Text of the determination
Case No: 227835 Determination Page 1 of 7
Case number: 227835
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
28 April 2011
Background
1. This matter arises from a dispute over the specifications, quality of
workmanship and costs of construction for a bluestone dividing wall on the
Applicant’s tenanted property.
2. In September 2009 the wall suffered damage. The Financial Services Provider
(FSP) denied liability for a claim made under the Applicant’s home insurance
policy for the cost of rectifying the wall. The Applicant disputed the reason for
the FSP’s denial of the claim and referred the matter to the Financial
Ombudsman Service (FOS). FOS determined the FSP indemnify the Applicant
for his proportion of the cost to reinstate the wall.
3. The Applicant’s neighbour’s insurer had accepted a claim under the
neighbour’s insurance policy. Following settlement of the claim, the neighbour
authorised a contractor to reinstate the wall. Appa rently, without the Applicant’s
consent, the fence has been rebuilt although to a height lower than it was.
4. The FSP offered settlement of the claim by cash payment in the sum of
$16,300. The Applicant rejected the offer and is claiming to sum of $24,800.
5. The Applicant contends the wall has not been reinstated to its original height
and that the quality of work on his side of the wall was not equal to the standard
of the wall prior to the damage occurring.
Summary of Applicant’s Position
6. He had nothing to do with replacement of the wall. His neighbour authorised t he
reconstruction without his consent.
7. The replacement wall has not been constructed to the height of the original
wall.
8. The workmanship on his side is not of the same standard and quality as it was
prior to the damage or equal to the finish on the neighbo ur’s side. His side of
the wall has no grooved joints and there is random mortar splatter. His
neighbour’s side has no surplus mortar and has neat recessed joints.
Determination
Case No: 227835 Determination Page 2 of 7
9. The absurdity of the FSP’s position is shown by the fact that it has had
ridiculously low estimate of the cost of repairs from one assessor ($6,000). In
relying upon its assessor “KL’s” opinion, it appears content to ignore the fact
that “KL’s” opinion is based upon a fence which he estimated at 1.7m. In fact,
the present height of the fence is 1.5m.
10. He is claiming:
Clean up and stack bluestone blocks $1,900
Build wall 25m long, 1.5m high $32,300
Cost to increase wall height another 400mm (25% x $32,300) $8,000
$42,200
His proportion 50% $21,100
+ Cost to clean mortar from wall and groove mortar joints $3,700
$24,800
11. He contends that the FSP has deliberately drawn out the process to avoid
payment and a penalty interest rate of 10.5% interest should apply in
accordance with the Penalty Interest Rate Act of 1983
Summary of FSP’s Position
12. An assessor “KL” inspected the wall with a view to ascertain a fair and
reasonable cost to repair the now repaired wall. He provided an estimate in the
sum of $27,610 with the Applicant ’s share being $13,805.
13. Attempts to contact the original repaire r “SK” were unsuccessful
14. In an effort to reach an amicable resolution it proposed settlement based on the
repairer’s invoice for the works of $32,600. The settlement offer is calculated as
follows:
Demolition/clean up costs $1,900
Cost of rebuild fence/wall $32,300
Less cost of repairing neighbour’s garden shed $3,000
$31,200
Less 50% $15,600
Less policy excess $300
Plus ex - gratia settlement $1,000
Amount payable $16,300
15. It contends the $8,000 claimed by the Applicant to increase the height of the
wall is a matter between the Applicant and his neighbour.
16. As it did not authorise the repairs, it has no liability for the $3,700 claimed by
the Applicant to clean mortar from the fence or grove the joints. The Applicant
should purse the contractor to rectify these issues.
17. As it did not authorise the repairs and the repairer was not one of its authorised
repairers, it is not prepared to provide any guarantee as requested by the
Applicant.
Case No: 227835 Determination Page 3 of 7
18. It submits its offer to cash settle the claim by payment of $16,300 meets its
liability to the Applicant. As the Applicant has not paid for any repairs he is not
entitled to any interest.
Issues
19. Whether the Applicant is entitled to any payment additional to the sum of
$16,300 offered by the FSP.
Reasons for Decision
20. The principal issue for Determination is to calculate the liability of the FSP
bearing in mind the steps which have already been carried by the Applicant ’ s
neighbour and the fact that a new bluestone fence has been constructed, albeit
of a lower height, and apparently inferior construction.
21. The matter is complicated by the course of action which has been followed
principally by the Applicant ’ s neighbour and his contractor. As has been
commented by several persons who have been obliged to consider this matter,
it seems extraordinary that the new fence has been constructed without the
Applicant ’s approval. It appears that the contractor “SK” only contracted to build
the fence to a height of 1.5 metres. There is no explanation as to why this
height was chosen when it has been clearly established (by an engineer who
prepared an original report for the FSP) that the original height of the fence was
1.9 metres. The matter is further complicated by the fact that it appears that the
new fence has been constructed using additional “ piers ” which have, no doubt,
used additional bluestone sleepers. Perhaps this is the reason why it was
chosen to build a fence of reduced height. The fact remains however that once
this Service had issued its determination in August 2010, the FSP
acknowledged its liability to reimburse the Applicant for half of the reasonable
costs of replacement of the original fence. This involves a fence of 1.9 metres.
22. The matter is further affected by the fact that at present, the Applicant has not
paid anything towards the costs of the new fence. This has led to strained
relations between the Applicant and their neighbour (I do note that the
Applicant is not presently residing in the property which is tenanted). Whilst the
neighbour ’ s acti ons in arranging for “SK” to build the new fence without the
Applicant ’ s approval, were outrageous, I am of the view that it is inevitable that
the Applicant will have to reimburse the neighbour for his share of the costs
incurred by the neighbour in building that fence. Due regard must be had for
some extraneous items such as damage to the neighbour’s garden, for which
the Applicant should not bear any responsibility.
23. On the other hand I bear in mind the fact that apparently the finish of the fence
on the neighbour’s side is perfectly adequate, whereas the appearance of the
finish on the Applicant ’ s side is very poor, I deduce that because the Applicant
had informed his neighbour that until matters were properly resolved, he would
not reimburse him for the costs in connection with the new fence, the neighbour
Case No: 227835 Determination Page 4 of 7
instructed “SK” not to complete the fence on the Applicant’ s side, to the same
standard as on the neighbour’s side.
24. I also observe that this matter centres around a fence which collapsed in
September 2009. Over 18 months has now elapsed and it is essential that
finality should be achieved. Whilst, ideally, additional steps might have been
carried out, such as the Applicant obtaining a firm quotation for the costs of
adding the extra 40cms to the height o f the fence, I think it reasonable that
calculations be made which enable this Determination to be handed down.
25. One contention of the FSP is that the disparity in height between the original
fence and that which has now been constructed , is a matter for the Applicant to
take up with his neighbour. To an extent, this is correct, but what must be
observed is that the FSP would have been liable for half the cost of a 1.9 metre
fence in any event. Presumably in order that the additional height can be added
to the fence, the Applicant will be obliged to enter into negotiations with his
neighbour (no doubt after the Applicant has agreed to reimburse the neighbour
for their share of the costs which have incurred to date).
26. Ultimately, therefore, the intent of this Determination is that the FSP should not
be placed in a less advantageous position than would have been the case if the
chain of events described above had not been followed. At the same time, the
FSP is not entitled to an unreasonable benefit by reason of the fact that the
fence has already been constructed, albeit to an unsatisfactory level.
27. The policy provides:
“ Settling claims – under buildings
If we agree to cover the claim under buildings insurance
we will
…
however
if we chose to repair or rebuild your home, we can nominate the repairer,
supplier or builder.
If we chose to pay you the cost to repair or rebuild your home, you may
rebuild or repair that part of your home that was damaged in any way you
like
change materials, plans, specifications or size
change the site of your home
we will not cover any increase in costs that these changes may cause.”
28. A copy of the FSP’s assessor’s initial report of the damage contains the
following:
“Scope of Work required 1.0 allow to pull down approx 5 metres of bluestone
fencing x 1600mm high
1.1 allow to relay aprox 18 metres of bluestone fencing
x 1600mm high.”
29. The following is an extract from a copy of an Assessment Report dated 13
October 2010:
“My inspection of the fence has confirmed that the new fence has been
constructed to a lower level that the original. This is however more related to the
Case No: 227835 Determination Page 5 of 7
fact that the new fence now has 6 x piers in total, where in discussion with
OC/tenant revealed that the original fence only had 2 x end piers, the utilisation
of the existing bluestone blocks to add the additional piers has directly affected
its overall height. I can confirm that the overall height has been affected by some
400-450mm.
30. The Assessment Report also noted the following:
“My inspection of the general workmanship revealed that in certain areas of the
wall on OC’s side, the mortar between the bluestone blocks have been poorly
finished. I have confirmed that the mortar has not been recessed (as in other
areas of OC’s property and indeed the front section of wall on OC’s property).
31. I have been provided with captioned photographs of the wall displaying both
sides. Photographs of the wall on the Applicant’s side displays mortar in the
joins has not been recessed and prese nts as a rough finish. A photograph of
the wall on the neighbour’s side displays recessed joins and a professional
finish.
32. A photograph of a section of the wall prior to the damage shows a professional
finish with recessed mortar joins.
33. The evidence has therefore established that the new wall is approximately 400
to 450 mm lower than the original wall and that the contractor failed to provide a
quality finish to the Applicant’s side of the wall. Further , the quality of the finish
on the neighbour’s side is consistent with the standard of finish shown on the
wall prior to the damage.
34. The policy provides that the damaged building, or in this matter, the damaged
wall will be repaired or rebuilt. It follows that the Applicant is entitled to have the
wall rebuilt to the same specifications as the original wall.
35. I am satisfied that the Applicant is entitled to have the wall constructed to the
same height that it was prior to the loss.
36. The evidence has also established to my satisfaction that the finish to the wall
on the Applicant’s side is not consistent with the finish of the wall prior to the
loss. According to the terms of the policy, the Applicant is entitled to have the
new wall returned to the same quality of finish as it was prior to the loss.
37. The FSP did not authorise the construction of the new wall. It will, therefore, not
be liable to guarantee the quality of the work which was carried out or to rectify
any faults which may arise from the new construction.
38. Accordingly I consider the FSP is liable for th e cost to clean up the Applicant’s
side of the wall including recessing the mortar joints to a standard equal to that
which existed prior to the loss.
39. There is no evidence that the damage to the neighbour’s garden shed was
caused by the A pplicant’s negligence. Nor is there evidence that the neighbour
has claimed the damage was caused by the Applicant’s negligence. As such,
the FSP is not liable for the cost to repair the neighbour’s garden shed.
Case No: 227835 Determination Page 6 of 7
40. The FSP’s assessor quantified the cost to repair the original damage in the sum
of $27,610. This included a wall height of 1.7metres. However, in my opinion
the costings are valid only when quoted by a contractor who is both qualified
and prepared to carry out the works quoted. In this matter the wall has been
reconstructed and a fee charged, thus providing an actual costing.
41. I note the FSP accepted “LK’s” charges for construction of the wall as the basis
for its offer to settle the claim.
42. This matter has been ongoing since September 2009. In order to bring the
matter to finality, I consider that the Applicant be cash settled with the sum
calculated on the following basis.
43. As set out above, no quotation has been provided for the cost of increasing the
wall height. In these circumstances, I have made an allowance for those costs
by reference to the costs which were incurred in the construction of the newly
constructed fence.
44. According to the FSP assessor’s initial report of the damage, the original wall
was 1,600mm high. According to the assessment of 13 October 2010, the
overall height was affected by approximately 400 to 450mm.That assessor
quoted on a wall 1,700m high. While a difference of 100mm occurs in the
assessments, I consider the original assessment may be relied on. On this
basis, the new wall will need to be 25% higher to be consistent with the original
wall.
45. The cost to construct the original wall was $32,300 less approximately $3,000
included for repairing the neighbour’s garden shed leaving a bal ance of
$29,300. Application of the factor of 25% to the cost of the new wall results in a
sum of $7,325.
46. I have not been provided with a quotation for the cost of cleaning the mortar
and grooving the joints. As no material has been presented to contradict the
Applicant’s estimate , I am prepared to include in the settlement the sum of
$3,700 for this item.
47. In these circumstances I consider the Applicant is entitled to settlement of the
claim based on the following calculation:
Rebuild wall as per contractor ’ s charges $32,300
Less cost of repairing garden shed $3,000
$29,300
+ cost of cleanup (as per quote) $1,900
+ cost of increasing height of wall $7,325
$38,525
Applicant’s proportion 50% $19,263
+ cost to clean mortar and groove joints $3,700
Balance $22,963
Less the policy excess $300
$22,663
Case No: 227835 Determination Page 7 of 7
48. I have then given consideration to the Applicant ’ s claim for interest. I bear in
mind that the Applicant has not outlaid any funds to date. The Applicant has
clearly been adversely affected by all that has happened between him and the
FSP, particularly in circumstances in which they have been aware that the
insurer for their neighbour has immediately cash settled the neighbour’s claim
for their half share of the cost of the fence. No doubt the relationship between
the neighbour and the Applicant has been adversely affected by the fact that
the Applicant has been unable, originally, to contribute to the costs of the fence
which has now been constructed. It appears that the other insurer was able to
resolve the neighbour’s claim prior to the end of 2009. By contrast, the FSP has
had the benefit of the money which it would have been obliged to outlay had
the matter been promptly settled.
49. Having said this, I acknowledge that the FSP considered that it was appropriate
to contest the issue of its liability for the collapse of the fence, and I do not think
it appropriate that it be penalised merely by reason of the fact that it chose to
have that issue determined by this Service. It is unfortunate however that even
since the determination on 30 August 2010 some seven and a half months
have elapsed.
50. After giving the matter very careful consideration, I think it appropriate that the
FSP pay to the Applicant interest at the rate of five percent per annum from 1
January 2010, until settlement, upon the sum of $22,663. In making this
decision, I am further a ffected by the knowledge that the sums quoted by “SK”,
were quoted in late 2009, and that when the additional work necessary for the
completion of the fence to its correct height is carried out, the costs per square
metre are likely to be increased.
Determination
51. For the reasons outlined above I determine the Applicant is entitled to payment
from the FSP in the sum of $22,663.
52. I also determine that the FSP should pay interest to the Applicant at the rate of
five percent per annum upon the sum referred to in the preceding paragraph,
until 20 October 2010 being 60 days after the earlier FOS Determination, plus
interest at the statutory rate thereafter until settlement.