Home / Financial Firm (Unknown - Insurer) / Determination 233276

Determination 233276

Denial of water damage claim as gradual deterioration

FirmFinancial Firm (Unknown - Insurer)
Decided2011-12-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured claimed for water damage to a roof, which he said occurred over 12 to 16 months and was caused by a 2009 storm. AFCA found the cause uncertain, the insured had not provided an expert report, and the FSP was entitled to deny the claim.

The insured bears the onus of proving that the loss falls within the policy's coverage, and the evidence did not establish a covered storm event rather than long-term deterioration.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 233276 Determination Page 1 of 5 Case number: 233276 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Gradual deterioration 30 December 2011 Background 1. On 22 February 2011 the Applicant lodged a claim under his home and contents insurance policy for water damage to his dwelling. The Applicant advised that the damage had occurred over the past 12 to 16 months and may have been due to helicopters chipping roof tiles or heavy storms. 2. The Financial Services Provider (FSP) denied liability for the claim on the grounds that the damage was due to maintenance related issues and not from a single insured event. 3. The dispute was considered by a Case Manager of the Service who issued a Recommendation. In that Recommendation, the Case Manager determined the dispute in favour of the FSP and determined that the Applicant had not established that a loss that was covered under the terms and conditions of the policy had occurred. 4. The Recommendation was not accepted by the Applicant. Pursuant to clause 8.5(c) of the Terms of Reference of the Service, the Applicant requested that the dispute proceed to Determination. Summary of Applicant’s Position 5. The Applicant maintains that if his home was built to the requisite code and standards of the time, then this should not impede any claim he makes. 6. The Applicant maintains that the house upgrades and any renovation were completed with compliance of the current building code of Australian and relevant standards. 7. The Applicant further maintains that the damage to his property was due to a storm in 2009 and there has not been further deterioration to the property since that time. 8. The Applicant says that if the damage was occurring over a long period of time, then there would be additional deterioration to the roof and the internal areas, but that the only damage is due to the one event during the period of cover and Determination Case No: 233276 Determination Page 2 of 5 if the water was coming into the home for a longer period of time then t he house would have more damage to it. 9. The Applicant says that the mould on tiles was disturbed by the replacement of tiles. Further that the house has been insured since 2006 and if water was coming in since that time, then the timber would be totally rotten. 10. The Applicant says that the majority of the damage is to the main roof and that most tiles were changed at the same time to ensure that further damage did not occur. 11. The Applicant challenges the FSP’s statement that he should have taken immediate action to repair as not even insurance companies will have the house repaired in two or so days. 12. The Applicant says that the Recommendation is a one-sided story and made without inspecting the house or even asking for further photographs to show there is no further deterioration. 13. Finally, the Applicant says that he has just received a Renewal Notice on his insurance for a higher dollar value and how could this be if he has not repaired the home and kept it in good repair. Summary of FSP’s Position 14. The FSP refers to the following policy terms: “You must also: - keep the home, unit and contents well maintained and in good condition, this includes rectifying faults or defects such as fixing roof, gutters, drains, water pipes and tiled areas when they leak or need repairs. ... Not meeting your responsibilities If you do not meet your responsibilities, it may lead us to: - reducing or refusing to pay your claim ... Insured events 1 to 12 ... We cover Loss or damage caused by storm or flood. ... We do not cover loss or damage ... Defect, structural fault or design Case No: 233276 Determination Page 3 of 5 Caused by a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (eg. if there are signs that a defect previously caused damage we will not pay a later claim for further damage from this defect). Failing to take care of the home or contents Caused by or as a result of your failure to: - take reasonable care of your home and contents - keep the home and contents in good condition and well maintained - fix faults and defects as soon as you become aware of them.” 15. The FSP says that on lodgement of the claim, the Applicant advised the damage had been occurring for 12 – 16 months and then at the time of assessment the Applicant advised the assessor that water had been entering the home since early 2009. 16. The policy specifically excludes loss or damage caused by a defect, structural fault or design fault that an insured knew about or should reasonably have known about and did not fix that damage. 17. The FSP further says that the Applicant has not established that the commencement of the damage did not occur prior to the commencement of the policy. 18. Finally, the FSP maintains that the damage has been significantly worsened by a combination of the Applicant’s failure to report the loss in a timely manner and his failure to rectify the defects. Issue 19. Whether the FSP was entitled to deny the Applicant’s claim. Reasons for Decision 20. I have reviewed all the material provided by the parties included in their respective submissions. 21. The Recommendation of the Case Manager has not been accepted by the Applicant and as such, this matter will proceed to Determination in accordance with the Terms of Reference of the Service. “8.5 Dispute is resolved on the basis of the Recommendation. c) If, within 30 days of receiving the Recommendation, either: (i) The Financial Services Provider does not accept the Recommendation in relation to the Dispute; or (ii) Either party requests FOS to proceed from a Recommendation to a Determination FOS will proceed to a Determination by either an Ombudsman or by a FOS Panel (as the Chief Ombudsman or his or her delegate Case No: 233276 Determination Page 4 of 5 decides is appropriate). Before the Determination is made, the parties will be given a reasonable opportunity to make submissions, and provide any further information, in response to the Recommendation.” 22. Subsequent to the Case Manager’s Recommendation, the Applicant has lodged a further submission by way of a letter of 1 December 2011. The FSP has elected not to provide any further submission but to rely upon the material previously provided. I have considered all of the material as part of this Determination. 23. The Case Manager to this Service within his Recommendation has set out the details of the reports provided by the assessor and the building consultant. The Case Manager has also detailed the photographs in relation to this matter. I am satisfied that the details provided by the Case Manager in respect to the assessor’s and the consultant’s report together with the photographs is accurate and does not need to be repeated within the confines of this Determination. 24. It is settled insurance law that the Applicant bears the onus of proof demonstrating that his loss falls within coverage provided by the policy of insurance. The Applicant has not provided a report to support his contentions. 25. I am concerned regarding the way in which the Applicant has presented his claim. 26. The Applicant does not dispute that at lodgement of the claim he advised that the damage had been occurring for 12 – 16 months, or that at the time of assessment, he advised the assessor that water had been entering the home since early 2009. 27. However, the further submission of the Applicant of 1 December 2011 appears to be that the damage was caused due to a single storm incident in 2009, but also that damage may have been occurring as a result of helicopters causing branches to fly up and impacting with the house. 28. As such, I am satisfied that there is uncertainty as to the precise cause of the loss being suggested by the Applicant. 29. I am also satisfied that this is in contrast to the views of the building consultant that the water has been leaking into the home for a long term due to ill-fitting roof tiles below the ridge capping together with inadequate barge flashings at the eaves and loose tiles. Further that this damage may have been occurring for many years. 30. As indicated, the Applicant bears the onus of proof in relation to the loss which he has suffered. The Applicant has not presented an expert report in this regard and given the evidence of the building consultant together with the photographs presented, I am not satisfied that the Applicant has satisfied his onus o f proof, and thus in the circumstances of this claim, the FSP is entitled to refuse indemnity. Case No: 233276 Determination Page 5 of 5 Determination 31. I determine that the FSP is entitled to deny the Applicant’s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.