Determination 234160
Denial of home inundation claim as flood (Wivenhoe Dam release)
Summary
The applicant's home was inundated around 12-13 January 2011 and the FSP denied the claim as flood damage, which the policy excludes. AFCA found the water was flood from the Brisbane River and Oxley Creek, mixed with rainwater and dam release water, and declined an ex-gratia payment.
Where rainwater mixes with river or dam overflow water, the mixture is flood under the policy and the flood exclusion applies, following the Wayne Tank principle.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 234160 Determination Page 1 of 8
Case number: 234160
General Insurance - Domestic Insurance - Home Contents - FSP Decision –
Flood - Denial of claim
26 September 2011
Background
1. The Applicant held a Home Building and Contents Insurance policy (the policy)
with the Financial Services Provider (FSP).
2. The Applicant lodged a claim on 15 January 2011 seeking indemnity for
damage to her property, after it was inundated by water during a severe
weather event experienced in the area.
3. The FSP declined the claim on the basis that the property was inundated by
floodwater and “Flood” is not an event insured under the policy.
Summary of Applicant’s Position
4. The Applicant maintains the inundation of the property was the result of
stormwater and water from the Wivenhoe Dam.
5. The Applicant believes that the water from Wivenhoe Dam did not escape but
rather was released.
6. The claim was denied on the basis that the inundation of the property was due
to floodwater.
7. It is her opinion that the FSP has proceeded to decline the claim without due
consideration and investigation into the circumstances of the loss.
8. The Applicant is seeking indemnity for loss estimated to be in the approximate
vicinity of $30,000. She has been a loyal customer of the FSP with a good
claims history over this period. Therefore, the FSP should consider making an
ex-gratia payment towards her loss in this instance.
Summary of FSP’s Position
9. The Applicant contacted the FSP on 15 January 2011 to lodge a claim for
damage to the insured property due to floodwater inundation.
Determination
Case No: 234160 Determination Page 2 of 8
10. The insured property is in close proximity to Oxley Creek and the Brisbane
River.
11. Inundation of the property had not occurred until 11 January 2011, when the
Applicant vacated her home. The Applicant was not sure when the property
was actually inundated. She advised that the floodwater came up the street
from the creek.
12. The water that entered the property was muddy and left a layer of silt. There
was no water that entered through the roof or the overflowing of the gutters.
13. The delay between the peak rainfall and peak of the floodwater demonstrates
that the flooding of the property could not have been the result of localised
stormwater (rainfall).
14. The information available in the Insurance Council of Australia (ICA) hydrology
reports establishes the immediate cause for flooding was the release of water
from Wivenhoe Dam.
15. The definition of flood in the policy includes water that is released from any
watercourse or lake whether modified or not. This includes water from
Wivenhoe Dam, as a dam is a mechanism for controlling the release of water
from a lake or watercourse.
16. The lake behind the dam has been created by damming the river, which is a
water course; as such both lake and river fall within the definition of flood under
the policy.
17. It was not water released from the dam that directly affected the insured
property, rather water that escaped from Oxley Creek and Brisbane River.
18. Although rainwater and water released from Wivenhoe Dam were contributing
factors in the rise of Brisbane River, they were not the only source of water.
Where there is a combination of factors resulting in loss or damage and one of
these factors is excluded under the policy, this exclusion prevails to override
the clause providing cover.
19. In addition to loss or damage resulting from flood being clearly excluded under
the policy, flood itself is not a listed insured event. In order for the Applicant to
claim indemnity under the policy she must establish that the event giving rise to
the loss is an event insured under the policy.
20. Local rainfall was not a major component in the flooding of the property as
rainfall had ceased in the area by the time of inundation of the subject property
and records indicate the peak rainfall in the area occurred two days prior to
inundation.
21. The FSP relies on the following policy provisions:
“ Page 3 – Listed Events Home Insurance
Listed Events Home Insurance covers your buildings or contents for loss or damage as
a result of any incident listed in this PDS.
Case No: 234160 Determination Page 3 of 8
We also provide cover for a range of additional covers and legal liability.
…
Page 12 - 17 – Listed Events cover
We will cover your buildings or contents for loss or damage as a result of the
incidents listed on the following pages.
If you make a claim, you will need to pay any excesses that apply – you will only need
to pay this amount once.
Any cover we provide is subject to exclusions.
Storm, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of storm,
rainwater or wind.
…
Water or liquid damage
We will cover your buildings or contents for loss or damage cause by water or
liquid. We will also cover the cost of finding where the water or liquid escaped
from, including the cost of repairing any damage that occurs while looking for
the cause.
We will ONLY cover loss or damage as a result of water or liquid escaping from
a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain
a bath, basin, sauna, spa, shower base or shower wall, sink, toilet or tiled floor
that has drainage holes
a washing machine or dishwasher
an aquarium
a waterbed
We will not cover the cost of repairing the item that caused the escape of water or
liquid escaped from.
…
Page 35-40 – Exclusions to your cover
Any cover we provide is subject to the following exclusions.
Listed Events cover, Additional cover and Strata Title Mortgagee Protection
exclusions
We will not cover any loss or damage as a result of, or caused by
flood
…
General exclusions
We will NOT cover any loss or damage, or liability as a result of, or arising from
flood or storm surge
…
Page 63 – flood
Case No: 234160 Determination Page 4 of 8
The covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is modified. Flood also includes
water escaping from the confines of any reservoir, channel, canal or dam. ”
Issue
22. Whether the damage claimed by the Applicant was caused by flood as defined
by the policy.
Reasons for Decision
23. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
24. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
25. There has been an exchange of material between the parties. It therefore is not
intended to recite details of the various reports in this Determination except
where considered relevant.
26. The evidence provided by the parties does not indicate a definite date of loss
however it has been confirmed that inundation had not occurred by the time the
Applicant vacated the risk address which was on 11 January 2011. It is
therefore reasonable to conclude the property was inundated after that
departure, most likely between 12 and 13 January 2011.
27. The Applicant has raised concerns in relation to whether the rise in the level of
Brisbane Ri ver was the result of water that “escaped” or was “released” from
Brisbane River. This argument relates to the definition of flood provided under
the policy.
28. The Panel has considered the fact that water was released from the Wivenhoe
Dam rather than escaped. The Panel acknowledges that the terms of the policy
itself draw attention to this issue under the policy’s definition of flood. The
definition provided under the policy is:
“Flood
The covering of normally dry land with water escaping or released from the
natural confines of a watercourse or lake, whether or not it is modified. Flood
also includes water escaping from the confines of any reservoir, channel or
dam. ”
29. The use of only the word “escaping” from the sentence relevant to dam and not
the words “escaping or released” suggest that the “release” of water from a
dam will not be regarded as flood.
Case No: 234160 Determination Page 5 of 8
30. The FSP provided a further submission relating to the flood wording. This
submission has been exchanged with the Applicant and each party has had the
opportunity to address the issue.
31. The FSP’s submission can be summarised as follows:
a. It is irrelevant whether the water was released or escaped from the dam
as the dam was built on the Brisbane River and was therefore a significant
modification of a watercourse. The FSP relies on the first part of the
definition to argue the flood was due to the escape or release of water
from a natural watercourse either in its natural or modified state.
The Panel does not accept this argument. The definition in the policy
clearly distinguished between a modified natural watercourse and a dam.
The second part of the definition relates specifically to a dam. It only
describes the escape of water from a dam as flood not the release. In this
respect if there is any ambiguity that ambiguity should be determined on
the basis contra proferentem rule, i.e. against the party which proposed or
drafted the clause.
b. The water released from the Wivenhoe Dam indisputably mixed with
water in the river and as such clearly became indistinguishable in fact and
law. The FSP relies on the “Wayne Tank” principle to argue that there are
two proximate or competing causes that led to the loss are, dam release
arguably not excluded and are, water from the river escaping its bank
(flood) which is excluded.
The Panel agrees that where there are two perils, in this case dam
release and water escaping the river operating contemporaneously to
produce a loss, the exclusion prevails and the resultant loss is not
covered. This is the effect of the “Wayne Tank” princip le.
32. The Panel however does not accept that it is a simple matter in attributing the
cause of the loss to two competing perils. Based on the ICA hydrology, the
release of water from the Wivenhoe Dam created a flood wave or wall of water.
The report concluded in part that the dam release was the immediate cause of
flooding along the reach of the Brisbane River downstream of the dam, the
lower reaches of the Lockyer Creek and the Bremer River and along tributaries
further downstream.
33. The report also notes that it does not quantify the relative contributions of dam
release floodwaters and floodwaters from the Lockyer and Bremer Creeks to
the flows in the Brisbane River.
34. The factual circumstances of each claim will determine whether the dominant or
proximate cause of flooding in a particular area was the dam release or not.
35. In this dispute the property was located some distance from the Wivenhoe Dam
with the maps showing the property close to the Brisbane River and Oxley
Creek. At this point down the river the Panel accepts that all inflows into the
river including the heavy rainfall, surface run off volumes, water from the
Lockyer Creek, Bremer River and various tributaries together with the dam
Case No: 234160 Determination Page 6 of 8
release would have contributed to the loss and therefore the “Wayne Tank”
principle has application.
36. The Panel is satisfied that while the intense rainfall may be regarded as the
initial cause for the rivers and creek flooding along with the release of water
from the dam, it is accepted law that when rainwater mixes with ri ver water or
water overflowing from a river, creek or dam, then that mixture of rain water
with other ground sourced waters is all deemed to be flood water. As such,
when a mixture of river water and rainwater causes damage to property, the
FSP is entitled to rely on the clause which excludes loss or damage caused by
flood water.
ICA Hydrology Panel report (ICA report) “Flooding in the Brisbane River
Catchment January 2011, Volume 1 & 2”.
37. The following are relevant matters contained within this report:
There were three distinct rainfall periods across Brisbane City LGA (Local
Government Area) during the period of 9 January 2011 to 13 January
2011. (pi Para 2)
The first occurred from around 0900 hours to 2100 hours on 9
January.
The second occurred from around 0600 hours to 1000 hours on 10
January.
The third occurred from around 0600 hours to around 1600 hours on
11 January.
Wivenhoe Dam release (9.3 p60)
Large releases were made from Wivenhoe Dam over the period from
0600 hours, possibly as early as 0300 hours on 11 January 2011
until around 0300 hours on 12 January 2011.
It was concluded that the dam release flood from Wivenhoe Dam
was the immediate cause of flooding along the reaches of the
Brisbane River downstream of the Dam.
Any inundation in the Brisbane City LGA along tributaries draining
into the lower Brisbane River will also have been caused by water
flow inundation, again principally associated with the dam releases
from Wivenhoe Dam.
There was little or no rainfall across the LGA after about 1800 hours
on Tuesday 11 January ( 9.1 p59 )
Damage by rainwater - Inundation from surface runoff rainwater
38. The ICA hydrological report states inundation from surface run off rainwater is
generally associated with intense rainfalls of short duration.
Case No: 234160 Determination Page 7 of 8
39. It is established that, on the balance of probabilities, the inundation of water into
the Applicant’s home occurred between 12 and 13 January 2011. Water had
not entered the property when she evacuated on 11 January 2011.
40. According to the hydrological evidence, there was significant and widespread
rainfall over Brisbane City LGA in the 72 hours to 0900 hours on 12 January.
The heaviest falls occurred in the 24 hours to 0900 hours on Monday 10
January and no rainfalls of note occurred after 0900 hours on 12 January.
41. There was no rainfall in western suburbs around Graceville after about 1800
hours on Tuesday 11 January 2011 and any inundation in the area after this
time would have been due to backwater flooding from the Brisbane River.
42. Based on the information, it is reasonable to conclude the water inundation to
the Applicant’s home occurred a significant time period after the last dist inct
rainfall event.
43. For these reasons, the Panel is of the opinion that the evidence does not
support a finding that surface runoff rainwater alone entered the Applicant’s
home.
Location of the Applicant’s property
44. Maps of the area show the Applicant’s h ome is located in reasonably close
proximity to the Brisbane River and Oxley Creek.
45. Maps forming part of the hydrological reports confirm that the Applicant’s home
fell well within the area inundated by flood water between 12 January 2011 and
13 January 2011.
46. Based on the Applicant’s own admission that the home had not been inundated
up until 11 January 2011, on the balance of probabilities, and in line with the
hydrologists’ opinions, the Panel is satisfied that it is not likely it was stormwater
alone, rather than either floodwater or a mixture of both that inundated her
property.
Floodwater
47. According to the hydrological evidence a number of factors contributed to the
Brisbane River overflow. These included intense rainfall in the catchment areas
and large releases from Wivenhoe Dam. These releases occurred between
about 0600 on 11 January 2011 and 0300 on 12 January 2011.
48. As noted above, the Applicant’s property is located in reasonably close
proximity to the Brisbane River and Oxley Creek.
49. The water inund ation to the Applicant’s home which occurred on or about 12
and 13 January 2011 is consistent with the timing of the Wivenhoe Dam
releases on 11 and 12 January 2011 and resultant down river flooding.
Case No: 234160 Determination Page 8 of 8
50. In considering the evidence as a whole, the Panel is of the opinion that the
water which gave rise to the claim was water from Brisbane River and Oxley
Creek.
51. According to the terms of the Applicant’s policy, damage caused by rainwater is
covered only in circumstances where the rainwater alone caused the damage.
52. In the Panel’s opinion, the evidence leads to the conclusion that on the balance
of probabilities the FSP has discharged the onus that rests with it to show the
cause for the damage claimed does not fall within the cover provided by the
policy.
53. The Panel has noted the Applicant’s assertion that she is entitled to an ex -
gratia payment by the FSP towards her loss. However, the Panel is bound by
the terms of the policy and the evidence. As such, it is unable to make a finding
which does not fall within the cover provided by the policy.
Determination
54. On the basis of the available information the Panel determines that the FSP
was entitled to deny liability for the claim.