Partial denial of hail storm roof damage claim for wear and tear and maintenance
Summary
The applicant claimed hail storm damage to a roof and internal items, and the FSP accepted limited tile damage but denied the rest as wear, tear and maintenance. AFCA ordered replacement of 60 tiles, a 40% contribution to valley and ridge repairs, and cover for the lights and windows, subject to the excess and roof repair.
Where the evidence is conflicting, AFCA made an arbitrary assessment of the hail damage and apportioned the valley repair cost, since the hail event was a significant contributing cause of the water penetration.
Issues
- Claim denial primary · upheld
“FSP asserted it was not liable for remaining tiles, capping tiles and valleys due to wear and tear and maintenance. AFCA allowed replacement of 60 tiles and a 40% contribution to valley and ridge repairs.”
- Poor claim handling secondary · not upheld
“Assessor appointment and the $1,000 excess requirement were addressed; AFCA confirmed the Case Manager's comments rejecting the applicant's complaints on these points.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Case No: 231367 Determination Page 1 of 7
Case number: 231367
General Insurance - Domestic Insurance - Home Building - FSP Decision - Hail
Damage - Extent of Damage - Partial Denial of Claim - Policy Exclusion – Wear
and Tear, Failure to Properly Maintain or Repair
26 August 2011
Background
1. This is a review of a Recommendation by the Service‟s Case Manager dated
18 May 2011 in favour of the Financial Services Provider (FSP). The Applicant
has rejected the Recommendation and in accordance with the Terms of
Reference, the matter has been referred to me for Determination. The
background, summary of each parties position, and the issues have been set
out in the Recommendation. For the sake of clarity and completeness, I will
repeat the same.
2. The Applicant holds a home building insurance policy with the Financial
Services Provider (FSP). The policy is subject to a standard excess of $100
and flexi-premium excess of $900.
3. On 9 March 2010, the Applicant contacted the FSP who recorded the following
claim description
“DUE TO A HAIL STORM [ON 6 MARCH 2010] THE HAIL HAS DAMAGE[D] MY
PROPERTY”:
4. On or about 18 October 2010, the Applicant submitted a quotation from “ A ”
Roofing stating repair costs in the amount of $4,950 for the replacement of
approximately 200 tiles, among others.
5. Subsequently, the FSP organised the inspection of the insured premises by “ S ”
Roofing who attended the insured premises on 22 October 2010 and 26
November 2010. “ S ” Roofing reported that only 25-30 roof tiles were damaged
by the hail storm. “ S ” Roofing al so reported that “the remainder of the roof is old
and the mortar had cracked in several sections throughout the roof
(maintenance [issue])” .
6. The FSP‟s claim messages o n 9 December 2010 show, among others:
“MR IO CALLED FOR UPDATE
ROOF REPORT TO HAND :
…
IO REQUESTED COPY OF REPORT
Determination
Case No: 231367 Determination Page 2 of 7
IO AWARE ROOF NOT [FSP] LIAB AND INTERNALS WILL NOT START UNTIL
ROOF FIXED”
7. The FSP ‟s claim messages on 17 December 2010 also show, among others:
“MR IO CALLED…
…
IO HAS NOT YET RCVD A COPY OF ROOF REPORT
WILL REQUEST ANOTHER COPY SENT
IO UNSURE WHY ROOF REPAIRS ARE NOT COVERED BY [FSP]
EXPLAINED THAT MAINTENANCE AND WEAR AND F[AU]LTY
WORKMANSHIP HAVE BEEN SIGHTED AS THE C[A]USE FOR THE ROOF
LEAK”.
8. The FSP‟s claim messages on 20 January 2011 relevantly show:
“CALLED IO AGAIN
DISCUSSED THE ROOF REPORTS
CLEARLY ADVISED THAT ROOF NEEDS TO BE FIXED BEFORE INTERNALS
WE HAVE SENT [S ROOFING] REPORTS TO HIM
IO SHOULD BE FULLY AWARE OF REQUIRED WORK TO RECTIFY ROOF
MAINT ISSUES
…
IO KEPT ON QUERYING WHY NOTHING HAS BEEN DONE
IT APPEARS NO EXCESS HAS BEEN COLLECTED
ADVISED WE NEED THAT BEFORE WE CAN GO AHEAD WITH ANYTHING
HAVE ORGANISED WINDOW MAKSAFE (SIC) FOR NOW
SENT 1000 XS LETTER OUT
HAVE ORGANISED … ELECTRICAL MAKESAFE AS HE ADVISED KITCHEN
LIGHTS NOT WORKING
WILL GET THEM TO INSPECT INSU[LA]TION TOO
IO WANTS ASSESSOR. ADVISED WE RELY ON IO TO VISUALLY SEE WHAT
DAMAGES THERE ARE AND ADVISE US SO WE CAN UPDATE OUR CLAIM
THEN WE WILL ORGANISE D&C ETC ONCE XS PAID.”
9. The Applicant is not satisfied with the FSP‟s decision and the manner in which
his claim was handled, hence this dispute.
Summary of Applicant’s Position
10. The Applicant says that the hail storm resulted to (a) roof damage (broken tiles,
collapsed valley, collapsed guttering and broken points); (b) kitchen flooding;
(c) two broken windows; and (d) two malfunctioning kitchen lights.
11. The Applicant asserts that prior to the hail storm there were no issues on the
valley. During the storm, he “was forced to get on the roof to push the cement
Case No: 231367 Determination Page 3 of 7
[mortar] back into the valley in two spots as it was broken by hail and was the
cause of the kitchen flooding”.
12. The Applicant says he pushed the mortar back into the valley during the storm
to stop the water getting into the kitchen, but “ S ” Roofing removed all the mortar
from the valley. Since then, extensive damage has occurred to the eaves in the
surrounding area. Outside sensor lights have shorted out the fuse and two
down lights in the kitchen have stopped working.
13. The Applicant says that he requested for an assessor to assess the ins ured
premises but the FSP told him that the damage to his home was not serious
enough to warrant an assessment. He raises the issue of whether the policy
states that the FSP “may deem a property and it[s] damaged not important
enough to assess”.
14. The Applicant also raises the issue of whether he has to pay $1,000 excess
before the FSP assigns an assessor to inspect and assess the insured
property. He alleges that the FSP expected him to pay the $1,000 excess
without any proper assessment by the FSP‟s assesso r first to determine
whether the repair costs would exceed $1,000. He asserts that if the repair
costs do not exceed $1,000 then he would repair the damage himself.
15. The Applicant also says that he had to request from the FSP three times for
copies of “ S ” Roofing ‟s reports and that the FSP did not contact him when it
said it would.
Summary of FSP’s Position
16. In its Notice of Response, the FSP does not dispute that the faulty lights and
broken windows were damaged by the hail storm and are covered under the
policy.
17. It also concedes that 25-30 roof tiles were damaged by the hail storm as stated
in “ S ” Roofing‟s report dated 22 October 2010. Thus, it agrees to replace 25-30
roof tiles and cover the associated costs of re -bedding and re-pointing of
capping tiles on the main top ridge.
18. However, the FSP asserts that it is not liable for the remaining tiles, capping
tiles and the valleys as these were not damaged by the hail storm but were
damaged due to wear and tear and maintenance issues. The FSP relies on “ S ”
Roofing‟s report dated 26 November 2010.
19. With regard to the removal of the cement/mortar from the valley, the FSP
contends that this was required to waterproof the roof to prevent further
damage.
20. The FSP alleges that it sent “ S ” Roofing‟s reports to the A pplicant when
requested.
21. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
Case No: 231367 Determination Page 4 of 7
“ What we do not cover
- general exclusions
You are not covered under any section of the policy for damage, loss, cost or liability
caused by or arising from or involving:
an unreasonable failure to properly maintain or repair your building,
wear and tear, rust, deterioration or corrosion,
mechanical, structural, electrical, electronic or other failure or breakdown,
other than as provided for under „Damage to electric motors‟ on page 22,”
Issues
22. Whether the Applicant has established that the entire roof damage (broken
tiles, collapsed valley, collapsed guttering and broken points) was caused by
the hail storm, and hence, the FSP must indemnify him for the entire roof
damage.
23. Whether the FSP has established that part of the roof damage was due to wear
and tear and poor maintenance and hence, it is entitled to partially deny the
claim.
24. Whether the policy requires the FSP to appoint an assessor to inspect the
insured property when requested by the Applicant.
25. Whether the FSP is entitled to seek payment of the policy excess first before it
proceeds with the assessment and/or repair of the damage.
Reasons for Decision
26. The Applicant has the burden of proving that loss or damage has occurred as a
result of an insured event. Once this is established, the onus shifts to the FSP if
it wishes to deny the claim to prove the breach of a policy exclusion, or breach
of a condition.
27. This claim arises from a house storm that occurred in and around the area of
greater Melbourne on 6 March 2010 resulting in external and internal damage
to the insured‟s home. It should be noted that the subject house storm wa s an
extraordinary event causing very widespread damage to property in the general
area. It is well known that in terms of severity, the hail storm was
unprecedented during the previous 50 years or more.
28. The dispute in this matter concerns the extent of the external/rift damage.
There is clear difference of view between the Applicant‟s roof repairer and the
FSP‟s roof consultant. Each of those reports lack detailed explanation and they
are referred to in the Case Manager‟s Recommendation as follows:
Hail damage
Case No: 231367 Determination Page 5 of 7
Applicant’s evidence
29. The Applicant has submitted a quotation from A Roofing which states, in
relevant part:
“ INSURANCE CLAIM DUE TO STORM/HAIL DAMAGE ON 6/3/2010
…
(1) SUPPLY SAFETY SYSTEM
(2) RE-PLACE APPROX 200 TILES
(3) RE-BEDS & POINT APPROX 45 [ILLEGIBLE] OF RIDGES IN FLEXIPOINT
(4) [ILLEGIBLE]…DAMAGED SURFACES”
FSP’s evidence
30. The FSP has submitted an “ASSESSMENT & EXPERT REPORT” by S
Roofing dated 22 October 2010 (first report). The first report states, among
others:
“ Conclusion(s)
Storm damage…. Yes
Impact damage…. Yes
Maintenance… Yes
Expert Opinion on Findings
Hail damage had occurred at this single storey dwelling with a concrete tiled roof.
Hail had impacted and damaged 25-30 roof tiles through the main roof.
The entire roof was thoroughly inspected and no other storm related damage
was found to ridge mortar, flashings or other roof items or penetrations.
The general condition of the roof tiles is in good order although the roof mortar is
beginning to crack throughout the main roof (maintenance).
See page 2 for photos.
…
Required and/or Recommended Repairs
Claimable Repairs: Replace approximately 25-30 broken/cracked roof tiles. Re-
bed (where necessary) and re-point the capping tiles on main top ridge where
these will be disturbed during tile replacement.
Non-Claimable Repairs : Re-bed (where necessary) and re-point all remaining
capping tiles where required with a combination of Bondcrete and silicone or
Flexi-point, whichever is more suitable to these capping ti les.”
31. The FSP submitted a second “ASSESSMENT & EXPERT REPORT” by S
Roofing dated 26 November 2010. A re-assessment was organised following a
telephone call from the Applicant on 5 November 2010. This second report
states, among others:
“ Conclusions
Storm damage…. No
Impact damage…. No
Case No: 231367 Determination Page 6 of 7
Maintenance…… Yes
…
Expert Opinion on Findings
Roof leaks had occurred at this single storey dwelling with a concrete tiled roof.
A leak in the kitchen was caused by the roof valley that is situated above this
area. The mortar within this valley had cracked and become loose (maintenance)
and had also been over-applied beneath the valley tiles (faulty work). This allows
rain water to become trapped and seep into the roof cavity.
A make safe has now been attempted by removing all of the valley mortar for
temporary weather proofing.
The general condition of the remainder of the roof is old and the mortar had
cracked in several sections throughout the roof (maintenance).
See page 2 for photos.
…
Required and/or Recommended Repairs
…
Non-Claimable Repairs: Need to clip and seal the valley tiles.
Re-bed (where necessary) and re-point all capping tiles with a combination of
Bondcrete and silicone or Flexi-point, whichever is more suitable to these
capping tiles.”
32. It is noted that there is substantial difference between each of the consultants
insofar as the Applicant‟s consultant claims that 200 roof tiles were damaged
and the FSP‟s consultant states that 25 – 30 roof tiles were damaged. The
FSP‟s consultant also identifies ma intenance issues in respect of the roof,
particularly in respect of the breaking of the ridge mortar in the area of the roof
valleys.
33. The FSP‟s expert also provided some photographs as to the damage, but they
are of minimal assistance to the untrained eye in determining to what extent the
damage relates to hail or maintenance issues.
34. Insofar as the issue relates to the number of tiles damaged, it may be that the
FSP‟s expert only included tiles that were cracked or had suffered penetration
as a result of the hail storm. That is mere conjecture on my part, but having
established that at least 25 tiles were so damaged, I am satisfied that that is a
minimal number and other damage may well have occurred albeit not to an
extent that caused penetration of the actual tile.
35. Although the evidence is unsatisfactory, having regard to the damage that is
clear on the evidence, I am of the view that it is likely the damage occurred to
more than the minimal number of tiles and that it is a matter of arbitrary
assessment to determine how many tiles fell into the category of being more
than superficially damaged in the heavy style hailstorm. In all the
circumstances, having regard to the wide disparity between the respective
assessments, I intend to allow for the replacement of 60 tiles.
Case No: 231367 Determination Page 7 of 7
36. As for the issue of maintenance, I note the comments of the FSP‟s consultant
as to the maintenance issues affecting the roof valleys, ridge mortar. Although
the FSP‟s expert acknowledges that the roof tiles were generally in good order,
this is somewhat at variance with the comment that there was a maintenance
issue that preceded the hail event. I accept that the roof was of some years
standing and there may have been maintenance issues. The actions of the
FSP‟s roof consultant in removing the loose mortar without making any
arrangement for its restoration or any recommendation to the Applicant in
respect of that matter is of some concern. It may be that the experts‟
reassessment including the comment “A make safe has now been attempted by
remov ing all of the valley mortar for temporary weather proofing” was intended
to indicate to the Applicant to need for weather proofing and although there is
general reference to poor workmanship, no detail in that regard has been
provided. Notwithstanding the unsatisfactory state of the evidence, I am of the
opinion that in respect of the damage to the roof valleys and mortar cracking
that the hail event was a significant contributing if not a dominating cause of the
water penetration and it is fair in the circumstances to apportion the cost of the
necessary repair work by a 40% contribution from the FSP.
37. In respect of the issues regarding the appointment of the assessor and the
excess set out in paragraphs 39 – 45 of the Recommendation, I confirm the
comments made by the Case Manager. I also note the referral of this matter to
the Code Systemic Issues team for further investigation.
Determination
38. I determine that:
Subject to payment of the $1,000 excess, the FSP indemnify the Applicant
for the cost of replacing 60 roof tiles and any associated costs;
The FSP contribute 40% to the cost of repair to roof valleys and ridge
mortar; and
The FSP indemnify the Applicant for the faulty lights and broken windows,
subject to the repair of the roof as indicated above.