Home / Financial Firm (Unknown - Insurer) / Determination 228159

Determination 228159

Adequacy of hail roof repairs; applicant sought roof replacement

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owner of a commercial building said the FSP's hail-storm repairs to the asbestos roof were inadequate and claimed a full roof replacement. AFCA held the FSP could repair rather than replace but had not shown the roof was leak-proof, so it must repair the five leaking areas.

Where the insurer elects repair, it must return the insured to its pre-storm position, and it remains liable for storm-damaged cladding that continues to leak after repair.

Issues

Subjects and remedies

home or building damagenatural disasterrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 228159 Determination Page 1 of 9 Case number: 228159 General Insurance - Commercial Insurance - Building - Hail Damage - Inadequate Repairs 03 February 2012 Background 1. The Applicant incepted a business insurance policy with the Financial Services Provider (FSP) on 1 May 2007 and renewed it annually. The period of insurance relevant to this dispute is 1 May 2009 to 1 May 2010. 2. The policy provided cover for, amongst other things, the Applicant‟s building for a sum insured of $800,000 against perils including storm, s ubject to an excess of $200. 3. On 8 March 2010, the Applicant lodged a claim for damage to his roof, internal suspended ceiling and aluminium sheeting following a hail storm during the preceding weekend. 4. The FSP accepted indemnity for the claim and following several inspections by relevant experts, elected to undertake repairs. 5. The Applicant has continued to suffer damage as a result of ongoing leaks. He maintains the FSP has failed to properly repair his roof and now requires the FSP to replace the roof, as the only viable course of action. 6. The FSP submits it has repaired all damage which resulted from the storm and any ongoing problems are unrelated to the storm. Summary of Applicant’s Position 7. The Applicant says he rang the FSP on 8 March 2010 to report da mage to his roof and ceiling caused by a hail storm on 6 March 2010. 8. The FSP advised him the roof was repairable and they would arrange for the repairs. 9. His obtained the services of an environmental engineer (IT) who initially agreed that the roof could be repaired, although as the roof was predominantly asbestos he also recommended further work to be carried out after the immediate repairs were completed. Determination Case No: 228159 Determination Page 2 of 9 10. Repairs were carried out on 13 July 2010, however his own expert IT reported that some work had been completed prematurely and some of the work appeared incomplete or inadequate and further work was required. 11. On 23 August the Applicant reported further damage and also further leaking on 24 August 2010. Yet more leaks occurred on 15 October 2010 and 13-14 November 2010. 12. Despite calling the FSP on a number of occasions, there have been no further repairs or modifications since 1 November 2010. 13. On 16 December 2010 his understanding was that the FSP‟s representative (CM) asked him to provide a quote for a new roof, however a further conversation with the CM on 18 January 2011 revealed the FSP had asked for quotes for the “ unsatisfactory repairs ” to the roof. 14. Since 19 November 2010 there have been five more leaks and this shows that the repairs which were carried out were inadequate, as before the March 2010 storm there had been no leakage. 15. He has provided a number of submissions and extensive commentary and documentation on the on-going problems. He has also provided many images of the roof, ceiling and other internal areas showing a number of leaks. 16. He has also provided a number of reports from his expert together with copies of some of the FSP‟s expert reports in support of his position. 17. He now wants what was originally promised to him, that is, a new roof. Summary of FSP’s Position 18. It recorded the report of the loss as follows: “What happened: Storm damage to roof and suspended ceiling aluminium sheeting repairs pending. Damage/ items: roof suspended ceiling, al uminium.” 19. It appointed an assessor (MF) who reported: “ Loss Circumstance: Approximately 3.00pm Saturday 6 March 2010 the Melbourne and metropolitan area experienced hail and thunder storms accompanied by high winds. The Bureau of Meteorology recorded more than 60mm of rainfall in some areas in less than two hours resulting in flash flooding and widespread damage throughout. Damage description: Hail caused gutters to overflow, fibrous roof cracked from hail. Damage has been sustained to the following:- * Internal ceilings * Exterior paint Case No: 228159 Determination Page 3 of 9 * Super 6 roof sheeting possibly asbestos) (sic) Action taken: Consultant to attend and provide a report Policy indemnity: Recommended acceptance. ” 20. On 15 March 2010, its engineer (CO) carried out an inspection of the damage. On receipt of his report, the FSP determined that a further report on the premises and damage to the roof and internal areas was required. 21. It therefore appointed building consultant (BL), building contractor (LC) and risk management company (NA) to attend and report. 22. After considering their reports, on 18 May 2010 it wrote to the Applicant outlining the cause and extent of the damage and provided a quote for the cost of repairs, inviting him to obtain an alternative quote, if required. 23. Although the Applicant was happy to proceed with its builder, he wanted to extend the scope of works to include some damaged roof sheets. The FSP agreed and work subsequently commenced. 24. It called the Applicant on 13 July 2010 to see how repairs were progressing and he advised he was happy with the progress. 25. However, on 23 August 2010 the Applicant advised that following a report from his expert he was concerned about various issues including new damage, damage to air conditioners and water ingress. 26. After further review it advised on 16 September 2010 that all storm related repairs had been satisfactorily carried out. It also sought further advice from its expert BL who confirmed adequate completion of repairs. 27. It received further reports of leaking and damage in November 2010, December 2010 and January 2011. It responded on several occasions, arranging further inspections and reports. However, it maintained its position that all storm related repairs had been carried out successfully. 28. Following further reports and leaks and further representations from the Applicant, it invited him to submit a new quote on a “ without admission ” basis. However after being advised of further leaks in February 2011, it again confirmed its position that the storm related damage had been properly carried out. 29. It submits that it has met its obligations under the policy. 30. It has also provided numerous and extensive reports from a range of experts in support of its position. 31. It relies on the following policy provision as detailed in its Notice of Response to the Service: Case No: 228159 Determination Page 4 of 9 “Insured events 4. Storm and wind … This insured event only includes storm, tempest, wind, rainwater (including cyclones and tornadoes), snow and hail.” Issues 32. Whether the FSP has fully discharged its obligations under the policy. 33. Whether the FSP is required to replace the Applicant‟s roof as a result of damage sustained on 6 March 2010. Reasons for Decision 34. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 35. This decision has been made by a Panel consisting of an Ombudsman, a Panel member with extensive experience in insurance industry matters and a Panel member with extensive experience in consumer claims. 36. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 37. The Panel notes the following are not in dispute:  a hail storm occurred on 6 March 2010;  the Applicant suffered damage to his property as a result of that storm; and  the policy extends to cover the Applicant for his loss. 38. The fundamental issue in dispute between the parties is whether the FSP has satisfactorily completed the repairs of all damage which resulted from the hail storm on 6 March 2010. The Applicant submits that the FSP has failed to do so and given the history of failed repairs, the only proper course of action is for the FSP to meet the cost of replacing his roof in its entirety. 39. The FSP disagrees. It submits that it has repaired all damage occasioned and any remaining issues, and any on-going leaks, are a result of other causes. It has therefore met is obligations under the policy. 40. The Panel also notes that other issues have also arisen during the course of this claim with respect to resultant damage including ceilings and floor Case No: 228159 Determination Page 5 of 9 coverings, and damage to other areas including air-conditioners and gutters. However, these aspects have not been raised as part of the current dispute. 41. The Panel will therefore restrict its considerations to the roof damage. 42. As noted, the parties have submitted numerous expert reports from a range of consultants including builders, engineers, environmental specialists and plumbers. The Panel does not intend to detail all of these, however it will refer to these as considered necessary. 43. It is instructive to note the chronology of information and expert reports from the time of the loss report. The FSP‟s loss assessor initially identified damage to the roof and sought the assistance of an engineer, CO, to assist in assessing the extent of damage and recommended course of rectification. 44. Of note is CO‟s first report which states: “ Summary It is our opinion that the damage to the roof complex as observed at our inspection is due to the hail storm event of 6 March 2010, which has resulted in cracking, dislodgement, star shaped denting and scouring of the corrugated asbestos roof sheets. … It is therefore our opinion that the asbestos roof sheets are now friable. It is also our opinion that this damage to the asbestos roof sheeting will necessitate the removal replacement (sic) of the entire roof in a safe and proper manner… Recommendations: We recommend the following: The roof be replaced in its entirety as per the attached Scope of Works – Roof…” 45. In response to that report, the FSP arranged for three experts to inspect and review the roof and make further recommendations. 46. In their separate reports, the experts - building consultant, BL, building contractor, LC, and risk management company, NA, reported as follows: 47. NA reported: “ We observed only one cracked roof sheet near a redundant air conditioning unit…The remainder of the asbestos cement roof sheeting appeared in good order for a roof of this age. It is evident that there have been some repairs to the roof sheeting, and several roof sheets had been replaced. Comment. It is our opinion that the roof sheeting has not been impacted by the hailstorm to cause the damage to the roof sheeting. The consequent flooding was due largely to inundation of the roof guttering and rain head outlets…the rain heads and downpipes would require upgrade to prevent further recurrence of a flood event at a future time.” Case No: 228159 Determination Page 6 of 9 48. LC reported: “The issues raised by the o wner of the premises in regards to the some existing cracks (sic) in the asbestos sheeting is correct but only to the extent that, they are, existing and once again in my mind were not caused by hail storm. They appear to be more consistent with age and foot traffic. The roof has at some stage had had some form of protective coating applied to it and this does show some minor damage that most probably has been caused by the hail storm. However, this would not be the cause of any of the water damage within the building itself.” LC refers to the rain heads and states they “ could be very easily blocked by a substantial downfall of hail as was the case on the day in question… Realistically I do not believe that the hail damaged the integrity of the asbestos roof sheeting. However as a result of the hail, water penetration most likely has occurred and consequently, the damage within the building, attributed to the storm by the owners of the premises, has merit. ” 49. BL reported: “ Outcome The existing asbestos roof cladding appears to be in good order. At some point prior to the storm it has been cleaned and treated with protective coating. It shows no evidence of holes and the cracks appear to be unrelated to the storm. The storm water outlets from the box gutters have been partially covered, possibly to prevent birds, and these no doubt backed up with the hail causing the box gutters to overflow.” 50. Significantly , the Applicant‟s expert „IT‟ also reported: “ The roof is one of the best observed by the undersigned and with proper repairs, is considered capable of many more years of useful life. It is considered difficult to define which damage was caused by the subject storm and which was present before the storm. Nevertheless the extent of damage is minor and it is understood subject to clarification, that the insurer intends to make proper repairs. ” 51. The FSP provided a repair quote to the Applicant, who after consideration accepted the FSP‟s intention to repair the roof. 52. At that point, despite CO‟s initial recommendati on, the parties agreed that repairs would be undertaken. 53. After the repairs were completed, further problems were reported by the Applicant and the premise experienced various instances of water ingress . 54. Following a further inspection, the FSP was of the view that all storm related damage had been satisfactorily completed and any other damage was either pre-existing or a result of poor maintenance. 55. The FSP identified several areas of pre-existing repair, where silicone had been applied, and it reported on a number of pre-existing cracks and of water ingress which pre-dated the loss. Case No: 228159 Determination Page 7 of 9 56. It also referred to the Applicant‟s own expert‟s report which noted that it was difficult to define which damage was caused by the subject storm and which was present before the storm. 57. Further, it provided a certificate showing that the repair work carried out was compliant with existing standards. 58. Despite this however, the Applicant continued to experience instances of water ingress which he maintains never occurred prior to the loss. As these events had only occurred since the hail storm and as they continued despite the repairs, he concluded that these can only be as a result of the inadequate repairs. 59. Having considered the various expert reports, the Panel finds it hard to recon cile the view of the FSP‟s engineer , CO, and its subsequent experts; the former stating categorically that the hail storm had caused cracking, dislodgement, denting and scouring of the sheets, whereas the latter found the roof to be in good condition and little evidence of hail damage. 60. However, the latter view was confirmed by the Applicant‟s own expert IT. 61. Given that all the experts have some expertise in the area of asbestos and roofing (although with different emphasis) the Panel accepts the preponderance of evidence that the roof was not extensively damaged and that repair was a clear option, particularly as this view was sup ported by both parties‟ experts . 62. Accordingly, the Panel finds that the FSP was entitled to undertake repairs rather than replace the roof. 63. Turning to the damage caused by the hail storm, the evidence before the Panel persuades it to conclude that the hail caused sufficient damage to the roof‟s asbestos cladding to cause the roof to leak. 64. In addition to the cladding leakage, leakage was also sustained resulting from the roof drainage system (box guttering, rain heads and downpipes) being unable to cope with the build up of water resultant from the storm and thus causing overflowing which contributed to the ingress of water into the premise. 65. However, there is no evidence of hail damage to the drainage system although there is some evidence of rust and of areas subject to the water pooling. 66. Given that the FSP elected to undertake repairs, the Panel accepts the FSP is responsible to return the Applicant to the position he enjoyed prior to his loss. 67. In that regard the Applicant maintains that there were no roof leaks prior to the hail storm and that since that time, leaks have continued. 68. The Applicant‟s expert, however, refers to “Fibres were exposed at sheet edges only where sheeting had been recently broken. Damage sealed by silicone sealant both by [Applicant] following the subject storm and prior, also adequately sealed the exposed edg es.” Case No: 228159 Determination Page 8 of 9 69. Moreover, in a report dated 30 September 2010 BLL states “During the initial visit the tenant indicated there had been some minor leaks prior to the storm”. 70. The A pplicant‟s response is that although continuing maintenance has been undertaken the prior repairs referred to by his expert were done before his purchase of the building eleven years ago. “I have not done any repairs or treatment for asbestos, within the 11 years of owning the property…”. 71. The Applicant also asserts that the leaking prior to the event came from the manhole cover, “These minor leaks are not leaks from the building, but instead came from the man hole exit cover” [which is located in the roof] …Drips have occurred in the past within this area…” . 72. Consideration of the whole of the e vidence presented, leads the Panel to accept the existence of pre-existing repaired damage to the roof, some new hail damage and other damage which may not be consistent with hail damage; although the extent to which each or all are contributing to the on-going leaking is problematic. 73. Further, in the absence of evidence that any of the drainage system, the skylights or the man hole were damaged by hail, the Panel accepts that the hail damage to the roof was confined to the asbestos cladding thereof. 74. Moreover, given the continuous nature of the leaking and notwithstanding the conflict in the evidence as to what damage is hail damage (or wear and tear, deterioration, lack of maintenance or foot traffic damage) the Panel is of the view that the FSP has not sufficiently demonstrated it has fully discharged its obligations under the policy to return the Applicant to the position he enjoyed prior to the onset of the hail storm. 75. That finding, together with the fact that this claim occurred almost 2 years ago and continues unresolved persuades the Panel to seek a conclusion rather than consider further expert reviews and opinion. In so doing, FOS Terms of Reference provide at 8.2 that [a Panel] will do what in its opinion is fair in all the circumstances. Determination 76. Accordingly the Panel considers it fair and reasonable to determine the FSP is liable to return the Applicant‟s asbestos roof cladding to a leak proof state. 77. It will discharge its liability by repairing the asbestos roof cladding in the five areas identified by the Applicant as leaking. That is those five areas not being near the gutters but subject to leaking. 78. Further, the FSP is only liable to repair the described asbestos cladding. It is not liable for affecting any repairs to the non hail damaged po rtions of the roof being the drainage system, the skylights and the man hole. Case No: 228159 Determination Page 9 of 9 79. Upon completion of the repairs to the five identified areas to a leak proof state the FSP will have discharged its liability under the policy for damage to the Applicant‟s roof arising from the hail storm.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.