Home / Financial Firm (Unknown - Insurer) / Determination 236057
Determination 236057
Denial of storm and water inundation claim under flood exclusion
Summary
The applicant's home was inundated in January 2011 and the FSP denied the claim under the flood exclusion. AFCA found the damage was caused by floodwater, the exclusion was clearly disclosed, and no non-financial loss was payable.
On the balance of probabilities the inundation was floodwater from the Brisbane River backing up into Oxley Creek, which the policy excludes.
Issues
- Claim denial primary · not upheld“The FSP is entitled to deny liability for the claim”
- Delay secondary · not upheld“The Panel has not found any evidence of the FSP delaying the resolution of the claim”
- Failure to disclose secondary · not upheld“The Applicant was clearly informed about what the policy did and did not cover”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 236057 Determination Page 1 of 13
Case number: 236057
General Insurance - Domestic Insurance - Home Building - Storm - Water
leakage - FSP Decision - Denial of claim - Exclusion/Condition - Flood
17 April 2013
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP). The period of insurance operated for 12
months beginning from 1 March 2010. An amendment on 15 July 2010
changed the sum insured to $150,000 for building and $50,000 for contents.
2. On 17 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation of his home in Oxley following severe weather
events in Queensland.
3. The FSP denied the claim on the basis that the damage was due to “flood”.
The Applicant, through his solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include his legal
representatives.
5. The Applicant and the FSP have provided detailed and extensive
submissions on the relevant issues. For the sake of brevity, the Panel will
only briefly summarise these submissions given all of the material made
available has been exchanged with the other party.
Summary of Applicant’s position
6. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
a. The FSP failed to “clearly inform” him of the “flood” exclusion as
required by Section 35 of the Insurance Contracts Act 1984 (the Act)
and to provide “clear, concise and effective” disclosure as per the
Corporations Act 2001 (the Corporations Act).
b. He has established that the loss was caused by the insured event of
“storm” and “water leakage”. Further, the FSP has failed to discharge
its onus of establishing the loss was caused by the “flood” exclusion.
c. He is entitled to compensation for non-financial loss for the detriment to
his peace of mind due to the time taken to resolve the claim.
Determination
Case No: 236057 Determination Page 2 of 13
7. The Applicant seeks to be indemnified for his claim.
Summary of FSP’s position
8. In response to the Applicant ’ s arguments, the FSP submits the following:
a. Its evidence corroborates that it sent the policy documents to the
Applicant and he admits to having received them when the policy was
incepted. Further, the policy structure and layout in conjunction with this
evidence enables it to rely on the exclusion clause of “flood” pursuant
to section 35(2) of the Act.
b. The Applicant has failed to establish that an insured event caused
damage to the property. The FSP relies on its expert evidence to
establish that flood was the cause of the loss.
As to the “water – leaking or escaping”, the Applicant would have
witnessed floodwaters flowing back through sewerage. Under the
Wayne Tank principle, the loss would still be excluded. Alternatively,
liability should be limited to the damage witnessed by the Applicant in a
small area of the house.
c. It denies there has been an unusual amount of time taken to resolve
the situation or interference with the Applicant’s peac e of mind and
therefore he is not entitled to compensation for non-financial loss.
9. The FSP relies on the following policy provisions within the Product
Disclosure Statement (PDS):
“ WHAT YOU ARE COVERED FOR
Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rain or
snow, or
a sudden, excessive run-off of water as a direct result of a
storm in your local area
…
however
we will NOT cover loss or damage caused by flood
…
Water – leaking or escaping
If your home or contents suffer loss or damage caused by water
leaking or escaping from
pipes
road gutters or curbing
house gutters or drainpipes
Case No: 236057 Determination Page 3 of 13
baths, sinks, toilets, basins or any other fixed plumbing
apparatus
...
...
What you are not covered for – general exclusions
we will NOT cover
loss, damage, injury or death that occurs as a result of
flood
...
Glossary
Use this glossary to find the meaning of words and phrases in this
booklet.
…
flood
is the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy
…
storm
is a violent wind, cyclone, tornado, thunderstorm or hail which may be
accompanied by rain or snow, or a sudden, excessive run-off of water as a
direct result of a storm in your local area. It does not include persistent rain
by itself. ”
Issues
10. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
11. Whether the cause of the Applicant’s loss was covered under the policy.
12. Whether the Applicant is entitled to compensation for non-financial loss.
Reasons for decision
13. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Financial Ombudsman Service’s (FOS’s)
Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
Case No: 236057 Determination Page 4 of 13
14. This decision has been made by a Panel consisting of an Ombudsman, a
person with extensive experience in the insurance industry and a person
with extensive experience in consumer claims.
15. The Panel is satisfied that a full exchange of relevant information has taken
place between the parties and each party has had the opportunity to address
the issues raised.
16. It is appropriate to consider the issues under the various headings.
Consideration of “ Flood ” Definition in PDS
17. The Applicant says that the contents of the PDS were not clear regarding the
flood exclusion. Further, he says the FSP has not provided evidence that he
was provided with a copy of the PDS as required by Section 35 of the Act.
18. The FSP argues that it did provide the Applicant with a copy of the PDS and
that the policy wording is clear and unambiguous. For the purpose of
establishing this, the FSP has provided extensive documentation on proof of
despatch of the policy documents.
19. In a statutory declaration of 20 March 2012 the Applicant states:
“I do not believe that I was clearly informed that I wasn’t covered for flood. I
remember reading the PDS or at least having a reasonable look at it …”
20. The Applicant in his submissions also refers to the difficulty of reading the
PDS. The Panel is satisfied, based on this information, that the Applicant did
receive a copy of the PDS and read it. The Panel also notes that the
Applicant at no point has argued that he did not receive the PDS.
21. The Panel accepts the FSP’s documentation establishes there was a system
in place, which demonstrates on the balance of probabilities a PDS was
despatched to the Applicant.
22. The Panel has reviewed the PDS and no tes its index directs the policyholder
to a sub- index for checking “what this policy covers” and to page 69 for
usage of the “Glossary”.
23. In the sub-index the policyholder is directed to pages 16 and 17 to read
about cover for “Storm” and “Water – leaking or escaping”. This sub -index
also points out to page 35 to find the “General exclusions”.
24. The policy wording for “Storm” and “Water – leaking or escaping” and the
“flood” general exclusions are as described in paragraph 9 of this
Determination.
25. To satisfy Section 35 of the Act the FSP must prove the wording of the policy
was such that a person of average intelligence and education would on
reading the policy understand the nature and extent of the limitations and
exclusions. Having read the policy the Panel is satisfied that the Applicant
would have had little difficulty in finding and understanding the flood
Case No: 236057 Determination Page 5 of 13
exclusion and is satisfied the FSP has adequately defined the events and
exclusions in the policy as required under Section 35 of the Act and under
the Corporations Act. Therefore, the FSP is entitled to rely upon same in
determining if the policy responds to the Applicant’s loss.
Water Inundation
The Evidence
26. Both parties have provided extensive evidence regarding the cause of loss.
The Applicant provided a Statutory Declaration signed on 20 March 2012 in
which he relevantly says:
He owns the property at 61 C Street, Oxley.
At approximately 4pm on 11 January 2011 water came from the
direction of the stormwater drains located in front of 63 and 70 C Street.
At about 1am on 12 January 2011, he and his family were forced out of
the property by the SES. They returned later to continue removing
contents with the help of friends. At about 3pm, he noticed the water
level in the toilets was almost to the brim in the back toilet and ensuite.
At about 2 – 3pm, he noticed there was water all over the ensuite floor
which he thinks was coming from the floor waste. At the time, the
ensuite floor was completely covered with a thin layer of water that was
creeping through the doorway into the master bedroom.
Everybody left the house at about 4pm on 12 January 2011. By that
time, the water was at floorboard level, leaving both sides of the house
under water. The water was about 2m past the rear of the house, which
rises up from the road at the front of the property.
It rained quite a lot on 12 January 2011. He recalls this because the
contents he was moving got wet. The rain was not too heavy but did
get heavier towards the end of the last hour before 4pm.
When he returned to his property a few days later, he found that about
1.1m of water had gone through the entire house. And about 0.4 – 0.6m
of water went through the garage at the rear of the property. There was
a thin (maybe 1cm) film of mud on the floors which stank and might
have been sewerage.
27. The Applicant also produced five statements from witnesses who said they
assisted with the move of contents on 12 January 2011. In summary, these
statements say that:
water was noticed entering the house via the floor waste or shower
recess in the ensuite and then creeping into the main bedroom;
the toilet bowls were nearly overflowing;
some of the statements say that it was raining on 12 Janua ry 2011;
Case No: 236057 Determination Page 6 of 13
at least one of the statements says that at the time the witnesses left,
the flood water levels were approaching the floor level of the home.
28. The Applicant also provided:
An invoice dated 12 September 2011 which says that plumber CR
cleared “tree roots and flood debris” from a blocked sewer line and an
“overflow relief gully” (ORG) branch sewer line.
A “Plan of House Drainage” of the subject property with date stamp of
10 December 1994. In this plan one can observe a handwritten note
stating that t he Disconnector Trap is the ORG and that “[t]he kitchen
waste water is the only thing that flows into it.”
29. To show the possibility of alternative causes of water escaping from drains at
the property, the Applicant provided several documents, among which:
statements from staff members of Queensland Urban Utilities (QUU);
a report titled “Terms of Reference for an Investigation on Flood Risk
Assessment and Mitigation Options of QUU Infrastructure”;
a document titled “Submission to the Queensland Floods Commis sion
of Inquiry”, and
documents regarding the damage sustained by the Oxley Creek
Sewerage Treatment Plant.
30. These and other documents provided are of a general nature and mainly
show QUU’s response to the January 2011 weather events. This includes
reported numbers of site clean-ups due to suspected sewerage
flooding/backflow and reports on the damage to the sewerage infrastructure
and to the Oxley Creek Sewerage Treatment Plant.
31. On the other hand, the FSP relies on a “Home assessment report” which in
summary says that:
The property was inspected on 31 January 2011. The building is a
single-storey house, which had been flooded in the 1974 floods.
The entry point of water seems to have been through the floorboards.
The water was muddy and smelly.
Water entered the property from 3pm on 12 January 2011 and built up
gradually, taking 13 hours to rise.
The maximum inundation levels were 0.9m internally and 2m
externally. The property was affected by water for 36 – 48 hours.
The water came from the direction of the creek on the opposite side of
the road.
32. The FSP also relies on a report commissioned by the ICA and a report
prepared by hydrologists W. Both of these reports are of a general nature
and the Panel notes the following information is of relevance to this case:
Case No: 236057 Determination Page 7 of 13
Rainfall ceased over the Brisbane City area at around 6pm on 11
January 2011, approximately 24 – 30 hours prior to the peak water
levels in the Brisbane River.
Rainfall over the western half of the Brisbane local government area
(200 – 370mm) was much heavier than over the eastern half (110 –
220mm).
There was no effective rainfall on the Oxley Creek catchment and in the
southern suburbs around Rocklea after about 6pm on 11 January 2011
and the maximum hourly rainfall during the 9 – 12 January period was
less than 10mm.
Any inundation in the southern suburbs after this time would have been
due to backwater flooding from the Brisbane River.
A total rainfall accumulation of 120mm was recorded at Archerfield.
Rainfall accumulations slowed from 10am on 10 January 2011 until
early on 11 January 2011, after which time the intensity of rainfall
increased again.
The data indicates that peak rainfall intensities over this period did not
exceed an Average Recurrence Interval (ARI) of two years.
33. W also provided one site-specific report and three follow-up memorandums
(the last of which included an additional site inspection). The report dated 3
April 2012 relevantly says:
The site was inspected on 22 March 2012.
Oxley Creek is approximately 300m east of the site and a small
unnamed tributary, which drains to Oxley Creek, about 130m east of
the site.
Terrain elevation data shows that the ground level is at approximately
5.8m AHD at the northern extent of the property (fronting C Street) and
9m AHD at the southern extent. The terrain slopes from south to north.
The ground level of C Street is approximately 5.3m AHD. There are
low-lying areas located both north and east of the property.
The Applicant was present during the site inspection and experienced
the inundation event.
The Applicant indicated that:
i. the majority of the dwelling was inundated during the event to an
estimated peak depth of 1m inside the house;
ii. two storm water drains located in 63 and 70 C Street regularly flood
during heavy rainfall, and
iii. after a couple of days, the floors throughout the house were
covered in mud and smelled of sewerage; the sewage line had to
be cleaned out.
Interpolation of data from alert gauges at Beatty Road (about 3.9km
upstream) and Oxley Creek Mouth (about 4.2km downstream) indicates
Case No: 236057 Determination Page 8 of 13
that the peak level of inundation at the site would have been
approximately 9.2m AHD occurring at 12.45am on 13 January 2011.
Aerial photographs show that the property was inundated during the
event. Topographic data and visible debris lines confirm that the
approximate peak level of inundation was 9.2m AHD.
Comparing the peak level with the elevation of the site, the peak depth
experienced would have been between 0.2 – 3.5m. The dwelling lies
below the peak flood depth.
The peak flood level at the site occurred approximately 34 hours after
the end of the intense rainfall in the upper catchment of the Brisbane
River.
The peak intensity of the rainfall was estimated to be less than a 1-year
ARI event. Considering the small catchment size draining to the site
and that the stormwater infrastructure is generally designed to
accommodate 2-year to 10-year ARI flows, it is unlikely that inundation
would have occurred due to stormwater runoff from the low intensity
rainfall or that the drainage system would have surc harged.
The stormwater drains in front of 63 and 70 C Street lie at a low
elevation (approximately 5m AHD). The Applicant may have witnessed
pooling of water within this area prior to the inundation as the water
level of the Brisbane River began to rise and its waters would have
begun flowing up Oxley Creek, the unnamed tributary and the local
stormwater infrastructure, inundating the low-lying areas.
The inundation of the property was caused by water escaping the
normal confines of the Brisbane River and travelling upstream through
Oxley Creek and the unnamed tributary.
34. W’s first memorandum of 23 April 2012 relevantly says that:
With regard to flows rising from the shower drains and toilet, W notes
the dwelling is raised in excess of 1m at the northern extent and the
floor level at the property is approximately 8.3m AHD (ground level at
the northern extent of the dwelling being 7.3m AHD).
Comparing the elevation of the floor level to data of the alert gauges at
Betty Road and Oxley Creek Mouth, flows would have initially
inundated the floor level of the dwelling at approximately 2pm on 12
January 2011. This is consistent with the Applicant’s recollections.
As water levels began to rise, inundating the ground level at the site,
flows would have entered the sewerage system via overflow ground
vents (OGV).
The initial surcharging of sewerage infrastructure within the bathrooms
and subsequent inundation of the house was due to flows of the
Brisbane River travelling upstream through Oxley Creek and into
sewerage infrastructure via the OGVs.
35. W’s second memorandum of 2 July 2012 relevantly says that:
Case No: 236057 Determination Page 9 of 13
The ground levels referred to in previous documents were extracted
from information from the city council. This shows that ground levels at
the dwelling are approximately 8m AHD at the south-western corner
and approximately 6.4m AHD at the north-eastern corner of the
building. An estimated ground level of 7.3m AHD was taken for the
centre of the building.
This level was estimated to enable calculation of the timing of the
ingress of floodwaters into the shower drains and toilet. The precision
of this estimated level does not affect the validity of the overall
comments made in W’s previous submissions.
Some level of uncertainty is inherent when determining ground levels
and peak flood levels; however, the aim of the hydrology report was to
determine the source of the waters inundating the property.
Aerial photographs show that a continuous body of water existed
between the property, Oxley Creek and the Brisbane River during the
event.
Save for a small patch of dry land in the south-western corner of the
property (higher than 9.2m AHD), debris marks throughout the
remainder of the property confirm that the building was inundated by
said continuous body of water.
The OGVs are small outlets located within the grounds of a property
and are designed to expel excess wastewater should blockages occur
in the system during day-to-day use.
Floodwaters were able to back up into these vents once the ground
level at the property had been inundated. The OGVs were merely a
conduit for the floodwaters that had begun collecting at the property to
enter the house.
It remains clear that the source of inundation was the Brisbane River
backing up into Oxley Creek and thence towards the property.
36. On its third memorandum of 20 November 2012 which followed an additional
site inspection conducted on 9 November 2012, W relevantly says that:
ORGs (referred to as OGVs in previous material) are installed at a
position lower than the remaining drains of the dwelling, so that
backflow will be forced to discharge at this position.
The inspection identified overflow structures under the dwelling and at
the western side of 63 C Street. These ORGs have the potential to
become entry points for water flow.
Data from Archerfield Airport rainfall gauge suggests that notable
rainfall ended at 3.30pm on 11 January 2011. Given the small
catchment size draining overland flows to the site, any stormwater
entering the local ORGs in the area would have occurred during or
shortly after this rainfall.
The Applicant’s observations indicate he witnessed flows discharging
out of the shower drain and toilet at about 2 – 3pm on 12 January 2011.
Case No: 236057 Determination Page 10 of 13
This is 22 hours after the conclusion of notable rainfall in the area. It is
unlikely that surcharging or the local sewerage network was a result of
local stormwater ingress.
The peak intensity of rainfall occurring 9 – 11 January 2011 is estimated
to have been less than a 1-year ARI event. Given the low intensity of
the rainfall, any surcharge of the sewerage network resulting purely
from stormwater ingress would be expected to occur frequently in the
area, but there is no indication of a similar issue previously occurring.
The water level of the Oxley Creek within the vicinity of the site had
reached 8.3m AHD at 2pm on 12 January 2011. This corresponds to
the time at which the claimant sighted surcharging flows covering the
ensuite floor.
A comparison of the creek’s level with the elevation of the ORGs
located on site and at 63 C Street (7 – 7.5m AHD) indicates that both
ORGs would have been submerged at 2pm on 12 January 2011.
Also, according to the Sewer Network Overview sourced from the city
council, a sewer outlet discharges wastewater collected from C Street
into Oxley Creek approximately 170m northeast of the property.
As the water levels within Oxley Creek began to rise, flows would have
progressed up the sewerage network via the sewer outlet.
Consequently, further wastewater added to the system would have
failed to adequately discharge.
As water from the Oxley Creek began to inundate low-lying areas to the
north-east, floodwaters may have further infiltrated the local sewerage
network. These potential entry points include the local sewer outlet at
Oxley Creek, other ORGs on private properties to the north-east or
various sewer maintenance holes north-west of the site.
When there are elevated water levels within a watercourse, said
structures can become submerged and increase the pressure on the
overall sewerage network.
During the January 2011 event, the sewerage network in the vicinity of
the subject property may have been pressurised by elevated flows from
Oxley Creek entering the system at other nearby locations, in addition
to entry via the ORGs at the property.
The surcharge at the property may have been caused by floodwaters
entering the sewerage network elsewhere if the ORG located on the
property had been blocked or was not functioning correctly at the time
of inundation.
37. The property’s FloodWise report says that the ground levels at the property
are 5.5 – 9.4m AHD and that the level of inundation was 9.2m.
Case No: 236057 Determination Page 11 of 13
Analysis
Preliminary issues
38. Both parties have sought to rely on several FOS decisions. The Panel notes
that each dispute is decided on its merits and particular facts and they are
not treated as precedent for other cases. The Panel will make reference to
these cases only when appropriate to this dispute.
39. The FSP’s onus at common law to establish the application of an exclusion
is the same as the insured’s to establish an insured event occu rred, that is,
on balance of probabilities.
40. The Applicant also argues W has not complied with what is set out in James
v Keogh [2008] SASC 156 which, he contends, applies to FOS matters.
41. Whilst there is a FOS document relating to the provision of expert opinions
the Panel notes that this document acts as a guide only and that FOS is not
bound by the rules of evidence. Not complying literally with this document
does not imply that an expert’s (W’s) opinion is not to be relied on.
42. The Applicant also raised concerns about relying on site-specific reports
which were commissioned some 15 months after the date of loss or even
later. He contends that the FSP chose to forgo the provision of a further site-
specific hydrology report at different claims handling stages, even when it
knew that such a report was relevant.
43. The Applicant refers to FOS decision 238186 and contends that the
circumstances of that dispute are “almost identical” to the subject dispute.
The Panel disagrees with this view. There are substantial differences
between both cases, mainly with regard to the evidence that the FSP sought
to rely on prior to commissioning a site-specific report.
44. In this instance, the FSP sought to rely on reports of a general nature first
and then when the Applicant questioned its findings, the FSP sought to
obtain site-specific reports to confirm information extracted from the general
reports.
45. Further, the Applicant agreed to W inspecting the site twice in order to obtain
site-specific reports.
46. The Panel is not persuaded that these circumstances warrant the
disregarding of W’s site -specific reports.
Analysis of water inundation
47. The Applicant argues that the FSP has not considered alternative
explanations for the discharge of water out of drains and toilets and that,
based on the evidence he has presented, these alternative causes have not
been disproven.
Case No: 236057 Determination Page 12 of 13
48. The Panel has reviewed the Applicant’s extensive material and
acknowledges that there may have been other possible causes of water
escaping from drains and toilets at the property. However, the Panel is not
satisfied that the material presented by the Applicant establishes, on the
balance of probabilities, a causal connection between that information and
the inundation at the site.
49. Based on W’s observations, the Panel is sati sfied on the balance of
probabilities that the building was inundated by floodwaters flowing back
from the Brisbane River into Oxley Creek.
50. The Panel accepts that W’s material provides a reasonable explanation as to
the potential infiltration of floodwaters into the sewerage network, which
suggests that the overflow from the shower drain and the toilet would have
been the result of floodwaters.
51. Established case law provides that:
if there are two concurrent causes of a loss where one is subject to
cover and the other is not, an insurer is not liable for the loss (refer to
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp
Ltd [1974] QB 57); and
a watercourse is said to overflow its normal banks when all the water
that would otherwise drain into it cannot be contained in it because it is
full, and all the surplus water is then overflow (refer to K Sika Plastics
limited v Cornhill Insurance Co Limited [1982] 2 NZLR 50).
52. Accordingly, if floodwaters (excluded under “flood”) mixed up with
wastewaters (potentially covered under “water – escaping or discharging”)
and caused the overflow from the shower drain and toilets, then the Wayne
Tank principle applies to defeat the claim.
53. Also, if wastewaters began flowing back through the drains because they
were unable to naturally drain away due to the rising water levels of the
Brisbane River and Oxley Creek, then this is also considered flood.
54. On the basis of the available evidence and on balance of probabilities, the
Panel is satisfied that the cause of inund ation of the property was “flood”.
Therefore, the FSP is entitled to deny liability for the claim.
Non-financial loss compensation
55. The Applicant argues he should be compensated for the detriment to his
peace of mind due to the time taken to resolve the claim.
56. The Panel has not found any evidence of the FSP delaying the resolution of
the claim. Further, since the Panel is satisfied that the FSP is entitled to deny
liability for the claim, there is no basis for compensation due to delay in
acceptance or payment of the claim.
Case No: 236057 Determination Page 13 of 13
Determination
57. On the basis of the available information the Panel determines that:
The Applicant was “clearly informed” about what the policy did and did
not cover.
The FSP is entitled to deny liability for the claim.
The Applicant is not entitled to compensation for non-financial loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.