Text of the determination
Case No: 228121 Determination Page 1 of 8
Case number: 228121
General Insurance - Domestic Insurance - Home Building - Storm damage -
FSP Decision - Denial of claim
26 May 2011
Background
1. The Applicants hold a home and contents policy with the Financial Services
Provider (FSP) which was incepted in January 1999.
2. On 11 March 2010, the Applicants lodged a claim for storm damage. The FSP’s
claim lodgement system recorded the following notations:
“Due to the hail storm, its caused water to leak from the skylight and damage the
ceiling and walls. Water has gone underneath the house damaging the heating
unit” [sic] .
3. The FSP appointed a repair company to assess the loss and determine the
scope of works. Upon review of the loss assessment reports, it denied the claim
on the basis that the damage to the property was consistent with lack of
maintenance, wear and tear and faulty design, provisions excluded in the policy
terms and conditions.
4. The Applicants continue to dispute the FSP’s decision, arguing the expert
reports it based its decision on are contradictory and inaccurate. They are
seeking the payment of repairs of all the areas of the building allegedly
damaged by the storm.
Summary of Applicants ’ Position
5. The Applicants say the Melbourne storm on 6 March 2010 caused damage to
their garage, the ceiling and walls of their lounge room, sunroom, laundry,
kitchen and kitchen skylight, as well as underneath the house, affecting heating
mains and ducts.
6. They are dissatisfied with the FSP’s decision. They argue the damage was not
caused by wear and tear, maintenance issues or faulty design, as stated by the
FSP. They have had the same plumbing for 22 years and have never had any
issues until the storm event.
Determination
Case No: 228121 Determination Page 2 of 8
7. They agree with the first expert report in that the damage to their property was
consistent with storm damage and that based on this evidence, the FSP had
initially approved repairs in the garage roof and ceilings and walls in the lounge
room, sunroom, laundry and kitchen, as well as the heating ducts.
8. After this first report, experts from the building assessment company “IL” visited
the property and issued further reports concluding that wear and tear and
maintenance issues affected the roofing system and that faulty design in the
plumbing caused the underground damage. Subsequently, the FSP denied the
claim for the garage roof and the water damage underneath the property.
9. They are of the opinion that there are inconsistencies and inaccuracies in the
different reports organised by the FSP. They argue that the three reports
drafted by “DF”, representative of “IL” , omitted to show the photos taken by him
of the underground area, which at the time of “DF’s” visit still had water from the
initial storm damage.
10. During “DF’s” second visit, he was unable to identify any leaking water pipes
that could have caused the underground water damage and refused to test any
other sources of water ingress.
11. They strongly believe the first report is more accurate since it was done closer
to when the storm happened. In addition, repairs to the roof were performed
before “DF” visited the house for damage inspection, so his observations would
not have been accurate.
12. They were informed by the FSP that a structural engineer would assess the
damage caused by water underneath the house but this never eventuated
because they required the soil to dry prior to structural assessment. They
however advised the FSP of cracks discovered in the ground underneath the
property.
13. While waiting for the claim to be settled, they asked the FSP to perform make
safe repairs in the ceiling of the lounge room and sunroom as every time it
rained, the water damaged the ceiling and walls further. The FSP organised for
a repairer to perform these repairs but they claim this worsened the amount of
water ingress during raining periods. They eventually fixed these ceilings by
themselves.
14. They are of the opinion that, even if there had been issues in the roofing
structure, they were unaware of them and should not have been expected to
know about them because there had never been water damage to the property
prior to the storm in March 2010. They consider this point of view is reinforced
by the fact that the first loss assessor was unable to identify these structural
issues during his inspection.
15. They have also received three settlement cheques by the FSP for a hearth
marble wall, heating unit, security box and pet costs. They say they had not
agreed to this. After enquiring with the FSP about this, they were told these
settlement cheques were meant for another insured and were sent to them by
mistake. The cheques have been since cancelled.
Case No: 228121 Determination Page 3 of 8
16. They are seeking for the FSP to repair the garage roof, heating ducts under the
property and kitchen skylight and to cash settle the repairs of the ceilings in the
lounge room, sunroom, laundry and kitchen. They are also seeking for the FSP
to locate and stop water going under the property, to pay for an independent
structural engineer to assess the house foundations and to repair any damage
that might have been caused from the stormwater flooding the underfloor of the
house.
Summary of FSP’s Position
17. The FSP denied the claim on the basis that the evidence presented in the
different expert reports is consistent with wear and tear and faulty design or
workmanship, provisions specifically excluded in the policy.
18. It relies on expert reports made by “DF” who identified that the damage to the
garage roof and property ceilings was part of a maintenance problem, and that
the water damage under the house was caused by a plumbing problem.
19. The roof report shows evidence of previous repairs which suggests “a pre -
existing problem and long- lasting condition”. It also relies on further reports that
say there had been various attempts to repair flashings in the garage and
therefore the damage in the garage should also be considered a pre-existing
problem.
20. The photographs in the reports show that the condition of the property is of
significant wear and tear issues and a lack of maintenance.
21. It has offered the Applicants a settlement of $3,500 for heating ducts, repairs of
the skylights, plumbing and for replacement of linoleum flooring in the garage. It
says this settlement was proposed on the basis of benefit of the doubt to the
Applicants and is considered to be fair and reasonable and in accordance with
the terms and conditions of the policy.
22. It notes the Applicants have disagreed with its expert reports but have failed to
provide any evidence to support that the damage was caused by the storm
event of March 2010.
23. The FSP relies on the following policy provisions:
“ The incidents we cover
Storm
We cover loss or damage caused by storm.
...
For Home Buildings Insurance we cover loss or damage caused by a storm to your
home and to the interior of your home when water enters through an opening made by
the storm.
...
General exclusions
Case No: 228121 Determination Page 4 of 8
These are the general exclusions that apply to all cover provided by this Policy. They
mean you are not covered for:
loss or damage, or
claims for injury or death
caused by or arising from:
wear, tear, rust, corrosion, deterioration or erosion
faulty design or workmanship
...
We may refuse a claim if...
These conditions apply to all cover provided by this Policy.
We may refuse a claim or cancel this Policy, or do both if...
you do not maintain your home in good repair and condition. This means your
home must be watertight, structurally sound, secure and well maintained ” .
Issue
24. Whether the FSP is entitled to limit its liability for the Applicants' claim under the
terms and conditions of the policy.
Reasons for Decision
25. As advised to the parties, due to the nature of the dispute, the Financial
Ombudsman Service (FOS) has considered it appropriate to expedite the
dispute to Determination in accordance with the Operational Guidelines to the
FOS Terms of Reference.
26. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
27. I have reviewed the submissions of the parties in relation to the dispute and the
terms and conditions of the policy. I observe there is no dispute the Applicants ’
property suffered damage in the garage roof, floor and benches, the ceiling and
walls of the lounge room, sunroom, laundry and kitchen, the kitchen skylight
and underneath the property.
28. The central issue of the dispute is to determine whether the cause of the
claimed damage falls within an insured event or whether it is excluded
according to the policy terms and conditions.
29. In these circumstances, when making a claim under an insurance policy, the
responsibility rests with the policyholder to establish, on the balance of
probabilities, that the cause of the loss claimed falls within the cover provided
by the policy. The responsibility then shifts to the insurer to establish the
application of any provision on which it relies to deny or limit the claim.
Case No: 228121 Determination Page 5 of 8
30. The Applicants have not provided any further information or evidence to prove
that the damage to their property was caused by a storm event. They solely rely
on the first report of 31 March 2010, in which the repair company says the
damage to the property is consistent with the storm of 6 March 2010. They
claim this to be the most accurate report as it was the one drafted closest to the
storm event and before any repairs were performed.
31. The FSP says this first report was performed by their repairers in order to quote
for repairs. Afterwards it organised for “IL” to perform a proper building
inspection and loss assessment and for a structural engineer to investigate the
damage to the sub flooring. The first report says:
“As a result of hail build up and vast amounts of water due to heavy rain. The
spouting and valleys to the dwelling have not been able to withstand the excess
water, causing the water to bank up and eventually enter the ceiling space to the
lounge room laundry, kitchen and sunroom.
This has resulted in minor damage the ceilings, cornice and walls to the above
rooms mentioned.
... at the time of the storm there were 200mm of water present under the house.
At the time of inspection the ground was still very wet, 3 weeks after the event.
This has concerned the insured, a engineer is required to attend and ascertain if
there has been any damaged caused to the sub floor infrastructure.
The damage sited at the time of inspection is consistent with the storm that
passed through Melbourne on March 6 th 2010” [sic].
32. “IL” issued various reports to detail the damage in the property. I note the
following excerpts of the “Roof Inspection Report” of 30 June 2010:
“ The terracotta roofing system presents itself in fair condition.
...
Flashing to tile and iron roof junction is rusting and is also in fair condition.
There are no storm created openings present whilst conducting site visitation.
Flashing to chimney is in poor condition with vast amounts of silicon having been
applied, this indicates that this is a pre existing condition and has been for an
extended period of time.
...
After being directed to areas of concern by insured it was noticed that some
staining has occurred to ceiling adjacent to skylight.
There were no conclusive sightings of stains to other areas as stated by insured.
...
The flashings to existing chimney has had silicon applied suggesting this to be
an on going concern for the insured. At time of site inspection the rear soaker to
chimney is holding water.
A pergola has been installed to under side of rear section of dwelling with no
apparent flashing to prevent water ingress in times of heavy rains. Given that the
pergola sheets abut wall above sliding door this is an area of concern for water
ingress, the same areas of concern are evident along the pergolas length of
dwelling.
Case No: 228121 Determination Page 6 of 8
In regards to skylight, there is no conclusive evidence of water ingress. A roofing
system failure is the direct cause in this instance.
An area where a roof pitch change on rear section of tiled roof has silicon applied
suggesting this to be an on going cause of concern.
...
In relation to the concerns as stated by insured, we believe that the staining to
plasterboard ceiling surrounding skylight is a direct result of recent storm
activities causing roofing system failure.
The conditions surrounding the other areas of concerns but not limited to
laundry, sunroom and lounge room walls to be a pre existing condition and has
been for an extended period of time, as such we believe this not directly
attributed to recent storm activities ” [sic].
33. A second “Roof Inspection Report” (referred to the garage roof) of 5 August
2010 says in the following excerpts:
“The asbestos roofing system presents itself in a poor condition with various
attempts at repairs throughout. This indicates a pre existing condition which has
been on going for an extended period of time.
The spouting along the length of garage has been displaced from its fixing due to
poor maintenance.
...
Upon being directed to affected are within garage it was noted that the linoleum
floor coverings were badly torn and in a bad state of disrepair.
A shelve housing bags of unidentified goods is seen to have been water stained.
No storm created openings were visible from both inside or outside of garage.
...
With the nature of the asbestos roof having a high pitched profile coupled with
wind drive rains the roof has failed.
Inconsistent flashings throughout the dwelling have exacerbated these
conditions.
Previous attempts at repairing water ingress issues have failed.
We believe that with the state of asbestos roof coupled with various attempts at
repair to flashings, that this is a pre existing condition and has been for an
extended period of time and cannot be attributed to recent storm activities.
The damaged coverings to garage floor are not directly attributed to recent storm
activities as we believe it to be a maintenance issue ” [sic].
34. I also note the following excerpt of the “Specialist Report” of 24 August 2010:
“Our inspection of the above property has revealed a series of extensive pre -
existing conditions which we believe are unrelated to any recent storm activities.
As illustrated in the photographs below, excessive silicon around the spoon
drain, brickwork and concrete path has been applied as an attempt to repair any
and all damage incurred. This silicon is old in appearance which therefore
suggests a pre-existing and long-lasting condition
Upon further examination, we noticed that the downpipe at the rear of the
property is discharging its catchment into a spoon drain, which in turn relays the
Case No: 228121 Determination Page 7 of 8
water into a garden bed. As a result, we believe that water has formed a natural
course and is becoming concentrated in a particular area and in turn has entered
the sub- floor of the dwelling”.
35. I accept, after observing these reports, that there were pre-existing issues
affecting the integrity of the property’s structure, which could have contributed
to the damage caused during the storm of 6 March 2010.
36. However, I also note that the FSP has not mentioned or taken into account in
its submissions the fact that the Applicants had performed repairs to their
property roof after the storm event and prior to the inspections by “IL”. I note
that the severe hail storm and heavy rain on 6 March 2010 was an
extraordinary weather event.
37. The Applicants also say that constant rain kept damaging the ceilings in the
property and that the “make safe” repairs performed by the FSP’s appointed
repairer only worsened the amount of water entering the property. They then
considered it was a matter of urgency to repair the roof area affecting their
lounge room and sunroom ceilings by themselves.
38. I also note that the FSP’s has not addressed this issue and the potential
contribution of the “make safe” repairs to the leaks in the lounge room and
sunroom ceilings. Given the lack of evidence, I do not accept these repairs
worsen the issue; however, I accept it did not temporarily fix the leak, as should
be its purpose. Otherwise, the Applicants would not have fixed the damage as
a matter of urgency instead of waiting for the FSP’s claim settlement . I
conclude it is fair in the circumstances for the FSP to contribute to the fixing of
these ceilings.
39. On the basis of the evidence before me and on the balance of probabilities, I
am persuaded that the Applicants have established the claim falls under an
insured event according to the policy wording. The issue is the extent of the
damage caused by the storm on 6 March 2010. However pursuant to clause
8.2 of the Terms of Reference, I can rely on what I consider to be fair in all
circumstances. In the circumstances of this matter, I consider a flexible
approach needs to be taken.
Determination
40. Accordingly, I determine the following:
The FSP is required to pay 50% of the total repairs of the ceilings in the
lounge room and sunroom.
The FSP is to pay the Applicants $3,500 as per its previous offer, or
alternatively, organise for the repairs of the heating ducts, skylight,
plumbing and linoleum flooring in the garage.
The FSP is to organise for a structural engineer to inspect the damage
occurred underneath the house, evaluate its cause and assess the claim
according to their policy terms and conditions.
Case No: 228121 Determination Page 8 of 8
The FSP is entitled to deny liability for the repairs of the garage roof and
the ceiling damage in the laundry and kitchen.
41. The FSP is to settle the claim within 30 days of notification from FOS that the
Determination has been accepted.
42. Should the FSP determine to cash settle this dispute, then interest in
accordance with section 57 of the Insurance Contracts Act 1984 , should be
paid on the settlement amount from the 21 December 2010, being the date of
the FSP’s Internal Dispute Resolution decision to date of payment of the claim.