Home / Financial Firm (Unknown - Insurer) / Determination 236077

Determination 236077

Claim amount - building damage from escape of liquid, executor claim

FirmFinancial Firm (Unknown - Insurer)
Decided2011-07-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$81,400
Non-financial loss—
Amount claimed$159,629
SourceAFCA PDF

Summary

The executor of his late mother's estate claimed $159,629 for subsidence and water-leak damage to an insured home, after the FSP offered $50,000 and the applicant demolished the property. AFCA accepted the insured event, rejected the demolition, lost-interest and loss-of-value heads, and determined a cash settlement of $81,400.

The reasonable cost to repair the damage less depreciation is the measure of loss under the policy, and the applicant's unsubstantiated demolition and interest claims were rejected, leaving the best available expert estimate of $81,400.

Issues

Subjects and remedies

deceased estatehome or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 236077 Determination Page 1 of 10 Case number: 236077 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 29 June 2011 Background 1. The Applicant is the executor of the estate of his late mother and held a home insurance policy in this capacity with the Financial Services Provider (FSP). The policy insured the building for $225,000 and the contents for $200,000. A standard excess of $100 applied. 2. The Applicant inherited the property from his late mother in 2006 and aimed to put it on the market as soon as possible. He obtained a valuation report dated 3 October 2006 where it was commented that there was subsidence. However, he did not lodge a claim as he believed the policy would not cover subsidence. 3. In 2007, he had discovered a hole in the ground on the southern side of the house above where he understood the stormwater drain to run. At first, this hole was small but it continued to increase in size. Finally, it was a metre across and he could see the bottom of the drain, which was about two metres below ground level. 4. The Applicant reported this to the council and sometime later, the council workers excavated and exposed the drain. It was then apparent that a large hole had formed at the bottom of the drain and he suspected this was contributing to the subsidence the property had been experiencing. In his opinion, he believed this issue was the council‟s responsibility and he engaged a solicitor and engineer to advise him regarding this as well as the likely cost of repair. 5. Some correspondence passed between the Applicant and the council where the outcome was the council would not repair the drain until remedial action was taken by him to repair the property. He could not afford the necessary repairs and attempted to sell it instead. Howe ver, the movement continued to worsen and when a builder acting for a prospective buyer inspected it in early 2010, he commented that he thought the home was unsafe. This was later corroborated by an engineer he engaged as well as one of the council‟s engineers. 6. Based on this, he decided to have the tenants vacate the property and to subsequently demolish it. At this point, he still had not considered the possibility that he had an entitlement to claim but notified the FSP of the situation given the change in the risk. Determination Case No: 236077 Determination Page 2 of 10 7. It was following this notification that a claim was subsequently lodged. A claim was recorded on the policy on 7 April 2010 and on the same day, the FSP appointed a loss adjuster to inspect the property and begin assessing the loss. Following the loss adjuster‟s inspection, the FSP intended to have an engineer inspect the property to report on the cause of damage. However, some period of time lapsed and in the process, the Applicant demolished the property. 8. The FSP continued with reviewing the claim and ultimately attempted to resolve it by offering payment of $50,000. The Applicant has rejected this and is seeking payment for $159,629. Summary of Applicant ’s Position 9. The Applicant‟s claim for $159,629 is based on the following breakdown: Loss on property $100,000 Demolition cost $24,750 Engineer‟s fee $2,002 Building permit $370 Removal of phone line $278 Lost interest $32,229 TOTAL $159,629 10. The calculation behind the loss on property is based on the fact the FSP obtained a valuation of the land for $175,000. If the house had not been damaged, his reasonable expectation of its sale price around the time of the claim would have been $275,000. This results in the property loss of $100,000. 11. He has also allowed for loss of interest on the capital at 5% per annum, compounding for three and a half years, less net rent. This equals $32,229. 12. The building was unsafe and required demolishment. He had informed the FSP of this intention after the loss adjuster first inspected the property. As no one responded to this comment, he proceeded with demolishing the home in the three months between the loss adjuster‟s first inspection and the engineer‟s site insp ection. Further, the decision to demolish was in everyone‟s best interests given it had been declared unsafe by a builder and a couple of engineers. Not demolishing the building would have resulted in higher costs. 13. He was not aware of any issue with the drain until early 2007 when he observed a hole in the ground where the drain was. Further, he did not discover a hole in the drain until the council investigated the issue a number of months later. 14. The FSP has indicated that issues with the drain has been p re-existing for some time. This is based on a couple of letters sent by his step father and a neighbour to the council in 1986 regarding flooding to their premises due to the Case No: 236077 Determination Page 3 of 10 drain being blocked. He was unaware of this issue at the time he took possession of the property. Further, as far as he was aware, this flooding did not cause any structural damage. 15. He also notes the apparent mechanism of the current subject damage is water leaking out of the bottom of the storm water drain. There is nothing to indicate this issue and the flooding in 1986 are related. 16. In relation to the failed sewer line, the FSP has indicated that this may have been pre-existing as well because this was identified by his parents when they purchased the property in 1983/84. However, he notes that when his parents purchased the property, the downstairs toilet was not used because it was understood that the sewer line had parted somewhere below ground level and this was the area of the problem. As a result, the cistern was turned off and t he water trap was dry. As his parents were not plumbers and there was no evidence of any further issues once these measures were taken, nothing further was done. In his opinion, this was reasonable in the circumstances. 17. He denies he ever installed laser equipment to monitor the subsidence on the property. The FSP‟s comments in this regard were likely in reference to a government funded review of the landslip in the area. 18. He did not notify the FSP of the property damage until much later as he believed the policy did not cover subsidence. Further, there was evidence of landslip in the area, which he also felt would likely result in the claim being outside of the cover. In relation to how this prejudiced the FSP, he does not consider this is significant given the damage did not deteriorate greatly once the damage first became evident. Summary of FSP’s Position 19. The FSP appointed an engineer (HS) to inspect the Applicant‟s property and review the likely cause of the foundation movement. HS conducted a structural inspection on 21 July 2010 and made further visits on 22 July 2010 and 26 July 2010 to gauge the likely flow through the council storm water pipe. During the site inspection, the property was in the process of being demolished. 20. HS provided a report dated 26 July 2010 which stated in the conclusion: “Water soaking into the soil from both the broken earthen ware sewer line located under the building and the broken concrete Council owned Storm Water line would undoubtedly have been significant contributors to the loss of soil bearing capacitates at the front of the house. The fact that the adjacent house to the South of the property is also near the broken Council Storm Water line, albeit not as close, and has not suffered inordinate settlement problems to date would suggest that the sewer line is the larger of the contributing factors. This is supported further by the locality of the break in the sewer line with respect to the two front pillars which had suffered the most from settlement. It is not possible to be absolutely definitive with regard to percentages to which each broken pipe would have contributed but I suggest that they would be in the order of one third Council Storm Water and two thirds domestic sewer line.” Case No: 236077 Determination Page 4 of 10 21. The FSP subsequently appointed another engineer (SBC) to carry out further enquires in conjunction with its loss adjuster. The following relevant information was gathered by SBC‟s consultant:  The Applicant advised him that his parents purchased the home in 1983 or 1984 and that as early as 1986, there had been a situation with the storm water drain;  The Applicant also advised that the sewer line had been disconnected since before his parent‟s purchase of the property and that this line could not have contributed to the escape of liquid;  He discussed the sewer line disconnection with the engineer from HS. This engineer advised him he found one domestic sewer line servicing the risk address and this was fractured. In regards to the Applicant‟s contention that the line was disconnected, he did not agree and believed it was more likely disused;  He discussed a quote provided by a builder, DC, who estimated the cost of repairs to be $74,000 plus GST. DC confirmed the estimate was based on works necessary to rectify the damage resulting from the water leak. However, it did not involve an in-depth assessment of the building to enable the presentation of a more detailed quotation. It also did not factor into consideration depreciation; and  The Applicant indicated that he had some ten years ago installed laser measuring equipment for a period of several months in order to determine if subsidence or earth movement was in place. 22. The FSP contends that given the engineer reports and the history of the claim, its offer of settlement was reasonable. This is taking into consideration that the property has had ongoing problems over an extended period of time, the Applicant‟s failure to take corrective action to rectify the problem, the property not being maintained in good repair and the Applicant‟s decision to demolish the building before the extent of claimable damage could be ascertained. 23. As a result, it submits that the Applicant‟s entitlement under the policy is likely between the sums of $25,000 and $50,000. In providing this figure, it is relying on the following policy provision as the Applicant had no intention of allowing it the option to repair the damage given he demolished the property: “If we have chosen to repair or rebuild your damaged buildings and you do not wish to repair or rebuild them, we will at our option: a. pay you the reasonable cost to repair or rebuild your damaged buildings less an amount for depreciation based on the age and condition of the buildings …” 24. In providing this estimate, the FSP relies on the following:  In the valuation report provided to the Applicant dated 3 October 2006, the author estimated the likely repair cost to be between $25,000 and $50,000. However, the Applicant did not undertake any steps to rectify the damage back then or later. As a result, the costs undoubtedly escalated; Case No: 236077 Determination Page 5 of 10  In December 2007, the Applicant obtained some written estimates, one from DC for $74,000 plus GST and the other from an engineer for $116,000. There is nothing to suggest the engineer‟s estimate was limited to the cost to rectify the water damage. DC‟s estimate was apparently limited to repairing the water damage, but did not take into consideration depreciation; and  In the Applicant‟s letter to the council dated 6 August 2009, he advised the cost of repairs to be between $50,000 and $100,000. Issues 25. Whether the Applicant is entitled to the amount sought regarding this claim. Reasons for Decision 26. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is due to the circumstances, quantum and complexity of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 27. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 28. Prior to arriving at this decision, the Panel confirms it has considered all the material submitted by the parties. Is the claim covered? 29. The onus is on the Applicant to establish, on the balance of probabilities, that he suffered a loss caused by a risk insured against (in this case, water or other liquid damage). Once this has been established on the face of the facts, the onus shifts to the FSP to show, on the balance of probabilities, the claim falls within an exclusion of the contract of insurance. 30. Upon reviewing the FSP‟s materials, it appears it has accepted liability of the claim although this has not been made clear. In the FSP‟s Notice of Response, it makes reference to a number of issues that entitle it to deny the claim, such as the fact the damage was pre-existing for a long period of time or that the policy does not cover gradual escape of liquid. It has also referred to numerous other exclusion clauses in its policy that, if applicable, would have entitled it to deny the claim. 31. However, it has made a number of attempts to resolve the Applicant‟s claim by way of cash payment, which would indicate that it accepts the claim falls within the cover provided by the policy. This therefore makes for a somewhat confusing submission. Case No: 236077 Determination Page 6 of 10 32. Regardless of th is, the Panel finds HS‟s report dated 26 July 2010 to be persuasive. This report has clearly identified a leaking stormwater drain and a sewer line being the main contributing factors to the foundation movement causing damage to the home. This was also cor roborated by the Applicant‟s engineers. 33. The Panel therefore accepts the dominant cause to the Applicant‟s property damage was the escape of liquid from the stormwater drain pipe and the sewer line. This falls within the following insuring provision: “ Water or other liquid damage We will pay for loss or damage which results directly from the bursting, leaking, discharging or overflowing of:  …  fixed pipes.” 34. The FSP has referred to letters sent by the Applicant‟s step -father and a neighbour that made reference to a blocked drainage causing damage to the property. It has attempted to infer that there is a connection between this event and the current leak. 35. However, the Panel is not satisfied such a connection exists. The letters made reference to the drain being blocked and causing water to overflow into the property. The issue in this claim is for a significant hole in the drain pipe causing water to seep into the soil beneath the home, resulting in significant damage. In the Panel‟s opinion, the FSP has not est ablished that the issues experienced by the Applicant‟s step -father resulted because of this hole. It appears more likely this is isolated to the one event given it has not occurred again and the large amount of years which lapsed since. 36. The FSP has also referred to the sewer pipe issue being in existence since 1983 which the Applicant was allegedly aware of through his parents. However, as the Applicant correctly pointed out, he was not aware of same until after the claim occurred given the property was owned by his parents. 37. Further, according to the Applicant, even if his parents may have been aware of an issue with the sewer pipe, they felt they were undertaking appropriate measures to protect the property given the lack of issues experienced afterwards. The Panel also notes the FSP has provided no substantive evidence to indicate that the issue with the sewer pipe back in 1983 is the same as the one identified by its engineer. 38. Given this, the Panel accepts that the Applicant has established an insured event occurred which caused damage to the property. Quantum Applicant’s claim Case No: 236077 Determination Page 7 of 10 39. One of the significant issues in dispute between the parties is the amount the FSP should pay towards the claim. The Panel does not find the Applicant‟s amount of $100,000 plus interest to be persuasive for the following reasons:  He has provided no direct evidence to support the contention that the property needed to be demolished. He has noted a number of people told him the property was unsafe but there was nothing to indicate that being unsafe meant the whole structure needed to be demolished;  He referred to an engineer‟s email sent to him dated 16 March 2010 that made reference to demolishment. However, this email stated “ I believe the best course of action is to make the building safe by demolishing any structures that are susceptible to imminent collapse ”. This clearly does not state that the whole property needed to be demolished;  The Applicant is seeking three and a half years worth of interest due to lost capital. This is unreasonable given he did not notify the FSP of the claim for three of those years; and  The available evidence indicates the damage to the property was repairable. There is no engineering or other expert evidence that states the property needed to be completely demolished and rebuilt. 40. The Panel therefore does not accept the Applicant‟s method of measuring his loss to be appropriate or in accordance with the cover provided by the policy. 41. The Applicant has also sought the costs he has incurred in demolishing the building. The policy provides for these costs under the following policy provision: “ Removal of debris, professional fees and extra costs … When the buildings have been destroyed or damaged by an insured event and we have agreed to pay your claim, we will also pay the reasonable and necessary costs of: a. demolition and removing debris from your risk address; b. architects‟, engineers‟, surveyors‟ and solicitors‟ fees; and c. meeting the requirements of any statutory authority. We will only pay these costs if they relate directly to the destroyed or damaged part of the buildings and we have agreed to do so before they are incurred.” 42. In this instance, the Applicant has clearly incurred these fees without the FSP‟s permission given the FSP did not instruct him to demolish the building. Although he states he informed the FSP or one of its agents that he intended to demolish the building, there is no evidence the FSP agreed to this. The fact the FSP did not respond to his comment does not, in the Panel‟s op inion, imply consent, especially given the FSP did not have an opportunity to properly assess the extent of damage. 43. The Applicant being a professional loss adjuster, albeit in another area of insurance, should have at least been aware that it is general insurance practice to assess the extent of a loss when reviewing the claim. As such, it is unclear why he felt it was appropriate to demolish the building given he was aware the Case No: 236077 Determination Page 8 of 10 costing assessments was yet to be completed. Although the Panel accepts there was some delay in the FSP arranging a site inspection from the loss adjuster‟s initial inspection, it does not accept that the Applicant was entitled to infer the FSP‟s consent to the property‟s demolishment. 44. Further, the Panel accepts the available evidence indicates demolishing the building was not necessary in the circumstances. 45. Accordingly, the Panel does not accept the FSP is liable for these costs. Amount 46. The policy provides for the following benefit in the situation when the FSP has chosen to repair the damage but the Applicant is seeking a cash settlement instead: “If we have chosen to repair or rebuild your damaged buildings and you do not wish to repair or rebuild them, we will at our option: a. pay you the reasonable cost to repair or rebuild your damaged buildings less an amount for depreciation based on the age and condition of the buildings …” 47. The policy also imposes the following obligation on an insured regarding the lodgement of a claim: “ Making a claim … 5. Contact us as soon as possible If there is any loss, liability, injury or damage which is likely to result in a claim, you must give us immediate notice of the full details of any loss, anticipated or alleged liability, injury or damage.” 48. Based on these provisions, the FSP is liable for the reasonable cost to repair the damaged building at the time the Applicant should have lodged the claim less depreciation. The Panel considers this approach is also fair in all the circumstances given it would account for the prejudice the FSP would have incurred in the delay in lodging the claim and the Applicant demolishing the home. 49. As articulated by the FSP though, there is minimal information available regarding what the cost of repairs would have been. The only available evidence is from a builder engaged by the Applicant, DC, who stated to SBC that his estimate of $74,000 plus GST was to repair the damage resulting from the water leak. However, DC acknowledged this amount did not account for depreciation. Further, DC acknowledged his estimate did not i nvolve an in- depth assessment of the building to allow the presentation of a detailed quotation. 50. The FSP has referred to a valuation report provided by the Applicant where the valuer estimated the cost of repairs to be between $25,000 and $50,000. However, the Panel does not consider a valuer has the appropriate expertise to Case No: 236077 Determination Page 9 of 10 provide an estimate of cost of repairs to building damage. Such an issue is more appropriately commented on by a builder. 51. As the Applicant demolished the building before the FSP could engage appropriate experts to review the damage, there has been no opportunity for a scope of works or detailed quotes to be compiled. 52. The Panel is therefore left in the situation of having to provide a figure that is fair in all the circumstances pursuant to clause 8.2 of the Terms of Reference given the limited information available. Clause 8.2 of the Terms of Reference state the following: “Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these)” 53. In this instance, the FSP has offered to settle the Applicant‟s claim by way of payment of $50,000. In the Panel‟s opinion, this seems low given the foll owing:  The only estimate available from an appropriately qualified expert provided an estimate of $81,400;  It is common for substantive building costs to exceed the initial estimates. As such, it is often appropriate to apply a builder‟s margin on the init ial estimate; and  There is no evidence to suggest the depreciation was so significant that it should account for more than 40% of the actual cost, especially given the policy normally allows new for old if the FSP had the option to repair the home. 54. As the FSP was aware, the Applicant‟s qualified expert provided an estimate of $81,400. Should the FSP have wished it could have led evidence demonstrating why that figure should not be accepted; it has not done so and accordingly, pursuant to the Panel‟s „fair a nd reasonable‟ mandate , it now determines that is the quantum for cash settlement. Determination 55. On the basis of the available information the Panel determines that the FSP pay the Applicant the sum of $81,400 in full and final settlement of the claim. Case No: 236077 Determination Page 10 of 10 56. In the event the Applicant accepts the Determination, the FSP is to pay this amount within 21 days of being notified of his acceptance.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.