Text of the determination
Case No: 236494 Determination Page 1 of 7
Case number: 236494
General Insurance - Domestic Insurance - Home Building - flood - Service -
Delay in claim handling
18 October 2011
Background
1. The Applicant holds a home building and contents policy with the Financial
Services Provider (FSP).
2. In January 2011, the Applicant’s home was inundated with water following
severe weather events in Queensland.
3. The Applicant’s claim was investigated and a fter obtaining site specific
hydrological evidence, the FSP agreed to cover building and contents loss up
to 100mm in the home.
4. The Applicant says she is satisfied with the building settlement; however,
maintains she was told her contents would be covered by the FSP when she
called at the time of the event. The Applicant discarded the majority of her
contents because the FSP told her she was covered and had she been told the
claim would be denied she would have tried to salvage more items.
Summary of Appli cant’s Position
5. She called the FSP around 6:00pm on 12 January 2011 regarding her policy.
The FSP’s staff member advised her claim was fully covered because it was
caused by rain and storm and they could discard the damage contents.
6. When she called the FSP two days later, she was advised the claim would not
be covered. She fails to understand how the FSP could give her two versions
as to what is covered.
7. The claim was assessed and then there were extensive delays while the FSP
stated it was awaiting hydrology evidence. On 10 March 2011, she called the
FSP and was told they were still awaiting the hydrology report. She checked
the Insurance Council of Australia website herself and found the hydrology
report dated 20 February 2011. She feels the FSP has lied to her on several
occasions and delayed the claim for approximately seven months.
8. She has requested call recordings from the FSP to prove she was provided
incorrect information. The FSP claims there are no recordings.
Determination
Case No: 236494 Determination Page 2 of 7
9. Since lodging the dispute, the FSP has agreed to cover building damage to
100mm in the home, being a monetary figure of $10,143.58. It has also paid
contents damage to 100mm.
10. However, she is not satisfied with the contents settlement as the majority of the
contents were discarded pursuant to t he FSP’s advice the claim would be
covered and that she could throw out the damaged contents. Had she been
aware the claim would not be fully covered, she would have tried to salvage
more contents items.
11. The Statutory Declarations from the FSP’s staff are vague and the staff
members do not even recall the specific conversations.
12. She has contents cover of $81,000 and now wants the difference between what
the FSP has settled for contents already (there were very few items that were
salvaged or unaffected by the flood) and the remaining sum insured.
Summary of FSP’s Position
13. The Applicant called on 12 January 2011 and was told she was only covered
for storm and rainwater damage.
14. The Applicant called twice on 14 January 2011 to request an assessor. She
was told to take photographs of items that required disposal.
15. Calls are not routinely recorded and there are no recordings of the Appl icant’s
calls in January 2011.
16. In March 2011, it was decided an investigation would be required to give the
Applicant a fully considered decision. The Applicants were interviewed and
after receiving the report and further hydrology evidence, it agreed to accept
building and contents loss up to 100mm in the property.
17. There is no evidence the Applicant was told the claim would be covered and
that she could throw out all the contents items. Staff were given instructions as
to what to tell customers about their claims at the time of the floods. The FSP
provides a copy of the instructions to staff, system notations relating to the
Applicant’s claim and Statutory Declarations from the staff members involved.
18. The Product Disclosure Statement also specifically outlines that flood is not
covered.
19. The Applicant was aware flood was not covered as early as 12 January 2011,
but certainly no later than 14 January 2011.
20. The Applicant discarded contents items because there was no choice. The FSP
argues there is no evidence the Applicant was provided with misleading
information and even if she was, she needed to discard the damaged contents
anyway, so no prejudice has been suffered.
Case No: 236494 Determination Page 3 of 7
21. The FSP relies on the following policy provisions:
“ What we cover - insured events
This section describes under the heading:
Yes - the insured events you are covered for,
No - the conditions and exclusions that specifically apply to particular insured
events.
…
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
…
No
Damage or loss caused by flood . Flood means the inundation or covering of normally
dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
Flood does not mean stormwater runoff from areas surr ounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or
surface.
…
What we do not cover - general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or aris ing from or involving:
…
flood, ”
Issues
22. Whether the Applicant was provided misleading information by the FSP on 12
January 2011, and if so;
23. Whether the Applicant suffered prejudice.
Case No: 236494 Determination Page 4 of 7
Reasons for Decision
24. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
25. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
26. There has been an exchange of information between the parties and the Panel
is satisfied that each party has had an opportunity to address the issues raised.
27. As noted, since the referral of this dispute to the Financial Ombudsman
Service, the FSP has agreed to cover building and contents loss up to 100mm
in the home.
28. The Applicant has confirmed she is satisfied with the building settlement and
the only issue remaining in dispute is the contents settlement.
29. The Applicant has informed the Service that the FSP had settled $24,445 for
contents (up to 100mm). The Applicant notes her contents sum insured is
$81,350 and seeks the remaining sum insured for water damaged contents.
30. The Panel has reviewed the hydrology evidence, including the site specific
report, dated 14 June 2011. The report concludes the maximum inundation
from backflow from pipes would have been approximately 100mm before the
direct inundation from the Brisbane River and this underpins the basis of the
FSP’s settlement made to date.
31. The expert evidence is not in dispu te and the Panel is satisfied the FSP’s basis
for settlement is sound.
32. Therefore, the only matter the Panel is required to consider is the issue of the
Applicant’s allegation that she was provided misleading information by the FSP
in January 2011.
Was the Applicant provided with misleading information by the FSP on 12
January 2011?
33. The Applicant submits when she called the FSP on 12 January 2011 to enquire
about her policy, she was informed the claim would be covered as the loss was
caused by storm and rainwater. On the basis of this information, she discarded
her contents.
34. The FSP submits there is no recording of the call. It submits its staff were
provided training to tell customers flood was not covered and that claims would
be assessed. The FSP provides a Statuary Declaration from the staff member
who spoke to the Applicant on 12 January 2011 and a copy of its system
notations from the call.
Case No: 236494 Determination Page 5 of 7
35. The Panel has reviewed the evidence. The FSP’s system notations from 12
January 2011 state:
- IO (the Applicant) called to enquire about flood cover
- Advised she is covered for storm and rainwater
36. The staff member’s Statutory Declaration states:
“ She did not remember the specific call.
The first thing she told callers at the time of the floods was that “you are not
covered for flood”. As this was second nature, a notation would not have been
made in the system.
She would have told the Applicant she was covered for storm and rainwater
damage and that is the reason for the notation.
She was in the habit of telling customers flood or water rising from a river is not
covered. She would ask if they lived near a river and also inform them that if
water backed up from drains or there was flash flood from rain, this would be
insured.
Through December 2010 and January 2011, management at the FSP
“drummed” it into staff that flood was not covered.
They were given scripts by management for suggested words to say to
customers. ”
37. Without a call recording it is very difficult for the Panel to determine with any
certainty what transpired during the call of 12 January 2011. The Panel accepts
both parties’ submissions have been made in good faith and finds no reason to
doubt either party’s version of events.
38. The Panel has listened to a number of call recordings in relation to the January
2011 flood disputes (from a variety of insurers) and has found occasions where
the insurers have either been very clear in advising flood is excluded, or
conversely extraordinarily unclear about flood cover. There have also been
occasions where it is clear the customer has failed to comprehend the
information given.
39. In this dispute, the Panel similarly notes that any of the following scenarios are
possible:
The FSP advised flood was not covered and the claim would need to be
assessed.
The FSP failed to advise flood was not covered.
The FSP advised flood was not covered, but as this was caused by storm
and rain, it would be covered.
The FSP advised flood was not covered, but storm and rainwater is
covered and the claim would need to be assessed.
40. The FSP also provides a Statutory Declaration from a staff member who spoke
to the Applicant on 14 January 2011. The evidence is similar to that of the first
Statutory Declaration, noted in paragraph 36 above.
Case No: 236494 Determination Page 6 of 7
41. The Panel has reviewed the interviews that were conducted with the Applicant
and her partner in March and April 2011, respectively. There was some
confusion as to what date they were aware there was no cover for flood. There
is an indication the Applicant was informed there was no cover on 13 January
2011 however, the Applicant maintains she was still under the belief there was
cover. Her partner believed the Applicant was told there was no flood cover the
day after 12 January 2011.
42. As the interviews were conducted more than two months after the event and
considering the extent of the damage and the stress on the Applicant and her
partner in the intervening weeks, the Panel does not place a great deal of
weight on the dates of calls in the interview, noting the Applicant does not
appear to be certain about the dates of calls.
43. The Applicant submits friends turned up and assisted in cleaning up the home
on 14 January 2011. It is the FSP’s submission that the Applicant was already
aware flood was not covered by this time.
44. The Panel cannot be certain this w as the case. The FSP’s claims notations do
not actually state the Applicant was told there was no flood cover. The Panel
accepts it is likely the Applicant may have been told there was no flood cover,
given the Statutory Declarations of the staff members and the process
reportedly being followed however, there is insufficient evidence to be satisfied,
to the required proof level, namely balance of probabilities.
45. Arguably the FSP’s system notation from 12 January 2011 actually supports
the Applicant as it only alludes to the Applicant being told she was covered for
storm and rainwater, which is consistent with the Applicant’s version of events.
46. The Panel has also considered whether the Applicant has suffered prejudice,
even if it was accepted she had been misinformed.
Has the Applicant suffered prejudice?
47. The FSP submits the Applicant would have needed to discard most of the
contents, irrespective of any advice given.
48. The evidence before the Panel shows the first floor of the Applicant’s home was
fully inundated with water and the second floor was inundated to a level of
900mm. This would indicate the majority of the Applicant’s contents items were
affected.
49. In the circumstances, while the Panel appreciates from its own knowledge of
flood damage, that the majority of affected items may have been
unsalvageable, nevertheless a different mind set is in play, between knowing
that each discarded item can only be replaced if and when one’s own budget
allows, thereby encouraging extreme care and frugality in so doing; and the
alternate scenario where one, believing items are covered by insurance, is
more inclined, under the accumulated stress of events, to make a clean sweep
of everything. In the circumstances of this matter, the Panel believes there is
sufficient do ubt implicit in the FSP’s submissions regarding the possibility of
Case No: 236494 Determination Page 7 of 7
innocent misrepresentation by its representatives to prompt recourse to
‘fairness in all the circumstances’, thereby requiring of the FSP, to cash settle
the Applicant 25% of the remaining contents sum assured, namely $14,138.75.
Delays
50. The Applicant has raised concerns that the FSP took approximately seven
months to make a decision on the claim.
51. The Panel acknowledges the FSP undertook additional enquiries in this claim
and is aware there were general delays across the insurance industry as the
result of a large number of claims in January 2011.
52. However, the Panel agrees this claim took an unreasonably long time and will
refer the matter to the Code Compliance department to review the FSP’ s
handling of the claim (though this will have no material effect on the Panel’s
decision in this Determination).
Determination
53. On the basis of the available information, the Panel determines the FSP is to
cash settle the Applicant an additional sum of $14,138.75 in full and final
settlement of its obligations in respect of the contents insurance.