Home / Financial Firm (Unknown - Insurer) / Determination 235758

Determination 235758

Claim denied as flood damage; initial stormwater inundation disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for contents damaged in the December 2010 Bundaberg flooding, which the FSP denied as flood. AFCA found the initial stormwater inundation covered and items stored at ground level or on pallets indemnifiable, but excluded items above pallet height damaged by river flood, with the items to be settled by replacement or cash within 14 days.

Damage from the initial stormwater runoff is covered, while damage from subsequent Burnett River flood water above pallet height is excluded.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 235758 Determination Page 1 of 9 Case number: 235758 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim – Flood 26 September 2011 Background 1. On 28/29 December 2010 water inundated the Applicants‟ property following intense rainfall in the area. 2. A claim under the Applicants‟ home insurance policy for the damage was denied by the Financial Services Provider (FSP) on the ground that the damage was caused by flood and excluded from cover provided by the policy. Summary of Applic ant’s Position 3. In 2003 they purchased the house in Bundaberg and arranged insurance on the building at one of the FSP‟s Australian Capital Territory (ACT) offices. When they moved into the home they transferred the contents policy to the Bundaberg address. 4. At the time they asked if there was any difference between insuring in NSW and Queensland. They were told there was no difference. 5. The Applicants state that in NSW houses are automatically covered for flood under the FSP‟s policies. At no time did the FS P indicate that there was no flood cover in Queensland. As they had read the policy covering their NSW property they had no reason to believe they were not covered. Had they been told the policy did not cover flood they would not have renewed it. 6. At 12.20pm on 28 December 2010 water from the storm drains was covering the nature strip in front of their home. At 1.25 pm water was covering the driveway and beginning to cover the front lawn. At 2.30pm police closed the street and houses across the road had water in them. 7. By evening water was under the house. It continued to rain overnight and water came up from Park Street. 8. Between midnight and 2.30am on 29 December the water level under the house rose to approximately 1.4metres. 9. On 30 December water surrounded the house and remained all day. Determination Case No: 235758 Determination Page 2 of 9 10. On 31 December the water began to go down. 11. The FSP informed the local Member of Parliament that it had paid 7 claims of the 13 claims made against it in the town. However the FSP insists that the hydrological reports on which it relied to deny their claim covered all claims in the town. 12. The Applicants refer to a discrepancy in the FSP submission to FOS when it referred to rainfall in the 24 hour period to 28 December of 165mm and its reference to the BOM figure of 276mm for the same period. 13. The Applicants refer to photographs which show the bottom of the laundry and downpipes can easily be seen through the water. When the assessor and hydrologist visited the site there was evidence of sticky silt over the concrete and downstairs belongings. 14. The Applicants contend the FSP is responding in an over-all blanket denial manner with little reference to individual claims, as all quotes used by them are from the hydrologist report. The hydrologist‟s reports rely heavily on information obtained from other institutions, rather than specific „at point‟ reporting. 15. The Applicants refer to the FSP‟s website which clearly states that the FSP covers the policyholder for flood. The website also has a section titled “Flood cover in NSW, ACT and Tasmania”. A sub heading states flood cover is provided in those states. 16. The FSP has at no time given them the choice of having flood cover a nd questions whether this discriminated against Queensland policyholders. Summary of FSP’s Position 17. The relevant policy terms on which it relies are: “WHAT YOU ARE COVERED FOR Storm if your home or contents suffer loss or damage caused by … however  We will NOT cover loss or damage caused by flood … What you are not covered for - General exclusions We will NOT cover  loss, damage, injury or death that occurs as a result of - flood … Glossary Case No: 235758 Determination Page 3 of 9 Flood Is the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this policy.” 18. The FSP relies on a n assessor‟s report and a hydrological report. 19. The FSP notes the Applicants‟ property is located in a low -lying area of Bundaberg, close to the Burnett River and Saltwater Creek and within the area flooded. 20. The conclusions reached by the hydrologist confirm that the damage was caused by „flood rather than storm‟. Heavy rain occurred over the catchment for 4 days resulting in flooding of the Burnett River and its tributaries some time later. This ultimately led to the inundation of the Applicants‟ house. 21. The city and property hydrology reports and BOM records confirm there was no significant rainfall in the Applicants‟ local area at the time of the loss. 22. The actual rainfall recorded in the local area at the time of the loss was insufficient to cause the inundation experienced at the property. 23. Rather, the inundation was a result of flooding caused by heavy rain across the entire catchment of the Burnett River for a period of several days which some time later overflowed the banks of Burnett River in Bundaberg and back flowed up Saltwater Creek. 24. The FSP submits the material clearly established that flood was the cause of the damage to the Applicants‟ property and as such it is entitled to deny indemnity for the claim. 25. The FSP submits that it has complied with section 35 of the Insurance Contracts Act 1984 by providing the Applicants with a Certificate of Insurance and Product Disclosure Statement (PDS). 26. The FSP states that the policy issued to cover the Applicants‟ contents at Bundaberg was first issued from its Brisbane Business Telephone Centre (TBC) on 7 July 2003. 27. The FSP states that its records show the building insurance policy covering the Applicants‟ property at Iluka NSW was issued at one of its ACT Branches on 23 August 2002. 28. The FSP submits that at th e time the Applicants‟ contents policy was incepted at the TBC in July 2003, there was no material difference between the cover provided in Queensland and NSW as flood was excluded from cover in both states. Case No: 235758 Determination Page 4 of 9 29. Flood cover in NSW was not introduced until 2009. Therefore the Applicants had no reason to believe that their insurance policy for the Bundaberg property included flood cover. Issues 30. Whether the FSP was entitled to deny liability for the claim. Reasons for Decision 31. As advised to the parties, FOS has co nsidered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 32. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 33. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. Policy terms 34. The Applicants state that they had been insured with the FSP for many years while in NSW and ACT. In April 2003 they purchased the Bundaberg property and insured it with the FSP through the ACT branch. They remained in the ACT living in a caravan. Their household contents were placed in storage until they moved into the Bundaberg house in July 2003. At this time the contents cover was transferred to Bundaberg. 35. At the time they asked whether there was any difference between insuring in NSW and Queensland and were advised there was no difference. They state that at that time houses in NSW were automatically covered for flood. 36. The Applicants state that after reading the booklet sent to them they knew they were covered for flood in NSW. 37. On the other hand the FSP states that according to its records on 23 August 2002 cover was arranged at an ACT branch for a building at Iluka NSW. According to the FSP the policy covering the Applicants‟ contents at Bundaberg incepted on 3 July 2003 and was initiated through the TBC. 38. Significantly the FSP advised that flood cover was not available to policyholders in NSW until 2009. The Panel has been provided with a copy of a PDS which carries the notation: “Edition 4 NSW & ACT GOOO72 09/02” Case No: 235758 Determination Page 5 of 9 39. The following is an extract from the document: “ Storm We cover loss or damage caused by storm. We do not cover loss or damage caused by:  flood, except for loss or damage caused by sudden, excessive run-off of water during a direct result of a storm in your local area” 40. “Flood” is defined by th at PDS as: “as the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this policy.” 41. The Panel has not been provided with any documentation to the contrary. 42. During the course of the site visit, the Applicants confirmed they had received the PDS. Although mention is made by the Applicants of misleading information on the FSP‟s website, the Applicants agree they did not access this site or rely on this site on inception of the policy. In the circumstances, the Panel does not believe the Applicants had been misled by the website. 43. The female Applicant advised that she had previously (many years before) worked for an insurer. She knew the importance of asking for flood cover. 44. Although the availability of flood cover may have been discussed on inception, the information on file establishes no flood cover was available in either NSW/ACT or QLD at the time of inception of the policy. 45. The Applicants further question why the FSP did not inform them in 2009 that flood cover had been excluded from cover in Queensland when at that time it was included in cover for NSW risks. 46. The consideration of the extent of cover offered in a particular area or state is a matter for the FSP and its underwriting considerations. It is not a matter that is relevant to this dispute. 47. In this matter in 2009 the FSP extended contracts insuring risks in NSW and ACT to include flood cover. At the time this cover was included in the NSW/ACT contracts the Applicants‟ policy insured risks located in Queensland. As such the Panel accepts that the FSP was under no obligation to inform the Applicants of the changes made to policies insuring NSW/ACT risks. Water inundation 48. Central to this dispute is the question of whether the inundation of the property was due to stormwater or flood. Significantly, the Applicants ‟ claim is for damage to contents stored in a storage area in the ground level of the property. The Applicants accept that the waters did not enter the first level of the Case No: 235758 Determination Page 6 of 9 property, which is approximately 1.6 metres to 1.8 metres above the ground level. 49. The FSP relies on several hydrological reports commissioned by it. As there has been an exchange of material between the parties it is not intended to recite the detail of those reports in this determination except where relevant. 50. The hydrologist report dated December 2010 revised 8 June 2011 titled “Overview Hydrology Report” contains the following:  The most intense part of the storm rainfall event causing the flood event in the Burnett River at Bundaberg occurred late on 27 and early 28 December 2010. Rainfall at Bundaberg had ceased by 9pm on 28 December.  The last burst of rainfall causing any significant local-area run-off ceased at around 10am on 28 December.  The Burnett River at Bundaberg rose above the moderate flood level of 5.5 metres around midday on 2 8 December. „Moderate‟ flood height is described as a height above which some low-lying houses may require evacuation and some bridges may be closed. 51. Following a site inspection of the Applicants‟ property on 7 January 2011, the hydrologist provided the following information in his report of 11 January 2011.  The floor of the Applicants‟ home is approximately 1.6 to 1.8 metres above ground level. The water level during the flood event peaked at about 1 metre above ground level. Water did not enter the upstairs living area.  The property is located near the Saltwater Creek floodplain.  There would have been high flows in Saltwater Creek during 28 and 29 December following the very heavy rainfall in Bundaberg during the 24 hour period proceeding 9.00am on 28 December.  The peak water level at the property coincided with the peak water level in the Burnett River. The water levels rose and fell in tandem with the water levels in the Burnett River.  The flooding at the property was therefore mainly a function of the peak water levels in the Burnett River which caused back-flow up the two creeks and prevented local catchment runoff draining away.  The high water level and water damage to the property was caused by high water levels in the Burnett River and flood runoff from the catchment of Saltwater Creek. Stormwater would not have entered the area beneath the house prior to the floodwaters. 52. The hydrologist provided a table setting out the daily rainfall totals for the Burnett River catchment. The report noted:  The heaviest rainfall occurred over the 4 day period from 9.00am on 25 December to 9.00am on 29 December. Case No: 235758 Determination Page 7 of 9  The heaviest 24 hour rainfall period occurred over the period ending at 9.00am on 28 December. 53. The Applicants have provided a detailed chronology of the events prior to and at the time of the inundation to their home. They did not leave the home at any time so that their description may be regarded as a valid version of the flooding. 54. The event as described by the Applicants is largely consistent with the information obtained from them by the hydrologist. That is that from 12.20pm on 28 December water coming up from the storm drains commenced moving across the front nature strip, up their driveway and front lawn. At 2.30pm the street was closed by police and water was in the house across the road. According to the hydrologist, the Applicants reported water rising above ground level in the yard around mid-day. 55. According to the rainfall data, heavy rain fell in the area over four days to 29 December with a total of 276mm with the heaviest fall in the 24 hour period to 9.00am on 28 December. A total of 24mm was recorded in the 24 hours to 9.00am on 29 December. The hydrologist noted the last burst of rainfall in Bundaberg causing any significant runoff ceased at about 10.00am on 28 December. 56. The hydrologist further noted that runoff rainfalls from 26 to 28 December combined with saturated catchment conditions; consequently the Burnett River rose to major flood levels causing flooding in Bundaberg. He noted the Burnett River rose above the moderate flood level of 5.5metres at about midday on 28 December which corresponded to flooding in the low lying areas in Bundaberg. 57. According to the hydrologist the Applicants‟ property was located near a floodplain of Saltwater Creek. Maps contained in his report show Saltwater Creek in close proximity to the Applicants‟ property to the north, adjacent to Park Street. 58. The hydrologist explained that flooding in the Applicants‟ street (3.2) was a function of flows from Saltwater Creek as well as water level in the Burnett River, the peak levels of which would have backed up the creeks and prevented the local catchment runoff draining away. 59. The Panel notes that the site specific hydrology whilst referring to the high water level at the property does not deal with the issue of the initial inundation at ground level. The report does not describe the local topography, the relevant stormwater/rainfall runoff in the immediate area or address the Applicants comment that the water initially e ntered the property from the street. 60. A site visit was conducted by The Panel Chair Ombudsman. Present were the Applicants and the FSP‟s representative. During the site visit the Ombudsman observed that the property was in a „sag‟ in George Street with the ground level below the height of the roadway at the front of the property. According to the Applicants, a property several doors up the street had been built over a drainage channel that ran under the roadway, this has been modified and water does not flow freely. Case No: 235758 Determination Page 8 of 9 61. The Ombudsman discussed with the parties, observations made during a site visit of a property opposite the Applicants‟ property. At that property, there was a large drain at the front. All of the runoff from the properties and street ran into this drain as did the runoff from surrounding streets. The residents believed the drain was not clearing efficiently during 28 December as all the rubbish etc from the surrounding area flows into this drain. Above the drain is a large tree that has caused some obvious surface damage. According to the residents, this drain has been altered and had a smaller diameter pipe installed which caused further blockages. 62. Contrary to allegations made in the FSP‟s further response, photographs have been provided that show the water building from the front of the property. Photographs also show local traffic driving through the waters causing bow waves that exaggerated, the height of the water flow through the front of the property. 63. The Ombudsman noted that the FSP‟s hydrolo gy did not address the initial inundation, did not address the local drainage, and did not address the runoff from the surrounding streets. The FSP was invited to reconsider its position and address these issues. The further response does not address the deficiencies in the site specific hydrology provided by the FSP. 64. The Panel having considered all of the information provided is of the view that the initial inundation at the property would have on the balance of probabilities been due to stormwater/rainwater runoff. Accordingly the Panel is satisfied the initial damage and loss would be covered under the terms of the policy. This is consistent with the Applicants‟ comments that water was observed above ground level around mid-day 28 December 2010. It is also consistent with the available rainfall data and hydrology. 65. The Panel accepts that subsequently the inundation with the higher water level and additional water damaged was caused by the high water levels in the Burnett River. 66. The Panel notes that some of the items damaged were stored at ground level or on pallets whilst other items stored at a higher level. In the Panel‟s view, in the absence of any information to the contrary, the items stored at ground level and on pallets most likely were damaged in the initial inundation from storm water. Items above this height would have been damaged by the subsequent floodwaters. Determination 67. On the basis of the available information the Panel determines that the FSP is liable to indemnify the Applicants for loss only for those items stored at ground level or on pallets at the time of the loss. Those items stored above pallet height are not covered as on balance, inundation above that height would be due to flood and not covered under the terms of the policy. Case No: 235758 Determination Page 9 of 9 68. As the documentation exchanged does not allow the clear identification of these items lost that were stored at ground level or on the pallets, the Applicants are required to identify those items from the list of damaged items that has been exchanged. 69. Once the Applicants have identified the items from the list and provided this to the FSP, the FSP must settle the Applicants‟ claim by way of a replacement of the items or by way of cash settlement within 14 days.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.