Refusal to rectify defective roof repairs after hail damage by relying on a building-defect exclusion; unlicensed contractor used

FirmFinancial Firm (Unknown - Insurer)
Decided2011-05-30
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owners' strata claim for hail damage to roofs was partly repaired by a contractor who was unlicensed and whose work was defective, and the FSP refused rectification by relying on a building-defect exclusion. AFCA rejected the exclusion and ordered the FSP to have all LO-repaired roofs brought to manufacturer specifications by a licensed contractor, with no payment figure ordered.

Having accepted the claim, authorised repairs and admitted that rectification was needed, the FSP had lost its right to rely on the exclusion, and it breached its duty of utmost good faith.

Issues

Subjects and remedies

home or building damagenatural disasterrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 228179 Determination Page 1 of 7 Case number: 228179 General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling – Rectification Repairs – Defective Workmanship 16 May 2011 Background 1. The Applicants held a residential strata insurance policy with the Financial Services Provider (FSP) from 15 December 2004. The policy provides cover for a number of apartments with a total buildings sum insured of $34,220,000. 2. The Applicants lodged a claim with the FSP on 13 November 2006 for extensive damage occasioned to the buildings following a severe hail storm one week earlier. 3. The FSP accepted the claim was one to which the policy responds and authorised repairs to the apartments. The cost of repairs to the Applicants’ apartments approximated $160,000. 4. The Applicants assert that the repairs to the roof of some of the apartments are inadequate and that rain water is still able to enter the properties. The Applicants seek to have the FSP engage a licensed contractor to attend to rectification repairs. 5. The FSP accepts that some of the repairs require to be rectified and has offered to cash settle the Applicants $13,000. However, the FSP submits that the rain water is able to enter the property due to a roofing defect which existed prior to the hail storm. As such, the FSP asserts that it should not be responsible for correcting the defect as issues such as this are excluded under the terms and conditions of the policy. Summary of Applicants ’ Position 6. The Applicants say that following repairs authorised by the FSP, some of the apartment roofs continue to allow the ingress of rain water. 7. The Applicants further say that as the FSP authorised such repairs, it should be responsible for all rectification work necessary to return the roofs to a serviceable condition with the correct materials necessary to complete the repairs. Determination Case No: 228179 Determination Page 2 of 7 8. The Applicants submit that the roofing contractor employed by the FSP, albeit the same contractor who completed the original roofing built in 2004, was unlicensed at the time of repairs being carried out. Summary of FSP’s Position 9. The FSP says that it accepts that some rectification repairs are required to some of the roofs following repairs and is prepared to cash settle the Applicants for the cost of same. 10. The FSP further says that the cause of the ingress of rain water is due to a building defect in relation to the pitch of the roof which is excluded under the terms of the policy. 11. The FSP submits that the Applicants should lodge a complaint with the Building Standards Authority in relation to the poor workmanship of the roofing contractor at the initial building stage. 12. The FSP relies on the following policy provisions contained within the Product Disclosure Statement (PDS): “ Basis of settlement applicable to this Section 1. Following the happening of a Defined Event to the Property Insured the Basis of Settlement on Buildings and Common Contents will be Reinstatement or Replacement. 2. For the purpose of this Section the term Reinstatement or Replacement will apply as follows: Reinstatement or Replacement: (Applicable to Buildings and Contents) The amount payable will be the cost of Reinstatement or Replacement of the Damaged Property Insured at the time of its Reinstatement, subject to the following provisions and subject also to the terms, conditions and Sums Insured in this Section. ... b. where Property Insured is Damaged in part only, the repair of the Damage and the restoration of the Damaged portion of the Property Insured to a condition substantially the same as, but not better or more extensive than its condition when new (including demolition or destruction of sound property necessary for the purpose of reinstatement or replacement). ... 3. We will not pay for any Damage arising directly or indirectly out of or in any way connected with: ... l. inherent vice or latent defect: ... q. error or omission in design, plan or specification or failure of design; r. faulty materials or faulty workmanship.” Case No: 228179 Determination Page 3 of 7 Issue 13. Whether the FSP is required to reinstate the roofs to a serviceable standard with the appropriate materials. Reasons for Decision 14. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had an opportunity of addressing any issues raised therein. 15. Due to the complex nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 16. It is not in dispute that on 7 November 2006 there was an exceptionally severe hail storm which caused extensive damage to a number of the Applicants’ apartments. 17. Furthermore, it is not in dispute that an event such as this is afforded cover under the terms and conditions of the policy. 18. Upon lodgement of a claim by the Applicants to the FSP, the FSP appointed a loss adjuster to attend the apartment complex and report on the extent of the damage sustained as a result of the hail storm. The loss adjuster reported in relation to the roofs: “Corrugated roofing over all towers has suffered extensive indentation from the hail. The damage is clearly visible from the ground when looking upwards at the unlined eaves overhang, and is also visible in the morning light looking across the lower roofs from the higher units. The current owner of the management rights informed us that he would not be concerned at the damage if it were not visible to unit occupants. However this is a 5-star resort, and the indentations on the roofing shall obviously detract from the overall appearance of the complex. As the buildings are located within a marine environment, we would anticipate that the roofing is of heavy duty (marine grade) steel. If so, it is unlikely to rust out despite the hail damage. On the other hand, regular (non marine grade) roofing will deteriorate rapidly following hail damage in the salt-laden air. We suggest that we engage a qualified roofer to inspect, report on the extent of damage, the materials used, and provide costs to reinstate all roofs to the complex.” 19. The loss adjuster arranged for the original roofing contractor, CR, who worked on the initial build of the apartments two years earlier, to attend the complex and quote on the cost of repairs. A quote dated 10 January 2007 was provided by CR which was subsequently accepted by the FSP, as the least expensive of two quotes obtained, and repairs were authorised. Case No: 228179 Determination Page 4 of 7 20. On 22 May 2007, the loss adjuster further reported: “Both contractors agree that occupants of th e upper apartments must vacate the premises during the removal and replacement of the roof material. The complex manager advises that this is not possible, and has discussed the issue with the Body Corporate. As a result, the Body Corporate Committee has requested consideration to a cash settlement for the hail damage to the roofing, as they are so concerned about the disturbance to the operation of the resort whilst repairs are being done.” 21. A response in relation to the Applicants’ request for a cash settl ement is detailed in an email from the FSP to the loss adjuster, dated 29 May 2007: “The suggestion from the Building Manager to cash settle should be resisted absolutely, as there is more likely to be ongoing issues that will haunt the insurance in the fu ture.” 22. In light of this response from the FSP, repairs were authorised with CR at a time suitable to the Applicants. Due to the holiday season and inclement weather, the repair work did not commence until February 2008. 23. Prior to the commencement of the roofing repairs, CR changed its trading name to LO Roofing. The Applicants have searched the Building Standards Authority website which shows that at the time repairs commenced LO was not licensed to carry out such work, his licence having been revoked on 8 March 2007. 24. The FSP has provided no evidence to show what procedures are put in place, prior to the commencement of repairs, to ensure that all contractors authorised to complete repairs are appropriately licensed to do so. 25. LO Roofing completed repairs to the roof and internal damage caused by the contractor during the course of the repair work in December 2008. 26. In July 2009, the loss adjuster contacted the FSP to advise that despite the completion of the roofing repairs, some of the apartments were still experiencing an ingress of rain water. The loss adjuster further reported: “The roofer has advised that the leak is the result of capillary action under the flat roof sheeting. He states that the existing roofing material is not designed to be used in this situation – the pitch is inadequate for this particular product. We questioned the roofer as to why this material was installed during the reinstatement process. He stated that this was the original material, which he was instructed to install by the principal contractor, and therefore the same material was used for the hail reinstatement/replacement. We now learn that there were problems with leaks through the roof sheeting prior to the hail storm event. We are advised that following completion of the original construction, the roof contractor had installed a soaker flashing under the box gutter to solve the problem. It is thought the fixings for the new roof sheeting may have pierced the flashing, leading to on- going leaks.” 27. The Applicants deny that any of the properties were leaking prior to the hail storm and the Panel has not been provided with any substantive evidence to demonstrate otherwise. As such, the Panel has no reason to doubt the Case No: 228179 Determination Page 5 of 7 Applicants’ submission that the apartments were watertight prior to the hail storm and subsequent repairs. 28. The Applicants also obtained further information from LO in regard to the ongoing roof leaks during periods of rain. LO detailed: “Generally the water ingress to the units listed below was due to wind driven rain. I could find not a problem with the roof installation or material. The main problem seems to be that the insulation installed by the original roof installers is too close to the end of the roof sheets. Rain driven up the ends of the corrugations is being soaked up by the insulation like a sponge. During the installation of your roof I installed infill strips at the box gutters to prevent rain being driven into the units’ ceilings. This had worked fine in previous storms and rain. Now it seems severe wind and rain will cause problems. My solution would be to cut back the excess insulation and install a baffle or caps at the end of the roof sheets. This is often necessary in highly exposed areas, particular with flat roofs and box gutters.” 29. The loss adjuster, at the request of the FSP, arranged for a further contractor, M, to attend the Applicants’ apartment complex and report on the cause of the ongoing ingress of rain water to nine of the units. M detailed: “The roof sheeting material is similar to Spandek wh ich is a pierced fixed deck. The manufacturer’s instructions are that the minimum fall for this type of sheeting be 3 degrees. In addition it is recommended that the valleys of the sheet be turned down at the gutter end. ... These procedures have not been carried [out] on any of the roofs. The consequence of the fall on the roof being too shallow increases the ability for capillary action to occur thereby drawing water back into the unit ceiling and wall structure. The gutter brackets are also a likely source of water ingress as they are level (no fall) and the ends of the brackets could not be determined during the inspection. The over flashing, where it has been installed is cut over the gutter brackets and this over flashing piece, where it crosses the bracket, is not sealed to prevent water ingress. The foam infill strips have not been correctly installed and, in some areas, they are falling into the box gutters. The insulation can act as a conduit for water as the capillary actions draws water back on the under-side of the sheeting. The water ponding on the roof sheets both at the box gutter ends and at all vent penetrations will shorten the roof life expectancy. The holes where fixings are broken or have missed the purlin below have been filled with silicone. This will also shorten the life expectancy of the sheeting. In my opinion the installation of the entire roof sheeting and associated work is sub-standard. ... The instructions required that I comment on the original roofing specifications – but I was unable to do so because they were not supplied. We would be happy to do so if they were made available. Case No: 228179 Determination Page 6 of 7 I was also asked to comment on the [LO] report. My findings above make it reasonably clear that I am unable to agree with the contents of that report .” 30. The loss adjuster opined that the incorrect fall for the roof sheeting was a building defect pre-dating the hail event. As such, rectification of this issue would fall within the exclusion of the policy. 31. Furthermore, the loss adjuster considered that as the Applicants had introduced LO to him as a potential repairer, any sub-standard work should be reported by the Applicants to the Building Standards Authority. The loss adjuster did accept that some damage relating to the hail repairs required rectification and the FSP has offered to cash settle the Applicants for this rectification work. 32. The Applicants provided the FSP with every opportunity at the outset to inspect the apartment roofs and to consider whether or not an exclusion within the policy terms w ould apply. The FSP’s loss adjuster found it unnecessary to carry out a detailed inspection of the roofs, possibly due to the location of the building M, required the erection of scaffolding to achieve access to the roofs. 33. The Panel is of the opinion that having accepted the claim, authorised repairs and admitting that rectification repairs are required, the FSP has extinguished its right to rely upon an exclusion in the policy terms more than three years later, in the factual circumstances of this case. 34. Clearly, the FSP had an obligation to the Applicants to act in the utmost good faith towards them, consistent with commercial standards of decency and fairness with all due regard to their interests. By failing to correctly inspect the roof prior to the commencement of repairs and by authorising an unlicensed contractor to undertake such repairs, the FSP cannot, in the Panel’s opinion, be considered as acting in the best interests of the Applicants. 35. As previously determined, the Panel is also satisfied that prior to the hail event, the Applicants’ properties was watertight and did not allow the ingress of water. 36. The FSP is required to put the Applicants in a similar position to which they were in prior to the hail event occurring, that is, with roofs fit for purpose, fitted with the correct materials and repaired by a suitably licensed repairer. This does not just extend to the roofs which are currently leaking but to all roofs repaired by LO. Determination 37. On the basis of the available information, the Panel determines that the FSP is required to ensure that repairs which were undertaken to all the damaged roofs repaired by LO are to the manufacturer’s specifications with the correct materials used. Case No: 228179 Determination Page 7 of 7 38. Should any of the repairs to the roofs be to a sub-standard quality, the Panel further determines that the FSP is required to appoint a suitably licensed contractor to complete rectification repairs to the manufacturer’s specifications.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.