Settlement amount for storm-damaged jetty, pontoon and slipway under accidental damage policy
Text of the determination
Case No: 228655 Determination Page 1 of 10
Case number: 228655
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount
18 July 2011
Background
1. The Applicant and his wife were insured under an accidental damage home
insurance policy with the Financial Services Provider (FSP). The relevant
period of insurance was 25 August 2008 to 25 August 2009. The policy was
arranged through an insurance broker.
2. The policy provided cover for building(s) with a total sum insured of $835,000.
Claims lodged under the policy were subject to a standard excess of $100 and
a voluntary excess of $100.
3. On 16 September 2009, a claim was lodged under the policy by the broker for
storm damage to a jetty/ramp and pontoon. The date of loss was initially
reported as 1 January 2009.
4. A claim form was submitted indicating the date of loss was around 10 March
2009. Following consideration of various reports, the FSP accepted the claim
and settlement was offered on 23 September 2009, based on a quote (MAS)
provided by the Applicant. The offer was as follows:
6 x 12m aluminium ramp and brackets $11,500.00 Full allowance allowed
Demolish and dispose existing jetty $2,350.00 Full allowance allowed
Construct new jetty $17,712.75 50% allowance
$31,612.75
Less Deductible $200.00
TOTAL $31,412.75
5. The Applicant was willing to settle his claim but raised issue with the 50%
allowance for the construction of the jetty. The Applicant was advised that the
FSP accepted 50% on the basis that a total replacement of the jetty would
constitute an upgrade or betterment which is not covered by the policy.
6. In a letter dated 18 November 2010, the FSP, following a review of the claim,
advised:
“... the committee can see no reason to consider any changes to the original
decisions taken by the claims department on the claim submitted. The offer has
Determination
Case No: 228655 Determination Page 2 of 10
been calculated in consideration of the jetty and pontoon that have been
severely corroded by rust and have deteriorated over a long period of time.”
7. When the claim was lodged for the jetty/pontoon, a separate claim was lodged
under the policy for impact damage caused to a slipway on or around
December 2008.
8. The FSP appointed an assessor to report on the damage to the slipway and
obtained an appropriate engineer’s’ report. It was noted the slipway had
suffered slight impact damage as well as suffering from wear, tear and rust.
9. The FSP offered settlement based on a contribution of $9,062.66 ne tt of $200
policy excess. The FSP advised the offer was based on the condition of the
slipway and the late lodgement of the claim.
10. The Applicant withdrew his intention to settle the claims following him obtaining
a quote to replace the damaged jetty, ramp, pontoon and slipway for $144,375.
11. The Applicant has referred this matter to the Service seeking indemnity under
the policy for the full replacement cost of the jetty, ramp, pontoon and slipway.
Summary of Applicant’s Position
12. The FSP wrote to him advising it would not pay for any accidental loss caused
by the likes of rust, corrosion, etc. The FSP concluded the jetty and pontoon
have been severely corroded by rust and deteriorated over a long period of
time.
13. The Applicant states he obtained reports from his own marine engineering
consultant who does not agree that the damage was caused due to “rust,
gradual dete rioration, depreciation, wear or tear.”
14. The Applicant states that prior to the storm, the jetty and pontoon were fully
functional and are now unserviceable.
15. The Applicant states he is seeking the cost of replacement and not betterment.
16. The Applicant relies on the same basis for the slipway claim.
17. The Applicant advised he paid a deposit of $55,550, to commence works to
replace the structure as he could no longer wait for the FSP.
Summary of FSP’s Position
18. The FSP states the policy is one of indemnity by way of reinstatement or repair,
subject to its choice, but only to the condition prior to the loss occurring should
repairs not occur within six months of the date of damage.
Case No: 228655 Determination Page 3 of 10
19. It accepted liability under the policy but only to the extent of the condition of the
property prior to the loss occurring, therefore excluding long term damage,
wear and tear etc.
20. The FSP states a fair offer has been made. It also states the late notification of
the claim and the inconsistent date of the indicated storm event have
prejudiced it.
21. In regards to the slipway, it accepted liability for the claim, but as the condition
of the slipway was deteriorated and requiring maintenance the settlement it
made to the Applicant reflects this.
22. The FSP relies on the following policy provisions :
“ Part A – Buildings and Contents
Accidental damage cover
What is covered
Your buildings and/or your contents as set out in your schedule are covered if they are
destroyed, lost or damaged. …
We will cover your buildings and your contents for accidental loss or accidental
damage. There is some loss or damage we will only cover under specific conditions.
…
What we will not pay for
We will not cover your buildings and your contents for any accidental loss or accidental
damage caused by:
…
Rust, corrosion, gradual deterioration, depreciation, wear or tear;
…
A defect in an item, faulty workmanship, structural defects or faulty design;
…
Additional things we will pay for when you have insured your buildings
…
We will pay these costs when they relate to loss or damage caused by or arising from
accidental loss or accidental damage that is covered by this policy:
…
Case No: 228655 Determination Page 4 of 10
We will pay the reasonable costs of demolishing and removing and disposing
any buildings debris when damage or loss occurs.
We will pay the reasonable costs of architects, surveyors and engineers and also
any legal fees that arise from reinstating your buildings when loss or damage
occurs
…
We will pay the costs necessary to meet the requirements of any statutory
authority in connection with rebuilding or repairing the buildings at the situation.
We will not pay any cost which resulted from any notice which a statutory
authority served on you before loss or damage to your buildings occurred. The
most we will pay in any one period of insurance is $25,000
…
What are buildings
…
Jetties, wharfs, pontoons and moorings used for domestic purposes.
…
How we pay a claim for your buildings
When loss or damage occurs to your buildings, we will pay the cost of rebuilding your
buildings or repairing the damaged portions to the same condition as when they were
new.
We will also pay any additional costs required to comply with government or local
authority bylaws. We will not pay these additional costs if you were required to
comply with these bylaws, and had not done so, before the loss or damage occurred.
Rebuilding or repairing your buildings must commence within six months of the loss
or damage occurring. If it does not commence within six months, we will do one of
the following:
Reinstate or repair your buildings to the condition they were in just before the
loss or damage occurred;
Pay you the cost of reinstating or repairing your buildings to the condition they
were in just before the loss or damage occurred; or
Case No: 228655 Determination Page 5 of 10
Pay you the value of the land and buildings just before the loss or damage
occurred. We will reduce this payment by the value of your land and your
buildings after the loss occurred.
We decide which one we will do.
…
What Parts A and B of the policy do not cover
We will not pay claims for loss, damage or liability arising from:
…
Flood, storm surge, the action of the sea, tidal wave, high water, or erosion;”
Issues
23. Whether the FSP was entitled to rely on policy terms and conditions in regards
to its offer of settlement for the jetty, ramp and pontoon.
24. Whether the FSP’s offer of settlement for the slipway fulfils its obligations under
the terms and conditions of the policy.
Reasons for Decision
25. FOS has considered it is appropriate to expedite the dispute in accordance with
clause 8.6 of the FOS Terms of Reference. This is because of the substantive
quantum involved. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
26. This decision has been made by a Panel consisting of an Ombudsman, a
person with extensive experience in general insurance matters and a person
with extensive experience in consumer claims.
27. The FSP has indicated that its offer of settlement of $31,412.75 for the repair of
the jetty is incorrect and that it should be $31,596.05 to correctly reflect the
demolition of the jetty.
There has been an exchange of material upon which the parties rely. Each party has
had access to the material on which the other party bases its case.
28. The FSP, in its submission dated 28 February 2011 advised it has not included
any comment in respect of the slipway claim as it was not included in the
subject of the Applicant’s dispute to the Service.
29. The FSP states that the slipway claim is an entirely separate claim.
Case No: 228655 Determination Page 6 of 10
30. However, the Applicant advised the Service the claim for the slipway has not
been settled. Indeed the Applicant states he has not had any offer of settlement
or any indication that the slipway claim was not one for acceptance.
31. The Panel notes the email from the FSP’s loss assessor dated 23 September
2010 regarding settlement of the jetty and pontoon claim. The Applicant is
advised that the settlement relates to the pontoon/jetty and that the claim for
the slipway is to be settled separately as a separate file exists.
32. In a letter to the FSP dated 25 October 2010, the Applicant advised:
“My policy with you covers replacement of the damaged jetty/pontoon and
slipway.
As shown on the attached cost summary, it will cost me $144,375.00 incl GST to
replace the jetty and slipway….
…
In writing, I wish to point out:
a) My claim is for the cost of works to replace storm-damaged jetty and slipway
in line with NSW Maritime’s approval, issued on 16 June 2010;”
33. The Service sought a submission from the FSP in response to the Applicant
having raised the issue of the slipway’s settlement. The FSP provided a
submission to the Service in regards to its settlement of the slipway. A copy of
the FSP’s submission was provided to the Applicant.
34. For the purposes of this determination, the Panel shall address the issues
regarding the jetty/pontoon and slipway separately.
Jetty/pontoon
35. The structure is described as a flat timber jetty attached to land at one end, with
a ramp attached to the other end which then attaches to a floating timber
pontoon.
36. According to the FSP’s letter of 18 November 2010, its contribution offer was
based on the condition of the jetty and pontoon.
37. However, the Applicant is seeking the full cost of replacement of the
jetty/pontoon. He claims the jetty/pontoon was rendered unusable because of
the damage sustained.
38. The FSP accepts there is storm damage. However, the FSP states there are
various maintenance related issues to the property which necessitate exclusion
from any settlement consideration.
Case No: 228655 Determination Page 7 of 10
39. It is noted under the terms and conditions of the policy the FSP will pay the cost
of rebuilding or repairing the damaged portions to the same condition as when
they were new.
40. However, also noted under the terms and conditions , the FSP can pay the cost
of reinstatement of repairs to the condition the building was in prior to the loss
or damage occurring if the rebuilding or repairs does not commence within six
months of the loss or damage occurring.
41. The FSP accepted liability on the latter provision and limited indemnit y under
the policy as it could not be established as to the certainty of the date of loss,
and prejudice caused in the delay in reporting the loss. However no formal
explanation is contained within the FSP’s submission regarding its prejudice as
a result of the late claim lodgement.
42. The Panel notes the Applicant’s concern with waiting long periods from the
claim lodgement to the finalisation of the FSP’s decision. The Applicant stated
the structure has been subjected to further damage from any future storm
events as well as normal day to day river movements.
43. Although there have been delays in the claims process, the Panel is aware that
that when the claim was lodged on 16 September 2009 the FSP was advised
the date of loss 1 January 2009. It was later noted on the claim form the date of
loss was 10 March 2009. This was still some six months after the alleged loss
occurred.
44. The Panel accepts that the FSP is entitled to rely on the terms and conditions
of the policy as to how it will settle the claim and in this case it is entitled to give
consideration to:
“ Rebuilding or repairing your buildings must commence within six months of the loss
or damage occurring. If it does not commence within six months, we will do one of
the following:
Reinstate or repair your buildings to the condition they were in just before the
loss or damage occurred;
Pay you the cost of reinstating or repairing your buildings to the condition they
were in just before the loss or damage occurred; ”
45. As such, the Applicant’s policy does not co ver him for the cost of replacement
as when new but covers him for the cost of replacement to the condition before
the damage occurred.
46. The FSP has allowed for the full cost of the replacement of the ramp as well as
the full cost of demolishing and disposing of the jetty. The FSP has only
allowed 50% of the cost of replacing the jetty. The FSP has not considered any
of the costs relating to the pontoon.
Case No: 228655 Determination Page 8 of 10
47. Based on the available information, there does not appear to be any storm
related damage to the pontoon. Rather it is recommended the pontoon be
replaced with a lighter fibreglass pontoon as it would be more appropriate for
the exposed location.
48. The Applicant initially accepted the FSP’s settlement offer but rejected this after
obtaining a quote for new replacement. However, as previously stated, the FSP
is entitled to settle on the cost to reinstate or repair to the condition just prior to
the loss. The Applicant has not provided any information that the FSP’s offer of
settlement does not fulfil that requirement.
49. Having analysed the material, giving consideration to the available reports and
photographs, the Panel is satisfied the FSP’s offer of settlement for the jetty
and ramp fulfils its contractual obligations under the terms and conditions of the
policy.
Slipway
50. The Applicant lodged a claim for impact damage to a slipway. The claim was
lodged at the same time as the claim for the jetty/ramp/pontoon. The date of
loss is noted by the Applicant’s broker variously as 1 December 2008 and 1
February 2009. Having noted the history provided by the Applicant to his
engineer, it seems likely that the date of loss being relied on is 1 December
2008. Therefore the Applicant is subject to the same terms and conditions of
settlement as for the jetty/ramp/pontoon claim:
“ Rebuilding or repairing your buildings must commence within six months of the loss
or damage occurring. If it does not commence within six months, we will do one of
the following:
Reinstate or repair your buildings to the condition they were in just before the
loss or damage occurred;
Pay you the cost of reinstating or repairing your buildings to the condition they
were in just before the loss or damage occurred; ”
51. The Applicant obtained a quote (CMS) dated 10 June 2010 to replace the
slipway for $54,200 plus GST and $9,820 plus GST to replace the vessel
cradle.
52. The FSP offered settlement of $5,962 (10% contribution) towards the repair of
the slipway and $3,240.66 (30% contribution) for the vessel cradle less the
policy excess of $200.
53. It appeared the 10% contribution of the repair of the slipway was based on one
of the 10 concrete piers having been damaged (cracked through).
Case No: 228655 Determination Page 9 of 10
54. According to the FSP, its offer was considered to be reasonable and based on
the condition due to the extensive wear, tear, rust and c orrosion. The FSP’s
offer was based on the advice from an external loss assessor.
55. However it was noted the western rail, lower rod tie and eastern bowing of the
lower end of the western rail may have suffered impact damage at some time.
This is covered by the policy. However, there does not appear to be any
consideration for repair of this damage in the FSP’s calculation.
56. Even though it is unclear from the material as to whether the damage had
occurred at the one time, in any event the policy covers accidental damage and
the Panel is satisfied the FSP’s offer should extend to make an appropriate
allowance for this.
57. The Applicant is seeking the cost for the replacement of a new slipway and
cradle. However, the policy terms and conditions allow the FSP to settle for the
cost of reinstatement or repairs to a condition it was in just prior to the loss. The
Panel is satisfied the FSP is entitled to do so in this circumstance.
58. However, whilst the ability to apportion a contribution may not be an exact
exercise, having noted that the FSP has offered a 10% contribution for repair of
the slipway alongside a 30% contribution offer for the repairs to the vessel
cradle and the apparent omission of any contribution for the rails/ties, this
appears a somewhat arbitrary and inconsistent approach.
59. The Panel has taken the stance, as is allowed under the Service’s Terms of
Reference, to consider what is fair in all the circumstances.
60. As such, the Panel has taken the view the FSP should take a consistent
approach. The Panel is aware that in relation to the jetty/ramp/pontoon claim
the FSP offered settlement based on 50% contribution towards replacement.
61. Therefore, for the sake of consistency, the FSP’s contribution for the repair of
the slipway and vessel cradle should be 50% of the cost of the accepted CMS
quote.
62. The policy also provides additional cover for the reasonable costs of architects,
surveyors and engineer’s fees. There is no indication as to what the FSP has
paid for or is willing to pay for in this regard. The FSP should review the various
reports and costs to establish the Applicant’s entitlement in this regard.
Determination
63. On the basis of the available information, the Panel determines that it does not
propose to alter the FSP’s offer of settlement for the jett y/ramp/pontoon.
64. In regards to the slipway/cradle claim, the Panel determines the FSP’s
contribution be increased to 50% of the cost of repairs based on the CMS
quote. As such, the FSP’s contribution is $35,211 (including GST).
Case No: 228655 Determination Page 10 of 10
65. The Panel determines the FSP give consideration of the Applicant’s entitlement
for cover under additional benefits in regards to the various reports obtained
and council requirements for the reinstatement of the structures. The FSP is to
make a contribution equivalent to 50% of the cost of the additional benefits
payable under the policy, consistent with the Panel’s other findings.