Text of the determination
Case No: 232985 Determination Page 1 of 11
Case number: 232985
General Insurance - Domestic Insurance - Home Building – Earthquake
damage – Extent of damage
31 August 2011
Background
1. The Applicant insured his home building under a Home Building Insurance
Policy against loss or damage caused by insured events for $275,600 with a
policy excess of $350. The period of insurance was 20 July 2010 to 20 July
2011. The Applicant had owned the property for approximately four years.
2. On 20 April 2010, the Applicant ’s house was damaged during an earthquake.
The Financial Services Provider (FSP) accepted that the earthquake caused
some damage to the house but denied indemnity for repairs to the entire house.
3. It initially offered to cash settle the claim for the amount of $6,930. This was
later increased to $16,604.50 consisting of cosmetic earthquake damage
$6,930 plus 50% of the cost of replacing a damaged bearer, that is, $9,674.50.
Following the FSP’s interna l dispute resolution decision to not meet the
Applicant ’s claim in full, the FSP increased its offer on a ‘without prejudice’
basis to $25,000.
4. The Applicant has rejected these cash settlement offers and contends that the
FSP should repair all of the damage to his house or replace it. A structural
engineer engaged by the FSP estimates the cost of rebuilding the house would
be $197,000.
Summary of Applicant ’s Position
5. The Applicant ’s dispute is in respect to the damage to his house. The FSP has
stated that his house was already in a bad state of repair when it was damaged
by the earthquake.
6. The FSP has stated that his house would not have suffered so much damage if
the timber stumps and load bearer had not been rotten.
7. The FSP’s appointed engineer stated th at the houses in his locality swayed
back and forth (laterally) during the earthquake. However, his house jumped
vertically and the engineer should have taken into account that the initial
vertical movement caused more damage than if the house only suffered lateral
movement.
Determination
Case No: 232985 Determination Page 2 of 11
8. When he initially insured his house it was sound from wind and rain. This is not
the case since the earthquake as his house now leaks when it rains and he
cannot close the front door fully.
9. The pre-dominant issue in his claim is the pre-existing condition of his house
and how specifically the condition of the foundation stumps contributed to the
overall damage.
10. The stumps require replacing but the FSP’s engineer states that the damage to
the stumps is not related to the earthquake. The engineer states that the pre-
existing condition of the stumps contributed to the damage to the house.
11. The engineer also stated there is clear evidence of significant pre-existing
structural damage including a floor slope causing a large gap between the f loor
and kitchen cupboard kickboards, disconnected roof rafters and a significantly
out of square window architrave.
12. The Applicant disputes the engineer’s findings. He was in bed when the
earthquake hit. It woke him up before any movement hit and when it did he
found himself, his bed and the house in mid-air. It all hit together and the house
shook for about eight seconds.
13. The front door had dropped in the east side wall and cracks from the top of the
frame to the roof on both sides of the door. The floor had bulged up in sections
and the east side external wall was also bulging.
14. From that day his house has deteriorated so that its condition is much worse
than when the FSP’s loss assessor first inspected it.
15. The previous owner of the house has seen the damage to the house. He has
submitted a statutory declaration deposing that when he purchased the house
in 1997 he renovated several rooms including the living room. The front wall
was replaced as were the timber stumps from the bedroom wall to the western
side of the house consisting of approximately three rows in from the perimeter
of the house. He also stated the lounge room floor was not in the condition that
it is in now as with the load bearer under the door.
16. When the builder appointed by the FSP was inspecting the damage, he told the
Applicant that he agreed that the damage was the result of the earthquake. He
informed the Applicant in order to repair the new damage; he would have to
repair the old damage. The house would have to be jacked-up to make it level
and any new or old damage would be irrelevant. The builder also estimated the
cost of repairs would be $165,000.
17. The loss assessor stated the bearer failed some time ago from ‘possible
decay’. However, the FSP’s engineer stated the bearer failed during the
earthquake and a photograph indicated that the timber had an older split. The
Applicant states that the engineer is unsure as to this assessment.
18. The engineer placed the camera in an inaccessible position where it was not
possible for the Applicant to see the crack and repair it.
Case No: 232985 Determination Page 3 of 11
19. The loss assessor inspected bedroom one, which is the last room to be
renovated, and was shown new cracks and old cracks were also pointed out.
The assessor stated the cracks over the window frame were old because of
dust. However, the assessor also failed to report that some cracks went from
the ceiling to the floor.
20. Bedroom one had not been renovated and obviously the internal walls were in
bad shape, but the FSP’s agents were shown that there was damage and
movement to the house. The Applicant contends that he has not satisfactorily
had explained to him what damage the stumps and bearer would have
sustained from the initial vertical movement of the house before the lateral
movement.
21. The Applicant ’s position is to have his house repaired to the condition it was in
when he purchased it. When he purchased the house the floor was level, the
bearer intact and he could close and lock the front door.
Summary of FSP’s Position
22. Following a severe earthquake in the Kalgoorlie/Boulder area on 20 April 2010,
a number of homes, including that of the Applicant, were damaged. The
Applicant ’s home is estimated to be 80 to 100 years old and wa s in extremely
poor condition.
23. After having received reports from a loss assessor, builder and independent
engineer on the damage to the Applicant ’s house, the FSP was able to identify
the extent of claimable damage. It initially offered an amount of $6,930;
however this offer was increased to include a contribution towards a
deteriorated floor bearer and offered $16,604.50. The Applicant refused both
offers.
24. The loss assessor, a structural engineer, attended the Applicant ’s property on 7
May 2010 and reported that the house was in an extremely poor condition with
very little adequate or essential maintenance having been undertaken in recent
years.
25. The assessor disputed some of the damage alleged to be caused by the
earthquake as some of the damage appeared to be pre-existing and aged.
26. An inspection of the sub-floor area revealed a fractured bearer that had not
occurred recently by earthquake. The fracture was presumed to have occurred
due to the flexural stresses in the timber being exceeded due to possible decay
that had reduced the bearer by at least 50%.
27. The assessor reported that, in his opinion, there was very little in the way of
damage that can be solely attributed to the earthquake. He considered the
majority of the damage to be pre-existing or has contributed significantly to any
recent cracking/damage.
Case No: 232985 Determination Page 4 of 11
28. On 26 May 2010, a builder inspected the Applicant ’s house and reported, in
part:
There were a number of maintenance issues around the house both
internally and externally. Window and door frames are skewed; walls
(both internal and external) are skewed.
Ground stumps supporting the house structure are variously lifted, sunk
and generally out of alignment.
Some damage is obviously fresh, whilst other damage obviously pre -
dated the earthquake event. Other damage is indeterminable.
29. The FSP engaged a consulting engineer to inspect and report on the damage.
In his report dated 7 October 2010 he stated:
The house was in poor condition before the earthquake.
The bulk of the lateral movement to the east and west external walls
occurred during the earthquake.
Much of the cracking to the internal linings is consistent with and was
caused by the lateral movement.
The poor condition of the timber foundations directly contributed to the
lateral movement and to the severity of the damage.
The settlement and much of the damage in the area of the front lounge
wall was caused by a bearer failure at a pre-existing weakness.
The downward slope of the timber floor toward the external walls was
caused by compaction of rotted footings.
It is not economically viable to repair the house to a standard of a sound
structure, primarily because of the state of the footings and the lateral
movement of the walls.
The earthquake damage loss to the Applicant is estimated at $7,000.
30. The engineer’s report highlights the poor condition of the premises prior to the
earthquake event. The FSP acknowledges the Applicant ’s house suffered
significant damage due to the earthquake but the damage was significantly
increased due to the poor state of the structure that pre-dated the event.
31. The builder provided a scope of works for the damage caused by the
earthquake and relied on the engineer’s report. The quote for repairs excluding
the bearer was $6,930. To replace the floor bearer the cost would be $19,349.
32. The FSP offered a cash settlement of $6,930 plus 50% of the cost to replace
the bearer, that is, $9,674.50 increasing the total offer to $16,604.50. This offer
was rejected by the Applicant.
Case No: 232985 Determination Page 5 of 11
33. The Applicant contends that at the time of the earthquake he felt the house
jump vertically which caused the earthquake damage. However, the engineer
has stated that:
‘whatever the directions of movement, we still believe vertical settlement experienced
by the floor structure would not have occurred had the stumps/foundations been in
good condition.’
34. An increased ‘without prejudice’ offer of $25,000 was made which the Applicant
again rejected.
35. The FSP maintains there was pre-existing damage to the building and
maintenance issues that needed urgent attention to make the house liveable
and in a sound state of repair. It considers the dominant causes of the house
movement were both the earthquake a nd decayed stumps, the former being an
insured event and the latter being excluded.
36. Where damage has two proximate causes, one of which is covered by the
policy and the other is subject to a policy exclusion, the exclusion applies to the
whole of the damage and the FSP is not liable for the damage. Wayne Tank
and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57.
37. It considers that had the stumps been in a sound state of repair, the house
would not have suffered the extent of apparent damage. This is evidenced by
similar houses in close proximity to the risk address that had minimal or no
damage.
38. The FSP acknowledges that the Wayne Tank principle should not act to defeat
the entire claim as it has been able to identify the earthquake damage i n
isolation from any contributory cause excluded peril. In this case, erosion,
gradual deterioration and wear and tear of the timber foundations.
39. The FSP contends that as it has been able to reasonably identify the damage
that would have occurred had the house been in a sound state of repair, this is
the extent of its liability. It does not accept the Applicant ’s assertion that the
house was damaged in its entirety due to the earthquake.
40. The expert evidence from qualified engineers and builders clearly sho ws the
pre earthquake condition of the property together with evidence of earthquake
damage and has also given the Applicant the benefit of doubt on damage that
could not be clearly determined.
41. Had the timber foundations, that is, stumps/bearers been in sound condition,
the house would not have moved and caused the extent of damage arising
from the earthquake.
42. The FSP believes the Applicant ’s entitlement is no more than $16,604.50 which
is the amount quoted for the repairs and it is entitled to cash settle the Applicant
in accordance with the conditions of settlement under the policy of insurance.
43. The FSP is prepared to offer $16,604.50 as a fair and reasonable settlement.
Case No: 232985 Determination Page 6 of 11
44. The FSP relies on the following policy/contract provisions:
‘Listed Events cover
If you have chosen Listed Events Home Insurance, we will cover your buildings or
contents for loss or damage as a result of the incidents listed...
...
Earthquake or tsunami
Under Listed Events, we will cover your buildings or contents for loss or damage as a
result of an earthquake or tsunami.
You must pay an additional excess of $250.
We will only cover loss or damage as a result of an earthquake if the loss or damage
occurs within 72 hours of the earthquake.
Exclusions to your cover
Any cover we provide is subject to the following exclusions
We will NOT cover any loss or damage as a result of, or caused by
...
Erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
...
...
How we settle a buildings claim
1 We will decide how we will settle your claim
If your buildings suffer loss or damage, we will decide whether to
...
pay you the cost to repair or rebuild that part of your buildings that suffered loss
or damage.
If we do, we will
...
only repair, rebuild or pay you for the part or parts of the building that actually
sustained loss or damage, including damaged portions of fixed coverings to
walls, floors and ceilings only in the room, hall or passage where the damage
occurred
...
glossary of words with a special meaning
...
Case No: 232985 Determination Page 7 of 11
incident
a single occurrence or a series of occurrences, including an accident or series of
accidents, arising out of one event.:
Issues
Whether the FSP has been fair and reasonable in its assessment of the extent of
damage caused to the Applicant ’s house due to the e arthquake.
Reasons for Decision
There has been an exchange of material which the parties rely on. Each party has
had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material in any great detail.
45. The Applicant ’s house suffered earthquake damage on 20 April 2010. The FSP
has accepted liability for some of the damage, but contends that the majority of
damage to the house was the result of wear or tear or gradual deterioration.
46. The FSP appointed a loss assessor, builder and consulting engineer to inspect
and report on the damage to the Applicant ’s house.
47. The loss assessor inspected the insured property on 28 April 2010. In his report
he stated;
‘ We are extremely concerned with the general condition of this building and lack of
adequate and routine maintenance. It is our considered opinion, based on the
evidence to us, that there is very little in the way of damage that can be solely
attributed to the earthquake on 20 April 2010. The majority of damage seems to be
pre- existing or has contributed significantly to any recent cracking/damage.’’
48. The builder appointed by the FSP inspected the insured building on or about 26
May 2010. The builder stated:
‘The numerous issues, both recen t damage and past damage coupled with obvious
maintenance problems are all intertwined and repairs to attributable damage cannot
be tackled without carrying out remedial works to issues unrelated to the insurable
event.
We suggest an engineer be appointed to resolve the delineation between
maintenance and insurable event damage prior to a quotation being prepared.
...
Please note that the obvious earthquake damage is certainly over $5,000.00 in value
and we are submitting a $5,001 (sic) for a second builder /engineer.’
49. In addition, on 22 December 2010, the builder reported orally to the FSP’s
Technical Manager that:
Case No: 232985 Determination Page 8 of 11
‘...Discussed the failed bearer. [Builder] advises the bearer had both wet and dry rot
and contained less than 10% of usable timber. This is contributing to the significant
floor slope of some 12 degrees. He did confirm there is clear evidence of pre-existing
floor slope as there is a 1 inch gap between floor and kickboard of kitchen cupboard
as cupboard is leaning backwards and gap was filled with dirt and dead insects etc.
Floor drops 5 inches over 3m. A window frame is also out of plumb by 50mm and
fresh paint goes right to window architrave indicating pre- existing buckle to building.’
50. The builder submitted a quotation for repairs dated 10 Januar y 2011 that was
based on the consulting engineer’s scope of works. The builder reported:
‘We attended to the revised scope of works (prepared by [engineer]) as requested.
Further to this attendance to the documents provided, we were instructed to carry out
a re-appraisal of the scope of works to provide a revised quotation for guidance
towards a cash settlement for the insured.
As previously stated and reiterated by both [assessor] and [engineer], the earthquake
related damage is enmeshed with a considerable amount of pre-existing damage and
general disrepair.’
51. The builder quoted $6,930 for identifiable earthquake damage and $19,349 for
works to replace the floor bearer, a total amount of $26,279.
52. In a report dated 7 October 2010, a consulting engineer stated:
‘Events in the Earthquake
The house experienced significant damage in the earthquake. Problematically, some
of the damage is either old damage that has been exacerbated by the earthquake or
the extent of the damage has been significantly increased because of the poor state
of the structure.
We believe that during the earthquake the superstructure suffered significant east
west lateral movement at its upper levels, particularly at the south (front) end. The
new cracking and movement damage now seen internally and externally occurred at
this time.
...
Pre-existing Conditions Influence Upon the Earthquake Damage
...The foundation construction is typical of the area for buildings of this age, that
being timber stumps in the ground. These timber stumps are prone to rotting
particularly the perimeter stumps that are more exposed to moisture.
We infer with some certainty that the settlement around the perimeter of the timber
floored area has been caused because these stumps were in a rotted state prior to
the earthquake. It is likely in fact that some settlement predated the earthquake.
...
The cracking to the floor bearer ...was obtained by placing the camera in an
otherwise inaccessible area...
Case No: 232985 Determination Page 9 of 11
The photo shows a fresh timber face which shows that the bearer collapsed in the
earthquake. The image suggest (sic) that the timber had an older split at which point
the newer splitting occurred. Without this older damage that the newer damage
would almost certainly would (sic) not have occurred and so the related damage in
this area would have (sic) non-existent.
...
As discussed earlier we believe that the significant damage that had occurred during
the earthquake resulted because of the poor condition of the foundations. There was
also a contributions (sic) to the damage from the bearer under the front wall as well
as pre-existing damage such as impact damage to the bedroom1 walls and old
cracking to the concrete path.
...
Based on an allowance of $200 per room for damage/crack repairs to linings and an
estimate that 50% of the wall and ceiling surfaces would be affected and require
painting the insured loss would be $7,000 which includes builder’s margin and GST. ‘
53. In respect to the engineer’s contention that the foundation stumps were rotted,
the Applicant challenges this stating the stumps around the house cannot be
seen.
54. The Applicant also contends that at the time of the earthquake, the house
‘jumped’ in the air. He contends that both the engineer and builder did not
mention the vertical movement of the house although this occurred before the
lateral movement.
55. The Applicant is of the opinion that ignoring the vertical movement of the house
detracted from what damage would have occurred to the load bearer and the
outside stumps. He has stated that the floor in the middle of the house sunk
back towards the north and that the stumps are not on the outside of the house.
56. In response the engineer stated:
‘ With regard to the condition of the stumps, our report accurately reflects the level of
certainty that we attribute to our assessment. If it were required to change that level
of certainty additional physical investigations would be required.
...
With regard to the motion of the house we believe that the ground motion in the
earthquake was largely lateral in nature based on our examination of damage to a
number of buildings in the area. We would expect that this residence would have
moved in the same way. However, clearly we have no direct experience of the
movement. The ground movement and the structure’s response to it may have been
more complex than we can infer from the limited physical evidence that is available.
Notwithstanding this, the fundamentals of our observations and conclusions do not
change; this was a particularly vulnerable building (due to its condition) that was
severely perturbed by the earthquake. Whatever the direction of movement, we still
believe vertical settlements experienced by the floor structure would not have
occurred had the stumps/foundations been in a good condition.’
Case No: 232985 Determination Page 10 of 11
57. The reports submitted by the loss assessor, builder, and consulting engineer
confirm that the insured building suffered earthquake damage. However, all
three professionals agree that it was difficult to identify what was actual
earthquake damage and damage caused by wear or tear or gradual
deterioration.
58. Further, all three professionals agree that the severe damage to the building
was contributed to by rotted timber foundation stumps.
59. Although the Applicant obtained a statutory declaration from the previous owner
of the building deposing that:
‘The front wall was replaced and so were the stumps from the bedroom wall to the
western side of the house, approximately 3 rows in. These stumps were jarra (sic)
wood. This was in the lounge room the floor in the lounge room was not in the
condition that it is now or the load bearer under the door.’
It does not provide any evidence as to the condition of the remaining foundation
stumps, for example, under the kitchen floor.
60. In addition, all three professionals stated that the Applicant ’s house had
significant damage which pre-existed the earthquake.
61. The Panel has also reviewed the extensive photographic evidence in support of
this contention. Having carefully examined these photographs, the Panel notes
significant damage to the property, some of which may be attributed to the
earthquake and some of which is clearly unrelated.
62. In the Panel’s view these photographs tend to support the view of the
professionals.
63. Although the Applicant contends that the condition of the foundation stumps did
not contribute to the damage to his house, he has not submitted any expert
opinion in support of his position.
64. In considering all of the evidence submitted, the Panel finds that the Applicant ’s
house suffered earthquake damage which was exacerbated by the poor
condition of the property together with pre-earthquake damage.
Determination
65. Therefore, the Panel finds that the Applicant is entitled to be indemnified for the
cost of repairs to the earthquake damage to the insured property. However,
each of the professional appointed by the FSP could not accurately quantify the
earthquake damage.
66. The consulting engineer prepared a scope of works for the repairs and the
builder submitted a quotation based on the scope of works. The builder quoted
$6,930 [including GST] for cosmetic repairs and $19,349 [including GST] to
replace the damaged bearer, a total of $26,279.
Case No: 232985 Determination Page 11 of 11
67. The FSP accepted the quote of $6,930; however, it agreed to pay only 50% of
the cost of replacing the bearer because of pre-existing damage to it.
68. The Panel is also faced with considering the possibility of undiscovered
earthquake damage to the building. The consulting engineer stated in his report
dated 7 October 2010:
‘There is known damage to the wall structure and there is also likely to be hidden
damage that may well compromise the building’s future safety. It would be unwise for
the stakeholders to proceed with a repair without investigating all damage. This
would have to be done by essentially stripping the building back to its frame.’
69. The FSP’s last offer to the Applicant was a cash settlement in the amount of
$25,000. The Panel considers this offer to be fair and reasonable given the
extent of the earthquake damage identified. The Panel therefore determines
that payment of this sum to the Applicant discharges the FSP’s obligation for all
of the damage identified.
70. Should there be additional earthquake damage discovered which has not yet
been identified, the Applicant will be required to provide details together with
appropriate expert report(s) to the FSP for further consideration.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.