Text of the determination
Case No: 233521 Determination Page 1 of 10
Case number: 233521
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
6 March 2012
Background
1. The Applicant’s home was insured with the Financial Services Provider (FSP)
under a home building policy.
2. He claimed for water damage to the home caused by leaks from the ensuite
and main bathroom showers.
3. The FSP accepted liability and elected to undertake the necessary repairs.
4. The dispute which was originally lodged with this Service involved a deci sion as
to whether the FSP was required to replace all the floor tiles on the top floor of
the home.
5. Whilst material was being exchanged in relation to that aspect, the Applicant
raised further issues relating to the quality of the repairs which had been
undertaken to the ensuite and main bathroom showers.
6. Although details of those matters were advised by the Applicant to the FSP,
and subsequently to the FSP by this Service, the FSP has declined to deal with
them, suggesting that they are separate or new matters. The Applicant rejects
this position.
7. The matter (relating to the tiles) was the subject of a Recommendation. On 20
May 2011, a Case Manager having carefully considered all of the material and
the submissions of the parties, the Case Manager recommended that the FSP
was entitled to limit its replacement of the tiles to the area which it had marked
in orange and green on the sketch plan it provided.
8. The Applicant did not accept this Recommendation.
9. When rejecting the Recommendation, the Applicant made further detailed
comments regarding the issue of the tiling. He did not however adduce any
expert evidence as to this subject.
10. He did however produce a considerable amount of additional evidence in
relation to defects in the quality of the work which had been carried out in
respect to the two shower recesses. I refer to that material below.
Determination
Case No: 233521 Determination Page 2 of 10
Summary of Applicant’s Position
11. The FSP is required to replace all tiles in order to properly rectify the water
damage to the home.
12. The FSP’s builder failed to carry out the repairs in accordance to the scope of
works.
13. The builder removed and disposed of the tiles although the scope of works
specifies that they were to be carefully lifted and reused once the necessary
repairs were completed. It also did so despite being aware that the original tiles
were no longer available before repairs commenced.
14. He was not present when the tiles were removed.
15. The builder also damaged some other tiles.
16. The home’s original tiler (AB) advised that he would have no trouble lifting the
tiles because the chipboard sub-floor was already wet and decomposing.
17. There was no qualified tiler on site when the builder removed the tiles.
18. There is no “architectural point” where tiling can be stopped.
19. A partial replacement of the tiles will significantly devalue his home.
20. The showers in the ensuite and bathroom are leaking again.
21. The showers in the ensuite and main bathroom are again leaking. Information
supplied by the Applicant’s expert “NR” and which is confirmed by the FSP’s
expert “S” has confirm ed that moisture escaping from the shower recesses is
due to defective building work due to failure or defective installation of the water
proofing membrane.
22. In the opinion of “S” which was furnished for the FSP, “S” opined that:
“During my inspection of the wet areas, I observed that the ensuite has been
finished in a proper and workman like manner. I observe during the water test on
the shower recess in the ensuite that the plastic sealing strip usually fitted to the
bottom edge of the pivot hung shower door was not fitted and allowed water to
escape the shower recess onto the tiled floor area. The water was able to track
under the vanity unit on the eastern wall and out the access door way to the
bedroom.
It is my opinion that the water escaping the ensuite from the defective shower
screen is contributing to the damp carpet in the main bedroom. I find this to be
defective building works.”
23. In his summary, “S” commented that:
“The two shower screens are in my opinion defective installations and require
remedial works to provide a water tight shower recess area. It is further my
opinion that the water escaping the ensuite shower through the shower screen
has contributed to the damp carpet in the main bedroom.”
Case No: 233521 Determination Page 3 of 10
24. After the FSP commented that the additional matters regarding the shower
recesses, the leaking ensuite, the soaked carpet etc. should be regarded as a
separate issue from the damage caused to the tiles, the Applicant submitted
that these issues were reported to the FSP in April 2011, only four months after
the replacement of ensuite, laundry, bathroom and toilet had been completed.
He further pointed out that approval to install drying equipment for the carpet
was received from a representative from the FSP. He further pointed out that
the original work h ad been carried out by the FSP’s contractors “PI” who had
carried out demolition and replacement of ensuite, laundry, bathroom and toilet,
together with replacing the floor in the walkway which is where the tiles are.
The work had been completed in December 2010, but the ensuite began to
leak again in April 2011.
25. The Applicant further pointed out that the FSP had accepted liability for the
original work and had appointed “PI” to commence that work.
26. In response to a claim at one point by the FSP that the Applicant had
responsibility for the appointment of “PI”, the Applicant stated that “at no time
did I engage any tradespeople to work on this job.” He made the point that “PI”
was the builder appointed by [FSP].
27. The Applicant submitted that in addition to the dispute regarding the tiles to
which I have made reference previously, the FSP should be required to:
Pay for demolition and reconstructing ensuite as both building reports
showed major structural flaws which cannot be rectified.
The FSP to pay for replacement of carpet to bedroom as this carpet was
water damaged and mouldy. The damage was caused by water leaking
from the new ensuite.
That the FSP pay for the cost of drying bedroom structure as per an
invoice supplied. This work was necessary to avoid secondary damage to
the structure and was approved by the FSP.
The FSP pay for the repair of water damage flooring in the bed room
caused by the leaking ensuite.
28. The Applicant places considerable reliance on the opinion by “NR”, a copy of
which was produced to this Service and to the FSP.
29. The Applicant has submitted quotations on paid accounts for the following
sums:
Drying out of carpet until the FSP attended to inspect and report on it -
$2,000.00;
Removal of mouldy carpet and disposal of same - $400.00;
Replacement of carpet in main bedroom damaged by the leaking ensuite -
$1,856.00.
Case No: 233521 Determination Page 4 of 10
30. The Applicant therefore submits that the FSP should reimburse him in the sum
of $4,256.00 and should repair or indemnify him for the cost of, or should
replace the ensuite, toilet and laundry.
31. The Applicant has also asserted that:
“I must now insist that the FSP be forced to fulfil their obligation to me as quickly
as possible. I must also point out that this has been going on for 13 months (as
at September 2011) noting that the original work commenced on 17 August
2010. This has left me suffering with depression and anxiety and I am currently
under the care of a psychologist to try and help me through this ordeal.”
Summary of FSP’s Position
32. The Applicant’s settlement expectation is excessive and beyond the scope of
the policy.
33. Repairs to the sub-floor cannot be carried out unless the tiles are removed.
34. Its builder initially believed that the tiles could be easily removed and reused
when it prepared the scope of works. However, the builder later discovered that
the tiles were tightly secured, leaving it with no option but to remove the tiles by
breaking them.
35. The Applicant was present when the builder discovered that the tiles were too
tightly secured to be removed without damage.
36. It has agreed to replace all tiles in the area marked out in orange on the sketch
plan of the Applicant’s upper floor.
37. It is immaterial whether or not the Applicant should have been consulted (so he
can consider his options) when the tiles could not be removed without breaking
them. There was no option. The tiles must be removed in order for the water
damaged sub-floor areas to be repaired.
38. It also agreed to replace tiles which the Applicant claimed were damaged by its
builder. It gave him the benefit of the doubt although its builder had denied the
allegation and the Applicant has not provided any evidence to substantiate it.
For this purpose, it agreed to replace all tiles in the area marked out in green on
the sketch plan of the Applicant’s upper floor.
39. The policy entitles it to confine its liability to the relevant room, hall or passage
where the damage occurred and its obligation is limited to trying to match the
new material with the original material. A room is the part of the building
“enclosed by walls, or partitions, floor and ceiling”. Hall or passage commonly
denotes a corridor or passageway. The lack of a door to separate each area is
immaterial.
40. Whilst it has been flexible in applying the relevant policy terms in open plan
home designs, it has to also consider that its premium pricing does not
accommodate replacement of entire floors of undamaged flooring.
Case No: 233521 Determination Page 5 of 10
41. The Applicant has not provided any evidence that his property had been
devalued. In fact, there is already an existing mismatched tile on the upper
floor.
42. The FSP relies on the following policy provisions:
“ How we settle a buildings claim
1 We will decide how we settle your claim
If your buildings suffer loss or damage, we will decide whether to
repair
rebuild, or
pay you the cost to repair or rebuild that part of your buildings that suffered
loss or damage.
If we do, we will
pay you up to the buildings sum insured, as listed on your schedule
only repair, rebuild or pay you for the part or parts of the building that actually
sustained loss or damage, including damaged portions of fixed coverings to
walls, floors and ceilings only in the room, hall or passage where the damage
occurred.
try to match any material used to repair your buildings with the original
materials or nearest equivalent available to the original materials
repair or pay you the costs to repair your buildings if the loss or damage was
caused by water or liquid that escaped from a bath, basin, sauna, spa,
shower base or shower wall, however
- we will NOT pay the costs to repair or replace the bath, basin, sauna, spa,
shower base or shower wall. ”
43. When the FSP has been presented with details of the claims made by the
Applicant in relation to the defective work carried out by “PI” in relation to the
two shower recesses, the FSP states “t he Applicant was responsible for the
cost of water-proofing and repair of the shower, as noted in the
Recommendation issued by this Service at page 37.”
44. The FSP further asserted (in July 2011) that it was addressing these matters
with its External Service Providers.
45. As a footnote to that response, the FSP stated the following:
“Since drafting the foregoing, the comments of “S” dated 18 July 2011 have been
received. They come to the commonsense conclusion that the shower screen
door needs to be repaired by reinstalling the plastic ceiling strips that the
Applicant removed and that further water testing can then be carried out to
determine whether there is another source of water leakage before considering
the radically destructive removal of the ensuite bathroom floor to check the water
stop has been installed correctly underneath the shower screen frame.”
46. Subsequently, another officer of the FSP, on 5 August 2011 the FSP stated
that:
Case No: 233521 Determination Page 6 of 10
“A representative of the builder inspected the issue and reported their opin ion
that the damage (wet carpet to bedroom number 1) constituted new damage,
unrelated to the original claim and recommended the Applicant to lodge a
separate claim.”
47. Nevertheless, the FSP noted that the Applicant sought that this issue be
considered under the current claim.
48. The FSP had therefore arranged for a further report from “S” in which “S” was
called upon to comment on the opinion of the Applicant’s own consultant “NR”.
49. The further report from “S” indicated that “S” now concluded that water was
either escaping from the new shower recess due to missing plastic strip at the
bottom of the shower screen door, or possible failure of the water stop or
incorrect installation of water stop under the shower recess door.
50. The FSP noted the opinion of “NR” i ndicating that a tiling angle had been
utilised instead of a water stop flashing at the ensuite/bedroom doorway,
possibly leading to water transfer into the bedroom area.
51. The FSP described the “NR” report as “also inconclusive in determining the
exact caus e or source of the water affecting the bedroom carpet.”
52. The FSP also made allegations that the plastic strip had been installed by its
contractors, but that the Applicant had removed it.
Issue
53. Whether the FSP is required to compensate the Applicant for the tiles which
had been removed in the course of the initial work carried out by “PI”.
54. Whether the other matters referred to by the Applicant relating to defective
shower recesses and escape of water into the bedroom etc. should be deemed
to be a separate claim.
55. Whether the FSP is obliged to indemnify the Applicant in respect to the matters
referred to in the preceding paragraph.
Reasons for Determination
56. I note that the material has been exchanged and the parties have had the
opportunity to respond to the issues raised.
The removal of the tiles by the FSP’s builder:
57. This was the subject of the original Recommendation. It appears clear that the
scope of works as proposed by the FSP’s representative involved the removal
of the smallest number of tiles possible in order that the work could be carried
Case No: 233521 Determination Page 7 of 10
out. It was contemplated that any tiles which were broken could be replaced by
other tiles in the possession of the Applicant.
58. Instead, a very large section of tiling had been lifted and removed. The
replacement tiles in the possession of the Applicant are in no way adequate to
fill the gap.
59. A point which particularly concerns the Applicant is that he was not informed by
the FSP’s builder about the difficulties which had been encountered in lifting the
tiles, and the fact that so many more tiles than had been contemplated were
being lifted, and indeed broken. Implicit in his argument is that had he been
informed of this difficulty, other alternatives could have been contemplated.
60. In his submission after the Recommendat ion, the Applicant claims that “it was
the builder’s apprentice carpenter who carried out this task and that the
removing of these tiles was carried out in a reckless careless manner because
shards of tiles were strewn throughout the house, some of which were up to 5
metres away from where the work was carried out. In addition, tiles had been
broken when the tiles were being removed. These tiles were not in the
immediate vicinity of wh ere the work was carried out”.
61. The Applicant further pointed out that the leak had originally been discovered
because some of the tiles in the passageway were loose and lifting due to the
decomposition of the sub-floor. He submitted that it was extraordinary that not a
single tile could be lifted successfully which in his view indicated the careless
manner in which the task was carried out.
62. As to this aspect the Applicant has not been able to elicit any expert opinion in
support of his claims. In the Recommendation, the Case Manager at paragraph
20 commented that it was immaterial whether or not the Applicant should have
been consulted (so that he could consider his options) when the tiles could not
be removed without breaking them. There was no option. The tiles must be
removed in order for the water damaged sub-floor areas to be repaired.
63. The Case Manager also pointed out (paragraph 21) that the FSP also agreed to
replace tiles which the Applicant claimed we re damaged by its builder. They
gave him the benefit of the doubt although its builder had denied the allegation
and the Applicant had not provided any evidence to substantiate it. For this
purpose it agreed to replace all tiles within a designated area marked out on a
sketch plan.
64. On the basis of the material which was available to the Case Manager at the
time of the Recommendation, I would have agreed with his Recommendation
as to this subject. However, I am concerned at the (uncontradicted) claim by
the Applicant as to the manner in which the tiles had apparently been broken,
with pieces being found at considerable distance from the point of the damage.
I do consider that the evidence is irresistible that the tiles had been removed
with no regard for the agreement which had been previously reached. As a
general rule, it is not appropriate to carry out work in contravention of an agreed
scope of works, without consultation with an insured. It is incontrovertible that
this has occurred in this case. Whilst I agree with the Case Manager’s
Case No: 233521 Determination Page 8 of 10
Recommendation that it was apparently the fact that the tiles were more difficult
to remove than had been contemplated because of the adhesive bind which
was in place, I do consider that the FSP’s contractor has acted in significant
disregard of the agreement which had been reached with the Applicant.
65. At the same time, I am unable to agree with t he Applicant’s contention that this
should lead to the result that all of the tiling on the first floor of the Applicant’s
property should be replaced. The policy plainly provides for no such remedy.
66. In the circumstances I consider that the FSP should compensate the Applicant
as to this aspect by payment of a relatively modest monetary figure.
The further claims in relation to defective installation of shower recesses
67. Whilst, as set out above, the FSP did commission experts “S” to comment on
these additional matters submitted by the Applicant, it continued to object to
this aspect of the Applicant’s claim. For example, by email of 13 February 2012,
the FSP has maintained this position saying:
“the issues raised by the Applicant do not seem to have a nything to do with the
dispute. The dispute was over replacement of matching tiles. The Applicant
seems to be starting new disputes and attempting to piggy back them into an
existing dispute. From FSP’s point of view these new points have nothing to do
wit h the existing dispute and are irrelevant.”
68. This response came about after I directed that specific questions be put to the
Applicant for his response. This was done by letter of 31 January 2012. In
essence, I asked the Applicant to demonstrate how these additional matters
related to the original claim.
69. The Applicant replied by detailed email of 8 February 2012, in a response
which clearly demonstrated the link between the damaged or unreplaced tiles
and the additional work relating to the leaking ensuite.
70. His response clearly demonstrated that all of these matters had stemmed from
the original claim, which had led to work commissioned by the FSP and to be
carried out by “PI” commencing in August 2010.
71. As the Applicant pointed out, the FSP had accepted the original claim and had
appointed “PI” to undertake the work to rectify the damage c aused by leaking
showers and this had involved demolition and replacement of the ensuite,
laundry, bathroom and toilet and replacing the floor in the walkway, which is the
side of the tiles. The work had been completed in December 2010 with the
walkway not tiled (thus leading to the original dispute).
72. It was plainly during the conduct of the original dispute that the ensuite began
to leak again in April 2011.
73. Having regard to all of these matters, I reject the FSP’s position in suggesting
that this should be treated as a separate claim and should not be the subject of
a Determination at present. Indeed the FSP’s position is entirely inconsistent
because in mid 2011, after it h ad supplied reports by its consultant “S”, the FSP
Case No: 233521 Determination Page 9 of 10
was submitting that the material available was sufficient for the matter to
proceed to a Determination.
The claim for the additional work for rectification of the work originally carried
out by “ PI ”
74. A consequence of the response recently provided by the FSP is that there has
never been a formal response to the additional matters raised by the Applicant.
This is despite the fact that the Applicant has supplied full details of the damage
which has occurred. He has supported his claim with a comprehensive report
from “NI”. To a significant extent, the opinion of “NI” is supported by the opinion
of “S” commissioned on behalf of the FSP.
75. The FSP has had many months to adequately investigate this matter and to
provide a formal response to the Applicant’s claims. On the face of it however,
there appears to be no doubt that, as all parties agree, the work originally
carried out by “PI” was defective.
76. I am concerned about aspects of the FSP’s handling of the matte r. The
allegation that the Applicant was responsible for the appointment of “PI” or for
the work carried out by “PI” is totally inaccurate. Any suggestion that this
conclusion could be drawn from paragraph 37 of the Recommendation is
absurd. Nothing in that paragraph suggested that the Applicant had been
responsible for the installation of the showers and the ensuite and main
bathroom.
77. At all times what should have been obvious to the FSP is that serious
complaints were being made about the quality of work carried out by its
contractor “PI” and that its own consultant was expressing serious concerns
about the quality of that work. In the meantime serious damage was being
occasioned to the Applicant’s property.
78. I therefore reach the opinion that the FSP must pay for the demolition and
reconstruction of the ensuite (recognising that certain items from the ensuite
may be reusable in the reconstruction).
79. The FSP must also reimburse the Applicant for the replacement of carpet to the
bedroom. The FSP must also pay for the cost of drying the bedroom structure
in accordance with the invoice supplied by the Applicant and the FSP must pay
for the repair of water damaged flooring in the bedroom caused by the leaking
ensuite.
Determination
80. I determine that the Applicant is not entitled to require the FSP to re-tile all of
the tiled areas on the first floor of his property. The FSP is entitled to limit the
replacement of the tiles to the area it had marked in orange and green on the
sketch plan it provided.
Case No: 233521 Determination Page 10 of 10
81. However, I determine that the FSP should pay to the Applicant the sum of $500
in compensation for the manner in which tiles have been removed in greater
number and in a manner not envisaged in the scope of works, and destroyed.
82. I determine the FSP indemnify the Applicant for the demolition and
reconstruction of the ensuite and that the FSP reimburse the Applicant in
respect to the following sums:
• Drying out of carpet $2,000
• Removal of mouldy carpet & disposal $400
• Replacement of carpet in main bedroom $1,856
83. As to the main bathroom shower, I determine that the FSP shall indemnify the
Applicant for the cost of repairing the water-proofing so that a warranty in
respect to this work is available to the Applicant.