The Applicant's garage contents were damaged in the January 2011 Brisbane flooding and the FSP denied the contents claim under the flood exclusion. AFCA found the FSP was entitled to deny liability because the water was flood water.

Water released from Wivenhoe Dam caused the Brisbane River to overflow and back up drains, so the damage fell within the policy's flood definition and exclusion.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 233006 Determination Page 1 of 6 Case number: 233006 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Flood 26 September 2011 Background 1. On 12 January 2011, as a result of intense rainfalls in the area water inundated the garage of the Applicant‟s home causing damage to the contents. A hot water service and tank pump located outside the home were also damaged. 2. The Financial Services Provider (FSP) accepted liability for the hot water service and tank pump, but denied the claim for contents contained in the garage on the grounds that the damage was caused by flood water as defined by the policy and excluded from the cover. Summary of Applicant ’s Position 3. The Applicant believes the damage was caused by flash flooding, stormwater, rain events, water released from Wivenhoe Dam and water from the Brisbane River. 4. The Applicant does not accept that the damage was caused by „flooding‟ and requires the Financial Ombudsman Service (FOS) to review the issues. Summary of FSP’s Position 5. The claim for the hot water service and water pump motor was accepted as storm water run-off and the run-off occurred prior to the flood water inundation of the garage and premises. 6. The FSP relies on the Insurance Council of Australia (ICA) hydrological report, reports issued by a hydrologist, the Applicant‟s evidence, the location of the property, an assessor‟s report, legal precedent and other information obtained from its files to confirm the damage was caused by flood as defined by the policy. 7. The FSP states that the Applicant‟s suburb was flooded by water escaping from the Brisbane River. Determination Case No: 233006 Determination Page 2 of 6 8. The Applicant advised that the inundation of her property occurred on 12 January 2011. This was after the rainfall had ceased. 9. The Bureau of Meteorology (BoM), reports indicate the peak rainfall fell in the local area on 10 January 2011. 10. There was considerable delay from the time of the rainfall to the time of the inundation of the App licant‟s home. The water level remained elevated for a relatively long period of time. Stormwater rises quickly and drains away quickly once the rain stops. Therefore the water which entered the Applicant‟s premises was not surface rainwater. 11. The FSP refers to case law which it states confirm the proximate cause for the damage claimed being „storm water‟ was in fact „flood‟ water. 12. The FSP submits that if the water that initially entered the premises was flood water then the damage is excluded. If the water was a mixture of storm and flood water, then the damage is also excluded. 13. The FSP submits that the hydrological evidence is such that the only source of water that inundated the Applicant‟s property was flood water or a combination of stormwater and flood water and according to the case law the loss sustained is excluded from cover provided by the policy. 14. The policy provisions on which the FSP relies state: “ Listed events cover Storm, rainwater or wind We will cover your buildings or contents for loss or damage as result of storm rainwater or wind. … Water or liquid damage We will cover your buildings or contents for loss or damage caused by water or liquid. … We will only cover loss or damage as a result of water or liquid escaping from  a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain. … Exclusions to your cover Any cover we provide is subject to the following exclusions. …  flood … General exclusions We will NOT cover any loss or damage or liability as a result of, or arising from … Case No: 233006 Determination Page 3 of 6  flood or storm surge … Glossary of words with a special meaning flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also included water escaping from the confines of any reservoir, channel, canal or dam.” Issue 15. Whether the damage claimed by the Applicant was caused by flood water as defined by the policy. Reasons for Decision 16. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference (TOR). This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. There has been an exchange of the material on which each party relies. Each party therefore has had the opportunity to respond to the issues relied on by the other party. 18. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 19. The Panel Ombudsman (TPO) attended at the Applicant‟s premises for the purpose of assisting the Determination process. At the premises, the Panel Ombudsman met with the Applicant and representatives of the FSP. 20. The FSP seeks to rely on a clause in the policy to deny the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause apply to defeat the claim. 21. A hydrologist report dated 18 February 2011, titled “South East Queensland Weather Event Report January 2011” contains the following relevant information:  In the lower Brisbane River catchment the storm began between 0800 and 1000 hours. (2 para 2)  In the central section of the Brisbane River catchment the onset of the storm began about 1000 hours on 9 January 2011. (2 para 5)  In the upper Brisbane River catchment intense rainfall began between 1200 hours on 10 January and 0200 hours on 11 January. Case No: 233006 Determination Page 4 of 6  Rainfall in the upper catchment of the Brisbane River catchment would have been the primary cause of overflows of large sized streams such as the Brisbane River. (page 12 para 4)  The rainfall in the upper catchment regions of the Brisbane and Condamine catchments led directly to the high stream levels in the middle and lower catchment regions. (page 12 para 6)  During the January weather event a large majority of the Brisbane River catchment experienced intense rainfa ll which combined with the saturated catchment condition led to the rapid rise in stream levels that occurred. (page 12 para 9)  Large volumes of runoff would have been generated in this region (Brisbane catchment) leading to overland flow that exceeded the capacity of local drainage systems and small streams within a short period of the onset of intense rainfall. (4.2 para 3) 22. The hydrological report commissioned by the Insurance Council of Australia (ICA) titled „ Flooding in the Brisbane River Catchment January 2011 Volume 2 Flooding in Brisbane City LGA ” dated 20 February 2011, provides a detailed analysis for the flooding experienced in that region. 23. Of particular relevance contained in that report are the following:  Floodwaters moving down the Brisbane Ri ver over the period 9 to 14 January were made up of releases from Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)  Water level response to these „normal‟ flood events in the lower Brisbane River was dwarfed by the subsequent water level rise associated with the releases from Wivenhoe Dam over the period 0600 hours on 11 January and 0300 hours on 12 January. (page 1 para 3)  Based on the recorded water level behaviour it was concluded that releases from Wivenhoe Dam was the principal immediate cause for flooding along the reach of the Brisbane River downstream of the Dam. (page i para 4)  Rain ceased over the Brisbane City area around 1800 hours on 11 January being about 24 -30 hours before flood levels in the Brisbane River peaked. (page ii para 3)  Given the rainfall across Brisbane City LGA ceased by 1800 hours on 11 January any flooding after this time will have been caused by water flow inundation from the Brisbane River and its tributary creeks it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River which in turn was principally caused by the dam release flood from Wivenhoe Dam. (page ii para 6)  The following factors affected and exacerbated the nature of flooding in the Brisbane City LGA over the period 10-14 January. – Intense rainfalls that occurred over the catchment areas upstream of Wivenhoe and Somerset Dams. Case No: 233006 Determination Page 5 of 6 – A „wet‟ catchment that maximised the rate of delivery and volume of surface runoff resulting i n large volumes of floodwater flowing into the Wivenhoe and Somerset Dams. – Significant releases from the Wivenhoe Dam made over the period 11-12 January together with significant out flows from Lockyer Creek and the Brisbane River. – In a number of instances high tail water levels in the Brisbane River and its creeks resulted in backflow, up piped drainage systems. The backflow led to inundation with waterway floodwaters of low-lying areas normally drained by the piped drainage system (pipe backflow inundation.) 24. Section 10 of the ICA report discussed factors affecting flooding in Brisbane City LGA Flood behaviour and included the following: “… However it is clear that the dam release flood from Wivenhoe Dam was the immediate cause of flooding in Brisbane City LGA.” (para 4) 25. The Panel notes the Applicant‟s evidence that when she went to bed at 1.00am on 12 January 2011, it was still raining but when she awoke at 4.00am, the rain had stopped. 26. After careful analysis of the hydrological reports the Panel accepts that intense rainfall periods occurred in the area over 9 to 13 of January. However, the evidence does not clearly state that these rainfall events of themselves caused the Brisbane River to overflow its banks. On the other hand the evidence established that the release of water from the Wivenhoe Dam was the principal cause for the Brisbane River flooding. 27. It is therefore appropriate to consider the policy definition of 'flood'. 28. The definition is in two parts. The first part stating that flood is the covering of normally dry land by water escaping or released from the normal confines of a watercourse. The Brisbane River is a watercourse so that any damage caused by water escaping from the river is not covered. 29. The second part of the definition states flood also includes water escaping from the confines of any dam. According to the evidence the water which caused the Brisbane River to overflow its banks was principally caused by water which was released from Wivenhoe dam. 30. There is a clear distinction between the meaning of the words „escaped‟ and released‟. „Escape‟ as defined by Macquarie Dictionary means “ 1 to slip away from as from confinement or restraint, gain or regain liberty, 3 to issue from a confining enclosure, as a fluid”. „Release‟ is defined as “ 1 to free from confinement, 2. To free from anything that restrains, fastens …” 31. While the words „released‟ and „escaped‟ are not interchangeable, the Panel is satisfied that the reference to “ water escaping from the confines of a dam” does not assist the Applicant. While the definition of flood goes so far as to specifically include water that „escapes‟ from a dam (as against, the operative Case No: 233006 Determination Page 6 of 6 factor with Wivenhoe, namely water was „released‟), this definition does not otherwise enlarge on or limit the manner in which water, upon entering the watercourse (in this instance the Brisbane River), then causes sufficient engorgement such that it escapes from its normal confines. 32. As such, water that enters a watercourse for any reason, including water released from a dam, which in turn is responsible for water escaping from the watercourse falls within the first part of the flood definition. 33. The evidence is that water overflowed the banks of the Brisbane River and caused widespread flooding. 34. The Applicant evacuated her home at about 4.00am on 12 January. According to the technical evidence, rainfall across the Brisbane City LGA ceased at 1800 hours on 11 January and any flooding after this time would have been caused by inundation from the Brisbane River. (ICA p11 para6) 35. Given that the property was not inundated when the Applicant evacuated at 4.00am, the Panel is not satisfied that the rain which the Applicant says fell until at least 1.00am, was the cause of the loss. 36. While the Applicant also refers to a large drain near her property, the evidence is that high tail water levels in the Brisbane River resulted in backflow up piped drains. 37. The courts have previously determined that water which cannot drain into a watercourse and water which backs up a drain because the watercourse was in flood is deemed to be flood water. 38. For these reasons the Panel concludes that the FSP has established the key ingredients of the clause on which it relies, apply to defeat the claim. 39. At the site visit, the Panel Ombudsman noted the location of the garage which contained the damaged contents. 40. The Panel is satisfied that water entering the garage is consistent with the floodwater reaching just below the floor level of the Applicant‟s home. 41. Given that the garage is enclosed and at the rear, top portion of the property, the Panel considers it improbable that the water entering the garage was run- off as distinct from the flood water in the area. Determination 42. On the basis of the available information the Panel determines that the FSP was entitled to deny liability for the damage to the contents of the garage.