Text of the determination
Case No: 232701 Determination Page 1 of 15
Case number: 232701
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
13 March 2012
Background
1. The Financial Services Provider (FSP) issued a home and contents insurance
policy to the Applicant on behalf of an insurer. The relevant period of insurance
operated between 15 November 2009 and 15 November 2010. During this
period, the building was insured up to a sum of $250,000 and contents for
$57,000. Claims were subject to an excess of $250.
2. For the purposes of this Determination, reference to the FSP will encompass
the insurer.
3. The Applicant is represented by a legal service, however, for the purposes of
this Determination they will be collectively referred to as “the Applicant”.
4. On 7 March 2010, the Applicant’s property was damaged due to water
inundation and a claim was lodged on this policy (“March 2010 claim”). The
FSP accepted the claim and authorised repairs. Some repairs were deferred to
enable the dwelling to dry out sufficiently.
5. The repairs associated with this claim were not completed when the property
was again inundated by water on 15 October 2010 (“October 2010 claim”). The
FSP engaged a hydrologist to conduct a site inspection and based on his
report, it denied this latter claim as th e damage was caused by “flood” as
defined by its policy.
6. The Applicant disputed this decision and the matter was reviewed via the FSP’s
dispute resolution procedures. During this process, the FSP identified that the
March 2010 claim was incorrectly paid, a nd by law, it was entitled to recover
monies paid on the basis of mistake as to the fact. However, on a without
prejudice basis, it offered to waive this right if the Applicant accepted its denial
for the October 2010 claim.
7. The Applicant disputed this decision and has now referred this matter to the
Service.
8. It is unclear whether the FSP is intending to seek recovery for the amounts paid
and owing under the March 2010 claim given the Applicant’s refusal to accept
Determination
Case No: 232701 Determination Page 2 of 15
its 'without prejudice' offer. For the sake of completeness, this issue will be
dealt with in the reasons for decision.
Summary of Applicant’s Position
Clearly inform about flood exclusion
9. The Applicant does not dispute receiving the policy. However, she says the
policy definition of “flood” is confusing and contradictory. The definition is too
broad as it excludes stormwater run-off despite the policy covering rainwater
run-off and stormwater as defined events. Pursuant to the comments made by
a previous Panel in Determination number 41709, the Applicant says the
definition does not comply with section 35(2) of the Insurance Contracts Act
1984 (the Act).
10. In relation to the FSP’s argument tha t section 35 of the Act does not apply
because she engaged the services of a broker, the Applicant disputes this
entirely. Alternatively, she states that at the least, this only applies to section
35(2) of the Act as the FSP has a statutory obligation to provide standard cover
for prescribed events (including storm and flood) which it can only avoid if either
it, or the broker, clearly informed the policyholder of the exclusion.
11. Given the above, the Applicant maintains the FSP cannot rely on the exclusion
for flood pursuant to section 35 of the Act.
Water Inundation
12. The Applicant maintains the hydrologist’s findings should not be relied upon
pursuant to the following reasons:
The hydrologist failed to consider the possibility that, given her property is
situated at the bottom of a hill, the inundation was due to stormwater run-
off from that hill.
The hydrologist misconstrued the information provided by the Applicant
during his site inspection. The Applicant informed him that she saw water
cascading down the hill behind her home, which he did not articulate in his
report. Further, she refutes the hydrologist’s reference that she told him
there was no initial rush of stormwater from the hillsides.
A neighbouring property on the other side of the creek had referred a
dispute to the Service regarding their claim for damage due to water
inundation. A Determination was issued in that Applicant’s favour
(240177) as the cause was determined to be stormwater.
The hydrologist failed to give sufficient weight to the saturation of the
grounds from heavy rains.
The Applicant recorded a total of 168mms rainfall in the period between
13 October 2010 and midafternoon 15 October 2010, which is higher than
Case No: 232701 Determination Page 3 of 15
recorded at BB recording station. Further, this recording station is
approximately two kilometres from her property.
The hydrologist relied upon evidence received from NSW Office of Water
that stated the most intense rainfall occurred between 11.45am and
12.15pm on 15 October 2010. However, the Applicant provided an email
from a GC at the NSW Office of Water who advised that:
“After reviewing the archived record for gauging station 410156 K Creek at BB
it was revealed that the rain gauge at this site was topped by flood water at
14:00 hours on 15/10/2010. One of our instrument people attended the site on
the 18/10/2010 and repaired the main gauge. If any rainfall occurred in this
period it would not have been recorded.”
The Applicant also advised that rainfall occurred on Wednesday through
to Friday and continued throughout that night. Accordingly, the
hydrologist’s evidence regarding the heaviest rainfall cannot be
substantiated and therefore, his conclusion that the water inundating the
property must have come from K Creek is flawed.
The hydrologist does not identify when the c reek broke its banks, if at all.
The hydrologist’s comment that there is no “evidence of shallow deep flow
from the hillsides above the property” (sic) is flawed because it does not
take into consideration local and regional factors.
13. In relation to the October 2010 claim, the Applicant recalls the events as
follows:
“that water initially flowed down the hill, backing up along the driveway beside
the house, then flowing past and down into the under floor space through the air
vents and then rising up through the floor boards. At that time there was no water
over- flowing from the Creek.”
14. The Applicant submits the water which inundated her property at 4pm on
Friday, 15 October 2010 was running down the hill, not overflow from the K
Creek. Accordingly, her loss occurred as a result of “storm” or “stormwater run-
off ” and should be covered.
15. Pursuant to this, she is seeking the following:
Be indemnified for her claim without limitation,
Payment of alternative accommodation expenses,
Interest pursuant to section 57 of the Act, and
An award of compensation due to the insurer’s delay.
Summary of FSP’s Position
16. The FSP submits section 35 of the Act does not apply because the Applicant
engaged the services of a broker. Accordingly, pursuant to section 71(1) of the
Act, she has no entitlement to any remedies associated with any potential
failure to comply with section 35 of the Act.
Case No: 232701 Determination Page 4 of 15
17. Further and in the alternative, the FSP submits that:
the Applicant has received the policy
this clearly excludes loss or damage arising from “flood”, and
the definition of “flood” is clear and unambiguous.
18. The FSP relies on the evidence of a hydrologist to substantiate its position that
the water which inundated the Applicant’s property in October 2010 was “flood”.
Further, in response to the Applicant’s submissions regarding the source of the
water inundation, the FSP says the following:
The Applicant’s home is located in the middle of a defined floodplain.
The homestead is located on the western bank of K Creek and situated
very closely to it.
There is no evidence the hydrologist misconstrued the Applicant’s version
of events in his report.
The Applicant has provided no expert evidence to contradict the
hydrologist’s report.
19. The FSP relies on the following policy provisions to substantiate its position:
“ Flood means:
The inundation of normally dry land by water escaping, overflowing or being released
from the normal confines of a:
1. Canal;
2. Dam;
3. Natural watercourse or lake (whether or not altered or modified); or
4. Reservoir.
Flood also means inundation of normally dry land by rainwater that cannot run-off into
any Canal, Dam, Natural water course or lake (whether or not altered or modified) or
Reservoir because they are flooded or over flowing.
Flood also means inundation of normally dry land by rainwater that mixes with
floodwater coming from any Canal, Dam, Natural water course or lake (whether or not
altered or modified) or Reservoir.
…
Section 9 Home Buildings …
What’s Not Covered …
7. Perils Not Covered
Loss or damage that arises from:
(a) Flood , the sea or a tidal wave.
…
Section 10 Home Contents …
What’s Not Covered …
8. Perils Not Covered
Case No: 232701 Determination Page 5 of 15
Loss or damage that arises from:
(a) Flood , the sea or a tidal wave. …”
Issues
20. Whether the policy definition of flood is ambiguous and therefore cannot be
relied upon by the FSP, and
21. Whether the water that inundated the Applicant’s home was “flood”.
Reasons for Decision
22. Due to the nature of the dispute, the matter has been referred to the Panel for
Determination in line with the Operational Guidelines to the Service’s Terms of
Reference.
23. This decision has been made by a Panel consisting of an Ombudsma n, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
24. The Panel Chair Ombudsman attended on site where he met with the
Applicant, her representatives and the FSP.
25. It is ap propriate to consider the Applicant’s issues under the various headings.
Clearly inform about the exclusion for flood
26. The Applicant maintains the policy definition of “flood” is too broad and
accordingly, does not satisfy the FSP’s requirements under secti on 35(2) of the
Act. However, the Panel accepts the FSP’s arguments that the Applicant is not
entitled to rely on section 35 of the Act given she utilised the services of an
insurance broker in arranging this contract of insurance.
27. Section 71(1) of the Act, which has been relied upon by the FSP and is
applicable in these circumstances, states the following:
“ 71 Agency
(1) A provision of this Act (other than subsection 58(2)) for or with respect to the
giving of a notice, a statement, any other document or any information to an
insured before a contract of insurance is entered into does not apply where the
contract was arranged by an insurance broker, not being an insurance broker
acting under a binder, as agent of the insured.”
28. Section 35 of the Act, in broad terms, states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay
the claim unless it can establish that it clearly informed its insured in writing that
it would not cover this event. This is generally a consumer protection
mechanism for certain limited types of insurance contracts, such as home
building, motor vehicle and travel.
Case No: 232701 Determination Page 6 of 15
29. However, the Panel accepts the intention of section 71(1) of the Act is to relieve
an insurer of this obligation given the insured has engaged the services of a
professional broker. This is due to the insured in those cases having access to
a professional whose duties normally extend to:
ensuring the insurance cover secured is appropriate to their needs, and
explains any exclusions or issues applicable to the cover secured.
30. This interpretation and effect of section 71(1) of the Act is consistent with the
rationale outlined in the Explanatory Memorandum that accompanied this
provision, which states:
“Where an insured engages a broker to negotiate his insurance, that broker is
under a duty to provide expert advice to the insured and should be aware of the
relevant notices that should be brought to the insured’s attention. It would be
pointless if an insurer were also required to give either the broker or the insured
information in these circumstances. Should the broker not inform the insured of a
matter to which his attention should have been drawn, e.g. an unusual term in
the contract, then the insured would have a right to sue the broker for
professional negligence.”
31. The Panel therefore accepts that the Applicant cannot rely on section 35 of the
Act in these circumstances. Further, in light of this, the previous Determination
in case number 41709 does not apply as section 35 of the Act was the
substantive basis of that Panel’s decision.
32. Although section 35 of the Act is not applicable, the Panel acknowledges the
Applicant’s submissions that the flood definition is confusing and ambiguous
and therefore, contractual principles may apply to her benefit if her contention
in this regard is correct.
33. The Applicant appears to contend there is inherent ambiguity in the exclusion
due to the fact it includes rainwater in the following circumstances:
Where it cannot run-off into a Canal, Dam, Natural water course of lake
(whether or not altered or modified) or Reservoir because they are flooded
or over flowing; or
It mixes with floodwater.
34. Further, it relied on case number 41709 to support that proposition. However,
the Panel reviewed the reasoning contained in that previous Determination and
does not accept that the Panel’s comments therein can be construed as stating
the definition itself offended the requirements of section 35 of the Act or is so
inherently confusing that it cannot be relied upon.
35. The Panel’s comments in the previous matter were focused on the policy’s
structure and drafting, in particular the omission to cross reference the relevant
policy provisions and how this offended section 35 of the Act. This cannot be
construed as being indicative of the failure of the flood definition itself.
36. In the current matter, in relation to the FSP’s policy definition of flood, the Panel
notes this attempts to mirror the common law position. Further, it essentially
Case No: 232701 Determination Page 7 of 15
describes flood in three different ways, each of which is essentially independent
of each other and can be severed from the contract if found to be so ambiguous
that it is essentially of no value.
37. However, the Panel does not accept this latter argument to be the case. The
first definition mirrors a common definition utilised by many insurers and also
currently in contemplation with respect to the Insurance Contracts Amendment
Bill 2011. Further, similar definitions to this have been subject to case law
where the situations contemplated in the following two definitions were
essentially reproduced.
38. In relation to the latter two definitions, the Panel does not accept that they are
so inherently confusing that they should be severed from the contract because
they purport to override the insured event of rainwater run-off. As with most
policies of insurance, the FSP’s policy sets out a number of insured events that
outline the parameters of what it will cover, which is then restricted through
various conditions or exclusions. This is generally permissible provided the
insured event in question is not negated to such an extent that its cover is
rendered essentially meaningless by the relevant exclusion or condition.
39. In this regard, the policy purports to cover damage caused by “rainw ater run-
off” but not in circumstances when it mixes with “floodwater” or cannot drain
into a canal, dam, etc. In the Panel’s opinion, this does not render the insured
event meaningless as it is conceivable that an insured could suffer damage due
to rainwater run-off that does not fall within this exclusion. For instance, if the
Applicant’s submissions are to be accepted in that rainwater run-off from the
local hill inundated her property without mixing with water overflowing from K
Creek, then this would c learly fall within the insured event of “rainwater run - off”
and not within the flood exclusion.
40. The Panel, therefore, does not accept the flood definition should be severed or
read down.
Estoppel & Mistake
41. There appears to be some discrepancy between the FSP and the Applicant
regarding estoppel. The Applicant has indicated the FSP was estopped from
recovering any of the monies paid in the March 2010 claim whereas the FSP
has dealt with this issue in the context that it is not estopped from denying the
October 2010 claim.
42. In regards to the FSP’s position, this does not appear to be disputed by the
Applicant. Further, the Panel accepts the FSP’s argument that there is no
estoppel in respect of the October 2010 claim due to the acceptance of the
March 2010 claim, particularly given both claims occurred in the same policy
year. Accordingly, the Applicant cannot allege she arranged this policy based
on a misapprehension that she was covered for flood at the time she arranged
the policy.
43. The FSP has made reference to the fact that it is potentially entitled to recover
the monies paid for the March 2010 claim based on a mistake of fact. Although
Case No: 232701 Determination Page 8 of 15
the FSP has not specifically stated what the factual mistake was, it appears this
is due to its omission to identify that the water which inundated the Applicant’s
property at that time was “flood”.
44. The Panel does not accept the FSP’s position. The FSP has not articulated
what facts it was not aware of that led to it mistakenly paying the Applicant’s
claim. Further, the FSP has not provided any information on which it relied that
led to the claim being accepted, its conduct before and after and at what point
the mistake was allegedly identified.
45. For instance, the Panel notes that a loss adjuster was engaged to review and
assess the claim. It is therefore foreseeable this loss adjuster was in a position
to advise the FSP of the property’s proximate location to the K Creek and the
circumstances leading to the loss. Following this, the FSP would clearly have
had the opportunity to engage a hydrologist to investigate the source of the
water inundation in light of the property’s proximity to K Creek.
46. However, it elected not to do so but instead accepted the claim and authorised
repairs without further investigation. Further, these repairs were almost
complete before the second inundation occurred at which point, it then
appeared to identify a mistake allegedly occurred.
47. That the adjuster may have failed to identify all of the salient issues or the FSP
had failed to fully assess the information may not now be held against the
Applicant. There is no evidence that she withheld any information, or that she
failed to cooperate with the FSP or its adjuster in assessing the loss.
48. Given these circumstances, the Panel does not accept the FSP has established
any entitlement to recover any monies paid based on mistake. In this regard,
the Panel refers to the seminal case that discusses the doctrine of mistake
provided by the High Court in David Securities Pty Ltd v Commonwealth Bank
of Australia [1992] HCA 48. The Court in that case distinguished payments
made voluntarily and by mistake. The former was described by the Court in the
following manner:
“The payment is voluntary or there is an election if the plaintiff chooses to make
the payment even though he or she believes a particular law or contractual
provision requiring the payment is, or may be, invalid, or is not concerned to
query whether payment is legally required; he or she is prepared to assume the
validity of the obligation, or is prepared to make the payment irrespective of the
validity or invalidity of the obligation, rather than contest the claim for payment.”
49. The Panel accepts that this applies in these circumstances. It is reasonable to
accept that an FSP, like most general insurers, would carefully assess each
and every claim before making a decision to accept them. Often, some insurers
will conduct a thorough investigation in circumstances when they believe they
may have a genuine entitlement to deny liability.
50. In these circumstances, the FSP had engaged a loss adjuster to review the
Applicant’s claim, engaged contractors to conduct repairs and were aware of
salient facts, such as:
The property being located near the K Creek and
Case No: 232701 Determination Page 9 of 15
The K Creek having broken its banks.
51. Despite this, the FSP elected not to engage a hydrologist to review the source
of water inundation but instead decided to accept the claim and authorise
repairs without further enquiry. Further, a significant period of time had passed,
namely seven months and repairs were almost completed before it even
reconsidered its position.
52. In light of this, the Panel therefore accepts that the FSP’s payment of the claim
can be said to be voluntary.
53. Further and in the alternative, the Panel also considers the FSP’s reliance on a
hyd rologist’s report conducted eight months after the event, as evidence that it
made a mistake in accepting the claim, to be tenuous. In particular:
The hydrologist acknowledged that some inundation occurred from
stormwater run-off alone which implies that at the least, part of the
damage sustained by the property was covered under the insured event
of “rainwater run-off ” ; and
His site observations provided no probative assistance given the time that
elapsed and the fact the October 2010 inundation had occurred.
54. Given the above and keeping in mind the principles of utmost good faith, the
Panel does not consider the FSP has established any entitlement to recover
any monies paid out in the March 2010 claim or a basis to refuse to pay out the
remaining balance owed, given its clear undertaking to make such payments.
55. Of relevance to this issue, the Panel Ombudsman Chair recently undertook a
site visit including the Applicant and a representative from the FSP during
which this aspect was discussed.
56. It should be noted and acknowledged that during this visit the FSP advised that
it no longer intends to seek recovery of any part of the previous claim.
Water Inundation
Hydrologist’s Report
57. The FSP has provided the hydrologist’s report which it is relying upon in
substa ntiating its position that the Applicant’s loss was caused by “flood”. This
report states, in summary, the following:
The Applicant’s property is a 140 year old rural homestead. It is located
on the western bank of K Creek. At its closest point, the property is
positioned approximately 100 metres west of the meandering line of K
Creek.
K Creek flows north towards its confluence with the M River. In the vicinity
of BB, K Creek is situated on the lower banks of a well-defined flood plain
that drains into the surrounding low granite hills. Several kilometres
upstream of BB, the T Creek flows into K Creek.
Case No: 232701 Determination Page 10 of 15
The K Creek catchment upstream of the Applicant’s property is 126
square kilometres and considered a large rural catchment.
The Applicant provided the following information to the hydrologist:
Rainfall occurred from 13 until 16 October 2010.
On 13 October, she observed flood waters from K Creek rising to the
level of wire fencing along the sides and rear of the property.
Flood waters were observed to recede during Wednesday night and
Thursday morning.
She observed flood waters rising from K Creek during Friday
morning and early afternoon before finally entering the house at
3.25pm. She stayed in the property during the flood event.
She did not observe any initial rush of stormwater from the hillsides
of her property unlike the March 2010 inundation.
He also observed the following in his site inspection:
Extensive inundation (suspended vegetation on fencing, sediments
and mud) along the entire rear of the property.
Evidence of fast moving sourcing flow.
Evidence of inundation of the house,
No significant evidence of shallow depth sheet flows from the
hillsides above the property and no significant evidence of
conveyance of shallow flows in the vicinity of the garage / carport.
Visual confirmation that the location of the subject site is on a well-
defined and obvious flood plain.
The K Creek is gauged at BB and shows a pre -storm base of
approximately 0.8m. This level peaked on 15 October at just over 4.544
metres at 3pm.
The closest rainfall station in T recorded 24 hour accumulated rainfall.
During the period between 13 and 16 October 2010, the highest rainfall
recorded was approximately 70mm on 14 October 2010. The second
highest was recorded on 16 October 2010 with approximately 55mm
rainfall.
BB also has a cumulative rainfall gauge. Although T recorded higher
rainfalls than BB, the latter gauge provides a useful comparison in
assessing the catchment response (lag time) between recorded rainfall
and resultant rise in river levels. The lag time was assessed as
approximately 3 hours and based on the following factors:
A reflection of the antecedent rainfalls across the catchment
producing an already saturated catchment area, and
Predominance of relatively short and steep flow paths into the K
Creek valley from the surrounding granite hills.
Case No: 232701 Determination Page 11 of 15
He concluded that the source of the water inundation was from the K
Creek overflowing.
58. The Applicant has referred to a previous Determination (240177) where the
Panel found the w ater damage to her neighbour’s property resulting from this
same event was covered. However, the Panel has had an opportunity to review
that previous Determination and does not consider it provides probative
assistance to the Applicant’s case due to the fo llowing significant
distinguishable features:
The definition of flood did not include rainwater which could not drain into
a Canal, Dam, Natural water course or lake (whether or not altered or
modified) or Reservoir because they are flooded or over flowing .
In that case, in particular paragraph 52, the Panel identified some of the
stormwater run-off that inundated the property could not drain into K
Creek and flowed back into that Applicant’s property. This would have
been “flood” had this FSP’s policy definition been in place.
The level of inundation was somewhat lower, namely 600mm to 800mm in
case 240177 versus one metre in this dispute.
The Panel identified substantive errors in the hydrologist’s report in
(240177). For instance he only accounted for one culvert near that
Applicant’s property when there were five and referred to there being no
rainfall on 14 October 2011 which was substantively rebutted by that
Applicant.
The topography surrounding the property in (240177) had quite different
features and particularly its location on the opposite side of the creek.
59. The Applicant has not provided any alternative expert evidence to refute the
FSP’s hydrologist’s findings, but has relied on some data provided by the NSW
Office of Water.
60. Having considered the available evidence, the Panel accepts it is likely that
waters from the K Creek have overflowed and inundated the Applicant’s
property at some point given the following:
Although the hydrologist’s evidence does not discuss at what level the
water needed to reach for the K Creek to break its banks, it does not
appear to be in dispute that due to the rainfall experienced in the K Creek
catchment, the K Creek did overflow. This is supported by media reports;
The close proximity of the Applicant’s property to K Creek; and
The fact the Applicant’s property was inundated by a water depth of
approximately one metre, which is difficult to associate purely with
rainwater run-off given the accumulated rainfall during the relevant period
did not reach that depth.
Case No: 232701 Determination Page 12 of 15
Rainwater run-off
61. The substantive issue in this case is therefore whether rainwater run-off alone
inundated the Applicant’s property prior to the waters from K Creek. In this
regard, the Applicant has raised a number of submissions to discredit the
hydrologist’s findings in substantiating her position that rainwater run-off alone
inundated her property.
62. The significant discrepancy between the parties is the hydrologist recollection
of the Applicant’s evidence regarding when and where the water came from
which initially inundated her property. The Applicant has refuted the
hydrologist’s comments regardin g her evidence and has instead stated water
had inundated her home from the hillside prior to the K Creek overflowing.
63. The FSP, in attempting to refute this discrepancy, has asked the Service to
allow more weight to the hydrologist’s recollection given his contemporaneous
report. However, the Panel does not accept this. The report appeared to have
been completed on 6 December 2010 and the inspection occurred on 23
November 2010. Accordingly, it is unclear that when the hydrologist was
collating the Applican t’s evidence in his report, he was referring to
contemporaneous notes taken at the inspection or relying on his memory alone.
If the former, then these notes should have been made available to the Panel to
corroborate the hydrologist’s evidence. If the lat ter, then it is possible the
hydrologist could have made an error when reconstructing the conversation
from his memory alone, approximately two weeks later.
64. However, as noted above, a recent site visit was undertaken by the Panel
Ombudsman C hair, at which the Applicant and a representative of the FSP
attended.
65. The Applicant again stated that she noted water cascading down from the
adjacent hillside and described this in some detail, and maintains that she
reported this to the hydrologist. She continues to r eject the hydrologist’s record
of her report.
66. In the absence of any contemporaneous file notes and the fact the Applicant
has provided direct evidence through her solicitors, and later during the on-site
visit, the Panel is inclined to prefer the Applicant ’s evidence in this regard.
67. The FSP has noted that the hydrologist’s findings should be accepted given the
various factors it has relied on. The Panel accepts the hydrologist’s report to
the extent that water from K Creek did inundate the Applicant’s prope rty at
some point. However, the issue the Panel has with the report is that in light of
the Applicant’s accepted evidence regarding her observations of the day, the
hydrologist has not adequately dispensed with the possibility that rainwater run-
off alone could have inundated the property prior to waters from K Creek.
68. Further, the hydrologist does not articulate when the water would have
overflowed the creek’s banks and/or the likely time of inundation.
Case No: 232701 Determination Page 13 of 15
69. The only evidence in the hydrologist’s report t hat appears to refute this
possibility (omitting his recollection of the Applicant’s evidence) is limited to the
following comments:
“No significant evidence of shallow depth sheet flows from the hillsides above the
property, and no significant evidence of conveyance of shallow flows in the
vicinity of the garage / carport.”
70. The Panel does not consider that this evidence is persuasive. The hydrologist’s
comment is limited to there being no significant evidence. This therefore implies
there was some evidence of shallow depth sheet flows in the hillside and in the
vicinity of the garage/carport to corroborate the Applicant’s evidence that
rainwater run-off alone inundated her property, even if to a marginal extent.
71. This is further supported by the hydrologist’ s evidence that the catchment was
saturated from the rainfall occurring prior to 15 October 2010. Accordingly, this
allows the possibility that rainwater on 15 October 2010 running off from the
hillside inundated her property prior to the water from K Creek mixing with this
run-off and inundating the property at a later time.
72. Given this, the Panel accepts the FSP is liable to accept the damage
associated with the rainwater run-off alone that inundated the property.
73. In support of this, during the recent site visit, the Applicant indicated that the
initial inundation of her home was to a height of perhaps 3mm above the level
of the floor, but not greater than a height of 5mm. She states the water rose
through the floor boards before the K Creek overflowed.
74. The Panel is persuaded that the initial inundation was, on the balance of
probabilities a result of stormwater run-off. Any damage exceeding this depth
will not be covered as the Panel is satisfied this would have occurred due to the
K Creek overflowing and either mixing with the rainwater run-off or reaching the
property on its own, both excluded under the policy definition of “flood”.
Quantum
75. The Applicant is seeking a declaration from the Service that the FSP should
indemnify her claim without limitatio n given the policy sum insured for the
building is limited to $250,000. However, the Panel is not satisfied that the total
damage, which has been assessed in the vicinity of $250,000, is attributable
solely to the inundation of the rainwater run-off alone.
76. Further and in the alternative, even if the amount of damage exceeded this
amount, the Panel does not consider there is any basis to compel the FSP to
pay an amount beyond this figure. The contract clearly enunciates the sum
insured and this was communicated both to the Applicant and her broker. In
this regard, the FSP is entitled to cap any payments for the cost of repairs to
the sum insured.
77. In order to ascertain the likely cost associated with the rainwater run-off
inundation, the FSP should obtain a scope of works associated with this. In this
regard, the Panel considers it is fair in all the circumstances to allow a depth of
Case No: 232701 Determination Page 14 of 15
5mm above floor level given the water depth would have been slightly above
the floor boards and consistent with the Applicant’s i ndications.
78. The parties are required to work cooperatively together in agreeing a scope of
works and costing to repair the damage which would have been caused by
water inundation up to a height of 5mm above the level of the floor in the
house. Once agreed, the FSP is required to cash settle the Applicant on the
basis of that costing.
79. In obtaining the scope of works and the quotations, the parties should also
attempt to identify the likely timeframe it would take to repair this damage. Upon
a timeframe being obtained, the Panel notes the FSP should pay for the
reasonable alternative accommodation costs the Applicant would have incurred
whilst these repairs are completed in line with the additional benefit of
“Emergency Accommodation” allowed for under its “Home Buildings” cover.
This is set out in the following policy provision:
“ Extra Benefits
1 Emergency Accommodation
We will pay You for Your extra living costs if You cannot live in Your Home Buildings
due to damage for which We have agreed to pay a claim under this Section. We will
not pay:
(a) For longer than the time that is reasonably needed to rebuild or repair them.
(b) If You do not repair or rebuild them.
(c) More than 10% of the Sum Insured . But, this payment will be additional to the
Sum Insured .
80. Further, the FSP will be required to pay interest on any cash payments made
pursuant to the rate prescribed by the Act.
Compensation
81. The Applicant has indicated she is seeking compensation due to the FSP’s
delay. However, the Panel notes that based on the FSP’s loss ad juster’s report
dated 4 November 2010, the claim appears to have been lodged that day. From
there, the hydrologist conducted a site inspection on 23 November 2010 and
the claim was denied on 6 December 2010, which is just over a month after the
claim was lodged.
82. In the Panel’s opinion, the length of time that lapsed between when the claim
was lodged and a decision made, was reasonable in the circumstances.
83. Although ultimately the FSP’s claim decision was incorrect, the Panel does not
consider that this should automatically entitle an insured to compensation. The
Panel is satisfied the FSP acted in good faith in relying on an expert report to
deny the claim and given the Panel has not found there to be any undue delay
in the handling of the claim, there does not appear to be any basis to award
compensation in these circumstances.
Case No: 232701 Determination Page 15 of 15
Determination
84. On the basis of the available information the Panel determines that this dispute
be resolved in the following manner:
85. The FSP engage an appropriate expert to provide a scope of works associated
with repairing the damage to the building and contents caused by the rainwater
run-off inundation. The Panel has allowed for a 5mm depth of inundation above
the floor boards.
86. Upon securing the Applicant’s agreement to the scope o f works, the parties are
to obtain one quotation each, based on those scope of works as well as an
estimated timeframe to complete these works .
87. Upon receipt of the two quotations, the FSP is to cash settle the claim based on
the average of the two quotations.
88. The FSP is to pay interest on any sum paid in accordance with the Act from 6
December 2010 (being the date it denied the claim) to the date when payment
is affected.
89. The FSP is also to pay the reasonable cost of temporary accommodation
expenses for the time it is estimated it will take to complete these repairs. In the
event the Applicant accepts this Determination, the FSP is to engage an
appropriate expert for the scope of works within 7 days of being notified of the
Applicant’s acceptance.