Determination 232034

Cash settlement amount for storm-damaged glass balustrade fence and tiles

FirmFinancial Firm (Unknown - Insurer)
Decided2011-11-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$27,600
Non-financial loss—
Amount claimed$40,575
SourceAFCA PDF

Summary

Applicants claimed for a storm-damaged glass balustrade fence and balcony tiles, seeking about $40,575 for full reinstatement. The FSP offered a cash settlement of $27,600 to rebuild to the original design. AFCA found that offer adequate for the fence, but ordered the FSP to pay for the storm-damaged tiles.

The policy requires reinstatement to the pre-loss condition without betterment, so bylaw upgrades to the fence are not payable, but tiles damaged by the storm and fence collapse are covered.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 232034 Determination Page 1 of 7 Case number: 232034 General Insurance - Domestic Insurance - Home Building - Service - Service quality 28 October 2011 Background 1. The Applicants hold an Accidental Damage Home Insurance Policy with the Financial Services Provider (FSP). The accidental damage policy provides cover up to $700,000 for buildings and is subject to a $300 excess. 2. On 8 July 2010, the Applicants ’ daughter contacted the FSP on behalf of the Applicants to lodge a claim for damage. The damage included a glass fence and balustrade (“fence” or “fencing”) on a balcony which had been blown over by winds. 3. The FSP engaged experts to review the damage and concluded the fence construction was defective. The FSP has agreed to make payment of the loss to ‘as new’ condition , but not the additional amounts it would require to bring the fencing up to an appropriate construction/design for the site location. 4. The Applicants dispute that the defect claimed by the FSP was material to the loss and further the quotation on which the FSP based settlement has excluded relevant items. Summary of Applicants ’ Position 5. The Applicants contacted the FSP’s preferred contractor w ho stated he did not know the balustrade glass was not clear and that the job would cost more if this was the case. 6. The quotation the FSP has based its offer on does not cover all anticipated costs. The quote specifically excludes tiling repairs and scaffolding costs. Further, the quote is not for replacement of opaque glass which incurs additional costs. 7. The Applicants do not consider the FSP’s engineer report as accurate. The engineer states the bolts holding down the fence failed, however, the photographs clearly demonstrate the bolts are still intact and still securing the pole base plate to the concrete. The poles have separated from the base plates rather than detached due to bolt failure. This casts significant doubt on the engineer’s conclusions. Determination Case No: 232034 Determination Page 2 of 7 8. The Applicants have concerns that the integrity of the membrane will be compromised during reinstallation of the new fence. 9. The Applicants have enclosed a quotation from “A” dated 1 March 2011 in the sum of $25,100 plus GST noting that this did not include replacement of damaged tiles or scaffolding or like for like glass. 10. The Applicants have enclosed quotation dated 20 June 2011 for the removal of 62 tiles, waterproofing and replacement of new tiles in the sum of $2,800. 11. The Applicants have provided a quotation dated 19 July 2011 for the replacement of the glass fence in the sum of $37,775. 12. The Applicants seek for the FSP to either conduct the repairs itself or to pay the cost of the two quotations in paragraphs 10 and 11. Summary of FSP’s Position 13. The FSP relies on the following policy terms and conditions: “What we will not pay for We will not cover your buildings and your contents for any accidental loss or accidental damage caused by: ... - A defect in an item, faulty workmanship, structural defects or faulty design. ... How we pay a claim for your buildings When loss or damage occurs to your buildings, we will pay the cost of rebuilding your buildings or repairing the damaged portions to the same condition as when they were new. ... - Reinstate or repair your buildings to the condition they were in just before the loss or damage occurred. - Pay you the cost of reinstating or repairing your buildings to the condition they were in just before the loss or damage occurred; or” 14. The FSP relies on an engineer’s r eport dated 28 February 2011, from which I note the following: The faulty design/workmanship has been responsible for the collapse of the balustrading and not storm damage as alleged. The anchorage for the balustrade support posts were not adequate for the normal range of wind conditions which could be expected at this exposed site. The 3 10mm diameter bolts used in the plates of the balustrade system failed to adequately anchor each post for the site conditions. The site is exposed to winds off a bay and geographical features which may result in wind tunnelling. Case No: 232034 Determination Page 3 of 7 The former balustrade glazing and posts were potentially suitable for the expected wind conditions but only if sufficiently anchored. There has been no roof tiling damage evident as a consequence of the incident. The bolts need to be cut off flush with the deck and a metal primer applied before filling the recess in the tiles with the suggested Dribond render. The render could be used to fill the balustrade footprint flush with the tile level and a larger base plate used so that it completely covered the existing circular base plate. The base plate should have polyurethane sealant applied before positioning and then caulked around the vertical face of the base plate after the bolts have been installed. Additionally, polyurethane should be used to seal the penetrations of the bolts through the base plate. The photographs enclosed with the report suggest metal base plate still in situ with bolts/screws. 15. The FSP relies on its assessor reports from “C”. I note the following from these reports: C was satisfied that the loss was the result of strong winds or storm conditions. The method of screwing the fence down rather than Dyna bolting it was always going to leave the fence prone to this damage type. There is no issue with the storm or its intensity. Both B and P have provided quotations which exclude certain items or anticipate potential other costs. C noted that B’s quotation was the successful quote at $31,317. 16. I note an email dated 17 June 2010 to C confirming that the FSP accepted the claim and requested C proceed with arrangements for repairs to the property. 17. The FSP has enclosed a report from “B” dated 9 August 2010 from which I note the following: Due to the damage a specialist was required to attend to inspect and report on the repairs required to the structure. The specialist stated that the original structure had not been installed correctly and in their opinion the affixing of the post to the concrete slab was not sufficient causing weakness to the support structure of the fence. The specialist believes the design of the fence was not strong enough to endure heavy/high wind speeds particularly given the location of the site. The fence could not be repaired to original form as the structure was improperly installed and poorly designed. A review of quotations is provided by B, and it is clear that there are varying scopes of work from each quoting party. Case No: 232034 Determination Page 4 of 7 18. The FSP has enclosed quotation from “P” dated 27 August 2010 in the sum of $38,557.75. The scope does not appear to include tiles or any ‘upgrading required by an authority’. A further quote from P dated 4 October 2010 notes that further amounts of fencing have collapsed and the waterproof membrane has failed around the base of the posts. In order to guarantee the balcony is waterproof, the tiles need to be removed and the entire roof top balcony will require re-waterproofing. 19. I note a further email dated 30 August 2010 from the FSP authorising repairs to proceed to the balcony stainless steel/glass hand rail as quoted. 20. I note email correspondence from the assessor to the FSP dated 29 October 2010 noting the fence was “constructed and fixed like a pool fence would be.....It was screwed and not even Dyna bolted into position....It is felt the Council would have required a permit with engineering computations for this position and elevation.” The assessor suggests that the contractor should be approached for the design and permit issued as well as any warranty terms. 21. I note the email dated 25 January 2011 in which the FSP informs to C that it accepts the damage to fencing. However, it seeks a cash settlement figure for the cost to reinstate it as original. The FSP notes the original installation is inadequate so the Applicants will be required to make payment to bring it in line with code/regulations. 22. I note email dated 2 March 2011 from the engineer to C enclosing a quotation from A in the sum of $27,610. The engineer notes that for a quality replacement using polished stainless steel posts for hardier salt air durability and with a back stay fitted to each post should be incorporated into any design. Further, stainless steel bolts should be used to secure the balustrade into the deck. 23. The FSP relies on a new updated quotation, to allow for opaque glass, in the sum of $27,300 plus GST. The works to be completed in accordance with specifications provided by the engineer. Further, A does not consider that scaffolding is required. 24. The FSP has enclosed copy of proposed alterations and additions to the property completed by Structural and Civil Engineers. The document has also been stamped by a Consultant Building Surveyor. 25. The FSP states that the engineer’s report indicates that the balustrading for the fence was of faulty design/construction due to the bolts not being strong enough to withstand strong winds for the location site. Further, the fencing which was still standing after the original incident has now fallen over. The FSP considers this demonstrates an issue with the design/construction. 26. The tile damage did not occur from storm damage or the original collapse of glass and therefore it is not liable for further costs to replace the tiling. Case No: 232034 Determination Page 5 of 7 27. The engineer also obtained a quote in the sum of $27,600 from A for re-building to the original specifications without an allowance for upgrades to comply with standards. The FSP offered settlement on this basis which it considers fair and reasonable. 28. The FSP contends that the structure would not have failed had the bolts not been undermined. If the same construction/design was used for reinstatement then it would fail again. 29. The FSP is entitled under its policy terms and conditions to pay the cost to reinstate or repair the buildings to the condition they were in just before the loss. Accordingly, the FSP’s offer is in accordance with the policy terms and conditions. 30. The Applicants have not produced any expert reports which refute the engineer’s findings. Issue 31. Whether the FSP’s settlement offer of $27,600 is in accordance with its policy terms and conditions. Reasons for Decision 32. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 33. I have read each party’s submissions and materials and will only refer to the relevant submissions and materials raised. 34. I consider the following policy terms and conditions as relevant to a consideration of this matter: “How we pay a claim for your buildin gs ... We will also pay any additional costs required for your buildings to comply with the government or local authority bylaws. We will not pay these additional costs if you were required to comply with these bylaws, and had not done so, before the loss or damage occurred.” 35. I note the case manager invited the FSP to provide submissions on this policy wording and its impact upon settlement, however, the FSP elected not to do so. 36. The parties have not disputed that the damage arose due to a storm event or that the Applicants are entitled to payment under the policy terms and conditions. Further, there is no dispute that the Applicants arranged for a contractor to construct the fencing only 12 months prior to the insured incident. Case No: 232034 Determination Page 6 of 7 37. The FSP has offered a reduced settlement on the basis that its liability is limited under the policy to the ‘as new’ condition of the Applicants’ fencing. As the Applicants’ fencing was constructed or designed in a defective manner for the location, the FSP argues that the Applicants are liable for any additional costs to construct the fencing to an appropriate standard. 38. In contrast, the Applicants have argued that the quotations do not include works which are clearly required to complete the reinstatement such as re-tiling the balcony, re-waterproofing the balcony and an allowance for scaffolding. The Applicants have sought full reinstatement costs. 39. I have carefully reviewed the report by the engineer. The engineer has not indicated whether there was a breach of any particular Australian Standard(s) or bylaws and nor has there been any comments made on the plans provided by the Applicants. However, the engineer has indicated that the fixing method of the fence poles was inadequate and that the fence poles require some backstop to provide more support given the site location. 40. There is no evidence that the Applicants’ have failed to obtain plans or permits as required or that they received any statutory or other notice for non- compliance. 41. On the other hand, the evidence of the engineer is clear that the work was defective in that it was unsuitable for the particular location of the Applicants ’ property. The engineer was clear that if the work was simply repeated the loss would re-occur. 42. There is no evidence that the defect related to a failure to comply with government or local authority by laws. The particular paragraph of the FSP’s policy refers to the “additional costs’ required to comply with government or local authority bylaws. If the Applicants has complied with the bylaws (and I have said that there is no evidence that there were applicable bylaws) in order for the FSP to repair old for new, they would need to comply with the bylaws. In those circumstances, I do not see how they are “additional” costs. They are simply the costs of repairing old to new. I am satisfied, however, that the terms and conditions of the policy that set out the FSP’s obligations are clear and unambiguous. 43. The FSP is required to replace what has been damaged with a new fence, not a better fence, but a new fence. If the old fence was unsuitable for the specific conditions, that is a matter for the Applicants, not the FSP. The Applicants are not entitled to betterment. 44. In the complete circumstances of the claim, I am satisfied that the FSP is entitled to cash settle the repairs based upon the quotation of $27,600. 45. I have considered the separate issue of the tiles/waterproof membrane and scaffolding. Case No: 232034 Determination Page 7 of 7 46. In respect to the question of tiles, the Applicants have provided a quotation for the replacement of 62tiles and the photographs which show some damaged tiles. There is no evidence to demonstrate why 62 tiles need replacing, however, I am satisfied that some tiles have been damaged. 47. I am satisfied that the FSP should pay the cost of the tiles that need to be replaced as a result of damaged caused by the storm and resultant failure of the glass fence. 48. I note P’s report that the membrane under the tiling had failed. The engineer was also of the opinion that the waterproof membrane needed to be reinstated – although he opined that the penetrations to the membrane could be sealed. I note the submission by the FSP regarding the engineer stating there was no damage to tiling appears to refer to the roof tiling and not the balcony tiling. 49. I consider that if the membrane can be repaired rather than re-done completely that the FSP is entitled to settle for the lesser cost. However, if the repaired waterproof membrane fails the FSP should be liable for the rectification and consequential loss due to same. 50. There has been no clear information provided to me regarding whether scaffolding is required. Accordingly, I can make no determination on this cost. Determination 51. On the basis of the available information, I determine that the FSP ’s offer of $27,600 was adequate to finalise settlement. 52. I determine that the FSP is to pay the cost of replacing the tiles damaged in the storm and the falling of the glass fence. 53. I determine the FSP is entitled to repair the waterproof membrane as appropriate, but will be liable for same if it fails. 54. I determine the FSP is not required to pay for scaffolding costs unless the Applicants can demonstrate that builders will not complete the work without scaffolding.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.