Home / Financial Firm (Unknown - Insurer) / Determination 232864
Determination 232864
Water damage claim denied under faulty design or workmanship exclusion
Summary
The applicant's home insurer denied a water damage claim relying on the faulty design or workmanship exclusion. AFCA found the damage was caused by faulty roof design and installation and that the FSP was not required to indemnify the loss.
Once the loss is prima facie covered the onus shifts to the insurer, which met it through expert evidence of installation faults; section 46 of the Insurance Contracts Act did not prevent reliance on the general exclusion.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 232864 Determination Page 1 of 7
Case number: 232864
General Insurance - Domestic Insurance - Home Building – FSP ’s Decision -
Denial of Claim
30 September 2011
Background
1. The Applicant holds a home insurance policy issued by the Financial Services
Provider (FSP).
2. A claim was lodged on the policy for water damage to internal plasterboard and
timber floor, which had occurred on 1 December 2010. The FSP appointed a
builder (PP) who considered the water damage was due to the dented roof
sheet and was not storm related.
3. A roof plumber (RC) was appointed by the FSP to provide a detailed report on
the roof. RC concluded that the primary and overriding cause of rainwater
penetration from the roof into the lounge room is due to faulty installation of the
metal sheet roof causing rainwater to overflow from the eaves gutters
positioned between the original house tiled roof and the newly installed
extension roof.
4. The FSP rejected the claim on the basis that loss or damage caused by faulty
design or workmanship is excluded from the cover by the policy.
5. The Applicant does not agree that the FSP is entitled to refuse the claim and
the matter was referred to the Financial Ombudsman Service (FOS) for a
review. Whilst the matter was being considered by FOS, the Applicant
submitted a roof plumber’s report for consideration. This report was exchanged
with the FSP.
6. The FSP maintained its decision stating that the Applicant’s plumber’s report
supports that the damage was due to installation faults of the roof which is
excluded from cover by the policy.
7. The amount in dispute is estimated to be approximately $12,391.50.
Summary of Applicant’s Position
8. He is unsatisfied with the FSP relying on the storm created opening exclusion
to deny his claim. He never specifically claimed under the insured event storm.
9. He believes the damage was caused by rainwater overflowing from external
eaves gutters. Thus, the loss claimed should be covered under the insured
event of water leaking or escaping from gutters.
Determination
Case No: 232864 Determination Page 2 of 7
10. The area that the FSP is claiming the major structural defect exists is 3 meters
away from the water damaged area in the lounge room. It is in a different area
to the enclosed gutter where RC states the water is entering.
11. There was no mention of faulty design or workmanship issues in the building
inspection report he obtained prior to purchasing the property in 2009. The
building was rated average which means that the overall condition is consistent
with a dwelling of the same age and construction.
12. He was unaware of the structural defects in the roof. Therefore, section 46 of
the Insurance Contracts Act 1984 (the Act) applies and the FSP cannot refuse
the claim.
13. His wife was told by the F SP’s repairer that the internal damage w ould be
covered under the policy.
14. T he FSP’s expert during his inspection walked across the roof and caused the
dents in it.
15. He has provided video footage showing that water is not pooling in the dents,
but is running off into the external gutter.
16. RC was not an independent expert and had a clear directive from the FSP to
find an outcome that suited it.
Summary of FSP’s Position
17. The Applicant is seeking indemnity under the defined events storm and/or
water escaping from a gutter. However, he has failed to provide evidence to
support his case.
18. There is no evidence of a storm created opening in the roof. As such, the
insured event storm is not applicable.
19. The FSP’s roof plumber RC reported that there are a number of installation
faults with the metal roof which had caused the water ingress.
20. The dents in the roof also contributed to the water entry into the property.
21. On the basis of the experts’ evidence , the FSP concluded that the primary
cause of the water damage was due to the incorrect retention of the eaves
gutters between the original roof and the metal deck extension which are filling
with water and overflowing into the ceiling.
22. It is arguable that the damage ingress was due to rainwater leaking or escaping
from the house gutters. However, the policy excludes cover for damage
resulting from faulty design or workmanship
23. The FSP refers to the Wayne Tank principle which provides that when there is
loss due to causes that operate simultaneously, one cause being covered and
any others being excluded under the policy, the exclusion operates to the
detriment of the total claim.
24. Alternatively, the FSP relies on its experts’ reports that there were several pre -
existing issues with the condition of the metal deck roof, including significant
dents and inadequate flashing. Accordingly, the FSP submits it is entitled to
Case No: 232864 Determination Page 3 of 7
deny indemnity on the grounds that wear and tear and/or failure to maintain the
roof is excluded under the policy.
25. There is no agreement to indemnify the Applicant, nor was a representation
made to this effect by the assessor. Even if the assessor did provide an
indication that the internal damage would be covered, this would not be a
binding agreement as the assessor did not have the authority to make a
decision on indemnity.
26. The FSP rejected the App licant’s allegation that its assessor had caused the
dents in the roof. The dents in the roof were pre-existing at the time of
inspection and are clearly shown in the photographs taken by the assessor.
27. The Applicant was or ought to have been aware of the problems with the
guttering and the leaks to his property. A reasonable person in the Applicant’s
position would have been aware of the problem by reason of the building
inspection report and would have had the gutters cleaned and inspected by a
plumber. However, the Applicant has not provided any evidence that this was
done.
28. The FSP further relies on the finding of the New South Wales Supreme Court
case of Nelson v Holland Insurance Co Pty Ltd [2010] NSWSC 199 to the effect
that a provision in a policy excluding liability for loss caused by faulty design or
workmanship is not affected by section 46.
29. The present dispute is similar to that of the above case.
30. The FSP relies on the following policy provisions:
“ Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rain or snow, or
a sudden, excessive run-off of water as a direct result of a storm in your local
area
…
we will under buildings insurance
rebuild or repair that part of your home that was damaged
…
however under buildings insurance
we will not cover loss or damage caused by storm to retaining walls, or when
water enters through an opening that was not created by the storm.
...
Water – leaking or escaping
If your home or contents suffer loss or damage caused by water leaking or
escaping from
house gutters or drain pipes
Case No: 232864 Determination Page 4 of 7
…
What you are not covered for – general exclusions
we will NOT cover
loss, damage, injury or death that occurs as a result of
wear, tear, rust, corrosion, deterioration or erosion
faulty design or workmanship
…
Things that may put your claim or cover at risk
You may put your insurance claim or cover at risk if you do not meet your obligations
to us. We may refuse a claim, cancel your Policy, or do both
do not maintain your home in good repair and condition. This means your
home must be watertight, structurally sound, secure and well maintained ”
Issue
31. Whether the FSP is entitled to deny indemnity for the claimed loss.
Reasons for Decision
32. Having reviewed the matter, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is
due to the circumstances and quantum of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
33. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
34. The parties have raised a number of issues in their submissions which I do not
consider pertinent to this dispute. Thus, I will only address the issues that I
consider relevant to my determination.
35. The onus is on the Applicant to establish, on the balance of probabilities, that
he suffered a loss caused by a risk insured against. Once it has been
established that the loss was prima facie caused by a risk insured against, the
onus shifts to the FSP to show that the loss did not occur as claimed or that the
loss is not covered by the policy if that is the FSP's belief.
36. The FSP relies heavily on its roof plumber’s report in denying liability fo r the
claimed loss. RC’s report dated 25 March 2011 provide s the following
conclusions:
“ CONCLUSIONS
Point 1
The prime and overriding cause of rainwater penetration from the roof into the
lounge room is due to overflow from the eaves futter positioned between the
original house tiled roof and the newly installed extension roof.
Case No: 232864 Determination Page 5 of 7
It should be noted that the in situ retained eaves gutter that is wholly in place
over the lounge room does NOT comply with *plumbing Standard and as such,
this particular leakage issues is entirely attributable to an installation fault.
Point 2
I found that there is a second point of rainwater ingress where there is
substantial pedestrian traffic damage to the overlap of the roof sheets.
I have absolutely no doubt whatsoever that the damage to this roof sheet will
allow rainwater ingress during storm situations.
I am unable to provide any definitive answer as to who may have caused the
dints roof sheets, however I can state that the spacing of the battens in the order
of 2 metres, is well above the maximum spacing allowed within * Pluming
Standards and Roof Cladding Manufacturer’s Installation Guidelines.
As such, any damage to the roof sheets can be attributed to a pre-existing
underlying installation fault.
Point 3
There is a third area of rainwater ingress occurring into the lounge room at the
discharge point of an eaves gutter.
Where the eaves gutter discharges onto the low gradient metal deck there is
absolutely No appropriate flashing and rather a totally inappropriate and
ineffective lead flashing installation.
The absence of any appropriate flashing is providing a point for rainwater ingress
at the discharge point of the eaves gutter. This is a pre- existing installation fault”
37. Based upon the above report, the FSP denied the claim on the basis that the
damage was as a result of the roof defects which had allowed water to enter
the property.
38. The Applicant in support o f his case provided a roof plumber’s report and
photos of the roof. I note this report was undated and does not include a
business name, or ABN. Nevertheless, I note this report contains the following
relevant information:
“ Roof system and components
On inspection of site I observed that the external eave gutter had no overflow
allowances. This would instruct a major role in the damage sustained to the
property due to when the downpipe is blocked, or in heavy downpour, the water
would overflow to the back of the gutter. This is also caused due to the back of
the gutter being fixed higher than the cladding forcing the water to run down the
wall cavity”.
39. I have had regard to both reports presented by the parties in relation to the
cause of the damage. Whilst I find the Applicant’s roof plumber report to be
brief and inconclusive, it nevertheless supported the findings provided by the
FSP’s experts. Thus, I am satisfied that the damage was caused by the faulty
design and installation of the roof.
40. The Applicant has claimed protection under s46 (2) of the Act on the ground he
was not aware of or could not reasonably been aware of a defect or
imperfection in the roof. I refer to my comments below and also note legal
authority supports the view that a clause in the contract can only be struck
Case No: 232864 Determination Page 6 of 7
down by s46 (2) if it purports to have reference to the defect at a time before
the contract was entered into, i.e. it was a pre existing defect.
41. The subject clause relied on by the FSP applied generally to faulty design or
workmanship and is not directed to mere pre-existing defects. The decided
case of Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199,
states that section 46 of the Act does not apply to an exclusion of an event
which makes no reference to when the event occurs. Therefore, only those
exclusions which refer to a condition existing before entry into the contract are
affected by section 46.
42. The Applicant submits there was no mention of faulty design or workmanship
issues in the building inspection report he obtained prior to purchasing the
property in 2009. The building was rated average which means that the overall
condition is consistent with a dwelling of the same age and construction.
43. The building inspection report dated 01 October 2009 provides the following
comments in respect to the exterior of the roof:
“ 3.0 THE ROOF EXTERIOR
Areas Inspected Location Type of
Defects
Description
of Defect/
Safety
Hazard
Significance of
defects and
recommended
action…
3.01 Roof
(Tiles, Shingles,
Sheeting, Roof,
Gables, Flashing)
All Chipped and
cracked roof
tiles/hip tiles
require
replacement
and cracked
mortar to hip
tiles require re -
pointing
3.02 Skylights,
Vents and flues
All Nil …
3.03 Valleys All Nil
3.04 Guttering All Sagging gutters
require re - fixing
(Rear of
pergola). All
gutters and
downpipes
require
cleaning and
flushing.
A gutter and
down pipe
required to the
rear of the
garage and
pergola.
Recommend a
Plumber
inspect and
detail the
requirements to
ensure that the
gutters are
functional and
adequate for
the situation.
Case No: 232864 Determination Page 7 of 7
3.05 Downpipes Front entry
and shed
The downpipe
to the front right
corner of the
building and
rear pergola
are not
connected to
drainage. Re -
connection to
drainage is
recommended.
Al l gutter s and
downpipe is
required to the
rear of the
garage and
pergola
Recommend a
Plumber
inspect and
detail the
requir ements to
ensure that the
downpipe are
functional and
adequate for
the situation
3.06 Eaves,
fascias and
barges
Life side and
rear of
building
Water leakage
and damage to
eaves
Rectify leak
44. The report clearly states that the eaves gutters would require maintenance. The
building inspector also recommended further inspections by a plumber to
ensure that gutters are functional and adequate for the situation.
45. There is no evidence before me to establish that the Applicant has instructed a
plumber to carry out further investigation, nor is there any evidence to establish
that he had carried out any maintenance works to the eaves gutters.
46. Based upon the above report, I find the Applicant would have reasonably been
aware that the eaves gutters would have been in need of maintenance in order
to prevent additional deterioration and/or water ingress into the property.
47. I further note the Applicant also provided photos of the damage, including
photos showing extensive water damage to the timber floor. The extent of
damage sustained to timber floor clearly shows the water ingress has been in
existence for a period of time and not from one single insured event.
Determination
48. On the basis of the available information, I determine that the FSP is not
required to indemnify the Applicant for his loss.