Determination 234387

Inundation claim partly declined as flood; stormwater portion disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's Charlton home was inundated in January 2011. The FSP accepted the early morning stormwater loss, offered $49,554.35, and declined the later flood damage. AFCA found the stormwater inundation up to 150mm was covered and ordered indemnity for that part, with statutory interest on the settled figure.

The applicant established a prima facie accidental damage claim, so the FSP had to prove the flood exclusion, and the mixed water above about 150mm was properly characterised as flood.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 234387 Determination Page 1 of 12 Case number: 234387 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 21 January 2013 Background 1. The Applicant held a Home Buildings and a Home Contents Insurance Policy (the policies) with the Financial Services Provider (FSP) which provided cover for accidental damage to the insured property subject to the relevant policy limitations. 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 January 2011 following the significant weather events experienced in Victoria during January 2011. 3. The FSP accepted a portion of the Applicant‟s loss it assessed to be covered under the policy. It has, however, declined indemnity for a major portion of the damage on the basis it was due to the event „flood‟, which is excluded under the policy. 4. The Applicant remains dissatisfied with the FSP‟s decision and is seeking complete indemnity for his loss arising from the initial stormwater inundation of his property. Summary of Appli cant’s position 5. The Applicant in disputing the FSP‟s decision to decline the claim has sought the assistance of legal representatives “M”. In the interest of brevity both the Applicant and “M” will be referred to as the “the Applicant” for the purpose of this determination. 6. The Applicant maintains:  The FSP proceeded to decline his claim without having obtained a hydrology report. It was only after he brought the matter to the Service that the FSP arranged for the site specific hydrology report.  Properties on higher ground across the road from his home have been covered for damage on the basis it was stormwater inundation damage.  The Applicant was present at the property and maintains it was inundated by water (around the dwelling) from early in the morning on 14 January 2011 which inundated the shed and sun room at the rear. Determination Case No: 234387 Determination Page 2 of 12 Also, the subsequent inundation that occurred between 5.00pm-5.15pm inundated the main part of his home up to an estimated 7cm inside the house, which is supported by his preferred hydrologist „PM‟.  The Applicant had only recently purchased the property prior to the date of loss (7-8 weeks) and had undertaken renovation and painting works within the dwelling.  The position taken by the FSP‟s appointed hydrologists „W‟ in relation to the possibility of early stormwater inundation in its most recent report is at odds with the position it adopted in earlier reports.  The loss adjusters „C‟ are not qualified to determine that the damage claimed is due to flood.  Yeurngoon Creek is an area of dry land near Yeurngoon Road and is not a creek as the name otherwise suggests.  It is reasonable to expect, given the strong likelihood of stormwater runoff from local paddocks that it would take some time for the intense rainfall from the south and east of Charlton to reach the township.  The Applicant relies upon hydrological evidence submitted by PM. It is his position that the first two waves of inundation of his property were due to stormwater runoff prior to the arrival of floodwaters from the Avoca River. Summary of FSP’s position 7. In their submission of 10 September 2012, the FSP accepted that there were three separate inundation events at the property on 14 January 2011 i.e. at 7.00am, 5.00pm and 7.00pm;  The cause of inundation at 7.00am was stormwater runoff;  The cause of the inundation at 5.00pm was floodwater  The cause of inundation at 7.00pm was floodwater;  The 5.00pm inundation reached a height of 7cm within the home. 8. The FSP‟s consultants „W‟ concluded that water that pooled around the dwelling from 8.00am onwards, eventually rising above floor level at 5.00pm was a mixture of overbank flow from Yeungroon Creek (the creek) and Avoca River (the river) and accordingly is excluded from cover. 9. PM‟s conclusions regarding the intensity of rainfall, and therefore the likelihood of it generating stormwater runoff, were based on an analysis of radar data. This being a source of data inferior to and not as reliable as pluviographic data used by „W‟. 10. The FSP accepted indemnity for the Applicant‟s damage to the sunroom, shed and contents stored within it, arising from what it accepts to be stormwater inundation earlier in the da y on 14 January. On the basis of Case No: 234387 Determination Page 3 of 12 quotes obtained from „S‟ and „P‟ it offered a cash settlement of $49,554.35 (less the excess) to the Applicant. 11. The damage claimed for the subsequent inundations at the property after the morning event (ie at 5.00pm and later) was due to floodwater inundation and accordingly excluded from cover. 12. The FSP relies on the following policy provisions: “ Section 2 – The Policy Wording … Words that have Special Meanings … Flood means the covering of land that is not normally underwater by: water that overflows or escapes from a naturally occurring or man made inland watercourse (such as a river, creek, canal or storm water channel) or a water pool (such as a lake, pond, or dam), whether it is in its original state or has been modified; or water released from a dam whether it be accidentally released or intentionally released to control, mitigate, regulate, or otherwise respond to excess water; or water that cannot drain or run off as a result of water that is overflowing or escaping from an inland watercourse or water pool preventing the escape of water. … Run-off means rainwater that has collected on or flowed across normally dry ground or has overflowed from swimming pools or spas. Section 2A – Your Home: What is Covered We will pay for accidental loss or damage to your home during the period of insurance. … What we won‟t pay for We will not pay for: … 12 loss or damage caused by or arising out of flood. ” Issues 13. Whether the damage to the Applicant‟s property was caused by stormwater runoff or floodwater as defined by the policy. 14. Whether the FSP was entitled to decline indemnity to the Applicant under the policy. Case No: 234387 Determination Page 4 of 12 Reasons for decision 15. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 16. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 17. There has been an exchange of material between the parties. Each part y therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 18. On 10 December 2012 the Panel Chair Ombudsman and a Panel member attended on site where they met with the Applicant and a representative of the FSP. 19. Prior to arriving at a Determination the Panel has read and considered all the material submitted by the parties to FOS. 20. The Panel is satisfied the parties do not dispute the following:  The Applicant held active building and contents insurance policies with the FSP at the time of loss.  The FSP provided and the Applicant received the relevant policy documentation including the Product Disclosure Statement (PDS) and Certificates of Insurance.  The insured property suffered extensive damage due to water inundation arising from the significant weather events experienced in the area during January 2011.  The policy provides cover for accidental loss or damage however excludes from cover damage arising from the event „Flood‟.  The Applicant remained within the property and witnessed the multiple waves of inundation resulting in the damage, the subject of the claim. 21. The Panel having reviewed the available evidence is satisfied that the policy provides cover for accidental loss or damage subject to the specified policy exclusions including flood damage. It is not in dispute that the Applicant suffered damage which was accidental and therefo re he has established a prima facie claim. In any event the FSP has accepted indemnity for the initial inundation in the morning of 14 January 2011. 22. The main issue in contention between the parties is whether the inundation which occurred at about 5.00pm on 14 January 2011 was caused by water which is properly characterised as stormwater, which would give rise to a Case No: 234387 Determination Page 5 of 12 degree of indemnity under the policy, prior to the arrival of floodwaters at about 7.00pm, which is excluded from coverage under the policy. 23. The Panel is satisfied that the property was ultimately inundated by floodwater to the maximum level however consideration as to the extent of stormwater inundation at or around 5.00pm on 14 January 2011 has been considered below. Cause of the Loss 24. The parties to the dispute have each obtained and rely upon information made available by their appointed expert consultants. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to comment. Accordingly, in the interest of brevity, the Panel will only reiterate information from these reports it finds necessary in providing this Determination. C’s Report dated 6 February 2011  The dwelling is a single storey weatherboard building built approximately 30 years prior to the date of loss and appeared to be in a good condition/well maintained.  Avoca River broke its banks and inundated approximately 80% of the town.  The Applicant advised that there was a town meeting held at 5.00pm on 13 January where residents were informed of the possibility that the town may flood.  C understood that water entered the property at approximately 9.30pm on 14 January at ground level. Dirty water reached a level of approximately 50cm inside the home.  The property is higher than the street level gutter with the river located around 1000m west and 800m north of the property.  The Applicant claimed that a storm water drain located at the rear of the property‟s grounds was unable to cope with the water and overflowed. W’s Flood Assessment Repor t 1 March 2011  Multiple site inspections were undertaken on 24 January 2011.  The average rainfall records for the upper regions of the Avoca River catchment are about 600mm per annum.  The Avoca River has flooded the town of Charlton a number of times in the past due to high rainfalls.  The Avoca River catchment soaked from previous rainfalls resulted in a higher than average conversion of rainfall to runoff, increasing the water flowing directly into watercourses and resulting in flooding across Victoria. Case No: 234387 Determination Page 6 of 12  Flood warnings were issued for a number of rivers including the Avoca River with one of the towns affected by the flooding being Charlton.  Historically Charlton has been flooded from two directions in a north south plane with an area remaining flood free through the centre of town along the St Arnaud – Charlton Road.  The most intense rainfalls periods in Charlton were experienced in the morning of 11 January (2011) and early morning 13 January (2011), with the maximum flood level from the Avoca River reaching its peak early morning 15 January (2011).  Flooding of the township was similar to the September 2010 event however, a much greater volume of water has been experienced in the eastern end of town on this occasion (January 2011).  Given the timing of the flooding of the eastern edge is similar to that of the gauge readings it is suggested that the Yeurngoon Creek and Avoca River flows merged to become one system.  Any flooding occurring after lunchtime (14 January 2011) can be directly attributed to Avoca River/Yeurngoon Creek flooding.  Floor inundation (sic) that occurred east of Armstrong Street early morning (14 January 2011) can be attributed to stormwater flooding.  The inundation of the property was due to flood. W’s Flood Assessment Report dated 21 March 2011  The site is a residential property located along High Street approximately 750m from Avoca River.  The Applicant advised the flooding was more widespread than the September 2010 event.  Water surrounded the house early morning on the 14 January 2011.  Water began to rise to the house floor level late in the afternoon of 14 January 2011.  The water was flowing chest high by 9.00pm on 14 January 2011.  The consultant noted the house was high above surrounding land.  The consultant concluded that flood damage occurred as a result of flood flows from Avoca River/Yeungroon Creek and the minor tributaries.  The damage to the shed or other on-ground infrastructure that can be shown to have been inundated in the morning of 14 January was likely to have been due to stormwater inundation, with the damage above floor level of the home dwelling resulting from flood damage. Case No: 234387 Determination Page 7 of 12 PM’s Charlton Floods - January 2011 dated 3 November 2011  The town of Charlton experienced heavy rainfall between 10 January - 14 January 2011 with extensive flooding in the area from the Avoca River from 14 January onwards.  Total rainfall over this period was recorded at 168.6mm with 66.2mm falling between 9.00am on 13 January and 9.00am on 14 January.  The highest intensity rainfall recorded was 15mm/hr between 7.00am- 8.00am on 13 January. There was no rainfall recorded after 8.00am on 14 January.  Although the records calculate the rainfall intensity on an hourly basis, rainfall periods at Charlton were highly concentrated in short duration bursts e.g. 10 to 12 minute intervals. Accordingly, if calculated on this basis it would represent 20-50 year ARI rainfall events as opposed to 1- 2 year ARI events (based on hourly intervals).  Accordingly, overflow from local drainage systems and culverts were highly likely as these systems are only designed to cope with 2-5 year ARI rainfall events.  Time of overflow would have to correspond closely with the timing of the intense rainfall periods and based on this, the first stormwater drainage overflow event would have occurred at around 7.00am on 13 January.  There are two possible sources of rainwater run-off in Charlton, run-off in the town which does not enter the stormwater drainage system and run-off from surrounding rural areas.  All rainfall that fell on 13 January and 14 January would have become saturated overland flow and followed natural drainage lines into Charlton. This would have led to the inundation of Charlton on these dates prior to the arrival of floodwaters from the Avoca River.  Floodwaters from the Avoca River would be of high sediment loads (muddy/mucky) and would not be clear. Clear water inundation would support, that prior to the arrival of floodwaters from the Avoca River, there was water sourced from local stormwater.  Depending on the exact locations of the properties, they will have begun to have been inundated by floodwater sometime on the afternoon or early evening 14 January. Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfalls were occurring (13 January and early morning 14 January).  Evidence in respect to water inundation of properties which occurred, particularly before 5.00pm on 14 January, should be taken into account. PM’s Charlton Floods January 2011 – On site assessment of flood conditions in Charlton and in Individual Properties dated March 2012  The property is on the north side of High Street, close to the junction with Wilson Street. It is approximately 130m from the drain running through east Charlton. A bend in the course of the drain means it is close to the property on both the east and north sides. Case No: 234387 Determination Page 8 of 12  PM interviewed the Applicant and undertook a site inspection on 2 March 2012 at 1.30pm at which time the Applicant advised:  At 9.30am on 14 January water was already covering the back garden and was in the sun room at the back of the house.  By 11.00am water was coming from the east down High Street onto the front lawn (low sediment load).  At 5.15pm the water was entering the house from the front and up through the floorboards.  At 6.00pm muddy water started arriving, moving from the west along High Street. The water was noticeably cooler than the water from the earlier inundations and started coming into the house at around 6.30pm.  The consultant concluded that:  The step from the sunroom into the house is 28cm high.  Given the height stormwater reached in other neighbouring properties across town, and the close proximity to the drain, it is likely that inundation up to 35cm can be attributed to stormwater with a high degree of confidence.  This is equivalent to 7cm of inundation inside the Applicant‟s home. W’s Flood Assessment Report dated 16 August 2012 25. The Panel notes the FSP‟s commissioned hydrologist (W) having considered PM‟s report (March 2012) raised several concerns. These concerns were detailed in the above titled report from W in addition to its finding arising from a site inspection undertaken at the insured property on 11 July 2012.  The town of Charlton is surrounded by a high ridge to both the east and west of the town, constricting the floodplain through the township.  The catchment areas for the following watercourses are:  Yeungroon Creek (the Creek) 72km 2  Charlton St Arnaud Road Tributary (CSAT) 7km 2  Calder Highway Tributary (CHT) 3km 2  The stormwater runoff generated in the catchments will concentrate along drainage lines and normally flow into the Avoca River (the River) upstream of Charlton for CSAT and downstream for CHT and to the east and further downstream of Charlton for the Creek.  Charlton received its largest rainfall total on the Thursday (13 January 2011) of 66mm recorded to 9.00am on Friday 14 January. The available data shows the rainfall over the area occurred in three main bursts.  The highest one minute rainfall intensity occurred at 6.28am on 13 January at 1.44mm/per minute. Case No: 234387 Determination Page 9 of 12  The maximum rainfall intensities are not exceptional and are generally equivalent to an ARI of 1-2 years.  Locally derived stormwater flows could not have caused significant flooding in Charlton after 7.00am-8.00am on 14 January.  Most of the flows caused by direct stormwater runoff generated from within the town and the catchment of Calder Highway would have passed through the town to the Avoca River by about 8.00am on 14 January.  The continuing flows into Charlton from about 8.00am (14 January) would have been caused by overland flows resulting from breakouts from the CSAT, the Creek and the River from further upstream.  Given the size of its catchment, the CSAT would have contributed flows into Charlton prior to the Creek and the River.  The site of interest is a residential property located on High Street in Charlton and approximately 175m west of the culvert where the CHT crosses High Street.  A Land Subject to Inundation Overlay (LSIO) and Floodway Overlay (FO) report indicates that the back of the property lies within the LSIO for the CHT of Avoca River.  Discussions with the Applicant revealed:  He remained inside the home until approximately 7.00am on 14 January, and at this time he observed that the entire property (front and back) was covered by water.  The back became inundated first and the entire area behind the property up to the railway line filled with water.  The water rose steadily from 7.00am-5.00pm on 14 January with the back room (built at ground level) inundated early on the day. The rest of the dwelling is elevated up from ground level by approximately 500mm.  The Applicant witnessed water bubbling up from an underground pipe in the back yard during the event, dislodging a large access cover.  At 5.00pm water was starting to enter the door and main area of the house. After it entered the property the water began to rise much faster.  The Applicant was evacuated at 9.00pm on 14 January when the water was up to approximately chest height on the road (High Street).  Given the size of the CHT catchment and response time of two hours, it is expected that peak discharge associated with the rainfall (up to 5.02am 14 January) would have occurred by the time the rainfall ceased. Accordingly, rainwater runoff ge nerated would have flowed downstream of the Calder Highway by about 8.00am. Case No: 234387 Determination Page 10 of 12  Any significant continuing flows in the tributary from after 8.00am (14 January) would be due to overland flows resulting from the „breakouts‟ from Yeungroon Creek, CSAT and later the River.  The CHT is quite shallow and the culverts under the Calder Highway may not have had the capacity to pass the peak flow of a 5 year ARI rainfall event. Initial flooding of the property outside the dwelling that occurred in the morning (prior to 7.00am) is likely to be due to local runoff.  Ongoing flooding from about 8.00am onwards would have been caused principally by tributary and overland flows resulting from „breakouts‟ from the Yeungroon Creek and Avoca River  The property was later (7.00pm on 14 January) inundated by breakouts from the river with water travelling towards the property from the west.  Clear water is not necessarily an indicator of stormwater, it is more an indicator of where the water has come from; in this case a flat vegetated catchment with little opportunity to pick up sediment (the Creek). 26. As noted earlier in this Determination, the policy is an accidental damage contract and accordingly provides cover for accidental damage to the insured building and contents subject to the noted limitations/exclusions provided within the PDS. The Panel is satisfied that the Applicant has established a prima facie claim under the policy. Accordingly, the onus rests with the FSP to establish its entitlement to decline indemnity in line with the specified policy limitation i.e. the damage claimed is due to the event „Flood‟. 27. The Panel representatives have now undertaken numerous site visits in the Charlton area where they have seen and discussed the inundation events with the Applicant, insurer representatives, hydrologists and other local residents. This has allowed the Panel to form a clear picture as to the mechanisms and timings of the inundation events through the period up to and beyond 14 January 2011. 28. In this dispute, the FSP has acknowledged and accepted that inundation occurring on the morning of 14 January 2011 was caused by rainwater accumulation and runoff. The issue in dispute therefore relates to the mechanism and timing of the events in the afternoon and evening of 14 January 2011. 29. The Panel notes that the Applicant was not evacuated from the property until after the ultimate inundation occurred and therefore witnessed the inundation of his home first hand. There is no dispute that the damage to the sunroom, shed and contents within this shed at the rear of the property was due to stormwater inundation and for which the FSP has accepted liability. Therefore the main issue in contention between the parties, relates to the inundation of the insured property above floor level in the main part of the Applicant‟s home. 30. The Panel notes that the FSP‟s preferred hydrologist is of the opinion that the water responsible for the inundation of the property in the afternoon of 14 Case No: 234387 Determination Page 11 of 12 January 2011, was due to breakout flows from the Yeungroon Creek and Avoca River and the CHT (tributary). 31. The Panel, following the site visit by the Ombudsman and a Panel member in the presence of FSP representatives and a number of local residents, and having considered the available evidence, is mindful of the significance of the impact of the work undertaken at the Charlton - St Arnaud Road on the natural flow of the water from the floodplain to the Avoca River. 32. The Charlton - St Arnaud Road had been elevated previously to allow access to the airport during floods. In doing so, it dissected the natural floodplain. Although, a number of pipes/culverts had been positioned under the road they proved insufficient to cope with the overland flow; according to locals the resultant flow was diverted initially east of Armstrong Road and eventually through the town. This information was provided by a number of local residents independently of the Applicant, to the Ombudsman and a Panel member in the presence of the FSP representatives. 33. In the Panel‟s view, water which accumulated i n this area and subsequently flowed into parts of the township was not from an area which could reasonably be described a watercourse. Although parts of this area are locally referred to as „Yeungroon Creek‟, this particular area does not contain features which adequately describe a watercourse, but rather are indicative of a flat area of floodplain. The Panel‟s determination in this regard is consistent with early determinations of the Panel concerning this topographical feature. 34. Having considered the evidence in this dispute, together with the experience gained from many other disputes, the Panel is inclined to the view that the area where the Applicant‟s home is situated was likely to have been inundated in the afternoon by water which originated from the south and east of Charlton which was channelled back into the town. The wider evidence leads to the conclusion that the level of inundation from this source would have risen to a height no greater than about 150mm in the vicinity of the Applicant‟s home p rior to the arrival of the floodwater from the Avoca River at about 6.00pm. 35. The Panel notes that the floor level of the main part of the Applicant‟s home would have been some 400-450mm above ground level and the raised outbuilding (the granny-flat) at about 350mm. Although the Applicant has submitted that the water level would have exceeded the floor level at about 5.00pm, based on the wider evidence, this appears to be inconsistent with the level of stormwater flow generally seen in the vicinity at that time. It would not have been until about 6.00pm that the level of water would have reached and exceeded that height, which would have been at about the time of the arrival of the floodwater from the river. 36. Given the above, the Panel is of the view that the water which inundated the Applicant‟s home at the level of the main floor and the level of the raised outbuilding would, on the balance of probabilities, have been a mixture of stormwater runoff and water which overtopped the Avoca River. The Case No: 234387 Determination Page 12 of 12 resultant mixture of water is properly characterised as floodwater for the purposes of the policy and as such any damage resulting from this would be excluded from cover. Conclusion 37. The conclusion is that the FSP is to provide indemnity for the Applicant‟s loss arising from inundation of water to the level of 150mm above ground, through the property. 38. The Panel has also considered whether this level of inundation would have impacted upon the foundations or structure of the Applicant‟s home. Given the extent of ultimate inundation from the Avoca River, the panel is not satisfied on the balance of probabilities that the initial stormwater inundation would have impacted upon the foundations or structure of the Applicant‟s home. 39. The Panel has not been provided with sufficient information which would allow it to come to an informed decision as to the extent/degree (monetary) of the FSP‟s liability under the claim arising from either the initial stormwater inundation of the shed, garage and dwelling, or the subsequent stormwater damage up to 150mm above ground through the property. Accordingly, the Panel urges the parties to act in a cooperative manner to reasonably establish the extent of damage to the insured property arising from the stormwater inundation determined at the insured property. Determination 40. On the basis of the available information the Panel determines that the FSP is liable under the policy to provide indemnity to the Applicant (within 30 days of receiving this determination) in line with the matters discussed above having regard to the terms and limits of the policy and any amounts already paid to the Applicant. 41. If the FSP elects to cash settle any part of the claim, the FSP is to pay to the Applicant interest at the statutory rate, in line with the Insurance Contracts Act 1984, on the final net settlement figure agreed between the parties, from the date of the decision to deny the claim to final settlement of the claim.