Determination 234023
Storm damage claim to commercial building declined
Summary
The applicant business claimed storm damage to a commercial building and sought a 25-50% contribution plus expert fees. AFCA found the damage was caused by soil reactivity, rust and maintenance issues rather than the storm, and dismissed the complaint.
The insured must prove loss from an insured event, and the expert and rainfall evidence did not link the damage to the 25 August 2009 storm.
Issues
- Claim denial primary · not upheld“There is insufficient evidence linking the rain event on 25 August 2009 to the damage at the property; the FSP was entitled to decline the claim in its entirety.”
- Other secondary · not upheld“Ex-gratia request for contribution to expert report fees refused: the FSP is not liable to contribute towards the fees of the builder's or other experts' reports.”
Subjects and remedies
home or building damagesmall businessno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 234023 Determination Page 1 of 6
Case number: 234023
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
18 May 2011
Background
1. The Applicant holds a business insurance policy with the Fina ncial Services
Provider (FSP). The policy commenced on 31 July 2009 and covers a
commercial building premise.
2. On 25 November 2009 the Applicant lodged a claim for storm damage which
occurred to the property on 25 August 2009.
3. The FSP reviewed the builder ‟ s inspection report and two engineering reports
and declined the claim as there was no evidence of the damage arising from an
insured event.
4. The Applicant disputes the declinature of the claim and considers a contribution
to the claim should be made as some of the damage arose from a storm event.
Further, the Applicant seeks an ex-gratia payment to cover expert report fees.
Summary of Applicant’s Position
5. The Applicant obtained a builder‟s report (“NR”) dated 27 August 2009. I note
that NR considered there to be five main problems causing damage to the
property which were as follows:
The bessa block walls which are part of the structure of the building had
bad moisture issues.
Moisture is entering inside the building through leaking box gutters due to
the joins and outlets being badly sealed and rusted.
„Paraphet‟ (sic) wall was not capped on top and sealed which caused
more cracking to the wall and structural damage inside.
The internal bessa block wall between the office and warehouse is leaking
through the existing vertical metal flashing as it has not been sealed at the
overlap joins.
Moisture damage has caused cracking and movement between the office
and warehouse.
NR costed the repair works at $41,490 GST inclusive.
Determination
Case No: 234023 Determination Page 2 of 6
6. The Applicant obtained an engineer‟s report (“B”) dated 2 September 2010. I
note the following from this report:
B conducted an external and internal examination and noted cracks that
had developed over time. Further, some of the cracks had been repaired
in the past but since re-opened.
B considered the construction type coupled with the drought experienced
in 2007/2008 and soil profile that some ground settlement and subsequent
cracking would be expected.
B opined that the cracks within the unit and office developed in direct
response to the invasive root systems of trees and desiccation of the local
soils caused by the trees and flora around the allotment.
B recommended removal of trees, installation of a soil rehydration system
and mulching the ground.
7. The Applicant has obtained an engineer‟s report (“NM”) dated 6 December
2010. I note the following from this report:
The soils in the area contain clays that are subject to swelling and
shrinkage movements with changes in moisture and salinity.
The building structure is brittle with no articulation joints in the concrete
masonry.
The footings of the warehouse and office areas are not structurally
continuous. Measurements taken of the floorings indicate movement in
the footings systems.
The type of movement viewed is common for constructions of this type on
clay soils where there have been significant seasonal changes ,
particularly drought.
The cracks have closed since B‟s report. NM understands this is because
B‟s recommendations of removing trees, soil re-hydration and ground-
cover mulch were acted upon.
NM notes that other factors contribute to variations in soil moisture
including lack of drainage and effective ground cover, evaporation and
direct ingress of moisture to the grounds, gutters, storm water pipes &
flashings potentially leaking.
8. The Applicant contends that a storm event occurred around the time of loss and
contributed to the damage.
9. The Applicant submits that the FSP should contribute 25-50% towards the loss
or alternatively seeks an expert assessor or structural engineer to categorically
state the storm did not contribute to the extent of the damage. In addition the
Applicant has sought an ex-gratia payment to offset the costs of the expert
reports.
Case No: 234023 Determination Page 3 of 6
Summary of FSP’s Position
10. The FSP relies on the following policy terms and conditions:
“Definitions
In this Section:
Accidental Damage means Damage to Property Insured but does not include
Damage,
(a) Caused by, or as a consequence of:
...
(16) moths, termites, other insects, vermin, rust or oxidation, mould, mildew, fungus,
wet or dry rot, corrosion, change of colour, dampness, variations in temperature,
evaporation, change in flavour, texture or finish, or stain or smoke from industrial
operations.
...
(18) wear and tear, fading, scratching or marring, gradual deterioration, developing
flaws, normal upkeeping or making good.
...
(20) normal settling, seepage, shrinkage or expansion in Buildings or foundations,
walls, pavements, roads, and other structural improvements, creeping, heaving,
vibration.
(21) faulty materials or faulty workmanship.
...
Fire and Perils mean
...
4. storm, tempest, rainwater, snow, sleet, wind, hail but not Damage caused:
...
(e) by erosion, subsidence, landslide, collapse or any other movement of
earth.
(f) by or resulting from water seeping, percolating or otherwise penetrating
into the Buildings as a result of structural defects, faulty design or faulty
workmanship in construction.
(g) by water entering Buildings through an opening in the wall or roof made for
the purpose of alterations, additions, renovations or repairs.”
11. The FSP has enclosed the Bureau of Meteorology (BOM) records for 25 August
2009 and notes the maximum rainfall for this date is only 15mm. Further, there
was no recorded significant weather event for Adelaide on this date.
12. The FSP considers the reports support the proposition that damage is not
storm related and would not have occurred as reported on 25 August 2009. The
FSP notes that soil reactivity is listed as the dominant cause and that damage
caused by settling or shrinkage of soil is specifically excluded under its policy.
Further, the reports provided by the Applicant do not suggest the storm caused
the damage.
Case No: 234023 Determination Page 4 of 6
13. The Applicant has acted on at least some of the recommendations and has
enclosed aerial maps which indicate the removal of trees. The FSP is unaware
of the extent of the Applicant‟s compliance with the other recommendations.
14. The FSP submits that there was evidence of prior patching of cracks and the
damage has been long term. Further, that the moisture issues would have been
apparent prior to policy inception and it was not on risk for any damage which
occurred before the policy was incepted.
15. The FSP contends that the Applicant has not met his onus to establish the loss
or damage arose from the storm event of 25 August 2009.
16. The FSP further contends that the Applicant is not entitled to any ex-gratia
payment for expert fees as the Applicant has the onus of establishing the
damage was caused by an insured event.
Issue
17. Whether the FSP was entitled to decline the Applicant‟s claim for damage and
expert fees.
Reasons for Decision
18. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
19. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
20. I consider the following Terms of Reference as relevant to an assessment of
this claim:
Terms of Reference 1 January 2010
8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be
provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all
the circumstances, having regard to each of the following:
legal principles;
applicable industry codes or guidance as to practice;
good industry practice; and
previous relevant decisions of OFS or a Predecessor Scheme (although FOS will not
be bound by these)
21. It is an accepted principle of insurance law that the onus rests with an insured
to prove, upon the balance of probabilities, that they have sustained a loss
caused by an event insured for under the policy in force at the date of loss
[ Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466] . Where the claimant
Case No: 234023 Determination Page 5 of 6
satisfies the onus of proof as above, the burden then shifts to the insurer to
establish that the claim falls within an exclusion from cover [ Bond air Services
Ltd v Hill (1955) 2 Q.B 417; Legal and General Assurance Society Ltd v The
commonwealth of Australia & Precision Cranes and Hoists Pty Ltd (1985) 3
ANZ Insurance cases 60-621]
22. I have read each expert report provided by the Applicant and note the experts
appear to concur that soil reactivity has been a major factor in movement of the
foundations and subsequent cracking. Interestingly, the recommendations have
been geared towards a re-hydration of the soil.
23. The monthly rainfall report from the BOM does not support a high rainfall on 25
August 2009 or indeed within August 2009 and further the experts have not
linked the damage to the rainfall on 25 August 2009. Accordingly, there is
insufficient evidence linking the rain event on 25 August 2009 to the damage at
the property.
24. The recommendations also appeared to suggest that an increase in soil
moisture would have been of assistance rather than a source of damage. This
is particularly given the soil re-hydration strategies provided by B and
apparently endorsed by NM.
25. Based on the information before me, there is insufficient evidence to establish
that the rain event on 25 August 2009 caused the damage at the commercial
property. In fact, the expert evidence is that reactive soil which has been
desiccated from the 2007/2008 drought and trees around the property have
caused the soil settlement and/or shrinkage.
26. I note that NR indicates other issues such as poorly sealed and rusted box
gutters, walls and joints. However, there is no evidence the storm event caused
poor sealing or rusting of gutters, walls and joints. Further, the policy
specifically excludes damage arising from rust, wear and tear or water entry to
buildings from structural defects, faulty design or faulty workmanship in the
construction. Accordingly, the additional causes of damage listed by NR fall
outside the policy cover and are excluded events under the policy.
27. There is additional evidence to suggest the damage has been ongoing for
some period of time and may have pre-dated the policy. The policy of course
does not cover any damage which has occurred prior to policy inception. I am
satisfied that the Applicant has failed to prove any connection between a storm
on 25 August 2009 and the damage to the property
28. The Applicant also seeks a contribution towards the costs of the reports
prepared by NR on 27 August 2009 – 2 days after the “storm” on 25 August
2009. This report was furnished at the time the claim was lodged.
29. The problem is that as the FSP notes in its response “the builder‟s report
obtained and submitted by the insured confirmed the damage was due to
maintenance issues and structural defects which are excluded perils ” .
Case No: 234023 Determination Page 6 of 6
30. The FSP having considered that report did not arrange for its own investigator
as expert to assess the claim. Thus, it has saved money which it would
otherwise have spent, had the NR report not been submitted.
31. I am however of the opinion that if on its face a claim is hopeless and there is
expert evidence supporting that conclusion, there is no obligation upon the FSP
to arrange for its own investigations or experts to assess a matter. I cannot
agree that in these circumstances, the FSP should contribute to the costs of the
NR report.
Determination
32. On the basis of the available information I determine that the FSP was entitled
to decline the Applicant‟s claim in its entir ety.
33. I further determine that the FSP is not liable to contribute towards the fees of
NR or any other of the experts engaged by the Applicant or his broker.