Home / Financial Firm (Unknown - Insurer) / Determination 232551
Determination 232551
Flood damage to business premises claim declined
Summary
Flood water entered the applicant's business premises and the FSP denied the claim under its flood exclusion. AFCA found the flood was excluded, but the FSP failed to prove under section 35 of the Insurance Contracts Act that it clearly informed her of the exclusion, so it ordered indemnity.
Under section 35 of the Insurance Contracts Act the FSP had to prove it clearly informed the insured in writing of the flood exclusion, and its mailing evidence was too unreliable to discharge that onus.
Issues
- Claim denial primary · upheld
“the Applicant is entitled to be indemnified for the damage caused by the flood event in December 2010.”
- Failure to disclose secondary · upheld
“the Panel is unable to establish from the material that a PDS and SPDS document were included as part of the overall documents sent.”
- Misleading conduct secondary · not upheld
“The Panel therefore does not consider the Applicant was advised she was covered for flood water damage from the Dawson River.”
Subjects and remedies
home or building damagenatural disastersmall businesspay claim
Text of the determination
Case No: 232551 Determination Page 1 of 8
Case number: 232551
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
6 June 2011
Background
1. On 28 December 2010 the Applicant‟s business premises were inundated with
water following severe rainfall in the area.
2. A claim under the Applicant‟s business Insurance policy was denied by the
Financial Services Provider (FSP) on the ground that based on hydrologist
reports the inundation above floor level was floodwater overflowing from Castle
Creek and Dawson River. The policy excludes cover for loss or damage caused
by flood.
Summary of Applicant’s Position
3. About two weeks before the flood occurred she contacted the FSP and was told
that she was covered if any rain causes creeks and rivers to rise and flood her
premises.
4. On the day she lodged the claim she was told she was covered. She contacted
the FSP on a number of occasions to obtain progress reports and was not at
any time told that she was not covered for damage caused by flood.
5. About four weeks after lodging the claim she received a letter from the FSP
advising the policy does not cover flood damage. When contacted in relation to
the reason for the denial, the FSP provided conflicting information relating to
the IDR process. She was disappointed with the FSP‟s management of her
claim.
6. She argues that she was led to believe her property was covered for damage
caused by flood. Three weeks after lodging her claim she was advised by letter
that she was not covered.
7. The original policy document issued to her does not state that she is not
covered for flood.
Summary of FSP’s Position
Determination
Case No: 232551 Determination Page 2 of 8
8. The FSP refers to the hydrologist report dated 16 February 2011 which
concluded:
“All properties impacted were inundated by Dawson River flood water and the
Dawson River flood water caused the maximum depth of inundation.
… Some properties may have been inundated via Castle Creek and possibly by
Castle Creek floodwater prior to the arrival of the Dawson River floodwater.”
9. The Applicant disputed the hydrologist‟s findings and a supplementary report
dated 8 February 2011was obtained which concluded:
“We agree with the insured that the initial inundation of the subject property was
due to flooding in Castle Creek.
Flooding in Castle Creek was caused by rainfall in the upper catchment in the
days up to and including 28 th December. It is likely that during the second flood
peak the property was inundated by Dawson River flooding. The property was
not inundated above floor level by local stormwater runoff.”
10. The policy specifically excludes cover for flood as defined by the policy.
11. The FSP submits that based on the hydrologist reports the Applicant‟s property
was inundated above floor level by floodwaters overflowing Castle Creek and
Dawson River. Therefore the claim for damage to her property is excluded from
cover provided by the policy.
12. The FSP relies on the following policy provisions:
“General definitions
…
6. “ flood means
The overflow of any lake, river, stream or other watercourse, whether natural
or altered, or any reservoir, dam, channel or canal onto land not normally
covered by water.”
…
Insured events
…
4 Storm and wind
…
This insured event does not include damage by;
(a) flood “
Claims handling
13. An audio recording of the conversation in which the Applicant claims she was
advised that her policy provided cover for flood was retrieved.
14. On review of this conversation it is clear that the staff member correctly advised
the Applicant that her policy did not provide cover if her property was flooded by
the Dawson River. The staff member advised the Applicant to investigate
alternate insurance to cover her for such an event.
15. As such it considers that the Applicant was informed prior to the flooding of her
property that she would not be covered for such an event.
Case No: 232551 Determination Page 3 of 8
16. In response to the Applicant‟s complaint that she was not in formed during the
initial stages of the claim that she was not covered for flood, the FSP submits
that on early lodgement of the claim it was not in a position to advise the
Applicant. It was not until the hydrologist report had been received that it could
make a decision in relation to the claim.
17. Further it emailed the Applicant daily up to 14 February advising that the
hydrologist report had not been received. As soon as the supplementary report
was received, the Applicant was contacted by phone on the same day the
decision was made. It then confirmed the decision in writing
18. It considers that it did not unduly delay processing the Applicant‟s claim or that
it failed to communicate with her in a reasonable manner.
Policy Disclosure Statement despatch
19. It maintains that the Applicant was provided with a PDS setting out the
definition of „flood‟. The Applicant acknowledged receiving the schedule sent
with the policy booklets and PDS.
20. Its despatch systems confirm that a PDS was despatched to the Applicant. As
such, it has complied with sections 35 and 37 of the Insurance Contracts Act
1984 (the Act) and is entitled to rely on the terms of the policy.
21. Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation
to the contract, an insurer may not refuse to pay an amount equal to the
minimum amount of cover set out in the regulations made pursuant to the Act
unless it can prove that before the contract was entered into, the insurer clearly
informed the insured in writing of the relevant provisions of the contract, or that
the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
22. Section 37 of the Insurance Contracts Act 1984 provides that an insurer may
not rely on a provision included in a contract (not being a prescribed contract)
of a kind that is not usually included in contracts of insurance that provide
similar insurance cover unless, before the contract was entered into, the insurer
clearly informed the insured in writing of the effect of the provision.
Business Interruption
23. Pursuant to section F of the FOS Terms of Reference, FOS is prevented from
determining the claim for business interruption.
24. It has considered the FOS request to include the business interruption section
of the claim in this matter but did not consent to the request.
Issues
Case No: 232551 Determination Page 4 of 8
25. Whether the damage was caused by flood as defined by the policy, and if so ;
26. Whether the FSP is entitled to rely on the relevant terms of the policy to deny
the claim.
Reasons for Decision
27. The FSP seeks to rely on terms in the policy to deny the claim and therefore
has the burden of establishing on the balance of probabilities that the relevant
terms apply to defeat the claim.
28. As advised to the parties, FOS considered it appropriate to expedite the dispute
in accordance with the FOS Terms of Reference. This is because of the
complex nature of the issues central to the dispute. This dispute has not been
the subject of a FOS Recommendation and has proceeded directly to
determination.
29. There has been an exchange of material between the parties. It therefore is not
intended to recite in detail the contents of the reports provided by the
hydrologist commissioned by the FSP.
Property damage
30. The Panel has viewed maps of the location of the Applicant‟s property. It is
clear that the property is located in close proximity on one side to the Dawson
River and the other side to Castle Creek.
31. The hydrologist commissioned by the FSP in his report of 27 January 2011
titled “Overview of the December 2010 to January 2011 flooding at Theodore”
included general advice on whether the area was inundated by floodwaters,
local stormwater runoff or a combination of both.
32. The report is comprehensi ve and includes references to catchment areas,
floodplains and tributaries in the vicinity of Theodore, hourly rainfall, river water
levels on 22 December 2010 to 7 January 2011, location of stream flow gauges
and aerial photographs of Theodore on 26 and 29 December 2010.
33. The hydrologist made the following relevant comments:
It was likely that Castle Creek floodwater caused the initial flood water
inundation of the eastern portion of Theodore.
The western portion would have been initially inundated via the Dawson
River (see 4.1)
If properties were not inundated by stormwater runoff on 8 February 2011
it is unlikely that they would have been inundated by stormwater runoff
during the December 2010 flood event. ( sect 5)
All properties impacted were inundated by Dawson River floodwater and
the Dawson River floodwater caused the maximum depth of inundation.
Case No: 232551 Determination Page 5 of 8
Given the very small catchment areas and the low rainfalls depths
recorded at nearby gauges it is unlikely that the depth of initial stormwater
inundation would have exceeded 100mm in most locations.
34. The Applicant explained that she was not present at the time of the inundation
of her premises. However, on 27 December 2010 she boated into town and
observed that water from Castle Creek had flooded housing and was continuing
to come towards the centre of town. She advised that it continued to rain
heavily during that day and for the next 24-48 hours. She advised that the creek
was almost full due to excessive rainfall and had there been no further rain over
24-29 December the creek would not have broken its banks.
35. The Applicant stated that the back part of her premises which faced Castle
Creek was lower than the front and that water entered this area of the premises
first.
36. The hydrologist provided a supplementary report dated 8 February 2011
following a site inspection. He concluded;
“We agree with the insured that the initial inundation of the subject property was
due to flooding in Castle Creek.
Flooding in Castle Creek was caused by rainfall in the upper catchment in the
days up to and including 29 th December. It is likely that during the second flood
peak, the property was inundated by Dawson River flooding. The property was
not inundated above floor level by local stormwater runoff.”
37. The Panel accepts the hydrologist was appropriately qualified to assess and
establish the source of water which inundated the Applicant‟s property. He has
come to the conclusion that the water inundation to the Applicant‟s premises
above floor level was not local stormwater but caused by water from Castle
Creek and Dawson River.
38. The policy excludes damage caused by flood which is defined as the overflow
of any river or other watercourse onto land not normally covered by water.
39. In the Panel‟s opinion the evidence leads to the conclusion that the flood water
as defined was responsible for the damage claimed by the Applicant. As such,
based on the terms of the policy, the Panel considers the FSP would be entitled
to deny the claim.
Advice given to Applicant
40. The Applicant maintai ns that about two weeks before the loss occurred, she
contacted the FSP and was told she was covered for flood damage if rain
caused a river to rise.
41. The Panel has been provided with a recording of that call which it has
reviewed.
42. The Panel notes that after firstly making some changes to the sums insured of
her policy the Applicant requested confirmation that her policy included flood
cover.
Case No: 232551 Determination Page 6 of 8
43. The initial response by the consultant could well have led her to believe that
flood was included, however, in an effort to make the situation clear, the
Applicant persisted in her questioning of the consultant. It was only after her
continued questioning that the consultant re-checked the policy cover and
finally advised that flooding from rivers etc. was not covered, although he
persisted in referring back to the inclusion of „flash - flood‟.
44. When the Applicant again sought a definitive position on this, the consultant
finally advised that flood was not covered, such cover could not be made
available to her and if required it was suggested that she contact a specialist
broker who may assist her in obtaining such cover. She acknowledged that she
would need to consider what further steps to take.
45. In the Panel‟s view the advice provided by the FSP‟s consultant was less than
satisfactory. A less persistent or less perceptive client may well have accepted
and believed that flood cover was provided. The initial lack of clarity and
uncertainty in the consultant‟s advice could well have been problematic for the
FSP, and it was onl y as a result of the Applicant‟s continued probing that the
true extent of cover was revealed.
46. If this instance is representative of the usual standard of advice provided by the
FSP‟s consultants , it would be well advised to review its standards of training.
However, the Panel accepts that at the conclusion of the call, the Applicant
acknowledged that she understood that she was not covered when the river
broke its banks and that she would have to seek cover elsewhere. At the
conclusion of the conversation, the FSP‟s officer advised the Applicant she
should contact the NIBA web site to seek the cover from a specialist broker.
47. The Panel therefore does not consider the Applicant was advised she was
covered for flood water damage from the Dawson River.
Section 35 of the Insurance Contracts Act 1984
48. The Applicant maintains that the policy documentation provided by the FSP
when she first signed up for the insurance does not state that she is not
covered by flood. The Applicant has provided FOS with the documentation
referred to which she states, other than letters relating to the claim, is the only
document she has received from the FSP.
49. The document is titled „Business Insurance, Premium Adjustment Notice”. The
text states that the policy has been amended as req uested and that the
amendment has resulted in a premium adjustment. The date of issue is 11 May
2010.
50. The Panel notes from the document that the period of insurance is from 4 May
2010 to 4 May 2011.
51. It is clear that this document was issued to the Applicant following a request to
the FSP to amend the cover. It contains a précis of the sections of cover
selected and the sums insured for each section. It is not a policy document and
Case No: 232551 Determination Page 7 of 8
is not a document intended to convey the terms and conditions of the policy
issued to the Applicant.
52. Section 35 of the Act as it applies to this matter, requires the FSP to prove that
before the contract was entered into, the insurer clearly informed the insured in
writing of the relevant provisions of the contract, or that the insured knew or a
reasonable person in the circumstances could be expected to have known of
such provision.
53. FOS has provided information to assist an FSP that is required to establish to
FOS‟s satisfaction that it sent a document to an Applicant. This infor mation
found in Circular 3 in part states the FSP will need to provide;
A detailed explanation of the usual process for sending the document;
A copy of any record showing the process that was followed to send the
document out and an explanation of that record;
Where the document is included in a group of documents sent out by the
FSP, a signed statement by an appropriately qualified individual which
sets out the following information;
– Identification and explanation of any computer or other records the
FSP relies on to show the document was one of a group of
documents that was despatched;
– Where an agent was used to send the document, the agent‟s
records show the document was included in the group of documents
received from the FSP for despatch;
– Information to show the document was actually posted that day;
– Information to show the address the document was sent to was
identified in the FSP‟s records as the last known address of the
Applicant;
– Confirmation the document was not returned to the FSP.
54. The FSP has provided FOS with an explanation of the FSP‟s process for
despatch of documents, record of production of the document and record of
lodgement of the documents with Australia Post.
55. The FSP refers to appendix 4 of the enclosures, which it states shows that t he
PDS and SPDS to be sent with new business on 6 May 2010 were included.
However, examination of appendix 4 reveals use of a number of codes for
“[FSP ] Notices NB”. No explanation has been provided to FOS to link or identify
any code with a PDS or SPDS document.
56. Further, while the document titled “Production Report” for job number xxx585P
includes data, such as documents, sheets and so on; there is no means of
linking that information to any batch which includes the Applicant‟s material.
57. For the Panel to be satisfied that a document was processed, it is helpful to
have the documents identified where codes are used and records supporting
the explanation which link one process to the next. Information supported by
documentary evidence will allow the document to be tracked through the
various stages of the process in place from the initial collection to despatch.
Case No: 232551 Determination Page 8 of 8
58. While the material confirms that a new business notice was generated on 6
May 2010, the Panel is unable to establish from the material that a PDS and
SPDS document were included as part of the overall documents sent to the
mail house and lodged with Australia Post as job number xxx858 -1 and -2 and
-3.
59. The Panel also notes the contents of an email from the mailing agent which
states, in part:
“Please find attached the lodgement report and production report for data
received on 6/7.
I can confirm lodgement did occur on 7/7 however 194 were lodged on Monday
10/7. Unfortunately there are no heat calls (sic) so I am unable to find out the
reason for the m issed lodgement”…….
“ As discussed the amount between the lodgement report and production report is
out by 105. This is because they (sic) could have been holdbacks or docs that
are sent out in express post bags and they are not recorded on the production
r eport. These are reported on the handline report which I was unable to locate.”
60. The Panel is unclear as to what the effect is (if any) of this reported discrepancy
and how the FSP is able to know with any degree of certainty which articles are
mailed by which method on which days.
61. In considering the evidence overall the Panel is of the view that in this instance
there is sufficient doubt as to the reliability of the mailing data provided by the
FSP on that day that it has failed to adequately discharge its obligations
pursuant to section 35 of the Act.
62. Section 35(1) of the Act provides that the FSP may not refuse to pay an amount
equal to an amount set out in the regulations made pursuant to the Act. Home
building insurance is a prescribed contract within the regulations and provides
cover for flood.
63. In these circumstances, the Panel is of the opinion that pursuant to section 35
of the Act, that the Applicant is entitled to be indemnified for the damage
caused by the flood event in December 2010.
Determination
64. On the basis of the available information, the Panel determines that the FSP is
required to indemnify the Applicant for her claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.