Text of the determination
Case No: 228059 Determination Page 1 of 10
Case number: 228059 General Insurance - Domestic Insurance - Home Building
- FSP Decision - Denial of claim
20 April 2011
Background
1. The Applicant holds a Landlord insurance policy with the Financial Services
Provider (FSP) covering a tenanted premise. The property is insured up to the
sum of $260,000 and is subject to an excess of $500.
2. The Applicant lodged a claim on 17 September 2010 for water damage to the
bathroom. The Applicant later lodged a further claim for water damage
elsewhere throughout the property.
3. The FSP arranged for experts to assess the property and consider the cause of
damage to the bathroom as well as the kitchen, lounge-room and bedrooms.
4. The FSP declined the claim for the bathroom on the basis that it was caused by
a leaking shower recess which is excluded from cover. Further, the damage to
other areas of the property was not caused by an insured event and therefore
excluded by cover.
5. The Applicant disputes the declinature of claim on the basis that the FSP via its
assessor accepted the claim by approving the works and paying the loss of
rental monies.
Summary of Applicant’s Position
6. The Applicant‟s initial contact with the FSP on 17 September 2010 was to claim
for water damage from a leaking tap in the bathroom only. The assessor sent
out by the FSP (“S”) attended on 20 September 2010 and proceeded to assess
all damage throughout the house.
7. An employee of the FSP (“BC”) contacted the Applicant by email to confirm
approval for work to proceed and that payment for rental monies would be
made. The FSP then declined the claim.
8. The Applicant is dissatisfied with the service received from the FSP and noted
that he repeatedly contacted the assessor, but received no return telephone
call.
9. The Applicant has enclosed copy of email from “ BC ” from which I note the
following:
Determination
Case No: 228059 Determination Page 2 of 10
“I have paid the rent loss from the 20 th Sept 2010 – 1 st Dec 2010.
...
I have paid 6 weeks as i believe it will take this long for the repairs to be
completed.
Should they exceed this time frame we can get another payment across to you to
cover for any time past his date.
The payment is for $1740, and has been transferred into you account.
...
And also as i have explained to you previously, all damages will be covered, it
just may be a case of you having lodge another claim to cover the kitchen
damage, but i will go through all that when we get the quote....” (sic)
10. The Applicant contends the reports are conflicting as to the cause of the water
damage. Accordingly, the Applicant considers the FSP s hould be bound to its
statement that all of the damage would be covered by it.
11. The Applicant has enclosed colour photographs of the damage to the bathroom
and other areas. I note the photographs of the bathroom with shower removed
show a substantial degree of blackened wood (which appears to be rotted) to
the side of the bathtub.
Summary of FSP’s Position
12. The FSP relies on the following policy terms and conditions:
“Water – leaking or escaping
If your Landlord buildings or Landlord contents suffer loss or damage caused by water
leaking or escaping from:
...
Bath, sinks, toilets, basins or any other fixed plumbing apparatus
...
Pipes
...
We will under buildings insurance
► repair or rebuild those parts of your Landlord buildings that were damaged
...
however
► We will NOT cover loss or damage caused by water leaking or escaping from a
shower recess or shower base
...
We will NOT cover
...
Case No: 228059 Determination Page 3 of 10
wear, tear, rust, corrosion, deterioration or erosion.
...
You may put your insurance claim or cover at risk if you do not meet your obligations
to us. We may refuse a claim, cancel your Policy or do both
If you
...
do not take all reasonable care to protect your property against loss or damage
...
Do not maintain your Landlord buildings in good repair and condition. This means your
Landlord buildings must be watertight, structurally sound, secure and well maintained”
13. The FSP relies on the expert report (undated) by the Applicant‟s repairer (“K”).
“ K ” states that he conducted an inspection on 17 September 2010 to determine
the cause of damage in the bathroom and states as follows:
“ - Cause being leaking tap in the bath hob adjoining the shower
- Damage being lifted floor tiles, water rotted plates and studs. Water also
under wall to hall- way swelling the flooring.”
The quotation provided by “ K ” outlines the required repairs quoted at $9,146.
14. The FSP has enclosed an invoice dated 13 December 2010 and 12 January
2011 in the sums of $5,099.69 and $724.94 which itemises the works
performed.
15. The FSP has enclosed a further report from “ K ” dated 28 October 2010 from
which I note the following:
“..1. Due to the age of the home a waterproof membrane was not evident as to
our technologies of our present methods (this does not mean there was nothing)
it is not evident as to what method was used. The shower screen is only a
curtain and yes some water will get outside this, but not enough to end up in the
hallway under the timber floating floor.
2. The walls were opened up firstly to find the leak; a pressure test was not
required as the area was quite wet and rotten. The problem was solved after
tightening the tap body within the wall, however significant damage has already
occurred.”
16. The FSP has enclosed a quotation dated 29 October 2010 from a building
company (“P”). The report lists the work for the bathroom as $5,245 and an
additional $18,839.50 to other portions of the home.
17. The FSP has enclosed a report from “ P ” dated 29 October 2010 from which I
note the following:
At the time of inspecting the property the shower recess had been partially
dismantled exposing pipe-work and wall framing.
“ P ” could not locate any failed water supply or wastepipes, however it was
noted that the tap penetrations to the shower recess were not sealed.
Case No: 228059 Determination Page 4 of 10
There was no evidence of suitable waterproof membrane having bee n
installed to the shower recess or junction of wall and floor to the bathroom
at the time of inspection.
The damage to the bathroom area and adjacent floating laminate flooring
in the hallway is a result of water escaping the shower recess during
normal operation due to either failed or inadequate waterproofing to the
shower recess.
The water supply and waste pipes in the kitchen and laundry showed no
signs of failure in the areas of the lounge or bedrooms.
The water damage to the kitchen bench-top was consistent with splashing
and spillage over a long period of time.
Damage to the gable of the floor cupboards may relate to a possible
washing machine overflow, but this event appears to pre-date the
laminate floor.
The damage to the lounge, dining and bedroom flooring is most likely the
result of incorrect cleaning methods (wet mopping of the floor).
18. The FSP has enclosed a builder‟s report dated 20 September 2010 from a
building consultant (“S”). The report notes the following:
The floor has been damaged in each room by water from several different
events.
The hallway has damaged floorboards consistent with an escape of water
originating in the bathroom (via shower). Further, the lounge, kitchen and
hallway would need to be done as the floor is in a continuous area.
The bathroom walls showed signs of severe water rot, brought on by a
water escape. The work required included reinstatement of waterproof
membranes.
The damage seen at the inspection is consistent with water escape, but
from different events. “ S ” does not provide an opinion on how the damage
to the kitchen, lounge-room and bedrooms has occurred.
The estimated cost of all works is $31,995
The report encloses colour photographs which include the shower recess. I
note the shower recess shows some rot to all sides of the recess, however the
worst of the rot appears to be towards the bathtub area and I note there are
blackened portions extending under the shell of the bath.
19. The FSP has enclosed report dated 6 October 2010 from a building consultant
(“SBA” ) from which I note the following:
At the time of attendance, the Applicant had already commenced
renovations, found damage and had the shower base, screen and the hob
wall between the shower and bath removed.
There was no evidence of debris left on the site or leaks noted whilst tests
were conducted such as running the shower.
Case No: 228059 Determination Page 5 of 10
There was no silicone between the tap spindles and tiles; however there
is no water on the gyprock in this area.
In SBA‟s opinion, the damage was caused by a leaking shower recess.
The water penetrated underneath the shower wall and into the hallway
creating damage to the floating timber floor in the area adjacent to the
bathroom door and hallway adjoining the dining room.
Additional damage was sighted to the living area ‟s continuous floating
timber floor which in SBA‟s opinion was due to wet mopping of the floor.
The photographs included with the report include a diagram of the property with
an indication of damaged areas. I note there are two areas of damage in the
hallway which adjoins the bathroom.
20. The FSP has enclosed a property manager‟s inspection report dated 15
December 2009 from which I note the following:
“A section of the timber flooring has swelled near one of the gaps in the joins –
water has entered ther e but I’m not sure how/where it is entering – took a photo
but you can’t see it doesn’t show in the photo.
...
Attending to the minor issues already discussed”
21. The FSP contends that the weight of expert evidence supports a finding that
water damage to the walls and floors in the bathroom was caused by a
combination of water escape from the shower as a result of the recess, tap
penetrations not being sealed properly, the absence of satisfactory waterproof
membrane or age and wear and tear to the waterproofi ng measures. Also K‟s
report indicates a leaking tap body behind the wall may have contributed.
22. The FSP considers the evidence supports a finding that the damage to the
wooden floors in the hallway was caused by water escaping from the shower
recess which penetrated underneath the floor tiles and wall in the bathroom
which then entered the hallway. Further, the wooden floors throughout the
property have been damaged by wet mopping.
23. The FSP notes the Applicant‟s dispute form does not argue the property was
damaged by an insured event. Further, the Applicant has not met his onus of
proof in establishing that „water escaped‟ from bath or any other fixed plumber
apparatus (other than shower).
24. The FSP submits that the proximate cause of water damage was the leaking
shower recess and not the escape of water as covered by the policy. The FSP
acknowledges K‟s report which states a leaking pipe caused the damage but
maintains the weight of evidence does not support this as the proximate cause.
Rather the proximate cause is the absence of adequate water proofing and
sealing and accordingly the damage was not caused by an insured event.
Further, the damage caused by wet mopping is also not an insured event.
25. The FSP contends that if the Service is minded to accept the leaking tap body
as a proximate cause then the Wayne Tank principle should apply. I note the
Case No: 228059 Determination Page 6 of 10
Wayne Tank principle is that if a loss has two or more proximate or effective
causes, and at least one cause is excluded from cover, the insurer is not liable.
26. The FSP submits that the Applicant failed to take reasonable care to protect his
property against loss and damage. Further, the Applicant failed to maintain the
property in good repair and condition by ensuring the property was kept
watertight, structurally sound, secure and well maintained and because the
policy excludes loss or damage caused by wear, tear, rust, corrosion,
deterioration or erosion. In support of its contention, the FSP relies on the
indications that damage has occurred over a period of time and the property
manager‟s report dated 15 December 2009 which did not result in action by the
Applicant to remedy the issues.
27. The FSP acknowledges the email from “ CB ” to the Applicant and contends that
it should not be bound by any indication the Applicant would be indemnified.
Further the FSP argues the following:
The email provides an indication that the damage will be covered and is
by no means a binding settlement agreement. There was no consideration
and no intention on behalf of “ CB ” or the FSP to be legally bound.
The email is excessively vague and there is no detail as to the basis upon
which the damage will be „covered‟ or which damages will be covered.
The language used is imprecise and incomplete and subsequently there
was no settlement agreement.
If the Service considers the email was a promise to indemnify the
Applicant, then the FSP submits it was made under a mistake of fact.
Further the FSP contends it was misled by “K‟s” quotation which states
the cause was a leaking tap in the bath hob adjoini ng the shower and
“K‟s” report that the issue was resolved after tightening the tap body within
the wall. “ CB ” was misled into believing the proximate cause of the water
damage was the leaking shower recess which was an excluded event.
If the Service considers the FSP is estopped from denying indemnity then
the FSP submits that there was no injurious reliance by the Applicant. The
rectification works would have been necessary regardless of the
insurance position.
Issues
28. Whether the FSP has appropriately d eclined the Applicant‟s claimed damage
for the bathroom and areas adjoining the bathroom.
29. Whether the FSP has appropriately declined the Applicant‟s claim for other
areas of the home including the kitchen and lounge -room.
Case No: 228059 Determination Page 7 of 10
Reasons for Decision
30. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
31. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
32. I consider the following principle relevant to an assessment of this matter:
Estoppel
The doctrine of estoppel, broadly put, is concerned to ensure that a person who
leads another to act to his or her detriment in reliance on a statement made by
that person should be held responsible to the actor. The statement may take the
form of an express promise or representation or may be inferred from the
conduct of a person. (See page 159 of Business Law of Australia [7 th Edition])
...
Proximate cause
In insurance law, the direct, real, dominant, operative, or efficient cause of loss or
damage: National & General Insurance Co Ltd v Chick [1984] 2 NSWLR 86 ; (1984) 3
ANZ Ins Cas 60-579 . An insurer will only be liable for loss suffered by the insured where
the loss was proximately caused by a peril insured against: for example (CTH) Marine
Insuranc e Act 1909 s 61; Company v Law Investment and Insurance Corp Ltd [1898] 2
QB 626 . Commons ense is the final arbiter in establishing the proximate cause of a loss:
National & General Insurance Co Ltd v Chick .
33. I consider that there are two discrete issues to be considered and I will review
each separately.
Damage to the bathroom and adjoining areas
34. There is no dispute that water damage has occurred to the bathroom and the
floorboards in the hallway which adjoins the bathroom area. There is of course
a dispute as to how that loss occurred.
35. The policy terms and conditions cover the leaking or escape of water from a
bath or pipe, but excludes loss or damage caused by water leaking or escaping
from a shower recess or shower base.
36. Accordingly, if I consider the water has leaked or escaped from the shower
recess or base then the loss is not covered. Alternatively if I consider the water
leaked or escaped from the bath or pipe then the loss is covered.
37. I have reviewed the expert evidence regarding the cause of the damage to the
bathroom.
38. The expert evidence provided by “ K ‟ indicates that the cause of the leak is a tap
in the bath hob adjoining the shower. “ K ” states a tightening of the tap body
was required and this resolved the problem.
39. In contrast the reports by “ S ” and “ SBA ” state the shower recess allowed water
leakage but are not specific as to the mechanism for same. The report by “ P ” is
Case No: 228059 Determination Page 8 of 10
somewhat supportive of “ S ” and “SBA‟s” position, but suggests inadequate
waterproof membrane allowed leaking. It should be noted that whilst the
spindles were not properly sealed that there was no damage to the gyprock
which suggests the lack of sealant at the spindles was not the point of damage.
40. I note that the experts “ S ” , “ P ” and “SBA” have not been precise regarding
where the water has leaked from. Accordingly, there is no evidence to
contradict “K‟s” opinion that the leak was a tap in the bath hob adjoining the
shower.
41. I further note that the leak has occurred in the bath hob which adjoins the
shower recess but is not strictly part of the shower recess itself. This may have
been difficult for the experts “ S ” , “ P ” and “ SBA ” to view given the removal of the
shower recess and separating wall between the bath and shower recess.
42. The policy does cover escape or leak of water from the bath and accordingly I
consider these circumstances fall within the insured event of escaped or
leaking water from the bath.
43. I have carefully considered the FSP‟s argument regarding proximate cause and
the contention that the leaking shower recess was another proximate cause.
44. I consider that there is no evidence demonstrating the shower base itself or any
component of the shower taps or pipes allowed water to escape or leak. I note
that experts “ S ” , “ P ” and “ SBA ” have not found leaks in these items from the
limited inspection allowed to them; however the observation of a lack of water
damage to the gyprock would not be supportive of a leak from the shower
taps/pipes. The evidence in fact suggest it is the bath hob tap -ware which is
leaking and for reasons already stated I do not consider this a part of the
shower recess.
45. “ K ” has indicated that due to the age of construction, the waterproof membrane
was not evident due to different technology used at the time of construction, but
this could not rule out any waterproofing. The FSP has not provided additional
comment on this from its experts and there is no indication as to what the
building standards relating to water proofing the bath hob should have been.
Accordingly, the evidence regarding waterproofing of the bath-hob and shower
recess is ambiguous.
46. In any event, the failure of the waterproofing is not a cause of the loss so muc h
as a factor that allowed an exacerbation of the loss. The Wayne Tank principle
is for when two distinct events have caused damage/loss and I do not consider
that the failed waterproofing in and of itself is actually a cause or effective
mechanism of the loss as envisaged by National & General Insurance Co Ltd v
Chick . The failing waterproofing would not have generated damage by itself, in
fact but for the leaking bath hob the water damage would not have occurred at
all.
47. I have further considered whether failure to maintain the property led to the
damage.
Case No: 228059 Determination Page 9 of 10
48. I have difficulty accepting that the Applicant had proper opportunity to maintain
an item which sits covered by affixed tiles. Further, whilst the property
manager‟s report does indicate a section of timb er flooring has swelled near
one of the gaps in the joins from water entry, it does not blame a leak from the
bathroom for this. Additionally, the report states the property manager is
„attending to the minor issues already discussed‟. It appears the repor t has
noted issues and the steps being taken to remedy the issues. There is no
explanatory notations provided by the property manager to explain the precise
location of the swelling floorboards or that the steps taken did not remedy the
issue and the Applicant was aware of this.
49. Given this, I do not consider that the FSP has demonstrated, on the balance of
probabilities, the Applicant has failed to maintain the property. Consequently it
appears to me that no exclusion to the damage in the bathroom and adjoi ning
hallway areas has been made out.
Damage to Kitchen, bedrooms and Lounge-room
50. I have received no evidence to support that an insured event caused the
damage recorded in the kitchen, bedrooms and lounge-room.
51. Accordingly, there is insufficient evidence to establish that a loss or damage in
these rooms was caused by an event insured for under the policy.
52. The Applicant however has not argued the damage is covered under the policy
per se, rather that the FSP should be bound by its statement it would cover all
damage.
53. I have reviewed the entire email provided by “ CB ” to the Applicant. I consider
that the wording of the email is not vague. Rather the email specifically states
that the FSP will cover all damage a lthough more than one claim might need to
be paid.
54. I disagree with the FSP‟s submissions regarding a lack of consideration from
the Applicant to the FSP. There is clearly already an insurance contract in place
between the parties for which the Applicant has paid a premium in
consideration of cover. The FSP‟s employee, “ CB ” , was handling a claim which
is an event envisaged by the contract of insurance.
55. I am not persuaded by the argument of mistake by the FSP, given that I agree
the bath hob was the proximate cause of damage I consider it appropriate for
the bathroom at least to be covered. Further, there is no direct evidence from
“ CB ” as to why he represented payment of the entire kitchen; lounge-room and
bedrooms would be covered. There is no evidence that the information
provided to “ CB ” led him to make a mistake in relation to these particular items.
I am further concerned as to why “CB‟s” decision that all damage would be
covered was overturned. “ CB ” appears to have ostensible authority as an
internal assessor to make the decision.
56. I consider the issue of estoppel requires careful consideration in relation to this
matter. The FSP has by its email led the Applicant to believe his entire claim
Case No: 228059 Determination Page 10 of 10
would be paid. However, I have no evidence indicating that the Applicant, in
reliance of this representation, has acted to his detriment in performing works to
the kitchen, lounge- room and bedrooms. Accordingly, I consider the FSP‟s
submission that there has been no injurious reliance, in relation to these items,
has merit.
57. I have no evidence that the Applicant in reliance of the FSP‟s representation
that the kitchen, bedroom and lounge-room would be paid, has proceeded to
commence works in this area. It appears from the evidence that the Applicant
only commenced works to the bathroom – which I have already determined
should be covered. Given this, the Applicant cannot rely on estoppel to have
the kitchen, lounge-room and bedroom damage paid for by FSP.
Determination
58. On the basis of the available information the FSP was liable to make payment
of the Applicant‟s claim for the bathroom damage and the floorboards in the
adjoining hallway. The FSP shall make payment to the Applicant within 14 days
of receiving notification of the Applicant‟s acceptance of this Determination .
59. The FSP shall make payment of interest on the repair costs outlined in
paragraph 58 from the date of declinature to the date of payment. The interest
component is to be paid within 14 days of the FSP receiving notification of the
Applicant‟s acceptance of this Determination.
60. On the basis of the available information the FSP was not liable to make
payment of the Applicant‟s claim for damage to the kitchen, lounge -room and
bedrooms.
61. This matter will be referred to the Code & Systemic Manager to determine
whether further investigation under the General Insurance Code of Practice is
required , as regards the actions of “CB”.