Scope of tile replacement and defective shower recess repairs after water damage

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,756
Non-financial loss—
Amount claimed$4,256
SourceAFCA PDF

Summary

The applicant disputed the insurer's limit on replacing first-floor tiles after water damage and defective shower work by its builder. AFCA refused to order re-tiling of the whole floor, ordered $500 for tiles broken beyond the agreed scope, reimbursement of $4,256 in carpet costs, and indemnity for rebuilding the ensuite and repairing the shower waterproofing.

The policy allows the insurer to limit replacement to the affected area, but the insurer remained responsible for its contractor's defective shower work and for removing tiles in disregard of the agreed scope of works.

Issues

Subjects and remedies

home or building damagepay claimpay compensationrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 233521 Determination Page 1 of 10 Case number: 233521 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 6 March 2012 Background 1. The Applicant’s home was insured with the Financial Services Provider (FSP) under a home building policy. 2. He claimed for water damage to the home caused by leaks from the ensuite and main bathroom showers. 3. The FSP accepted liability and elected to undertake the necessary repairs. 4. The dispute which was originally lodged with this Service involved a deci sion as to whether the FSP was required to replace all the floor tiles on the top floor of the home. 5. Whilst material was being exchanged in relation to that aspect, the Applicant raised further issues relating to the quality of the repairs which had been undertaken to the ensuite and main bathroom showers. 6. Although details of those matters were advised by the Applicant to the FSP, and subsequently to the FSP by this Service, the FSP has declined to deal with them, suggesting that they are separate or new matters. The Applicant rejects this position. 7. The matter (relating to the tiles) was the subject of a Recommendation. On 20 May 2011, a Case Manager having carefully considered all of the material and the submissions of the parties, the Case Manager recommended that the FSP was entitled to limit its replacement of the tiles to the area which it had marked in orange and green on the sketch plan it provided. 8. The Applicant did not accept this Recommendation. 9. When rejecting the Recommendation, the Applicant made further detailed comments regarding the issue of the tiling. He did not however adduce any expert evidence as to this subject. 10. He did however produce a considerable amount of additional evidence in relation to defects in the quality of the work which had been carried out in respect to the two shower recesses. I refer to that material below. Determination Case No: 233521 Determination Page 2 of 10 Summary of Applicant’s Position 11. The FSP is required to replace all tiles in order to properly rectify the water damage to the home. 12. The FSP’s builder failed to carry out the repairs in accordance to the scope of works. 13. The builder removed and disposed of the tiles although the scope of works specifies that they were to be carefully lifted and reused once the necessary repairs were completed. It also did so despite being aware that the original tiles were no longer available before repairs commenced. 14. He was not present when the tiles were removed. 15. The builder also damaged some other tiles. 16. The home’s original tiler (AB) advised that he would have no trouble lifting the tiles because the chipboard sub-floor was already wet and decomposing. 17. There was no qualified tiler on site when the builder removed the tiles. 18. There is no “architectural point” where tiling can be stopped. 19. A partial replacement of the tiles will significantly devalue his home. 20. The showers in the ensuite and bathroom are leaking again. 21. The showers in the ensuite and main bathroom are again leaking. Information supplied by the Applicant’s expert “NR” and which is confirmed by the FSP’s expert “S” has confirm ed that moisture escaping from the shower recesses is due to defective building work due to failure or defective installation of the water proofing membrane. 22. In the opinion of “S” which was furnished for the FSP, “S” opined that: “During my inspection of the wet areas, I observed that the ensuite has been finished in a proper and workman like manner. I observe during the water test on the shower recess in the ensuite that the plastic sealing strip usually fitted to the bottom edge of the pivot hung shower door was not fitted and allowed water to escape the shower recess onto the tiled floor area. The water was able to track under the vanity unit on the eastern wall and out the access door way to the bedroom. It is my opinion that the water escaping the ensuite from the defective shower screen is contributing to the damp carpet in the main bedroom. I find this to be defective building works.” 23. In his summary, “S” commented that: “The two shower screens are in my opinion defective installations and require remedial works to provide a water tight shower recess area. It is further my opinion that the water escaping the ensuite shower through the shower screen has contributed to the damp carpet in the main bedroom.” Case No: 233521 Determination Page 3 of 10 24. After the FSP commented that the additional matters regarding the shower recesses, the leaking ensuite, the soaked carpet etc. should be regarded as a separate issue from the damage caused to the tiles, the Applicant submitted that these issues were reported to the FSP in April 2011, only four months after the replacement of ensuite, laundry, bathroom and toilet had been completed. He further pointed out that approval to install drying equipment for the carpet was received from a representative from the FSP. He further pointed out that the original work h ad been carried out by the FSP’s contractors “PI” who had carried out demolition and replacement of ensuite, laundry, bathroom and toilet, together with replacing the floor in the walkway which is where the tiles are. The work had been completed in December 2010, but the ensuite began to leak again in April 2011. 25. The Applicant further pointed out that the FSP had accepted liability for the original work and had appointed “PI” to commence that work. 26. In response to a claim at one point by the FSP that the Applicant had responsibility for the appointment of “PI”, the Applicant stated that “at no time did I engage any tradespeople to work on this job.” He made the point that “PI” was the builder appointed by [FSP]. 27. The Applicant submitted that in addition to the dispute regarding the tiles to which I have made reference previously, the FSP should be required to:  Pay for demolition and reconstructing ensuite as both building reports showed major structural flaws which cannot be rectified.  The FSP to pay for replacement of carpet to bedroom as this carpet was water damaged and mouldy. The damage was caused by water leaking from the new ensuite.  That the FSP pay for the cost of drying bedroom structure as per an invoice supplied. This work was necessary to avoid secondary damage to the structure and was approved by the FSP.  The FSP pay for the repair of water damage flooring in the bed room caused by the leaking ensuite. 28. The Applicant places considerable reliance on the opinion by “NR”, a copy of which was produced to this Service and to the FSP. 29. The Applicant has submitted quotations on paid accounts for the following sums:  Drying out of carpet until the FSP attended to inspect and report on it - $2,000.00;  Removal of mouldy carpet and disposal of same - $400.00;  Replacement of carpet in main bedroom damaged by the leaking ensuite - $1,856.00. Case No: 233521 Determination Page 4 of 10 30. The Applicant therefore submits that the FSP should reimburse him in the sum of $4,256.00 and should repair or indemnify him for the cost of, or should replace the ensuite, toilet and laundry. 31. The Applicant has also asserted that: “I must now insist that the FSP be forced to fulfil their obligation to me as quickly as possible. I must also point out that this has been going on for 13 months (as at September 2011) noting that the original work commenced on 17 August 2010. This has left me suffering with depression and anxiety and I am currently under the care of a psychologist to try and help me through this ordeal.” Summary of FSP’s Position 32. The Applicant’s settlement expectation is excessive and beyond the scope of the policy. 33. Repairs to the sub-floor cannot be carried out unless the tiles are removed. 34. Its builder initially believed that the tiles could be easily removed and reused when it prepared the scope of works. However, the builder later discovered that the tiles were tightly secured, leaving it with no option but to remove the tiles by breaking them. 35. The Applicant was present when the builder discovered that the tiles were too tightly secured to be removed without damage. 36. It has agreed to replace all tiles in the area marked out in orange on the sketch plan of the Applicant’s upper floor. 37. It is immaterial whether or not the Applicant should have been consulted (so he can consider his options) when the tiles could not be removed without breaking them. There was no option. The tiles must be removed in order for the water damaged sub-floor areas to be repaired. 38. It also agreed to replace tiles which the Applicant claimed were damaged by its builder. It gave him the benefit of the doubt although its builder had denied the allegation and the Applicant has not provided any evidence to substantiate it. For this purpose, it agreed to replace all tiles in the area marked out in green on the sketch plan of the Applicant’s upper floor. 39. The policy entitles it to confine its liability to the relevant room, hall or passage where the damage occurred and its obligation is limited to trying to match the new material with the original material. A room is the part of the building “enclosed by walls, or partitions, floor and ceiling”. Hall or passage commonly denotes a corridor or passageway. The lack of a door to separate each area is immaterial. 40. Whilst it has been flexible in applying the relevant policy terms in open plan home designs, it has to also consider that its premium pricing does not accommodate replacement of entire floors of undamaged flooring. Case No: 233521 Determination Page 5 of 10 41. The Applicant has not provided any evidence that his property had been devalued. In fact, there is already an existing mismatched tile on the upper floor. 42. The FSP relies on the following policy provisions: “ How we settle a buildings claim 1 We will decide how we settle your claim If your buildings suffer loss or damage, we will decide whether to  repair  rebuild, or  pay you the cost to repair or rebuild that part of your buildings that suffered loss or damage. If we do, we will  pay you up to the buildings sum insured, as listed on your schedule  only repair, rebuild or pay you for the part or parts of the building that actually sustained loss or damage, including damaged portions of fixed coverings to walls, floors and ceilings only in the room, hall or passage where the damage occurred.  try to match any material used to repair your buildings with the original materials or nearest equivalent available to the original materials  repair or pay you the costs to repair your buildings if the loss or damage was caused by water or liquid that escaped from a bath, basin, sauna, spa, shower base or shower wall, however - we will NOT pay the costs to repair or replace the bath, basin, sauna, spa, shower base or shower wall. ” 43. When the FSP has been presented with details of the claims made by the Applicant in relation to the defective work carried out by “PI” in relation to the two shower recesses, the FSP states “t he Applicant was responsible for the cost of water-proofing and repair of the shower, as noted in the Recommendation issued by this Service at page 37.” 44. The FSP further asserted (in July 2011) that it was addressing these matters with its External Service Providers. 45. As a footnote to that response, the FSP stated the following: “Since drafting the foregoing, the comments of “S” dated 18 July 2011 have been received. They come to the commonsense conclusion that the shower screen door needs to be repaired by reinstalling the plastic ceiling strips that the Applicant removed and that further water testing can then be carried out to determine whether there is another source of water leakage before considering the radically destructive removal of the ensuite bathroom floor to check the water stop has been installed correctly underneath the shower screen frame.” 46. Subsequently, another officer of the FSP, on 5 August 2011 the FSP stated that: Case No: 233521 Determination Page 6 of 10 “A representative of the builder inspected the issue and reported their opin ion that the damage (wet carpet to bedroom number 1) constituted new damage, unrelated to the original claim and recommended the Applicant to lodge a separate claim.” 47. Nevertheless, the FSP noted that the Applicant sought that this issue be considered under the current claim. 48. The FSP had therefore arranged for a further report from “S” in which “S” was called upon to comment on the opinion of the Applicant’s own consultant “NR”. 49. The further report from “S” indicated that “S” now concluded that water was either escaping from the new shower recess due to missing plastic strip at the bottom of the shower screen door, or possible failure of the water stop or incorrect installation of water stop under the shower recess door. 50. The FSP noted the opinion of “NR” i ndicating that a tiling angle had been utilised instead of a water stop flashing at the ensuite/bedroom doorway, possibly leading to water transfer into the bedroom area. 51. The FSP described the “NR” report as “also inconclusive in determining the exact caus e or source of the water affecting the bedroom carpet.” 52. The FSP also made allegations that the plastic strip had been installed by its contractors, but that the Applicant had removed it. Issue 53. Whether the FSP is required to compensate the Applicant for the tiles which had been removed in the course of the initial work carried out by “PI”. 54. Whether the other matters referred to by the Applicant relating to defective shower recesses and escape of water into the bedroom etc. should be deemed to be a separate claim. 55. Whether the FSP is obliged to indemnify the Applicant in respect to the matters referred to in the preceding paragraph. Reasons for Determination 56. I note that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. The removal of the tiles by the FSP’s builder: 57. This was the subject of the original Recommendation. It appears clear that the scope of works as proposed by the FSP’s representative involved the removal of the smallest number of tiles possible in order that the work could be carried Case No: 233521 Determination Page 7 of 10 out. It was contemplated that any tiles which were broken could be replaced by other tiles in the possession of the Applicant. 58. Instead, a very large section of tiling had been lifted and removed. The replacement tiles in the possession of the Applicant are in no way adequate to fill the gap. 59. A point which particularly concerns the Applicant is that he was not informed by the FSP’s builder about the difficulties which had been encountered in lifting the tiles, and the fact that so many more tiles than had been contemplated were being lifted, and indeed broken. Implicit in his argument is that had he been informed of this difficulty, other alternatives could have been contemplated. 60. In his submission after the Recommendat ion, the Applicant claims that “it was the builder’s apprentice carpenter who carried out this task and that the removing of these tiles was carried out in a reckless careless manner because shards of tiles were strewn throughout the house, some of which were up to 5 metres away from where the work was carried out. In addition, tiles had been broken when the tiles were being removed. These tiles were not in the immediate vicinity of wh ere the work was carried out”. 61. The Applicant further pointed out that the leak had originally been discovered because some of the tiles in the passageway were loose and lifting due to the decomposition of the sub-floor. He submitted that it was extraordinary that not a single tile could be lifted successfully which in his view indicated the careless manner in which the task was carried out. 62. As to this aspect the Applicant has not been able to elicit any expert opinion in support of his claims. In the Recommendation, the Case Manager at paragraph 20 commented that it was immaterial whether or not the Applicant should have been consulted (so that he could consider his options) when the tiles could not be removed without breaking them. There was no option. The tiles must be removed in order for the water damaged sub-floor areas to be repaired. 63. The Case Manager also pointed out (paragraph 21) that the FSP also agreed to replace tiles which the Applicant claimed we re damaged by its builder. They gave him the benefit of the doubt although its builder had denied the allegation and the Applicant had not provided any evidence to substantiate it. For this purpose it agreed to replace all tiles within a designated area marked out on a sketch plan. 64. On the basis of the material which was available to the Case Manager at the time of the Recommendation, I would have agreed with his Recommendation as to this subject. However, I am concerned at the (uncontradicted) claim by the Applicant as to the manner in which the tiles had apparently been broken, with pieces being found at considerable distance from the point of the damage. I do consider that the evidence is irresistible that the tiles had been removed with no regard for the agreement which had been previously reached. As a general rule, it is not appropriate to carry out work in contravention of an agreed scope of works, without consultation with an insured. It is incontrovertible that this has occurred in this case. Whilst I agree with the Case Manager’s Case No: 233521 Determination Page 8 of 10 Recommendation that it was apparently the fact that the tiles were more difficult to remove than had been contemplated because of the adhesive bind which was in place, I do consider that the FSP’s contractor has acted in significant disregard of the agreement which had been reached with the Applicant. 65. At the same time, I am unable to agree with t he Applicant’s contention that this should lead to the result that all of the tiling on the first floor of the Applicant’s property should be replaced. The policy plainly provides for no such remedy. 66. In the circumstances I consider that the FSP should compensate the Applicant as to this aspect by payment of a relatively modest monetary figure. The further claims in relation to defective installation of shower recesses 67. Whilst, as set out above, the FSP did commission experts “S” to comment on these additional matters submitted by the Applicant, it continued to object to this aspect of the Applicant’s claim. For example, by email of 13 February 2012, the FSP has maintained this position saying: “the issues raised by the Applicant do not seem to have a nything to do with the dispute. The dispute was over replacement of matching tiles. The Applicant seems to be starting new disputes and attempting to piggy back them into an existing dispute. From FSP’s point of view these new points have nothing to do wit h the existing dispute and are irrelevant.” 68. This response came about after I directed that specific questions be put to the Applicant for his response. This was done by letter of 31 January 2012. In essence, I asked the Applicant to demonstrate how these additional matters related to the original claim. 69. The Applicant replied by detailed email of 8 February 2012, in a response which clearly demonstrated the link between the damaged or unreplaced tiles and the additional work relating to the leaking ensuite. 70. His response clearly demonstrated that all of these matters had stemmed from the original claim, which had led to work commissioned by the FSP and to be carried out by “PI” commencing in August 2010. 71. As the Applicant pointed out, the FSP had accepted the original claim and had appointed “PI” to undertake the work to rectify the damage c aused by leaking showers and this had involved demolition and replacement of the ensuite, laundry, bathroom and toilet and replacing the floor in the walkway, which is the side of the tiles. The work had been completed in December 2010 with the walkway not tiled (thus leading to the original dispute). 72. It was plainly during the conduct of the original dispute that the ensuite began to leak again in April 2011. 73. Having regard to all of these matters, I reject the FSP’s position in suggesting that this should be treated as a separate claim and should not be the subject of a Determination at present. Indeed the FSP’s position is entirely inconsistent because in mid 2011, after it h ad supplied reports by its consultant “S”, the FSP Case No: 233521 Determination Page 9 of 10 was submitting that the material available was sufficient for the matter to proceed to a Determination. The claim for the additional work for rectification of the work originally carried out by “ PI ” 74. A consequence of the response recently provided by the FSP is that there has never been a formal response to the additional matters raised by the Applicant. This is despite the fact that the Applicant has supplied full details of the damage which has occurred. He has supported his claim with a comprehensive report from “NI”. To a significant extent, the opinion of “NI” is supported by the opinion of “S” commissioned on behalf of the FSP. 75. The FSP has had many months to adequately investigate this matter and to provide a formal response to the Applicant’s claims. On the face of it however, there appears to be no doubt that, as all parties agree, the work originally carried out by “PI” was defective. 76. I am concerned about aspects of the FSP’s handling of the matte r. The allegation that the Applicant was responsible for the appointment of “PI” or for the work carried out by “PI” is totally inaccurate. Any suggestion that this conclusion could be drawn from paragraph 37 of the Recommendation is absurd. Nothing in that paragraph suggested that the Applicant had been responsible for the installation of the showers and the ensuite and main bathroom. 77. At all times what should have been obvious to the FSP is that serious complaints were being made about the quality of work carried out by its contractor “PI” and that its own consultant was expressing serious concerns about the quality of that work. In the meantime serious damage was being occasioned to the Applicant’s property. 78. I therefore reach the opinion that the FSP must pay for the demolition and reconstruction of the ensuite (recognising that certain items from the ensuite may be reusable in the reconstruction). 79. The FSP must also reimburse the Applicant for the replacement of carpet to the bedroom. The FSP must also pay for the cost of drying the bedroom structure in accordance with the invoice supplied by the Applicant and the FSP must pay for the repair of water damaged flooring in the bedroom caused by the leaking ensuite. Determination 80. I determine that the Applicant is not entitled to require the FSP to re-tile all of the tiled areas on the first floor of his property. The FSP is entitled to limit the replacement of the tiles to the area it had marked in orange and green on the sketch plan it provided. Case No: 233521 Determination Page 10 of 10 81. However, I determine that the FSP should pay to the Applicant the sum of $500 in compensation for the manner in which tiles have been removed in greater number and in a manner not envisaged in the scope of works, and destroyed. 82. I determine the FSP indemnify the Applicant for the demolition and reconstruction of the ensuite and that the FSP reimburse the Applicant in respect to the following sums: • Drying out of carpet $2,000 • Removal of mouldy carpet & disposal $400 • Replacement of carpet in main bedroom $1,856 83. As to the main bathroom shower, I determine that the FSP shall indemnify the Applicant for the cost of repairing the water-proofing so that a warranty in respect to this work is available to the Applicant.