Home / Financial Firm (Unknown - Insurer) / Determination 236067
Determination 236067
Denial of flood claim for commercial premises
Summary
Stormwater and rainwater inundated the applicant's commercial premises in January 2011 and the FSP denied the claim as flood damage. AFCA found the FSP had not shown the water was other than rainwater, a covered defined event, and ordered the claim paid.
Where the insured event falls within a defined cover, the insurer bears the onus of proving that an exclusion such as flood applies, and it failed to do so.
Issues
- Claim denial primary · upheld“The Panel is not satisfied that the FSP has established that the inundation was other than by rainfall and thus the FSP has failed in their onus of proof.”
Subjects and remedies
home or building damagenatural disastersmall businesspay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 236067 Determination Page 1 of 5
Case number: 236067
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood – Runoff rainwater
14 September 2011
Background
1. Between 11 and 12 January 2011 the Applicant‟s commercial premises were
inundated with water following intense rainfalls in the area causing substantial
damage to the contents.
2. A claim under the defined events section of the Applicant‟s commercial
business insurance policy was denied by the Financial Services Provider (FSP)
on the ground that the damage was the result of flood water overflowing from
the Brisbane River.
Summary of Applicant’s Position
3. The Applicant argues that the damage was caused by storm water and not
flood.
4. The Applicant states that between 11 and 15 January 2011 the business was
subject to stormwater damage.
5. Water came up through storm water drains resulting in extensive damage to
their stock, plant and equipment.
6. Their premises are much higher than the flood level for the area. Consequently
all the damage was a result of water bursting through storm water outlets.
7. The water was the result of heavy rain and was unable to run off enough
through the existing stormwater systems.
8. The Applicant notes the lowest point of their premises is much higher than the
local flood level.
Summary of FSP’s Position
9. The FSP relies on hydrologist reports commissioned by it and a report
commissioned by the Insurance Council of Australia (ICA).
Determination
Case No: 236067 Determination Page 2 of 5
10. The policy is clear and unambiguous in the meaning.
11. The policy clearly notifies the Applicant of both the “Flood” defini tion and the
“Flood” exclusion.
12. The expert hydrological evidence obtained confirms that the water damage to
the Applicant‟s insured business premises was the result of flood, not
stormwater run-off.
13. The Appl icant‟s claim for damage to the insured business premises falls outside
the terms of the policy.
14. The FSP relies on the following policy provisions:
“ General definitions
…
“Flood” means the inundation of normally dry land by water escaping or released
from the normal confines of any natural watercourse or lake (whether or not they have
been altered or modified) or from any dam, reservoir or canal.
…
Defined events cover
We cover you for loss or damage at the Business Premises caused by the following
defined events:
…
(7) Storm, tempest, rainwater, snow, sleet, wind, hail but not
(a) by water from or action of the sea, tidal wave, storm surge, high water
or Flood.
…
Optional Extensions
1. Flood
When Flood is shown on the current Policy Schedule, We will cover loss or damage to
Business Property cause by Flood.”
Issues
15. Whether the FSP was entitled to deny liability for the claim on the ground that
the damage was caused by flood as defined by the policy.
Reasons for Decision
16. As advised to the parties, FOS has considered it appropriate to expedite this
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
Case No: 236067 Determination Page 3 of 5
17. The material on which each party relies has been exchanged. Each party
therefore is aware of the issues and has had the opportunity to comment. As
such it is not intended to recite the details of the various reports provided to
FOS in this determination except where considered relevant.
18. Prior to determining the dispute, the Panel has reviewed and considered all the
material presented to FOS.
19. This Determination has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
20. The Panel Ombudsman attended at the Applicant‟s premises and met with the
Applicant and a representative of the FSP. The Applicant confirmed the details
he had previously provided to the Service.
21. The hydrologist commissioned by the FSP in his report of 3 February 2011
referred to the floor level of the Applicant‟s premises and discussed the peak
river level at Milton, recorded rainfall from Brisbane and the history of previous
stormwater inundation.
22. Based on this assessment the hydrologist concluded the Applicant‟s property
was inundated above floor level by floodwater from the Brisbane River which
surcharged through the Western Creek channel and stormwater drainage
system.
23. The Applicant rejected the report arguing the report assumed calculation of
levels and presented further argument that the inundation was not flood water
from the river but instead was storm water overflow for a storm water
catchment pit positioned on a neighbour‟s property which was higher than his
property.
24. The hydrologist provided a second report dated 17 February 2011. The
following is a summary of relevant information contained in that report:
The heavy rainfall which caused flooding in the Brisbane River catchment
occurred to the west of Brisbane not over the city itself.
It is unlikely that the rainfall of the intensity recorded in Brisbane on 11
January which was not exceptional, would have resulted in stormwater
i nundation of the Applicant‟s property.
Peak stormwater runoff from surrounding properties would have occurred
within minutes after the peak rainfall.
The peak stormwater runoff would have occurred around 1030 hours or
earlier on 11 January prior to the evacuation of staff. There was no
evidence of stormwater inundation before the staff were evacuated.
Based on recorded water levels in the Brisbane City gauge it is likely that
the property was not inundated above floor level by water from the river
until the afternoon of 12 January.
Case No: 236067 Determination Page 4 of 5
No rainfall was recorded on 12 January so there was no stormwater runoff
on 12 January.
Water from the river would have flowed back up through the stormwater
pipes draining the Applicant‟s property and increased water levels in the
stormwater pit referred to by the Applicant until it overflowed and
inundated their property above floor level.
25. The hydrologist refers to photographic evidence which shows water inundating
the property above floor level and a “Nearmap” image which show s high water
marks extending across the front of several adjacent properties.
26. The hydrologist noted that the “Nearmap” image clearly shows the flood waters
did reach the property.
27. The FSP also refers to ICA hydrological reports. The report titled “Volume 2
Flooding in Brisbane City LGA” dated 20 February 2011 contains the following
details of relevance:
Rain ceased over the Brisbane City area around 1800 hours on 11
January, being some 24-30 hours before flood levels in the Brisbane
River peaked (ii para 3)
Given that rainfall across the Brisbane City LGA had ceased by 1800
hours on 11 January any flooding after this time will have been caused by
water flow inundation from the Brisbane River and its tributary creeks.
Inundation along the tributaries was associated with backwater flooding
from the Brisbane River which in turn was principally caused by dam
release flood from Wivenhoe Dam. (ii para 6)
Large releases were made from Wivenhoe Dam over the period 0600
hours on 11 January until around 1300 hours on 12 January. (60 para 1)
It was concluded that the dam release from Wivenhoe Dam was the
immediate cause of flooding along the reach of the Brisbane River
downstream of the dam and along tributaries through the Brisbane City
LGA. (60 para 3)
28. There is a dispute as to whether water which had overflowed the banks of the
Brisbane River directly inundated the Applicant‟s property. The hydrologist
calculates that the river rose to a height in excess of the Applicant‟s property,
and also states that this is consistent with a comparison of the aerial
photographs and contour maps provided by the Brisbane City Council.
Conversely the Applicant states that the flood level did not reach his property.
29. However, the Applicant also provided a “Nearmap” image that shows the flood
waters did not reach the insured premises.
30. In addition to that image, the Applicant also presented a photograph of the next
street that runs parallel to the Applicant‟s street . That photograph clearly shows
that the flood waters from the Brisbane Ri ver did not reach the area of the
Applicant‟s premises.
Case No: 236067 Determination Page 5 of 5
31. On the basis of this material, the Panel is satisfied that the water which
inundated the Applicant‟s premises was not water that had escaped from the
confines of the Brisbane River.
32. A further issue for consideration by the Panel is whether the inundation was
caused by the inability of the stormwater system to cope with the local
catchment and whether pumps referred to by the Applicant were unable to cope
with surface run-off rainwater.
33. This is a defined events policy that includes coverage for the defined events of
storm and rainwater. Given the evidence presented, the Panel is satisfied that
the Applicant‟s premises were impacted by the Brisbane rainfall event. In those
circumstances, the onus shifts to the FSP to establish that the flood exclusion
applies to exclude coverage of the Applicant‟s claim.
34. The Panel notes with interest that the policy definition of „flood‟ makes no
reference to drains or water entering or exiting drains.
35. The FSP bears the onus of establishing that the water which inundated the
Applicant‟s property was other than rainwater; rainwater being a defined event
which provides coverage under the policy.
36. The evidence presented demonstrates a significant rainfall event over the
Brisbane City area until at least 1800hrs on 11 January 2011.
37. According to the evidence the premises were evacuated at about midday on 11
January 2011 and thus the evidence is that rainfall continued to fall for at least
another six hours subsequent to the evacuation of the building.
38. Given that the Panel is satisfied that the inundation of the premises is not from
water which has escaped from the confines of the Brisbane River, the Panel is
not satisfied that the FSP has established that the inundation was other than by
rainfall and thus the FSP has failed in their onus of proof.
39. In those circumstances, the Panel is satisfied the claim must be paid.
Determination
40. The Panel determines that the FSP meet the Applicant‟s claim under the terms
of the policy in respect of the Applicant‟s loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.