Text of the determination
Case No: 228159 Determination Page 1 of 9
Case number: 228159
General Insurance - Commercial Insurance - Building - Hail Damage -
Inadequate Repairs
03 February 2012
Background
1. The Applicant incepted a business insurance policy with the Financial Services
Provider (FSP) on 1 May 2007 and renewed it annually. The period of
insurance relevant to this dispute is 1 May 2009 to 1 May 2010.
2. The policy provided cover for, amongst other things, the Applicant‟s building for
a sum insured of $800,000 against perils including storm, s ubject to an excess
of $200.
3. On 8 March 2010, the Applicant lodged a claim for damage to his roof, internal
suspended ceiling and aluminium sheeting following a hail storm during the
preceding weekend.
4. The FSP accepted indemnity for the claim and following several inspections by
relevant experts, elected to undertake repairs.
5. The Applicant has continued to suffer damage as a result of ongoing leaks. He
maintains the FSP has failed to properly repair his roof and now requires the
FSP to replace the roof, as the only viable course of action.
6. The FSP submits it has repaired all damage which resulted from the storm and
any ongoing problems are unrelated to the storm.
Summary of Applicant’s Position
7. The Applicant says he rang the FSP on 8 March 2010 to report da mage to his
roof and ceiling caused by a hail storm on 6 March 2010.
8. The FSP advised him the roof was repairable and they would arrange for the
repairs.
9. His obtained the services of an environmental engineer (IT) who initially agreed
that the roof could be repaired, although as the roof was predominantly
asbestos he also recommended further work to be carried out after the
immediate repairs were completed.
Determination
Case No: 228159 Determination Page 2 of 9
10. Repairs were carried out on 13 July 2010, however his own expert IT reported
that some work had been completed prematurely and some of the work
appeared incomplete or inadequate and further work was required.
11. On 23 August the Applicant reported further damage and also further leaking
on 24 August 2010. Yet more leaks occurred on 15 October 2010 and 13-14
November 2010.
12. Despite calling the FSP on a number of occasions, there have been no further
repairs or modifications since 1 November 2010.
13. On 16 December 2010 his understanding was that the FSP‟s representative
(CM) asked him to provide a quote for a new roof, however a further
conversation with the CM on 18 January 2011 revealed the FSP had asked for
quotes for the “ unsatisfactory repairs ” to the roof.
14. Since 19 November 2010 there have been five more leaks and this shows that
the repairs which were carried out were inadequate, as before the March 2010
storm there had been no leakage.
15. He has provided a number of submissions and extensive commentary and
documentation on the on-going problems. He has also provided many images
of the roof, ceiling and other internal areas showing a number of leaks.
16. He has also provided a number of reports from his expert together with copies
of some of the FSP‟s expert reports in support of his position.
17. He now wants what was originally promised to him, that is, a new roof.
Summary of FSP’s Position
18. It recorded the report of the loss as follows:
“What happened: Storm damage to roof and suspended ceiling aluminium sheeting
repairs pending. Damage/ items: roof suspended ceiling, al uminium.”
19. It appointed an assessor (MF) who reported:
“ Loss Circumstance:
Approximately 3.00pm Saturday 6 March 2010 the Melbourne and metropolitan
area experienced hail and thunder storms accompanied by high winds. The
Bureau of Meteorology recorded more than 60mm of rainfall in some areas in
less than two hours resulting in flash flooding and widespread damage
throughout.
Damage description:
Hail caused gutters to overflow, fibrous roof cracked from hail.
Damage has been sustained to the following:-
* Internal ceilings
* Exterior paint
Case No: 228159 Determination Page 3 of 9
* Super 6 roof sheeting possibly asbestos) (sic)
Action taken:
Consultant to attend and provide a report
Policy indemnity:
Recommended acceptance. ”
20. On 15 March 2010, its engineer (CO) carried out an inspection of the damage.
On receipt of his report, the FSP determined that a further report on the
premises and damage to the roof and internal areas was required.
21. It therefore appointed building consultant (BL), building contractor (LC) and risk
management company (NA) to attend and report.
22. After considering their reports, on 18 May 2010 it wrote to the Applicant
outlining the cause and extent of the damage and provided a quote for the cost
of repairs, inviting him to obtain an alternative quote, if required.
23. Although the Applicant was happy to proceed with its builder, he wanted to
extend the scope of works to include some damaged roof sheets. The FSP
agreed and work subsequently commenced.
24. It called the Applicant on 13 July 2010 to see how repairs were progressing and
he advised he was happy with the progress.
25. However, on 23 August 2010 the Applicant advised that following a report from
his expert he was concerned about various issues including new damage,
damage to air conditioners and water ingress.
26. After further review it advised on 16 September 2010 that all storm related
repairs had been satisfactorily carried out. It also sought further advice from its
expert BL who confirmed adequate completion of repairs.
27. It received further reports of leaking and damage in November 2010, December
2010 and January 2011. It responded on several occasions, arranging further
inspections and reports. However, it maintained its position that all storm
related repairs had been carried out successfully.
28. Following further reports and leaks and further representations from the
Applicant, it invited him to submit a new quote on a “ without admission ” basis.
However after being advised of further leaks in February 2011, it again
confirmed its position that the storm related damage had been properly carried
out.
29. It submits that it has met its obligations under the policy.
30. It has also provided numerous and extensive reports from a range of experts in
support of its position.
31. It relies on the following policy provision as detailed in its Notice of Response to
the Service:
Case No: 228159 Determination Page 4 of 9
“Insured events
4. Storm and wind
…
This insured event only includes storm, tempest, wind, rainwater (including cyclones
and tornadoes), snow and hail.”
Issues
32. Whether the FSP has fully discharged its obligations under the policy.
33. Whether the FSP is required to replace the Applicant‟s roof as a result of
damage sustained on 6 March 2010.
Reasons for Decision
34. Due to the nature of this dispute, FOS has considered it appropriate to expedite
the dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
35. This decision has been made by a Panel consisting of an Ombudsman, a Panel
member with extensive experience in insurance industry matters and a Panel
member with extensive experience in consumer claims.
36. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
37. The Panel notes the following are not in dispute:
a hail storm occurred on 6 March 2010;
the Applicant suffered damage to his property as a result of that storm;
and
the policy extends to cover the Applicant for his loss.
38. The fundamental issue in dispute between the parties is whether the FSP has
satisfactorily completed the repairs of all damage which resulted from the hail
storm on 6 March 2010. The Applicant submits that the FSP has failed to do so
and given the history of failed repairs, the only proper course of action is for the
FSP to meet the cost of replacing his roof in its entirety.
39. The FSP disagrees. It submits that it has repaired all damage occasioned and
any remaining issues, and any on-going leaks, are a result of other causes. It
has therefore met is obligations under the policy.
40. The Panel also notes that other issues have also arisen during the course of
this claim with respect to resultant damage including ceilings and floor
Case No: 228159 Determination Page 5 of 9
coverings, and damage to other areas including air-conditioners and gutters.
However, these aspects have not been raised as part of the current dispute.
41. The Panel will therefore restrict its considerations to the roof damage.
42. As noted, the parties have submitted numerous expert reports from a range of
consultants including builders, engineers, environmental specialists and
plumbers. The Panel does not intend to detail all of these, however it will refer
to these as considered necessary.
43. It is instructive to note the chronology of information and expert reports from
the time of the loss report. The FSP‟s loss assessor initially identified damage
to the roof and sought the assistance of an engineer, CO, to assist in assessing
the extent of damage and recommended course of rectification.
44. Of note is CO‟s first report which states:
“ Summary
It is our opinion that the damage to the roof complex as observed at our
inspection is due to the hail storm event of 6 March 2010, which has resulted in
cracking, dislodgement, star shaped denting and scouring of the corrugated
asbestos roof sheets.
…
It is therefore our opinion that the asbestos roof sheets are now friable.
It is also our opinion that this damage to the asbestos roof sheeting will
necessitate the removal replacement (sic) of the entire roof in a safe and proper
manner…
Recommendations:
We recommend the following:
The roof be replaced in its entirety as per the attached Scope of Works – Roof…”
45. In response to that report, the FSP arranged for three experts to inspect and
review the roof and make further recommendations.
46. In their separate reports, the experts - building consultant, BL, building
contractor, LC, and risk management company, NA, reported as follows:
47. NA reported:
“ We observed only one cracked roof sheet near a redundant air conditioning
unit…The remainder of the asbestos cement roof sheeting appeared in good
order for a roof of this age.
It is evident that there have been some repairs to the roof sheeting, and several
roof sheets had been replaced.
Comment.
It is our opinion that the roof sheeting has not been impacted by the hailstorm to
cause the damage to the roof sheeting. The consequent flooding was due largely
to inundation of the roof guttering and rain head outlets…the rain heads and
downpipes would require upgrade to prevent further recurrence of a flood event
at a future time.”
Case No: 228159 Determination Page 6 of 9
48. LC reported:
“The issues raised by the o wner of the premises in regards to the some existing
cracks (sic) in the asbestos sheeting is correct but only to the extent that, they
are, existing and once again in my mind were not caused by hail storm. They
appear to be more consistent with age and foot traffic. The roof has at some
stage had had some form of protective coating applied to it and this does show
some minor damage that most probably has been caused by the hail storm.
However, this would not be the cause of any of the water damage within the
building itself.”
LC refers to the rain heads and states they “ could be very easily blocked by a
substantial downfall of hail as was the case on the day in question… Realistically
I do not believe that the hail damaged the integrity of the asbestos roof sheeting.
However as a result of the hail, water penetration most likely has occurred and
consequently, the damage within the building, attributed to the storm by the
owners of the premises, has merit. ”
49. BL reported:
“ Outcome
The existing asbestos roof cladding appears to be in good order. At some point
prior to the storm it has been cleaned and treated with protective coating.
It shows no evidence of holes and the cracks appear to be unrelated to the
storm.
The storm water outlets from the box gutters have been partially covered,
possibly to prevent birds, and these no doubt backed up with the hail causing the
box gutters to overflow.”
50. Significantly , the Applicant‟s expert „IT‟ also reported:
“ The roof is one of the best observed by the undersigned and with proper
repairs, is considered capable of many more years of useful life.
It is considered difficult to define which damage was caused by the subject storm
and which was present before the storm. Nevertheless the extent of damage is
minor and it is understood subject to clarification, that the insurer intends to
make proper repairs. ”
51. The FSP provided a repair quote to the Applicant, who after consideration
accepted the FSP‟s intention to repair the roof.
52. At that point, despite CO‟s initial recommendati on, the parties agreed that
repairs would be undertaken.
53. After the repairs were completed, further problems were reported by the
Applicant and the premise experienced various instances of water ingress .
54. Following a further inspection, the FSP was of the view that all storm related
damage had been satisfactorily completed and any other damage was either
pre-existing or a result of poor maintenance.
55. The FSP identified several areas of pre-existing repair, where silicone had been
applied, and it reported on a number of pre-existing cracks and of water ingress
which pre-dated the loss.
Case No: 228159 Determination Page 7 of 9
56. It also referred to the Applicant‟s own expert‟s report which noted that it was
difficult to define which damage was caused by the subject storm and which
was present before the storm.
57. Further, it provided a certificate showing that the repair work carried out was
compliant with existing standards.
58. Despite this however, the Applicant continued to experience instances of water
ingress which he maintains never occurred prior to the loss. As these events
had only occurred since the hail storm and as they continued despite the
repairs, he concluded that these can only be as a result of the inadequate
repairs.
59. Having considered the various expert reports, the Panel finds it hard to
recon cile the view of the FSP‟s engineer , CO, and its subsequent experts; the
former stating categorically that the hail storm had caused cracking,
dislodgement, denting and scouring of the sheets, whereas the latter found the
roof to be in good condition and little evidence of hail damage.
60. However, the latter view was confirmed by the Applicant‟s own expert IT.
61. Given that all the experts have some expertise in the area of asbestos and
roofing (although with different emphasis) the Panel accepts the preponderance
of evidence that the roof was not extensively damaged and that repair was a
clear option, particularly as this view was sup ported by both parties‟ experts .
62. Accordingly, the Panel finds that the FSP was entitled to undertake repairs
rather than replace the roof.
63. Turning to the damage caused by the hail storm, the evidence before the Panel
persuades it to conclude that the hail caused sufficient damage to the roof‟s
asbestos cladding to cause the roof to leak.
64. In addition to the cladding leakage, leakage was also sustained resulting from
the roof drainage system (box guttering, rain heads and downpipes) being
unable to cope with the build up of water resultant from the storm and thus
causing overflowing which contributed to the ingress of water into the premise.
65. However, there is no evidence of hail damage to the drainage system although
there is some evidence of rust and of areas subject to the water pooling.
66. Given that the FSP elected to undertake repairs, the Panel accepts the FSP is
responsible to return the Applicant to the position he enjoyed prior to his loss.
67. In that regard the Applicant maintains that there were no roof leaks prior to the
hail storm and that since that time, leaks have continued.
68. The Applicant‟s expert, however, refers to “Fibres were exposed at sheet edges
only where sheeting had been recently broken. Damage sealed by silicone
sealant both by [Applicant] following the subject storm and prior, also
adequately sealed the exposed edg es.”
Case No: 228159 Determination Page 8 of 9
69. Moreover, in a report dated 30 September 2010 BLL states “During the initial
visit the tenant indicated there had been some minor leaks prior to the storm”.
70. The A pplicant‟s response is that although continuing maintenance has been
undertaken the prior repairs referred to by his expert were done before his
purchase of the building eleven years ago. “I have not done any repairs or
treatment for asbestos, within the 11 years of owning the property…”.
71. The Applicant also asserts that the leaking prior to the event came from the
manhole cover, “These minor leaks are not leaks from the building, but instead
came from the man hole exit cover” [which is located in the roof] …Drips have
occurred in the past within this area…” .
72. Consideration of the whole of the e vidence presented, leads the Panel to
accept the existence of pre-existing repaired damage to the roof, some new hail
damage and other damage which may not be consistent with hail damage;
although the extent to which each or all are contributing to the on-going leaking
is problematic.
73. Further, in the absence of evidence that any of the drainage system, the
skylights or the man hole were damaged by hail, the Panel accepts that the hail
damage to the roof was confined to the asbestos cladding thereof.
74. Moreover, given the continuous nature of the leaking and notwithstanding the
conflict in the evidence as to what damage is hail damage (or wear and tear,
deterioration, lack of maintenance or foot traffic damage) the Panel is of the
view that the FSP has not sufficiently demonstrated it has fully discharged its
obligations under the policy to return the Applicant to the position he enjoyed
prior to the onset of the hail storm.
75. That finding, together with the fact that this claim occurred almost 2 years ago
and continues unresolved persuades the Panel to seek a conclusion rather
than consider further expert reviews and opinion. In so doing, FOS Terms of
Reference provide at 8.2 that [a Panel] will do what in its opinion is fair in all the
circumstances.
Determination
76. Accordingly the Panel considers it fair and reasonable to determine the FSP is
liable to return the Applicant‟s asbestos roof cladding to a leak proof state.
77. It will discharge its liability by repairing the asbestos roof cladding in the five
areas identified by the Applicant as leaking. That is those five areas not being
near the gutters but subject to leaking.
78. Further, the FSP is only liable to repair the described asbestos cladding. It is
not liable for affecting any repairs to the non hail damaged po rtions of the roof
being the drainage system, the skylights and the man hole.
Case No: 228159 Determination Page 9 of 9
79. Upon completion of the repairs to the five identified areas to a leak proof state
the FSP will have discharged its liability under the policy for damage to the
Applicant‟s roof arising from the hail storm.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.