Home / Financial Firm (Unknown - Insurer) / Determination 234279

Determination 234279

Hail damage to slate roof settled at lower cash amount

FirmFinancial Firm (Unknown - Insurer)
Decided2011-07-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$10,507
Non-financial loss—
Amount claimed$10,507
SourceAFCA PDF

Summary

A hailstorm damaged the applicant's slate roof, and the FSP offered a $6,300 cash settlement based on a limited scope. AFCA accepted the contractor's scope and ordered the FSP to cash settle $10,506.50.

The FSP's assessor was silent on damage to the west and south slopes, so the contractor's more detailed assessment was preferred.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 230182 Determination Page 1 of 6 Case number: 234279 General Insurance - Domestic Insurance - Home Building – Hail damage – Policy exclusion – wear and tear 24 June 2011 Background 1. The Applicant insured her home building under a Complete Replacement Home Building Policy. The policy commenced on 1 July 2007 and had been renewed annually to 1 July 2012. The policy carried an excess of $400. 2. On 9 June 2010, the Applicant reported that the slate roof on her house had been severely damaged in a hailstorm that had occurred some months earlier. She only discovered the damage when it was found that rainwater had entered the interior of her house. 3. The Financial Services Provider (FSP) engaged a roof services firm, “S”, to inspect and report on the damage to the roof. “S” rep orted that approximately 120 – 170 slate roof tiles on the west elevation had been damaged during the hailstorm. 4. However, “S” also reported that many of the slate roof tiles had pre -existing damage due to wear and tear. “S” provided a quotation of $6,300 i ncluding GST, to replace the damaged tiles. 5. The FSP has relied upon the report and quotation from “S” to offer the Applicant a cash settlement of $6,300. 6. However, the Applicant also obtained reports and quotations from two roofing contractors. Contractor “P” quoted $8,873 to repair the west facing slope and $5,445 to repair the south slope, a total of $14,318. The second contractor, “R” quoted $24,046 to replace the entire roof. 7. The Applicant is seeking payment of $10,506.50 to replace the damaged tiles for the amounts of $8,873 and 30% of $5,445. Summary of Applicant ’s Position 8. On 8 July 2010, the FSP arranged for roof services firm “S” to inspect the roof and estimate the cost of repairs. The report from “S” maintains that only 120 – 170 slate tiles need replacing. Subsequently the FSP offered the Applicant a cash settlement of $6,300 which she rejected. Determination Case No: 230182 Determination Page 2 of 6 9. She engaged a roofing contractor “P”, who had been maintaining the roof for about 15 years to also provide a quote for the amount of $17,544 to repair the west and south slopes and north facing hips. 10. “P” reported that the west facing slopes were badly hai l affected and beyond practical repair; about 30% of the front southern slope was damaged; and the two hips facing north had only minor damage. 11. In his second report dated 4 January 2011, “P” stated: “This roof has been maintained by me for more than 15 yea rs and prior to the hail storm in March, was in excellent condition.” 12. “P” maintains that “S‟s” quote significantly underestimates the cost of replacing the damaged slates. 13. “P” maintains that the entire west facing roof, which took the brunt of the storm, needs replacing because in excess of 80% of the tiles on that slope had hail damage. “P” also reports that the south slope experienced substantial storm damage where approximately 30% of the slate tiles were hail damaged. 14. The Applicant states that she is prepared to pay for all repairs to the roof that was not caused by the storm. She has not made a claim for repairing old guttering or repairing damage to the front verandah. She has also not made a claim for the east and north slopes which experienced only minor damage. 15. The Applicant contends that the FSP should pay for the repairs to the west slope which incurred damage to over 80% of the slates, and only 30% of the south slope slates which were damaged. Her claim is for: 100% of the cost of repairs to the west slope $8,873 and 30% of the cost of repairs to the south slope (30% of $5,445) $1,633.50 a total of $10,506.50. Summary of FSP’s Position 16. The FSP accepts that the slate roof of the Applicant‟s house was damaged by the insured event, hailstorm. However, the policy of insurance does not cover damage or loss caused by or arising from or involving wear, tear, rust, or deterioration. 17. It appointed “S” to inspect and report on the damage to the roof. “S” found that the two western faces of the roof had suffered hail damage and the front of the house had hail damage to some of the tiles. “S” also noted that the original slate tiles are very brittle and care must be taken whilst working on the roof. 18. The FSP also contends that “S” reported that many of the slat e roof tiles have a pre- existing condition where the tile surface has „laminated‟ which is a maintenance issue. “S” stated that lamination is a slow process over a period of Case No: 230182 Determination Page 3 of 6 time where the top layers of the slate tiles begin to separate from the surface of the tiles. 19. The FSP states that in the absence of any evidence to the contrary, it submits that it can rely on the experience of “S” and its assessor in determining the cause of the damage to the Applicant‟s house. 20. It notes that some of the damage to the roof is a result of wear, tear and deterioration rather than an insured event. 21. Based on the report from “S”, it submits the correct scope of works is limited to the replacement of approximately 120 to 170 slate roof tiles damaged by hail. It contends the A pplicant‟s policy excludes cover for any pre -existing deterioration. Therefore, it advises the quotation from “P” does not provide an accurate cost to repair the authorised damage to the Applicant‟s roof. 22. The Applicant believes that its settlement based on the quotation from “S” is insufficient for the Applicant to engage a repairer to complete the repairs to her home. However, the FSP has offered to carry out the repair on a „do and charge‟ basis in the event the amount was not sufficient. However, the Applicant was not satisfied with this. 23. The FSP confirms that the policy of insurance clearly states it will decide to repair the home or pay the cost of repairing it. Therefore, the FSP can choose to provide a cash settlement for the damage to the Applicant‟s roof caused in the storm. 24. The FSP relies on the following policy/contract provisions: “What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of snow or hail. ... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: Case No: 230182 Determination Page 4 of 6 ... wear and tear, rust, deterioration or corrosion, ... What we will pay – new for old ... Repairing your building When we establish that your home building can be properly repaired, we will decide to: repair it, or pay the cost of repairing it. When we repair your building, we will use new materials. We will make reasonable endeavours to match materials. Where this does not achieve an exact match, materials that in our opinion match the damaged or lost materials as near as reasonably practicable will be used. We will not pay to replace undamaged materials or any undamaged part of them to achieve a match.” Issues There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. 25. There is no dispute that the slate roof of the Applicant‟s home was damaged by the insured event „hail‟. However, there is a disagreement between the Applicant and the FSP as to the extent of that damage. Reasons for Decision 26. The FSP‟s Claim Details file notes „Assessment Details Description‟, under the heading „Observations‟ states: “The house has a slate double hip roof to the rear. The 2 western faces of the roof has (sic) hail damage to the original slate roof tiles which will need to be completely replaced. The front of the house is also slate but only has hail damage to some of the slate tiles that need to be replaced. The original slate is very brittle and all care must be taken whilst working on this roof.” The front of the house faces south. Case No: 230182 Determination Page 5 of 6 27. The FSP appointed a builder to inspect and „make safe‟ the Applicant‟s property. In his report dated 30 June 2010, the builder stated: “On attendance found: Hail stones have damaged the slate roof. There is damage all over the roof, but mainly on the two left apexes of the roof. There are several hundred broken slate tiles. Water has entered the hallway and master bedroom ceiling space of the single storey, slate ro of, weatherboard home.” 28. However, a roofing service firm, “ S ” , appointed by the FSP, reported that approximately 120 to 170 slate roof tiles, particularly on the west elevation, had been damaged. Further, although “ S ” stated that approximately 120 to 170 slate tiles had been damaged, he only stated that the west elevation was particularly damaged. His report is silent as to what damage did occur to other elevations of the roof. 29. The Applicant appointed a roofing contractor, “ P ” , to inspect and report on the condition of the roof. “ P ” reported on the 29 August 2010:  the slates to the west facing slopes are badly hail affected and beyond practical repair;  on the front southern facing slope approximately 30% of the slate tiles are damaged; and  two back hips facing north have minor damage only. 30. The FSP has not offered any comment on the report submitted by the builder and relies entirely upon the findings of the roof service firm, “ S ” , who admitted to the Applicant that it does not carry out many repairs and mainly prepares quotes for insurance companies. 31. The Applicant‟s roofing contractor, “ P ” , initially submitted a quotation to repair three elevations of the damaged roof. The quote was to replace 100% of the western elevation, 30% of the south elevation and minor repairs to the north elevation. 32. The Applicant has excluded from her claim the quote for repairs to the north elevation and as only 30% of the slate tiles were damaged on the south elevation, she has reduced the amount of her claim for this elevation to 30% of the quote. 33. On the evidence submitted by both parties, the Panel is persuaded that more than 120 to 170 slate tiles on the Applicant ‟s house roof had been damaged in the hail storm. The FSP‟s builder stated that there was damage over the entire roof but mainly to the west elevation. The Applicant ‟s contractor reported that there was hail damage to the west, south and north facing sections of the roof. 34. However, contractor “ S ” was silent as to any hail damage to the roof other than on the western elevation. The FSP has relied upon the opinion of “ S ” to offer the Applicant a cash settlement of $6,300. Case No: 230182 Determination Page 6 of 6 35. Although the FSP states that it offe red to carry out repairs on a „do and charge‟ basis in the event the amount was not sufficient, the Panel notes the FSP has not offered to extend repairs to other than the western elevation. Determination 36. Therefore, the Panel finds that the slate tiled roo f of the Applicant‟s home suffered hailstorm damage to the west and south elevations and that the Applicant‟s contractor‟s assessment of the damage and cost of repairs to be more reliable than that provided by contractor “ S ” . 37. Accordingly, the Panel determines the FSP is to cash settle the Applicant the amount of $10,506.50 being 100% of $8,873 and 30% of $5,445.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.