Flood versus stormwater dispute over building damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2011-12-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$75,472
Non-financial loss—
Amount claimed$150,944
SourceAFCA PDF

Summary

The applicant's home was hit by stormwater and then floodwater, and the FSP denied most of the building claim as flood damage and offered $40,018.45. AFCA apportioned the damage 50/50 and ordered a cash settlement of $75,472.21 plus interest.

Where stormwater and flood damage cannot be separated, AFCA decided what is fair in all the circumstances under its Terms of Reference and apportioned the damage equally.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 228804 Determination Page 1 of 10 Case Number: 228804 General Insurance - Home building insurance policy – flood damage or stormwater run-off. 9 December 2011 Background 1. The Applicant insured her home building and contents under a home insurance policy for $143,500 and $45,500 respectively with a $100 policy excess. The policy commenced on 31 March 2003 and had been renewed annually to 31 March 2011. 2. On 15 October 2010, the Applicant ’s building and contents suffered water damage due to the inundation of her house. 3. The Financial Services Provider (FSP) accepted liability for the total loss of the Applicant ’s contents on the ground the damage to the contents had been caused by stormwater run-off. The FSP paid the amount of $46,128 in full settlement of the contents claim. The FSP also paid the Applicant temporary accommodation for ten weeks at $100 per week. 4. However, the FSP accepted liability for part of the damage caused to the building by the water inundation. The FSP contends the building was first damaged by stormwater run-off followed by the flood water. 5. The FSP has denied indemnity for the amount of damage it considers to be flood damage. 6. The FSP initially offered the Applicant a cash settlement of $37,637.59 which was increased to $40,018.45. The Applicant ’s claim is for the amount of $150,944.42. Summary of Applicant ’s Position 7. The Applicant is being represented by a legal service which will be referred to as the Applicant. 8. During a storm event on or about 15 October 2010, the Applicant ’s house and contents were severely damaged. She has since had to vacate her property for health reasons. Determination Case No: 228804 Determination Page 2 of 10 9. The FSP informed the Applicant that her claim for damage to the home building would be denied because of neglect, lack of maintenance and flood damage. 10. The Applicant ’s home is insured for $145,000 and prior to the claim being denied the Applicant was contacted by a building services company engaged by the FSP to organise a time to undertake repairs to her home. 11. However, the FSP then informed the Applicant that it was denying her building claim. The building requires considerable structural work to floors, piers and walls. 12. The FSP contends that the damage to the house was caused by flood water. However, a hydrologist’s report and the Lockhart Shire Council support the view that the damage to the property was caused by stormwater run-off following a storm event. Further, the FSP has already admitted a storm event occurred by making payment on contents for the sum insured amount. 13. The FSP has accepted that some of the damage to the house was caused by stormwater. However, the FSP’s scope of works (SOW) was insufficient and did not include a number of items. The SOW contained a number of incorrect measurements and is unreliable. 14. The Applicant obtained a SOW and has submitted a quote for repair work to her house. 15. The Applicant accepts the FSP’s offer of $4 6,128 for the contents claim and $1,000 for rental costs. However, she contends that the damage to her house was caused by the initial stormwater inundation and is now claiming the amount of $150,994.42. Summary of FSP’s Position 16. On 20 October 2010, the FS P’s building service’ s company inspected the insured property and reported flash flooding to about 50 houses in the area. Flood water flowed through the Applicant ’s house approximately 20cm above floor level. 17. The building consultant stated the damage to the property was typical of all flood claims where water had entered the house moving the footings. The builder reported floor boards, walls, cupboards, vanity, doors and skirting will all need to be replaced and fully painted. 18. A hydrologist was appointed to assess whether the property was inundated by floodwater, local stormwater run-off, or a combination of both. 19. The hydrologist reported the house was inundated to a maximum depth of 35cm above floor level during the event. The floor level at the front of the house is higher than the rear and was inundated to a depth of 25cm above floor level. Case No: 228804 Determination Page 3 of 10 20. The hydrologist also reported the depth of inundation from the local catchment run-off is unlikely to have been greater than 15cm in the rear of the house and less than 2cm in the front of the house. He stated in his conclusion: „...the house at the subject property was initially inundated by stormwater run-off from the local catchment to the east of Lockhart. The house was subsequently inundated to a maximum depth of 0.35m above floor level by floodwater overflowing from Brookong Creek.‟ 21. The FSP appointed a building consultant ‘S’ to provide a report on the condition of the property and the effect of the incident. 22. ‘ S ’ reported the house had three main areas that have been constructed at different periods. The original area sits on timber stumps, the extension to the western elevation sits on brick piers and the extension to the northern ele vation is built on a concrete slab. 23. ‘ S ’ stated the floor of the original section is relatively level however there is evidence of some movement where the floor has peaks and troughs. He observed the timber stumps have partially deteriorated over time as surface water from the exterior of the residence has accessed the area. He also reported the flood water level in the front section was approximately 30cm. 24. The consultant was of the opinion the floor level had deteriorated prior to the flood event. However, the flooding has further exacerbated the problem. He was of the opinion the flooding contributed to 50% of the movement. 25. He therefore considered the floor level to be a maintenance related issue and not the result of the recent flooding event. 26. In respect to the western extension he reported:  There was a significant slope in the floor level where the level from the external wall to the access door of the original building to be approximately 5cm out of level;  There was no evidence of any cracking to any wall linings or timber architrave around door openings;  It would be expected that a movement of 5cm there would be cracking and openings in wall linings and joints in architraves and skirtings;  He observed a section of wall lining had started to ‘bulge’ from t he wall indicating some minor movement;  He was of the opinion the floor level to the extension was originally built out of level and was a building defect and not the result of the flood event. 27. In respect to the rear northern extension he reported;  There is severe cracking to the floor slab which he considered existed prior to the storm event; Case No: 228804 Determination Page 4 of 10  He was of the opinion the concrete slab had cracked and deteriorated over the life of the material as a result of its installation and was a building defect. 28. In his summary, the consultant stated: „I am of the opinion that the movement associated with the floors of the residence has been the result of deterioration over and (sic) extended period of time including the way in which they have been constructed. The flood waters would have exacerbated the issue. Therefore, I consider the damage to the floor structure to be a building defect and maintenance related issue.‟ 29. Subsequently, the FSP denied the claim on the grounds the damage was the result of maintenance related issues that had occurred over an extended period of time as well as defect related issues. Further, the flood waters had exacerbated the issues to the Applicant ’s property. 30. In response to the Applicant ’s objection to its decision, the FSP had the building consultant revisit the property. The consultant reported that if the timber stumps had been in good condition, the stormwater run-off would not have contributed to any further deterioration. 31. The consultant also stated the lack of ventilation and the fact that the outside ground level around the house does not divert water away from the underfloor space had also contributed to the deterioration of the timber floor structure over an extended period of time. 32. The claim was referred to the FSP’s Internal Dispute s Resolution (IDR) department who determined that the FSP would pay for damage caused by the storm water run-off only. 33. After considering the various reports and quotes, the FSP offered to cash settle the claim for the damage to the building for the amount of $37,637.59. 34. The Applicant declined the offer and subsequently submitted a SOW from the Applicant ’s builder. However, the SOW and quote included previously excluded items, that is, the timber flooring and flood related items. 35. The FSP engaged an external loss assessor to examine the Applicant ’s builder’s quote and to adjust the quote to limit it to cover works required for stormwater run-off damage only. 36. The loss assessor’s revised estimate was $40,018.45 which was submitted to the Applicant. 37. The Applicant did not accept the revised offer. 38. It is clear that stormwater run-off had inundated the Applicant ’s property to no more than 15cm to the rear and less than 2cm to the front of the home. These are extremely small levels of water and would not have caused considerable Case No: 228804 Determination Page 5 of 10 damage had the flooding not occurred and there were no pre-existing issues. The FSP considers its offer to be fair and reasonable in the circumstances. 39. The Applicant has provided no expert evidence in support of its position. 40. As a matter of law, if water that enters the premises is flood water or a mixture of storm and flood water, the loss is excluded, and further a concurrent inundation of storm and flood water is excluded. 41. It is the FSP’s submission that the hydrological evidence is such that the only source of water that inundated the subject property after the storm water run-off was flood water of a combination (mixture) of storm water and flood water and accordingly, under established law, all loss sustained is excluded from cover. 42. The FSP relies on the following policy/contract provisions: “ Listed Events cover We will cover your buildings or contents for loss or damage as a result of the incidents listed on the following pages. If you make a claim, you will need to pay any excesses that apply – you will only need to pay this amount once. Any cover we provide is subject to exclusions. ... Storm, rainwater or wind We will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind. ... Water or liquid damage We will cover your building or contents for loss or damage caused by water or liquid. ... We will ONLY cover loss or damage as a result of water or liquid escaping from  a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain ... Exclusions to your cover We will NOT cover any loss or damage as a result of, or caused by  settling, shrinkage or any movement of earth  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear  ...  a defect in an item, structural defects, or faulty workmanship or design  ...  flood  ... ... Case No: 228804 Determination Page 6 of 10 glossary of words with a special meaning ... flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam.” Issues 43. To what extent did the stormwater run-off cause damage to the Applicant ’s property. Reasons for Decision 44. FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 45. This decision has been made by a Panel consisting of an Ombudsman, a Panel member with extensive experience in insurance industry matters and a Panel member with extensive experience in consumer claims. 46. There has been an exchange of material which the parties rely on and each Party has had the opportunity to address the issues arising from the material exchanged. 47. On 20 October 2010, a building services company (BSC) representative inspected the Applicant ’s water damaged property. The BSC stated there was flash flooding in the area and flood water flowed through the Applicant ’s house to a depth of approximately 20cm. The BSC reported:  House is old timber frame with wood floor boards in the main section of the house;  The back section has a concrete floor with different floor levels;  The concrete has cracked and with water still under the house the concrete is starting to sink into the mud;  Bottom of wall sheeting, door and cupboards are starting to swell;  Typical of all flood claims where water has entered the house moving the footing. Floor boards, walls, all cupboards, vanity, doors and skirting boards will all need to be replaced and fully painted. 48. On 10 November 2010, a building consultant, ‘S’, inspected the Applicant ’s property. He reported, in part:  Timber stumps supporting the timber floor have partially deteriorated over time; Case No: 228804 Determination Page 7 of 10  He is of the opinion that the floor level had deteriorated prior to the flood; Case No: 228804 Determination Page 8 of 10  However, the flooding further exacerbated the problem and he is of the opinion the flooding contributed to 50% of the movement;  There was a crack in the concrete floor in the rear section of the house which existed before the storm event and was a building defect;  He considered damage to cupboards, wall and floor linings, and an electric hot water heater to have been damaged due to the flood. 49. It is noted that ‘ S ’ did not differentiate what property had been damaged by the stormwater run-off or flood water. The FSP’s loss assessor advised that ‘S’ informed him that the two incidents, that is, the stormwater run-off followed by the flood were so close together the damage could not be separated. 50. There are inconsistencies as to the level of water that flowed through the house:  The BSC stated the water level was 20cm above the floor level;  Building consultant ‘ S ’ stated the water level was 30cm above floor level;  An hydrologist estimated the water levels were: o Pre-flood – front of house 2cm rear of house 15cm o Post flood – front of house 25cm rear of house 35cm 51. The Panel notes the FSP settled the Applicant ’s contents claim on a total loss basis and accepted that the damage was caused by stormwater run-off. 52. The Lockhart Shire Council’s Director of Engineering issued a statement dated 20 December 2010 as follows: “ During the afternoon of 15 October 2010 a rain event of unprecedented intensity occurred. Storm water built-up extremely quickly with water flowing east-west from the vicinity of East Street and south – north from Green Street towards the creek that runs around the north and west of town. This storm water flowed through many properties on its way to the creek and in doing so entered the sewerage system via residences‟ floor wastes. [ Applicant ‟s] property at F Street was one property affected by this storm water. As the day progressed the creek rose and broke its banks inundating some properties a second time.” 53. Given the inconsistencies in the various reports it is impossible to place an accurate measure on the stormwater run-off level in the Applicant ’s house before the storm water was joined by water flowing from the creek. 54. The front of the house is the main li ving area and consists of the main bedroom, hallway, lounge room and sitting room. If the water level in this section of the house was only 2cm deep it is difficult to understand that all of the contents in those rooms would have been totally destroyed. The Panel notes the FSP accepted the contents damage. Case No: 228804 Determination Page 9 of 10 55. Building consultant ‘ S ’ prepared a SOW dated 25 November 2010 upon which the Applicant ’s builder prepared a quotation for repairs to the amount of $150,944.41. 56. However, the quotation was to repair all damage to the Applicant ’s house and the quote had not been discounted to take into account the damage estimated to have been caused by flood water. Further, it included an amount of $60,023 to rectify floors and $10,000 to remove asbestos. 57. The FSP referred t he builder’s quote to its loss assessor to review and recalculate the amount by discounting the $150,944.41 total to take into account the flood damage. The revised amount arrived at was $40,018.45. 58. The quote made no allowance for repairs to the floor system and reduced the quote for asbestos removal to $5,000. 59. In the Panel’s view, there is no absolute accurate method in which the actual damage caused by the stormwater run-off and flood can be calculated. 60. The Applicant considers that her stormwater run-off was responsible for all of the damage to her home while the FSP states that the flood water caused the majority of the damage. 61. In view of this the Panel is inclined to rely on the FOS Terms of Reference, section 8.2, which provides that when deciding a dispute it will do what in its opinion is fair in all the circumstances, having regard to legal principles , applicable industry codes or guidance as to practice and good industry practice. FOS. 62. Having regard to all of the information exchanged the Panel considers the damage caused to the Applicant ’s house to be caused by both the stormwater run-off and flood water. The Panel considers it fair in the circumstances to apportion 50% of the damage to each separate cause. That is, the stormwater run-off caused the initial damage and the flood water came in over the stormwater. 63. Using the Applicant ’s builder’s quote based upon ‘S’s’ SOW of $150,944.41 the Panel calculates the cost of repair of the stormwater damage at $ 75,472.21 Determination 64. Accordingly, the Panel determines the FSP is to cash settle the Applicant for the amount of $75,472.21. Case No: 228804 Determination Page 10 of 10 65. Further the Panel determines interest is payable from 3 December 2010 to date of payment of the claim in accordance with section 57 of the Insurance Contracts Act 1984.