Home / Financial Firm (Unknown - Insurer) / Determination 236414

Determination 236414

Roof replacement denied after storm as wear and tear

FirmFinancial Firm (Unknown - Insurer)
Decided2011-07-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$16,000
SourceAFCA PDF

Summary

After January 2011 storm and rain, water entered the house and the applicant claimed $16,000 to replace the asbestos roof. AFCA found no evidence the storm damaged the roof and that the interior water entry came through a rusted valley, an excluded wear and tear event.

The applicant had to show on the balance of probabilities that the storm caused the roof damage, and the evidence instead pointed to gradual deterioration and wear and tear, which the policy excludes.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 236414 Determination Page 1 of 6 Case Number: 236414 General Insurance – Home Building – storm damage – Policy exclusion – wear and tear Date: 29 July 2011 Background 1. The Applicant insured her home building against loss or damage caused by insured events under a Home Building Insurance Policy for $180,000 with a $500 policy excess. The policy commenced on the 17 October 2008 and had been renewed annually to 17 October 2011. 2. The Applicant submits that on the 10 January 2011, the insured house suffered storm damage to its fibre-cement roof resulting in rainwater entering the interior of the house causing damage to the walls and ceiling between two bedrooms. 3. The Applicant contends that the roof was damaged during cyclonic winds on the 10 January 2011 and it requires to be replaced at a cost of $16,000. 4. The Financial Services Provider (FSP) has accepted liability for the damage to the interior of the house, but has denied indemnity for the replacement of the roof. The FSP contends that there is no evidence of storm damage to the roof and the rainwater entered the house due to wear and tear of the roof valley. Summary of Applicant ’s Position 5. The FSP has ignored the fact that a severe storm occurred on 10 January 2011 resulting in damage to her house. The FSP has also ignored the terms and conditions of its policy of insurance. 6. The insured house was built in about 1947 and has an asbestos roof. It has been well maintained, repaired and painted. Due to regular cyclonic storms in recent times, rain and hail on many occasions this year and previous years, the roof developed cracks which have not leaked, but the valley has leaked. 7. Severe storms, winds and rain caused major damage the roof on the 10 January 2011. Rain entered two bedrooms leaving black marks on the walls. Carpet and a wardrobe were also damaged. 8. The Applicant states that during normal rainfall, before the storm event on 10 January 2011, rainwater did not cause severe leaking from the roof. Determination Case No: 236414 Determination Page 2 of 6 9. Storms and cyclonic winds lift roof sheets and the nails holding the roof in position are loosened on each successive storm/cyclone event. The cyclonic winds push the roof nails up or out because the roof is lifted by the force of the strong winds. When the winds are strong, naturally major leaks resulted. It has nothing to do with the age of the house or its maintenance. 10. The FSP refers to rusted areas of the roof. However, the roof is constructed of fibro-cement which does not rust. Further, th e FSP‟s building consultant did not have a close look at the roof by getting up onto the roof. 11. The building consultant also stated the cause of the leaking roof was a maintenance issue and not caused by a storm event. The Applicant disputes this as she has had several repairs carried out including an extensive repair that cost $1,600. 12. The age of the roof is not known, but she purchased the house about 20 years ago and has prompt repairs carried out as required in spite of repeated s torm events that fall within the cover provided by her policy. 13. The FSP has admitted that the cumulative effect of adverse weather in January 2011 at the location of the insured property resulted in water damage to the house. 14. The Applicant states the FSP ha s not provided proof of builders‟ or roofers‟ statements stating that cyclonic winds/rain do not cause roofs to crack or lift the roof sheets and nails, which causes leakage. 15. Owners of property in Brisbane and the location of the insured property do not call in roofers to check roofs every time there has been a storm. 16. The last repair at her property was on 10 March 2011 when she witnessed the metal valley being removed. It was not rusty. 17. The Applicant contends maintenance to the property was carried out when required. The FSP‟s statement that maintenance was not carried out is unacceptable. It is merely an excuse to not pay her claim. 18. Cyclonic damage is not a maintenance issue. Storms have been damaging and cracking the asbestos roof for many years. Fortunately, the roof did not leak due to the good maintenance carried out as needed. 19. The FSP‟s building inspector has stated that the roof is old asbestos and needs replacing. Other roofers agree with this, however, the FSP refuses to meet her claim to replace the roof. Summary of FSP’s Position 20. The FSP appointed a building consultant to inspect and report on the condition of the roof on the insured property. In his report dated 31 January 2011, he stated: Case No: 236414 Determination Page 3 of 6 “Attended high set single storey residence of around sixty years of age to find internal ingress to the front bedroom asbestos ceiling, wall and cornice with water damage to the carpet. This damage is situated underneath the roof valley which is rusted and faulty. The main roof is Super 3 asbestos CGI profile with a rear Super 6 asbestos skillet. The roof was painted several years ago covering up its very poor condition. I found the ridging and sheeting to be VERY fragile and deteriorated to a dangerous state with the screws loose allowing the sheeting to lift at will. This roof should be replaced as soon as possible as ingress occurs at will and it is possible the roof could peel off in the severe wind conditions being experienced”. 21. The FSP submits that the assessment report clearly indicates that the damage to the Applicant ‟s property was situated underneath the roof valley and that t his roof valley, at the time of inspection, was rusted and faulty. The report also advised that the ridging and sheeting was very fragile and deteriorated to a dangerous state. 22. The FSP acknowledges that the entire Brisbane area, including the location of the insured property, was repeatedly subjected to lengthy periods of intense rain and storm events in the weeks and months around 10 January 2011. 23. However, the FSP submits that it was the cumulative effect of this adverse weather, when applied to the Applicant ‟s old and unserviceable roof, which ultimately resulted in water ingress to the house. 24. The FSP submits that the damage to the roof would not have occurred had the roof not been in such poor condition. 25. The Applicant states that she has performed repairs to the roof and can recall three separate instances where repairs have taken place and has submitted a work order dated 15 July 2000 as evidence of the repair work. 26. The FSP does not dispute that the Applicant arranged for work to be performed on the roof. However, an old roof will progressively need more and more maintenance and eventually reach the end of its serviceable life. When this occurs, the roof must be replaced. 27. The FSP submits that it is the responsibility of the Applicant to ensure that the roof is adequately maintained. Regardless of the maintenance carried out by the Applicant over the years, the evidence reported by its building consultant of the roof valley being rusted and faulty, and the ridging and sheeting being fragile and deteriorated, means that ultimately these efforts did not constitute adequate maintenance. 28. The FSP submits that the cause of the damage to the Applicant ‟s property was the lack of adequate maintenance to the roof. As this is listed as a general exclusion applicable to the Applicant ‟s home insurance policy, it submits that its decision to deny the Applicant ‟s claim for damage to the roof was correct. Case No: 236414 Determination Page 4 of 6 29. The FSP relies on the following policy/contract provisions: “Home insurance cover ... If your home suffers loss or damage caused by an event listed below, we will choose to do one of the following:  repair the damaged portion of your home,  replace your home,  compensate you for the amount we would have paid for repair or replacement. ... Home insurance – What IS covered ... √ Storm, hail or rainwater ... General exclusions applicable to your policy You are not covered under any section of this policy for damage, loss or liability caused by, arising from or involving any of the following. General exclusions applicable to your policy ... × Wear and tear, lack of maintenance or inherent defect, × Rust, corrosion, mildew, wet or dry rot, rising damp or seepage and other signs of failure to keep your home in good order and repair, ... Glossary of important words and phrases ...  Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail.” Issue 30. Whether the roof of the Applicant ‟s house was damaged by the insured event „storm‟. If this is substantiated, whether the FSP has established that, on the balance of probabilities, the damage to the roof was caused by an exclusion under the policy of insurance. Case No: 236414 Determination Page 5 of 6 Reasons for Decision There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. 31. The Bureau of Meteorology reported that there was a major rain event from the 10 to 12 January 2011 in southeast Queensland including Brisbane and the locality of the insured property. This extreme rainfall event resulted in Brisbane suffering severe flooding. 32. The Applicant submits that the asbestos roof of her house was damaged due to the extreme rainfall on or about the 10 January 2011. The interior of the Applicant ‟s house was also damaged due to rainwater leaking from the roof. 33. The FSP engaged a building consultant to inspect and report on the condition of the roof. An extract from his report is quoted above. The building consultant reported that water had entered the insured house through a rusted roof valley. The Applicant has not submitted any evidence that rainwater entered her house through the asbestos roof. 34. Although there was extreme rainfall in early January 2011, the Bureau of Meteorology reported that there was only one strong wind event in January which was on the 10 January 2011. The Bureau reported that the strongest wind gust was 54 km/h. 35. The Beaufort Wind Scale determines that wind speed of between 51 and 62 km/h is a near gale in which whole trees are in motion and there would be inconvenience when walking against the wind. 36. However, the Bureau does not consider that property damage would occur until wind speeds reached between 76 and 87 km/h. 37. The FSP‟s building consultant reported that he found ridging and sheeting with screws loose allowing the sheeting to lift at will. The Applicant has conceded that “Storms have been damaging and cracking our asbestos roof for years. Fortunately the roof stayed put – and did not leak yearly due to good maintenance...which was done as needed.” 38. The Applicant has stated that she was present when the rusted roof valley through which the rainwater escaped, was removed. On sighting the roof valley, she stated that there was no evidence of rust in the valley. If this was the case, it raises questions as to why the valley was replaced and why the Applicant authorised the valley to be replaced. 39. The Applicant contends and the FSP does not dispute, that she carried out maintenance on the roof when required. However, the Applicant has stated that “The nails holding the roof in position are lo osened at each successive storm or cyclonic event.” Case No: 236414 Determination Page 6 of 6 40. This being the case, the Applicant should have ensured that the roofing sheets were secure after each event. If this was not done , it would lead to more serious degradation of the roof. 41. The Applicant has not submitted any evidence that the storm events on or about the 10 January 2011 caused damage to the asbestos roof. The rainwater entry was through the rusted roof valley. Although there may have been loose roofing sheets according to the Applicant ‟s sub mission, any loose sheets through which rainwater entered the interior of the house, although there is no evidence of this, it would have occurred over a number of years. 42. Therefore, on the facts submitted, I find that there is no evidence that the storm event on or about the 10 January 2011 caused damage to the asbestos roof of the insured property causing rainwater to enter the interior of the house. I am also of the opinion that if there were any loose roofing sheets, this would have been the result of gradual deterioration over a number of years. Determination 43. Therefore, I find that the Applicant has failed to establish that, on the balance of probabilities, the storm events on or about the 10 January 2011 resulted in damage to the roof that allowed rainwater to enter the interior of the house through the asbestos roofing sheets. 44. I further find that the damage to the interior of the house was caused by rainwater entering the house through the rust damaged roof valley which was the result of the excluded event „wear and tear‟. 45. Accordingly, I determine that the FSP is entitled to deny indemnity to the Applicant for the cost of replacing the roof of insured house.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.