Text of the determination
Case No: 230463 Determination Page 1 of 11
Case number: 230463
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
24 November 2011
Background
1. The Applicant insured his home under a home building policy held by the
Financial Services Provider (FSP).
2. On 1 April 2010, the Applicant contacted the FSP to advise of significant hail
damage to the property following a catastrophic event which occurred in the
insured locality.
3. The FSP initially arranged for an external assessor to attend the property and
assess the nature and extent of the damage. However following ongoing
issues, the FSP requested the assessor close its file and engaged a building
company to provide an assessment and quotation of the damage.
4. On 28 June 2010, the builder provided a scope of works for the damage
however, it was advised by the Applicant that the scope of works had not
included quotations for the solar pool webbing and air-conditioning.
5. In mid 2010, the Applicant travelled overseas consequent upon the death of his
mother.
6. On 16 September 2010, the Applicant advised that he had returned from
overseas and wished to proceed with the claim.
7. On 11 October 2010, the Applicant noted that he would prefer a cash
settlement due to the delay in the claim.
8. The FSP advised that it would be prepared for the Applicant to arrange his own
repairs and the FSP would make direct payment to the repairer. This was not
acceptable to the Applicant.
9. On 18 October, the FSP reviewed its initial decision not to provide a cash
settlement and advised the Applicant in an attempt to finalise the claim that it
would be prepared to offer a cash settlement in the amount of $22,831.04 and
that the policy would be cancelled within seven days from the issue of the
payment as a result of the damage to the property.
Determination
Case No: 230463 Determination Page 2 of 11
10. The Applicant was not satisfied with the review from the FSP and on 12
November 2010 having had the matter reviewed at IDR, the Applicant was
offered the following settlement options:
a. The FSP’s preferred builder would attend the property and undertake the
repairs as quoted; or
b. Applicant could organise his own repairers and provide the FSP with
detailed invoices and the FSP would make direct payment to the repairers;
or
c. The Applicant agrees to the cash settlement amount of $22,831.04.
11. The Applicant was still dissatisfied with the outcome of the review and has
sought a review of the dispute from the Financial Ombudsman Service (FOS).
12. The Applicant has, in his referral to FOS noted a number of peripheral issues
he maintains have not been resolved.
13. The Applicant is now seeking a determination that the FSP be required to pay
him a cash settlement of $40,000 being $28,000 for repairs and relevant
penalty payments imposed by FOS in respect to each deliberate and malicious
breach of the policy terms and conditions as identified by himself.
Summary of Applicant ’s Position
14. In correspondence to FOS, the Applicant has noted a myriad of issues which I
summarise briefly:
a. The FSP has altered the meaning of the policy wording to avoid meeting its
contractual obligations.
b. The FSP has refused to address serious complaints presented to them
verbally and in writing.
c. The FSP or its agents have acted maliciously and fraudulently in dealing
with the Applicant.
d. The FSP has breached privacy regulations in relation to the death of the
Applicant ’ s mother.
e. The FSP has falsified file notes and has supplied emails without dates, or
has omitted to supply certain emails altogether.
f. The FSP has failed to adequately answer questions that the Applicant
has put to it.
g. The FSP has breached its policy regulation; and
h. The FSP has offered a fraudulent settlement offer.
Case No: 230463 Determination Page 3 of 11
15. The Applicant states that as a result of the above issues, he is entitled to a
cash settlement of $40,000 which reflects the cost to repair the damage to his
property and compensation for the FSP’s numerous breaches during the
course of the claim.
Summary of FSP’s Position
16. The FSP states it acknowledges that initially there were issues with respect to
information provided to the Applicant and the initial scope of works.
17. Further, the FSP accepts that there were some delays in the claim process,
particularly when a particular assessor was engaged, however notes that the
Applicant for personal reasons was also unavailable for a period of just over
one month.
18. However, the FSP states that issues concerning the provision of information
and a complete scope of works was resolved and it offered the Applicant fair
and reasonable options to settle the claim which the Applicant has refused.
19. The FSP relies on the following policy provisions:
“ SECTION 2 HOW WE SETTLE YOUR CLAIM
2.1 Repair, Rebuilding Or Replacement
When an insured event causes loss or damage to your home we will, if we accept
your claim, pay at our option for the reasonable cost of repairing, rebuilding or
replacing your home at the site:
to its condition when new; or
to its condition when last renovated, altered or restored.
...”
Issues
20. Whether the FSP has discharged its obligation to the Applicant in offering a
settlement of the claim based on:
a. Its preferred repairer undertaking the repairs; or
b. The Applicant engaging its own repairers and the FSP paying the repairer
direct on receipt of detailed invoices; or
c. A cash settlement based on the original scope of works, on the basis that if
it is accepted the policy will be cancelled.
Case No: 230463 Determination Page 4 of 11
21. Whether the FSP has breached its contractual obligations during the course of
the claim as alleged by the Applicant.
Reasons for Decision
22. I am satisfied that a full exchange of information has occurred between the
parties and each party has had the opportunity to address all the issues raised.
23. Having carefully read the policy terms and conditions, I am satisfied that the
policy allows the FSP at its option to either repair, rebuild or replace.
24. The FSP accepted, based on the scope of works, that the property was able to
be repaired and following the Applicant ’s request for a cash settlement offered
the following settlement options:
1. For its repairer to repair the damage; or
2. To pay the Applicant ’s repairers direct following receipt of a detailed invoice.
25. It is noted that the Applicant was not satisfied with these options and following a
review, the FSP offered to pay a cash settlement based on the scope of works.
However, it informed the Applicant that it would cancel the insurance policy until
such time as the Applicant could provide evidence that the repairs had been
completed.
26. The Applicant was still dissatisfied with this option as he believed the
settlement offer to be “fraudulent” on the following basis:
1. That the property was to be left uninsured.
2. That there was no offer of an insurance refund .
3. That no other insurance company would be prepared to insure them; and
4. The settlement offer was based on a revised quotation from the builder and
20% less than the original scope of works.
27. The Applicant has submitted that none of the settlement offers meet the
requirement of the contract of insurance. In making this allegation, the
Applicant has relied on the following to support his assertion:
1. The offer of a cash settlement is conditional and unconscionable as it does
not conform to the contract of insurance;
Case No: 230463 Determination Page 5 of 11
2. That work to be done by the FSP’s repairer is not appropriate as the builder
in question refused to approve and quote works to the Applicant in writing
and falsified documents at the request of the FSP; and
3. That he may well find it hard to have contractors work with its preferred
repairers and they would face legal action from delayed payments and the
like.
28. It is noted that a Case Manager from FOS contacted the Applicant via email
prior to this determination being made and no ted that the FSP had offered
$28,000 cash settlement in full and final settlement of the dispute.
29. Understandably, the Applicant requested additional information as to whether
his insurance policy would be cancelled once this cash payment was made.
30. After considerable delay, reasons for which have not been disclosed by the
FSP, the Applicant was subsequently informed that the FSP was maintaining its
decision to cancel the policy if a cash settlement was paid on the basis that its
underwriting guidelines do not allow houses which are damaged to be covered
by insurance.
31. It is noted that the Applicant rejected the settlement offer and requested that a
determination be made in relation to the dispute.
32. I note that the Applicant has stated that the settlement options offered by the
FSP contravene the insurance contract.
33. However, in carefully reviewing the policy, I cannot see any evidence that the
two earlier options offered to the Applicant have contravened the contract.
34. In the Applicant ’s final response to FOS, it was noted that he was seeking
$28,000 for the repairs with the remainder of the $12,000 being compensation
for the alleged breaches of the FSP.
35. Based on the evidence presented, I cannot find any evidence that the FSP has
been unconscionable as alleged by the Applicant, or unreasonable in providing
options for settlement and requesting the Applicant to choose his preferred
option, (but subject to my remarks in paragraphs 57 to 61 below).
36. However, given the obvious strained relationship between the Applicant and the
FSP, it would be, in my opinion, the most preferable option to have the matter
settled by way of a cash settlement.
37. On 29 April 2011, in response to the Applicant ’s detailed submission in which
he made plain that he would accept a total of $40,000, comprising $28,000 for
the repairs, and a further $12,000 in compensation for the FSP’s handling of
the matter, the FSP made a further offer. On this occasion, it offered a $29,000
in full and final settlement. In response to queries from the Applicant, the FSP
again insisted that in the event that its offer of settlement was accepted, it
would cancel the policy of insurance. This was conveyed by email of 31 May
2011 as follows:
Case No: 230463 Determination Page 6 of 11
“I have now received instructions from our WA office. They confirm that as the
house remains damaged, it doesn’t meet our underwriting guidelines and
therefore we will not be extending insurance. Please let me know if you require
any further information”.
38. The reference to “extending insurance” was in response to a query from the
Case Manager then handling this matter, as to whether, in the event the offer
was accepted, the FSP would maintain cover until a date of expiry of the policy.
I do note that the reply from the FSP was only forwarded after some five weeks,
and numerous emails from this office to the FSP seeking a response on this
subject.
39. This is one of the matters which I consider should be taken into consideration in
reviewing the FSP’s handling of this matter.
40. As the Applicant has made plain on numerous occasions, a significant part of
his present claim is for compensation for the manner in which the FSP has
handled this matter. In those circumstances, it is necessary to consider
paragraph 9.3 of this Services’ Terms of Reference. They are as follows:
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for consequential financial loss or
damage up to a maximum amount of $3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant’s expectation of enjoyment or
peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy rights – injury has
occurred to the Applicant’s feelings or humiliation has been suffered by the
Applicant. The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute. ”
41. On 15 July 2011, I directed that a set of questions be put to the FSP by email in
which I set out my concerns about certain aspects of the matter. In reaching a
conclusion as to the matters which should be submitted to the FSP for their
comment, I had regard to the voluminous complaints made by the Applicant in
a submission running to some 99 pages, plus attachments which he had filed
following receipt of the FSP’s response to this claim.
42. I specifically pointed out to the FSP that the Applicant was making a claim
which (although not specified by the Applicant) was clearly of a kind recognised
within paragraph 9(3) and I asked for the FSP’s response as to this aspect of
the matter.
43. In considering the possibility of 9.3 compensation, I asked the FSP to respond
to the proposition that Adjusters had been appointed who appeared to have
provided an inadequate assessment, omitting many items damaged, that
subsequently a builder had been appointed on a “do and charge” basis but that
he had merely prepared quotations and had not done the work.
Case No: 230463 Determination Page 7 of 11
That, rather, he had submitted a quotation which again omitted a number
of items.
That there were then serious delays in obtaining a further assessment by
that builder.
That as a result of complaints from the Applicant, the original Adjuster had
been removed from the handling of the matter, but nevertheless an Officer
of the FSP then told the Applicant that the builder would have to be
recontacted through the Adjuster.
That the “file” which had been forwar ded to this office had been difficult to
interpret because emails were not dated.
That, at least in the view of the Applicant, many emails and other
documents which were relevant to his claim had been omitted from the
FSP’s file which was sent to this Serv ice as part of its submission.
44. Other matters were also canvassed in the list of questions which were
submitted to the FSP but it is more convenient to deal with them separately in
due course.
45. In response to the matters referred to above, the FSP replied on 21 July 2011.
46. Essentially, the FSP reiterated all the steps which it had carried out in this
matter. Whilst admitting that there had been certain errors in its handling of the
matter, and after referring to the fact that there had been a huge volume of
claims associated with the March storms in Western Australia, which had
affected Builders, Insurers and Loss Adjusters, the FSP commented that it was
“more than happy that the conduct and handling of the claim since (the
Adjuster’s) removal from the file, had been to acceptable standard.”
47. I note also that there has been no response from the FSP as to one important
question. As noted above, the Builder was engaged on a “do and charge”
basis. Yet he did nothing of the kind. He produced a quote which omitted
certain items. Much time was expended until this was remedied. I do not
understand why the FSP did not direct the Builder to proceed to carry out the
works. Much time and effort would have been avoided had this occurred.
48. Whilst I have found absolutely no evidence, contrary to the submissions of the
Applicant , that the FSP’s handling of the matter has been “malicious” or
“fraudulent,” I do no t agree with the FSP. I accept that this FSP must have been
under heavy pressure at this time by reason of the number of claims which had
arisen following the 2010 storms in several States. Nevertheless there were, in
my view, a number of clear errors in the handling of the matter and these led to
quite unnecessary delay, which perhaps heightened the Applicant ’s
apprehension that he was being unfairly dealt with.
49. Without descending into detail again, I am concerned at the failure to obtain
quotations which adequately included all of the items of damage, failure, after
this had been pointed out, to obtain amended quotations within what should
have been a very short period of time and the (admitted) error when the
Applicant was advised that the builder who had supplied the second quotation,
Case No: 230463 Determination Page 8 of 11
could only be contacted through the Adjuster, notwithstanding that the Adjuster
had previously been removed from the handling of the matter. (At all times the
FSP has apologised for this error which I accept was an innocent mistake made
by a representative who was not familiar with the file).
50. Therefore, in conclusion as to this aspect, I would have found that based upon
the matters to which I have referred above, the conduct of the matter was not
acceptable by the FSP and that it, alone, would have caused an unusual
degree or extent of physical inconvenience, time taken to resolve the situation
or interference with the Applicant ’s expectation of enjoyment or peace of mind.
51. A separate reply was provided in relation to the printing of emails from the
system, where it was stated that the “formatting omitted the dates and times,” it
was pointed out that this had not been done intentionally and the FSP offered
to retrieve these emails from the system and to reprint them with dates if I
requested.
52. In response to the suggestion that many relevant emails and other documents
had been omitted from the file which was provided to this Service, the FSP
contented itself with a submission that “all documents relevant to the claim in
our poss ession” were provided. Of course, whether the FSP was correct in its
belief that “all documents relevant to the claim” had been provided, is an issue ,
in itself.
53. I revert now to the list of questions which were submitted to the FSP for
comment. As stated above, when making two of the offers of settlement upon
which the FSP relied, it attached a condition, notably that seven days after the
payment of the cash sums involved (the last being $29,000) the policy of
insurance over the Applicant ’s property would b e cancelled.
54. As to this subject, the following question was put to the FSP:
“I refer to the settlement offer made on 19 October 2010. In it, a cash sum was
offered. But in paragraph 2, it is advised that seven days after the payment, the
insurance on the property would be cancelled and the property would be
considered uninsured until repairs had been completed. Pursuant to which
provisions of the Insurance Contract, or the Insurance Contracts Act 1984, was
such a condition attached to the offer of settlemen t?”
55. Although this question did not refer specifically to the later offer of settlement
made in April 2011, the same principles would have applied. That offer was
also made subject to the same condition.
56. As to this subject, the FSP has replied:
“A t this stage, certain damage to the Applicant ’s property is still unrepaired. This
presents a future risk to the member especially in circumstances where the
member would not have any control over the remedial work if the Applicant
accepted the offer. Consequently, the member made the offer on the condition
that if accepted, the policy would be cancelled with the member until such time
as any outstanding repairs had been effected.
Case No: 230463 Determination Page 9 of 11
Under clause 6 of the Home Building Policy of Insurance, the Applicant is
required to take all reasonable steps to reduce the loss or damage and to
prevent any further loss or damage. Thus far, no remedial action has been taken
in relation to a number of affected areas of the Applicant ’s property.”
57. Any cancellation of the policy would be made with power derived from Section
60 of the Insurance Contracts Act 1984 (Commonwealth). Section 60 (1)(d) of
the ICA is set out below. It provides that an insurer may cancel a Contract of
Insurance if a provision of the contract is not complied.
“ SECT 60
Cancellation of contracts of general insurance
(1) Where, in relation to a contract of general insurance:
...
(d) a person who is or was at any time the insured failed to comply with a
provision of the contract, including a provision with respect to payment of the
premium;”
58. I do not accept this submission. It is true, that, as the FSP claims, the property
has not been, apparently, repaired since the damage caused in the original
storm. But this is at least in part due to the failure of the FSP to conduct an
adequate assessment of the damage and particularly the failure of the FSP to
insist that the builder who provided the second quotation, but who, it was
specified, was appointed on a “do and charge” basis , should do the work.
59. Then, when offers had been made to the Applicant, the thrust of which was that
if he accepted the offer he would attend to the work, effectively he was to be
given seven days to complete the work failing which the policy would be
cancelled.
60. I cannot see how this could be regarded as reasonable. A judgement should
have been made as to a reasonable time which should be allowed for the
completion of the repairs. It might have been reasonable to specify that the
policy would be cancelled if, for example, within 120 days of the payment of the
cash settlement, the repairs had not been effected (it is not for me to make a
judgement as to precisely how long would be required to effect the repairs).
61. The imposition of this condition, not surprisingly, irritated the Applicant
considerably. I consider that he was absolutely justified in rejecting the offer of
settlement to which this condition was attached.
62. Further, I do not consider that the FSP is correct in its suggestion that pursuant
to Section 60(1)(d), it had the power to impose such a condition. In seeking to
rely upon that section, the FSP could only rely upon a breach of the policy
terms by the Applicant and I do not understand how anyone could conceive of
the Applicant being in breach of the terms of the policy, if he had not effected
repairs within seven days. (I do not consider that the policy envisages that an
Applicant should attend to repairs using funds independently provided, before a
claim is resolved).
Case No: 230463 Determination Page 10 of 11
63. This is a further matter which I regard as being highly relevant to the question
of compensation pursuant to paragraph 9.3(b)(i) of the Terms of Reference.
64. A problem however which confronts the Applicant is that whilst he seeks a sum
of $12,000 in compensation for the FSP’s handling of th e matter, the fact is that
the Terms of Reference limit any total award to $6,000, in the event that it was
determined that the Applicant had sustained both consequential financial loss
of $3,000, and $3,000 for what I may describe as “non - financial loss”.
65. I do not consider that the Applicant has been able to demonstrate a financial
loss caused by the FSP’s handling of the matter, other than a loss which may
be at least partly remedied by an award of interest.
66. In making these comments, I stress that this determination is based upon the
material which is available to me at this time. If, for example, it could be shown
by the Applicant that a consequence of the delays in resolution of the matter
has been that costs associated with the repairs to the property have escalated,
then the Applicant cannot be precluded from raising further issues with the FSP
based upon that point.
67. By no means has all of the delay been caused by the FSP. At times, the
Applicant has taken lengthy periods to respond – far longer periods than I
consider were warranted, during which the Applicant has produced
unnecessarily lengthy responses.
68. I therefore conclude that at this point the Applicant has not satisfied me that he
has suffered any financial loss such as would be recog nised pursuant to
paragraph 9.3(a).
69. Different considerations apply however to “non - financial loss” pursuant to
9.3(b)(i).
70. For reasons which I have set out above, I consider that as to a number of
points the FSP’s handling of the matter has fallen well short of acceptab le
standards, whilst I recognise that all insurers were suffering under the weight of
the extraordinary influx of claims following the storms to which I have referred.
Conclusion
71. At various points in his submissions, the Applicant has conceded that the sum
which has been offered by the FSP, notably $28,000 (or ultimately $29,000)
has been an appropriate sum for the reimbursement of the cost of repairs.
72. I therefore propose to recognise that sum as being appropriate under that
heading, subject, of course, to a grant of interest.
73. For reasons set out above, I do propose to make an award pursuant to
paragraph 9.3(b)(i).
Case No: 230463 Determination Page 11 of 11
Determination
74. In reaching this Determination I have read the extraordinary volume of material
submitted by the Applicant. I have considered all of his allegations only some of
which have been referred to in paragraph 14. I have noted his constant
references to adjusters and others engaged by the FSP as the “FSP’s
employees”. They were not and I don’t believe the Ap plicant thought they were.
75. I particularly note the Applicant’s allegations as to a breach of privacy relating
to the death of his mother in the UK. I can see no substance whatever in this
complaint. There was no reason why some weeks after the Applicant’s sudden
return to the UK, the FSP should not attempt contact with the Applicant to
attempt to restore the matter. The FSP could have been criticised had it not
done so.
76. I determine that the FSP’s offer of settlement in the sum of $29,000 is
appropriate to reimburse the Applicant for the cost of repairs to the property
caused by the April 2010 storm.
77. I determine that the FSP should pay to the Applicant interest at the statutory
rate upon this sum from 30 June 2010 until the date of settlement.
78. I determine that the FSP should not cancel the Applicant ’s policy of insurance
unless, after 120 days from the date that the Determination has been accepted
by the Applicant, the repairs which are required to the property have not been
effected by the Applicant.
79. Pursuant to paragraph 9.3(b)(i) of the Terms of Reference, I determine that the
FSP should pay to the Applicant the sum of $2,000.