Home / Financial Firm (Unknown - Insurer) / Determination 228179
Determination 228179
Refusal to rectify defective roof repairs after hail damage by relying on a building-defect exclusion; unlicensed contractor used
Summary
The owners' strata claim for hail damage to roofs was partly repaired by a contractor who was unlicensed and whose work was defective, and the FSP refused rectification by relying on a building-defect exclusion. AFCA rejected the exclusion and ordered the FSP to have all LO-repaired roofs brought to manufacturer specifications by a licensed contractor, with no payment figure ordered.
Having accepted the claim, authorised repairs and admitted that rectification was needed, the FSP had lost its right to rely on the exclusion, and it breached its duty of utmost good faith.
Issues
- Claim denial primary · upheld
“the FSP has extinguished its right to rely upon an exclusion in the policy terms more than three years later”
- Inadequate claim investigation secondary · upheld
“By failing to correctly inspect the roof prior to the commencement of repairs”
- Repairs or contractors secondary · upheld
“by authorising an unlicensed contractor to undertake such repairs, the FSP cannot ... be considered as acting in the best interests of the Applicants”
Subjects and remedies
home or building damagenatural disasterrepair or rectify
Text of the determination
Case No: 228179 Determination Page 1 of 7
Case number: 228179
General Insurance - Domestic Insurance - Home Building - Service - Delay in
Claim Handling – Rectification Repairs – Defective Workmanship
16 May 2011
Background
1. The Applicants held a residential strata insurance policy with the Financial
Services Provider (FSP) from 15 December 2004. The policy provides cover for
a number of apartments with a total buildings sum insured of $34,220,000.
2. The Applicants lodged a claim with the FSP on 13 November 2006 for
extensive damage occasioned to the buildings following a severe hail storm
one week earlier.
3. The FSP accepted the claim was one to which the policy responds and
authorised repairs to the apartments. The cost of repairs to the Applicants’
apartments approximated $160,000.
4. The Applicants assert that the repairs to the roof of some of the apartments are
inadequate and that rain water is still able to enter the properties. The
Applicants seek to have the FSP engage a licensed contractor to attend to
rectification repairs.
5. The FSP accepts that some of the repairs require to be rectified and has
offered to cash settle the Applicants $13,000. However, the FSP submits that
the rain water is able to enter the property due to a roofing defect which existed
prior to the hail storm. As such, the FSP asserts that it should not be
responsible for correcting the defect as issues such as this are excluded under
the terms and conditions of the policy.
Summary of Applicants ’ Position
6. The Applicants say that following repairs authorised by the FSP, some of the
apartment roofs continue to allow the ingress of rain water.
7. The Applicants further say that as the FSP authorised such repairs, it should be
responsible for all rectification work necessary to return the roofs to a
serviceable condition with the correct materials necessary to complete the
repairs.
Determination
Case No: 228179 Determination Page 2 of 7
8. The Applicants submit that the roofing contractor employed by the FSP, albeit
the same contractor who completed the original roofing built in 2004, was
unlicensed at the time of repairs being carried out.
Summary of FSP’s Position
9. The FSP says that it accepts that some rectification repairs are required to
some of the roofs following repairs and is prepared to cash settle the Applicants
for the cost of same.
10. The FSP further says that the cause of the ingress of rain water is due to a
building defect in relation to the pitch of the roof which is excluded under the
terms of the policy.
11. The FSP submits that the Applicants should lodge a complaint with the Building
Standards Authority in relation to the poor workmanship of the roofing
contractor at the initial building stage.
12. The FSP relies on the following policy provisions contained within the Product
Disclosure Statement (PDS):
“ Basis of settlement applicable to this Section
1. Following the happening of a Defined Event to the Property Insured the Basis of
Settlement on Buildings and Common Contents will be Reinstatement or
Replacement.
2. For the purpose of this Section the term Reinstatement or Replacement will apply
as follows:
Reinstatement or Replacement: (Applicable to Buildings and Contents)
The amount payable will be the cost of Reinstatement or Replacement of the
Damaged Property Insured at the time of its Reinstatement, subject to the following
provisions and subject also to the terms, conditions and Sums Insured in this
Section.
...
b. where Property Insured is Damaged in part only, the repair of the Damage and
the restoration of the Damaged portion of the Property Insured to a condition
substantially the same as, but not better or more extensive than its condition when
new (including demolition or destruction of sound property necessary for the
purpose of reinstatement or replacement).
...
3. We will not pay for any Damage arising directly or indirectly out of or in any way
connected with:
...
l. inherent vice or latent defect:
...
q. error or omission in design, plan or specification or failure of design;
r. faulty materials or faulty workmanship.”
Case No: 228179 Determination Page 3 of 7
Issue
13. Whether the FSP is required to reinstate the roofs to a serviceable standard
with the appropriate materials.
Reasons for Decision
14. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had an opportunity of addressing
any issues raised therein.
15. Due to the complex nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the FOS
Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. It is not in dispute that on 7 November 2006 there was an exceptionally severe
hail storm which caused extensive damage to a number of the Applicants’
apartments.
17. Furthermore, it is not in dispute that an event such as this is afforded cover
under the terms and conditions of the policy.
18. Upon lodgement of a claim by the Applicants to the FSP, the FSP appointed a
loss adjuster to attend the apartment complex and report on the extent of the
damage sustained as a result of the hail storm. The loss adjuster reported in
relation to the roofs:
“Corrugated roofing over all towers has suffered extensive indentation from the
hail. The damage is clearly visible from the ground when looking upwards at the
unlined eaves overhang, and is also visible in the morning light looking across
the lower roofs from the higher units. The current owner of the management
rights informed us that he would not be concerned at the damage if it were not
visible to unit occupants. However this is a 5-star resort, and the indentations on
the roofing shall obviously detract from the overall appearance of the complex.
As the buildings are located within a marine environment, we would anticipate
that the roofing is of heavy duty (marine grade) steel. If so, it is unlikely to rust
out despite the hail damage. On the other hand, regular (non marine grade)
roofing will deteriorate rapidly following hail damage in the salt-laden air.
We suggest that we engage a qualified roofer to inspect, report on the extent of
damage, the materials used, and provide costs to reinstate all roofs to the
complex.”
19. The loss adjuster arranged for the original roofing contractor, CR, who worked
on the initial build of the apartments two years earlier, to attend the complex
and quote on the cost of repairs. A quote dated 10 January 2007 was provided
by CR which was subsequently accepted by the FSP, as the least expensive of
two quotes obtained, and repairs were authorised.
Case No: 228179 Determination Page 4 of 7
20. On 22 May 2007, the loss adjuster further reported:
“Both contractors agree that occupants of th e upper apartments must vacate the
premises during the removal and replacement of the roof material. The complex
manager advises that this is not possible, and has discussed the issue with the
Body Corporate. As a result, the Body Corporate Committee has requested
consideration to a cash settlement for the hail damage to the roofing, as they are
so concerned about the disturbance to the operation of the resort whilst repairs
are being done.”
21. A response in relation to the Applicants’ request for a cash settl ement is
detailed in an email from the FSP to the loss adjuster, dated 29 May 2007:
“The suggestion from the Building Manager to cash settle should be resisted
absolutely, as there is more likely to be ongoing issues that will haunt the
insurance in the fu ture.”
22. In light of this response from the FSP, repairs were authorised with CR at a
time suitable to the Applicants. Due to the holiday season and inclement
weather, the repair work did not commence until February 2008.
23. Prior to the commencement of the roofing repairs, CR changed its trading name
to LO Roofing. The Applicants have searched the Building Standards Authority
website which shows that at the time repairs commenced LO was not licensed
to carry out such work, his licence having been revoked on 8 March 2007.
24. The FSP has provided no evidence to show what procedures are put in place,
prior to the commencement of repairs, to ensure that all contractors authorised
to complete repairs are appropriately licensed to do so.
25. LO Roofing completed repairs to the roof and internal damage caused by the
contractor during the course of the repair work in December 2008.
26. In July 2009, the loss adjuster contacted the FSP to advise that despite the
completion of the roofing repairs, some of the apartments were still
experiencing an ingress of rain water. The loss adjuster further reported:
“The roofer has advised that the leak is the result of capillary action under the flat
roof sheeting. He states that the existing roofing material is not designed to be
used in this situation – the pitch is inadequate for this particular product.
We questioned the roofer as to why this material was installed during the
reinstatement process. He stated that this was the original material, which he
was instructed to install by the principal contractor, and therefore the same
material was used for the hail reinstatement/replacement.
We now learn that there were problems with leaks through the roof sheeting prior
to the hail storm event. We are advised that following completion of the original
construction, the roof contractor had installed a soaker flashing under the box
gutter to solve the problem. It is thought the fixings for the new roof sheeting may
have pierced the flashing, leading to on- going leaks.”
27. The Applicants deny that any of the properties were leaking prior to the hail
storm and the Panel has not been provided with any substantive evidence to
demonstrate otherwise. As such, the Panel has no reason to doubt the
Case No: 228179 Determination Page 5 of 7
Applicants’ submission that the apartments were watertight prior to the hail
storm and subsequent repairs.
28. The Applicants also obtained further information from LO in regard to the
ongoing roof leaks during periods of rain. LO detailed:
“Generally the water ingress to the units listed below was due to wind driven rain.
I could find not a problem with the roof installation or material. The main problem
seems to be that the insulation installed by the original roof installers is too close
to the end of the roof sheets. Rain driven up the ends of the corrugations is being
soaked up by the insulation like a sponge.
During the installation of your roof I installed infill strips at the box gutters to
prevent rain being driven into the units’ ceilings. This had worked fine in previous
storms and rain. Now it seems severe wind and rain will cause problems.
My solution would be to cut back the excess insulation and install a baffle or
caps at the end of the roof sheets. This is often necessary in highly exposed
areas, particular with flat roofs and box gutters.”
29. The loss adjuster, at the request of the FSP, arranged for a further contractor,
M, to attend the Applicants’ apartment complex and report on the cause of the
ongoing ingress of rain water to nine of the units. M detailed:
“The roof sheeting material is similar to Spandek wh ich is a pierced fixed deck.
The manufacturer’s instructions are that the minimum fall for this type of sheeting
be 3 degrees.
In addition it is recommended that the valleys of the sheet be turned down at the
gutter end.
...
These procedures have not been carried [out] on any of the roofs.
The consequence of the fall on the roof being too shallow increases the ability for
capillary action to occur thereby drawing water back into the unit ceiling and wall
structure.
The gutter brackets are also a likely source of water ingress as they are level (no
fall) and the ends of the brackets could not be determined during the inspection.
The over flashing, where it has been installed is cut over the gutter brackets and
this over flashing piece, where it crosses the bracket, is not sealed to prevent
water ingress.
The foam infill strips have not been correctly installed and, in some areas, they
are falling into the box gutters. The insulation can act as a conduit for water as
the capillary actions draws water back on the under-side of the sheeting.
The water ponding on the roof sheets both at the box gutter ends and at all vent
penetrations will shorten the roof life expectancy. The holes where fixings are
broken or have missed the purlin below have been filled with silicone. This will
also shorten the life expectancy of the sheeting.
In my opinion the installation of the entire roof sheeting and associated work is
sub-standard.
...
The instructions required that I comment on the original roofing specifications –
but I was unable to do so because they were not supplied. We would be happy
to do so if they were made available.
Case No: 228179 Determination Page 6 of 7
I was also asked to comment on the [LO] report. My findings above make it
reasonably clear that I am unable to agree with the contents of that report .”
30. The loss adjuster opined that the incorrect fall for the roof sheeting was a
building defect pre-dating the hail event. As such, rectification of this issue
would fall within the exclusion of the policy.
31. Furthermore, the loss adjuster considered that as the Applicants had introduced
LO to him as a potential repairer, any sub-standard work should be reported by
the Applicants to the Building Standards Authority. The loss adjuster did accept
that some damage relating to the hail repairs required rectification and the FSP
has offered to cash settle the Applicants for this rectification work.
32. The Applicants provided the FSP with every opportunity at the outset to inspect
the apartment roofs and to consider whether or not an exclusion within the
policy terms w ould apply. The FSP’s loss adjuster found it unnecessary to carry
out a detailed inspection of the roofs, possibly due to the location of the building
M, required the erection of scaffolding to achieve access to the roofs.
33. The Panel is of the opinion that having accepted the claim, authorised repairs
and admitting that rectification repairs are required, the FSP has extinguished
its right to rely upon an exclusion in the policy terms more than three years
later, in the factual circumstances of this case.
34. Clearly, the FSP had an obligation to the Applicants to act in the utmost good
faith towards them, consistent with commercial standards of decency and
fairness with all due regard to their interests. By failing to correctly inspect the
roof prior to the commencement of repairs and by authorising an unlicensed
contractor to undertake such repairs, the FSP cannot, in the Panel’s opinion, be
considered as acting in the best interests of the Applicants.
35. As previously determined, the Panel is also satisfied that prior to the hail event,
the Applicants’ properties was watertight and did not allow the ingress of water.
36. The FSP is required to put the Applicants in a similar position to which they
were in prior to the hail event occurring, that is, with roofs fit for purpose, fitted
with the correct materials and repaired by a suitably licensed repairer. This
does not just extend to the roofs which are currently leaking but to all roofs
repaired by LO.
Determination
37. On the basis of the available information, the Panel determines that the FSP is
required to ensure that repairs which were undertaken to all the damaged roofs
repaired by LO are to the manufacturer’s specifications with the correct
materials used.
Case No: 228179 Determination Page 7 of 7
38. Should any of the repairs to the roofs be to a sub-standard quality, the Panel
further determines that the FSP is required to appoint a suitably licensed
contractor to complete rectification repairs to the manufacturer’s specifications.