Home / Financial Firm (Unknown - Insurer) / Determination 233151

Determination 233151

Storm water versus flood damage - claim denial under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2011-07-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed for building and contents water damage he said came from storm water on 22 December 2010, and the FSP denied it as flood from the Nogoa River. AFCA found the loss was flood and the exclusion applied, so no payment was ordered.

On the balance of probabilities the damage resulted from Nogoa River floodwater, which the policy definition of flood and exclusion covers.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 233151 Determination Page 1 of 6 Case number: 233151 General Insurance - Domestic Insurance - Home Building and Contents - FSP Decision – Flood - Denial of claim 20 July 2011 Background 1. The Applicant held a Home Building and Contents Insurance policy (the policy) with the Financial Services Provider (FSP). 2. The Applicant contacted the FSP on 6 January 2011, to lodge a claim for storm water damage to both building and contents at the insured address, which he alleges took place on 22 December 2010. 3. The FSP denied the claim on the ground that the water which inundated the property was flood water from the Nogoa River and as such was excluded from cover. 4. The Applicant remains dissatisfied wi th the FSP‟s decision and maintains that the damage occurred as a result of the overflowing of a storm water drain at the front of the insured property prior to Emerald being inundated with floodwater. Summary of Applicant’s Position 5. The FSP has refused to pay the Applicant for loss of property, due to storm water flooding on 22 December 2010. 6. Heavy rain caused the river to run high and water has come up the storm water drain causing local flooding to residential property in the Applicant‟s street. 7. The App licant‟s street often fills up with water anytime it rains heavily, as the water cannot drain away quickly enough. 8. The FSP should pay for the rebuilding of the insured property and damaged contents. Summary of FSP’s Position 9. On 6 January 2011, the Applicant lodged a claim for damage to the insured property on the alleged date of loss of 22 December 2010. Determination Case No: 233151 Determination Page 2 of 6 10. The insurance industry appointed consultants “WR” to provide a report into the cause and timing of the flooding in Emerald. 11. The FSP also engaged consultants “WT” to provide a report as to the cause of the flooding in Emerald. 12. The FSP maintains that both consultants‟ reports do not support the Applicant‟s contention that the insured property was inundated by storm water on 22 December 2010. 13. Rainfall levels leading up to the alleged date of loss (22 December 2010) were very low, establishing that the rainfall between 20 December 2010 and 22 December 2010, were not significant enough to cause any storm water inundation in the area. 14. The Applicant has acknowledged not being at the property at the time of loss and did not return till the New Year. As such, the FSP maintains it is entitled to give greater weight to the consultants‟ reports in determining the time and cause of the loss. 15. Based on the collat ed data, the two hydrologists‟ reports, review of the flood summary for Nogoa River at Emerald and the proximity of the insured property to the river, the FSP asserts the date of loss was between the period 29 December 2010 and 31 December 2010 during which Emerald experienced significant flooding from the Nogoa River. 16. The policy is clear and unambiguous in that flood, is not an insured peril and in order to be entitled to cover under the policy, the loss or damage has to be the result of an insured event. 17. The FSP maintains that, on the balance of probabilities, it has established the damage to the insured property is due solely to inundation of flood water from Nogoa River, and its decision to decline the claim is in line with the policy. 18. The FSP relies on the following policy provisions: “ Page 3 – Our agreement with you We will insure you for:  loss or damage caused by one or more of the insured events as set out in this policy occurring during the period of insurance. … Page 4&5 – Words with special meanings „ flood ‟ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified and from any reservoir, canal or dam. Note: This policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents. … Page 17&19 – Insured events we will pay for Case No: 233151 Determination Page 3 of 6 9. Storm, rainwater or run off We will pay for loss or damage caused by storm, rainwater or runoff. We will not pay for loss or damage a. caused by:  flood, or  flood water combined with run- off and/or rainwater” Issue 19. Whether the damage claimed by the Applicant was caused by flood as defined by the policy. Reasons for Decision 20. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 21. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 22. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 23. The Applicant maintains the water damage to the insured building and contents occurred on 22 December 2010 as a result of storm water overflowing from a storm water drain at the front of the property. 24. The Panel notes that the Applicant was not present at the time of the loss and relies on advice given to him by his neighbour. No evidence has been submitted to substantiate t his statement from the Applicant‟s neighbour. 25. The FSP on the basis of the evidence collected, submits that rainfall levels in the Emerald area between 20 December 2010 and 22 December 2010 were too low to cause inundation of the Applicant‟s property due to stormwater; it asserts the damage claimed is due to flood water overflowing from Nogoa River between 29 December and 31 December 2010. 26. The Panel notes that the rainfall levels recorded on or before the alleged date of loss (22 December 2010), were quite low. The recorded levels are: Station Name Station Number 21/12/2010 0900hrs 22/12/2010 0900hrs Emerald Airport 35264 0.4mm 0.0mm Emerald Radar 35146 0.0mm 0.6mm Case No: 233151 Determination Page 4 of 6 27. The Panel has reviewed the evidence made available by the parties and notes that the hydrologists‟ reports confirm: WR Report – January 2011  Emerald is generally flat with ground levels varying by no more than 5 metres across the township. The majority of Emerald drains via stormwater pipes either directly to the Nogoa River or to open cha nnels.  Fairbairn Dam has been constructed on the Nogoa River about 16.5km upstream of Emerald as a water supply source for the numerous towns, irrigators and mines downstream of the dam.  Then highest rainfalls over a seven day period (26 December 2010 – 1 January 2011) were centred over the southern half of the Nogoa River catchment, with lower rainfalls recorded around Emerald.  Majority of the recorded rainfalls occurred between 26 December 2010 – 28 December 2010, with very little rain after 28 December 2010.  The highest level of rainfall in Emerald over a one day period was on the 27 December 2010 (27.2mm). It is unlikely that rainfalls of such low intensity would result in stormwater inundation in Emerald.  At this stage water levels of Nogoa River were well within its banks and about five metres below its peak. Therefore, any water inundation after this time could only have been from Nogoa River and not storm water.  On 29 December 2010, Nogoa River overflowed in low lying areas of Emerald adjacent to the river bank. The river continued to rise, eventually backing up a number of storm water drains and inundating low lying roads and properties. The storm water drains carried Nogoa River flood water and not storm water runoff as no rainfall had occurred in the preceding period.  Nogoa River peaked at 16.5 metres during the early hours of 31 December 2010 and inundated significant parts of Emerald.  Storm water inundation was highly unlikely to have occurred because rainfall intensities in Emerald were insignificant over the period of interest. WT Report - February 2011  The consultants are specialist flooding engineers.  Emerald is located adjacent to the Nogoa River with the majority of developments on the western side of the river.  Nogoa River flows past Emerald in a north easterly direction downstream from Fairbairn Dam. River levels are largely determined by dam discharges.  Heavy rainfall was experienced in Queensland in 2010, this kept Fairbairn Dam at 100% capacity throughout December 2010. Case No: 233151 Determination Page 5 of 6  Heavy rainfall was observed in the upper eastern section of Fairbairn Dam catchment in the 24 hours prior to 9.00am on 27 December 2010. A total of 257mm at Wharton Creek Station and 210mm at Spring Creek Station.  This rainfall is the principal cause of the inundation in Emerald that peaked on Friday 31 December 2010.  Rainfall in the local area of Emerald was experienced between 24 December 2010 and 27 December 2010. The rainfall data for Emerald indicates a maximum rainfall intensity of 6mm/hr fell on 25 December 2010 at 6.00pm and again on 27 December 2010 at 7.00am, amongst other less intense rainfall.  Statistically the one year ARI hour rainfall for Emerald is approximately 33mm/hr, and therefore the rainfall that fell in Emerald leading up to the inundation from Nogoa River, is very minor and unlikely to produce storm water type flooding.  Flood waters from Nogoa River flowed through Emerald from multiple locations. This leads to the belief that flood flows from the Nogoa River would have most likely broke its banks upstream of Emerald and engaged several different paths into the city.  Very little rain was observed in Emerald in the days leading up to the peak water level from the Nogoa River and therefore the likelihood of storm water type flooding during this period is very low and no stormwater type flood damage was observed from WT‟s inspections. 28. Having considered the evidence made available, the Panel is satisfied that, the level of rainfall experienced in Emerald on and before 22 December 2010, was low. 29. The Panel considers it significant that while the Applicant refers to the evidence of a neighbour to pin point the inundation as 22 December 2010, the Applicant has not provided a statement or any other document to support the neighbour‟s statement. In these circumstances, the Panel is satisfied that little or no weight can be given to the Applicant‟s evidence regarding the neighbour. 30. In the absence of any evidence to the contrary, the Panel is not satisfied that the Applicant has been successful in establishing that the water damage to his home and contents is the result of storm water inundation on 22 December 2010. 31. The Panel is persuaded the Applicant‟s loss was, on the balance of probabilities, the result of floodwater from the Nogoa River occurring in the period 29 to 31 December 2010. The policy defines “flood” to include water that escapes or is released from the confines of a watercourse. 32. As the FSP‟s policy wording outlines that flood is not covered, the FSP is entitled to rely on the exclusion . It follows that the Applicant‟s claim does not succeed on this occasion. Case No: 233151 Determination Page 6 of 6 Determination 33. On the basis of the available information, the Panel determines the FSP is entitled to refuse the claim under the terms and conditions of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.