Applicant. 41. The Panel is satisfied that at the time of the 2007 policy inception the Applicant did not receive the opportunity to review the PDS and Certificate of Insurance prior to entering the contract of insurance. 42. However, under section 69 of the Act, the FSP may provide the PDS and other policy documentation within 14 days after the date on which the contract was entered into if it is not reasonably practicable to provide the information prior. 43. The Panel accepts the documentary evidence before it that the PDS and other policy documents were forwarded to the Applicant within the 14 day period as required by section 69 of the Act. 44. The Panel notes the submissions regarding the resources of the FSP and the allegation that the FSP should have been able to determine the Applicant was near the river and should have advised of the flood exclusion. The Panel has not received any evidence regarding what resources the employees responsible for incepting the policy would have access to. There is further no evidence that the Applicant alerted the FSP as to his location and the specific importance of the flood exclusion to his circumstances. 45. The Panel also notes that the FSP is not generally required to provide specific advice to a potential insured. Specific advice regarding whether a policy is right for a particular individual requires particular licensing. The FSP can only provide information regarding its policy and respond to queries on coverage. There is no evidence the Applicant actually sought information regarding whether the FSP covered flood. 46. The Panel is satisfied that the PDS was sent to the Applicant consistent with section 77 and 69 of the Insurance Contracts Act. 47. The Panel notes that once the PDS was sent in the postal mail to the Applicant, the FSP was also entitled to rely on the PDS for future renewals contingent on there being no changes to the PDS. 48. The Panel accepts that the PDS clearly informs the Applicant of the flood exclusion. The PDS is indexed, identifies the events covered and the exclusions. At page 15, it identifies the flood exclusion, again at page 35. At page 70 und er the definition, „flood‟ is clearly defined. 49. Accordingly, the FSP had actually complied with section 35 prior to the renewal of the insurance contract for the relevant period of cover. Therefore Case No: 236910 Determination Page 9 of 10 the Panel accepts that the FSP was entitled to rely on the policy terms and conditions. Whether the FSP was entitled to decline the claim 50. The Panel notes the following policy terms and conditions” “Water – leaking or escaping If your home or contents suffer loss or damage caused by water leaking or escaping from - Pipes - Road gutters or curbing - House gutters or drainpipes ... However - We will NOT cover loss or damage caused by water leaking or escaping from a ... - stormwater channel or canal - stormwater pipe off site” 51. The policy provides cover for storm and accidental damage but this cover is subject to conditions. In particular the policy provides no cover under either insured event if the damage arose from flood. Accordingly, if the Panel accepts the damage arose from an insured event such as stormwater run-off prior to flood inundation then it would be covered. If however the Panel accepts the damage arose from the excluded event of flood then it is entitled to refuse the claim. 52. The Panel notes the Applicant‟s position is that stormwater run -off inundated t he property prior to the inundation by flood. The hydrologist evidence („W‟) is that although rainfall was recorded in the area, given the size of the catchment and low lying land in the vicinity of the property, the low lying area would have filled to a level of RL 4.6m AHD, which is below the level of the home. Therefore, it is unlikely that the property would have been inundated due to an accumulation of run-off from the local catchment. 53. The Panel also confirms that if the stormwater run-off was mixed with riverine water prior to entering the home, the Wayne Tank principle would exclude the total damage. 54. The only witness evidence regarding the inundation is from C. The Panel notes that both parties have provided information regarding C‟s observations on the date of inundation. However, neither party has arranged a full statement regarding what C witnessed. 55. The Applicant states C noted water coming from the street side rather than the river side. However, there is no information regarding whether the water was from rainfall run-off or from water surcharging from the drains. Case No: 236910 Determination Page 10 of 10 56. WP recorded some of C‟s observations regarding water levels, the existence of one way valves installed by the Council and his belief the accumulated water was run-off generated in the local catchment. However, there is no detail regarding the basis of C‟s belief in this regard. 57. The Panel considers that the reliance on C‟s evidence is limited given the lack of relevant detail regarding the source of the water coming from the street and why C believed the water was run-off. This is particularly so given the relatively low level of rainfall on 11 January 2011. 58. Hydrologist „W‟ notes that rainfall data collected at Toowong (the closest site most indicative of local rainfall) shows that 50mm of rain accumulated in the hours between 10.00am and 3.00pm on 11 January 2011. He estimates this to be equivalent to an ARI of one year and as such is insufficient to inundate the site. 59. The hydrologist has indicated that even if this rainfall could not drain then the low lying land in the vicinity of the insured premise would have filled to a level of 4.6mAHD which is insufficient to inundate the property. 60. The hydrologist has confirmed that the stormwater drains may have surcharged, although non-return values may have prevented this. 61. The Panel notes that if the stormwater drains did surcharge and was the cause of water inundation to the home that this would be excluded by the policy which excludes water escaping from stormwater pipes and channels. Further, there is a body of substantive common law which would indicate that drains surcharging with riverine water is deemed flood water rather than stormwater run-off. 62. The Panel concludes on the basis of the evidence before it that the damage arose from riverine flooding rather than stormwater run-off. Determination 63. On the basis of the available information the Panel determines the FSP is entitled to rely on the policy terms and conditions. 64. On the basis of the available information the Panel determines the FSP was entitled to decline the claim on the basis that the inundation occurred from the excluded event of flood.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.