Text of the determination
Case No: 227812 Determination Page 1 of 11
Case number: 227812
General Insurance - Domestic Insurance - Home Building – Storm damage –
repair rectification – Lifetime Guarantee – Utmost Good Faith
01 April 2011
Background
1. The Applicants insured their home building against loss or damage caused by
insured events for $566,000. There was no policy excess.
2. On 11 June 2007, the Applicants reported that their home had suffered damage
due to a storm on 8 June 2007. There was extensive damage including
damage to the decking/veranda (decking) at the rear of the house.
3. The Applicants were authorised by the Financial Services Provider (FSP) to
have the damage to the decking repaired by their own appointed builder and
the FSP cash settled the Applicants for the cost of repairs
4. The Applicants reported that some time after the repairs had been completed,
they discovered water leaking down from the decking. They contacted the
building contractor who had carried out the repairs but in spite of promises to
inspect the decking he failed to do so. The damage caused by leaking water
over a period of twelve to eighteen months has resulted in the decking having
to undergo extensive repairs where the Applicants have been informed that the
estimated cost of repairs will be $20,000.
5. On 1 June 2010, the Applicants notified the FSP of storm damage to their
home. They informed the FSP that they were of the opinion that the builder they
engaged to carry out repairs from the 2007 storm was responsible for the latest
damage due to faulty workmanship as the decking had leaked since the repair
had been completed.
6. The FSP reviewed the storm claim from June 2007 and found that it had not
arranged, authorised or paid the building contractor directly for the repairs. Due
to this, the FSP contends that the Applicants are not entitled to receive the
benefit under the “lifetime guarantee” of the policy.
7. As the damage to the decking had not been caused by a storm but was the
result of faulty workmanship and gradual deterioration over at least twelve
months, the FSP denied indemnity to the Applicants.
Determination
Case No: 227812 Determination Page 2 of 11
Summary of Applicants ’ Position
The Applicants received the assistance of the Insurance La w Service in preparing
their submission.
8. At the time of the 2007 storm event, in view of the wide spread storm damage,
the FSP sent a loss assessor, who was from New Zealand, to inspect the
damage to their home. The assessor advised them that it would be best to
arrange their own builder because it would take months for the FSP to find a
builder. The assessor also stated that their home was a health hazard due to
escaping sewerage and to get it repaired straight away.
9. I n order to mitigate their loss, and relying on the assessor‟s advice, they
arranged for the repairs to be carried out. They contacted a builder, „M‟, by way
of a newspaper advertisement, who agreed to carry out the repair work.
10. They contacted the FSP and provided it with a detailed quotation dated 20 July
2007 for the proposed work. The FSP did not make any enquiries of the
proposed work by M and provided a cheque for the quoted repair cost in the
amount of $5,210.
11. In about 2008/2009, they noticed water leaking from the ceiling below the
decking that had been repaired by M. They were unsuccessful in their attempts
to contact M who they understand is no longer working.
12. They submitted a claim on the FSP for the cost of repairs to the decking but it
has declined to indemnify them.
13. They contend that the FSP is estopped from relying on the policy exclusions to
deny liability for the repair work as they relied upon the advice provided by the
FSP‟s assessor in good faith to their detriment. In particular:
The FSP intended for them to act on their assessor‟s advice and it was
reasonable for them to act on that advice;
If they had not done as the FSP‟s assessor had advised, according to
the assessor, they would have suffered greater damage. They tried to
mitigate the ir loss on the assessor‟s advice.
They would suffer a loss or detriment if the FSP is allowed to deny what
was stated at the time.
In the circumstances, the behaviour of the FSP is such that it would be
unconscionable to allow the FSP to deny the claim and leave them with a loss.
It would also be a breach of the FSP‟s duty of utmost good faith.
They have recently received a quote from a builder for the amount of about $20,000
plus GST to carry out the repairs. They have also been told that the decking is
not safe and could collapse at any time.
Case No: 227812 Determination Page 3 of 11
14. They consider that a reasonable outcome to settle the matter is for the FSP to
accept their claim, and the repair work is carried out within a reasonable time
frame.
Summary of FSP’s Position
15. The onus lies with the Applicants to establish that an insured event has
occurred which has led to the claimed damage. It is the belief of the FSP that
the Applicants have failed to demonstrate that the decking has sustained any
damage related to the storm event as required by the relevant policy.
16. However, it has obtained a report from a building specialist, „TK‟, who has
provided its opinion as to the condition of the decking and the cause of the
resulting water damage to the fibro cladding on the ceiling below.
17. TK has confirmed that the repairs conducted by the Applicant s‟ repairer in 2007
were substandard in that the builder failed to waterproof the decking while
completing repairs. This has resulted in water leaking into the decking cavity
each time it rained, gradually resulting in the damage that is clearly evident.
18. Its policy of insurance states that it will not fix a fault that existed before the loss
or damage occurred.
19. The Applicants have attempted to argue that the rule of estoppel applies and
that because the FSP paid them money to repair the damage then it should be
liable for any costs incurred to rectify that damage should it be found to be
faulty. It disagrees with this opinion.
20. It contends that the Applicant s‟ policy that was active in 2007 stated that the
lifetime guarantee only applied to repairs that the FSP had arranged,
authorised and paid the builder directly for.
21. On review of the 2007 claim, it notes that the Applicants submitted a quotation
for repairs to their home to the FSP. It then cash settled the Applicants directly
for those costs incurred to repair the home. After which the Applicants
arranged, authorised and paid the repairer directly for his services.
22. On this basis it refutes that it is required to rectify any faulty repairs or works
uncompleted at the insured premises in 2007.
23. In addition, it notes that the Applicants noticed water leaking through the
decking soon after the repairs had been completed. The Applicants assert that
after they discovered the leaking water they had attempted to contact the
repairer over a period of twelve to eighteen months to have him re-attend and
rectify the damage.
24. It was only after this period of time that they elected to contact the FSP to
obtain assistance by lodging a claim. However, over the 12 to 18 month period
the resulting water damage had deteriorated to such an extent that the
estimated costs of rectifying such damage are now in the vicinity of $11,656.
Case No: 227812 Determination Page 4 of 11
25. It submits that whilst it would not have paid to rectify the defective decking
membrane, had the Applicants contacted it when the damage was first noticed,
it would have accepted the resulting damage which would have been minimal in
the early stages.
26. Due to the Applicant s‟ failure to mitigate their loss early, the extent of the
damage has deteriorated substantially. Therefore, it is not in the position to
ascertain exactly what the extent of its liability would have been had the
Applicants alerted it to the problems when they first occurred. The policy
specifically excludes gradual deterioration and damage resulting from a defect
the Applicants knew about.
27. As the resulting water damage to the decking is clearly due to a defect, the
absence of waterproofing, which the Applicants knew about over a 12 to 18
months period, this has led to the gradual deterioration of the fibro ceiling lining
and is excluded from the cover provided by the policy.
28. Pre-existing defect or imperfection – Section 46 of the Insurance
Contracts Act 1984 (the Act)
Section 46 of the Act provides that if a claim is made in respect of a loss that
occurred in whole or in part as a result of a defect, and that the Applicants were
not aware of such a defect, then the FSP is only entitled to deny the claim in so
far as the defect itself.
Given that the Applicants have stated that the water damage had been
occurring for some 12 to 18 months prior to the claimed damage, it submits that
the Applicants were clearly aware of the defect and failed to mitigate their loss
by having a suitably repairer attend to rectification of the defect after attempts
to contact the builder M had failed.
Their failure to act promptly exacerbated the problem resulting in the damage
that now exists. As the defect was one that the Applicants were aware of, the
FSP submits that under section 46 of the Act, it is not required to rectify the
damage subject to the claim.
29. The FSP relies on the following policy/contract provisions:
Policy wording in force on 8 June 2007
“Types of cover you can choose
...
Home Cover
When we insure your Home, we will cover it for loss of or damage which:
is caused by an Insured Event and
happens in the period of insurance.
...
Case No: 227812 Determination Page 5 of 11
How claim are paid
Home, Contents, Personal effects or Landlord’s Fixtures and Fittings claims
We choose how your claim is settled. If we agree to pay a claim for loss, theft or
damage to your Home, Contents, Personal effects, Landlord‟s Fixtures and Fittings,
we will decide if we will:
√ repair damage new for old or
√ replace Home, Contents, Personal effects, Landlord‟s Fixtures and Fittings new for
old or
√ pay you what it would cost us to repair or replace Home, Contents, Personal effects
or Landlord‟s Fixtures and Fittings new for old.”
Supplementary Product Disclosure Statement (SPDS)
Applied to the Policy wording in force on 8 June 2007
“Before the section „Making a Claim‟ the following section is inserted:
Our guarantee on home repairs
We guarantee the quality of materials and workmanship of repairs that we authorise
and arrange for the lifetime of your home.
This guarantee applies to work to repair, build or rebuild your home where we:
Authorise
Arrange and
Pay the builder or repairer directly for this work.
We guarantee the materials used and standard of the workmanship to be free of
defects. If a defect arises in the lifetime of your home as a result of poor quality
workmanship or use of incorrect materials, then we will rectify the problem.
This guarantee does not apply:
To repairs you authorise or make yourself
To loss, damage or failure of any electrical or mechanical appliance or
machines
To wear and tear consistent with normal gradual deterioration at your home
(e.g. paint peeling off after its expected life cycle, wood rotting from moisture
in the air or ground, or roofs weathering) or
Where we agree with the repair quote and we give to you, or the builder or
repairer, a cheque for the cost of the repairs and you arrange the repairs.”
PDS and Policy wording applying from 28 January 2008
Case No: 227812 Determination Page 6 of 11
“What we cover
We cover loss or damage caused by insured events 1 to 12
When we insure them, your home and contents are covered for loss or damage by
the insured events 1 to 12 at the insured address.
...
We do not cover loss or damage
...
Defect, structural fault or design fault
Caused by a defect, structural fault or design fault that you knew about (or should
reasonably have known about) and did not fix before the loss or damage occurred
(eg. If there are signs that a defect previously caused damage, we will not pay a later
claim for further damage from this defect)
...
We do not cover
...
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould,
rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or
rot
unless this is covered under:
- insured event 1 (storm and flood)
- ...
...
Making a claim
When to make a claim
Contact us as soon as possible if you suffer loss or damage, or there is an incident
that could result in a claim.
...
How we settle your claim
We choose how your claim is settled
If we agree to pay a claim for loss, theft or damage to your home, contents or
landlord‟s fixtures and fittings, we will decide if we will:
- repair damage new for old or
Case No: 227812 Determination Page 7 of 11
- replace home and contents new for old or
- pay you what it would cost us to repair or replace home or contents new for old.
The meaning new for old is defined on the next page.
We will not
- pay extra to replace your home, contents or landlord‟s fixtures and fittings to a
better standard, specification or quality than it was before the loss or damage
occurred except as stated in „new for old‟ on the next page.
- fix a fault that existed before the loss or damage occurred.
...
Dealing with defects
If a known defect is the cause of the damage
We do not pay for loss or damage caused by a defect, structural fault or design fault
at your home that you knew about (or should reasonably have known about) and did
not fix the loss or damage occurred.
...
Lifetime guarantee on home repairs
When we repair or rebuild your home, we guarantee the quality of materials and
workmanship of that work for the lifetime of your home if we:
- authorise and
- arrange and
- pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the workmanship to be free of
defects. If a defect arises in the lifetime of your home as a result of poor quality
workmanship or use of incorrect materials, then we will rectify the problem.
This guarantee does not apply:
- to repairs your authorise or make yourself
- ...
Terms explained
...
incident or event
A single occurrence which is not intended or expected to happen by you.”
Case No: 227812 Determination Page 8 of 11
Issues
30. The Applicants submitted a claim for storm damage to the decking of their
home that initially was caused on 8 June 2007. On the advice o f the FSP‟s loss
assessor, the Applicants had to arrange for a builder to attend to repairs and
the FSP paid the Applicants for the cost of the repairs.
31. Sometime after the repairs had been completed, the Applicants discovered
that when it rained the decking leaked. They attempted to have the builder
return to their home to rectify the problem but he failed to return to assess his
repairs.
32. Over a period of 12 to 18 months they followed up the builder where he would
state that he would check his work but never did so. As the damage to their
home was increasing they contacted the FSP and submitted a claim for the
storm damage.
33. The FSP has denied indemnity for the recurring damage due to it not having
appointed the builder and it reimbursed the Applicants for the cost of repairs
which resulted in its lifetime guarantee not applying to the faulty repairs.
34. Further, the FSP has stated that it would have accepted the claim for the
additional damage, but not the installation of a membrane, if the Applicants had
reported the damage in a timely manner. It contends that the delay of 18
months before the Applicants contacted it resulted in the gradual deterioration
of the Applicant s‟ home which is an exclusion of the policy of insurance.
Reasons for Decision
Lifetime Guarantee on Repairs
35. As a result of the widespread storms on or about 8 June 2007, the FSP was not
able to handle the additional work load from its normal resources. In this case,
it had a loss assessor from New Zealand assess the Applicant s‟ property.
36. The Applicants have informed FOS that the storms caused their sewerage
system to overflow and the assessor advised them to attend to the problem
immediately because it was a health hazard. The assessor also advised them
to arrange for a builder to attend to the repairs to their home because it would
take months for the FSP to find a builder.
37. The Applicants contacted a builder through a newspaper advertisement who
prepared a scope of works and quotation for repairs.
38. The FSP contends that the builder for the c laim was arranged, authorised and
paid directly by the Applicants and the FSP cash settled the Applicants directly
for that part of the claim.
39. At the date of the storm damage, the Applicant s‟ policy had been extended to
„lifetime guarantee‟ on repairs that the FSP had arranged, authorised and paid
Case No: 227812 Determination Page 9 of 11
the builder directly for. In view of its contention that the Applicants arranged,
authorised and paid the builder directly for the repairs it states that the lifetime
guarantee on the repairs carried out by builder M did not apply.
40. However, in a Claim File note recorded by the FSP on the 18 September 2007
in relation to repairs to the Applicant s‟ front fence, it was stated:
“...Insd has fence cover on their policy so is covered for this, called Insd and
advised I will be sending her cheque out for the amount and she needs to call
[Builder M] to arrange repairs, [Builder M] has previously done work on this claim
for us as appointed by [loss assessor] for building repairs.” My emphasis
41. This file note contradicts the F SP‟s contention that the Applicants authorised
the repair work to their house. In fact, builder M had submitted his quote to the
loss assessor who authorised the repairs to proceed because it agreed with his
assessment of the damage.
42. Therefore, although, a t the instigation of the FSP‟s loss assessor the Applicants
had gone to the trouble of finding a builder, it was the loss assessor who had
authorised his appointment and accepted the builder‟s quote which tacitly
arranged for the builder to proceed with repairs.
43. There is no dispute that the FSP paid the Applicants for the cost of repairs who
then paid the builder. Therefore, on a strict interpretation of the requirements
for the lifetime guarantee to apply, the Applicants fail because they paid the
builder direct and not the FSP.
44. However, the FSP has chosen to ignore its actions, through its loss assessor,
who advised the Applicants to appoint their own builder because it would be
months before the FSP could do so. The FSP has not disputed this statement
submitted by the Applicants.
45. Section 14 of the Act provides that if reliance by a party to a contract of
insurance on a provision of the contract would be to fail to act with the utmost
good faith, the party may not rely on the provision. In deciding this issue the
court shall have regard to any notification of the provision that was given to the
insured, whether a notification is required by section 37 or otherwise.
46. At time the Applicant s‟ property suffered storm damage there was such
widespread damage that the FSP external loss assessor company had to
transfer its loss assessors from other parts of Australia and New Zealand. The
loss assessor who attended Applicant s‟ property was from New Zealand.
47. The loss assessor was of the opinion that the Applicants should make their own
arrangements for repairs to be carried out. However, other than authorising the
repairs and builder to complete those repairs, there was no follow up as to
whether the repairs had been completed to a satisfactory standard. To leave
the acceptance of the repair work to the Applicants, who are not qualified to
make such a judgement, was to abrogate the responsibility of the FSP to
ensure that the Applicant s‟ property was repaired to the condition it was in prior
to the storm event.
Case No: 227812 Determination Page 10 of 11
48. I consider that this was a failure on the part of the FSP to act with the utmost
good faith towards the Applicants and accordingly it cannot abrogate its
responsibility towards them.
49. The lifetime guarantee also carries an exclusion that the guarantee does not
apply if the Applicant s had authorised the repairs. As stated above, the FSP‟s
loss assessor had authorised the repairs.
50. Accordingly, I find that the Applicants can rely upon the lifetime guarantee on
the repairs carried out by builder M.
Policy exclusion applying to a fault that existed before the damage occurred
51. The FSP submits that the damage subject to the claim must result from an
insured event under the terms and conditions of the policy. It states that its
repairer, TK, confirmed that the cause of the water ingress into the Applicant s‟
home occurred from faulty workmanship by builder M.
52. However, the damage to the Applicant s‟ home was caused by the insured
event „storm‟ in June 2007 and the Applicants have now submitted a claim for
the rectification of the faulty work performed by builder M in carrying out repairs
to the storm damage.
53. As mentioned above, I have found that the Applicants can rely upon the
contract of insurance lifetime guarantee on the repairs carried out by builder M.
Therefore, the FSP cannot rely upon the policy exclusion in respect to a pre-
existing fault to deny liability.
Policy exclusions in respect to defect, structural fault, wear, tear, gradual
deterioration, rust or mould
54. The foundation of the Applicant s‟ claim arises from defects, structural fault and
wear and tear to their home.
55. The Applicants have informed FOS that it was some months after the repairs
had been completed that water began to leak into their home. They found that
the cause of the leak was a breakdown in the waterproof membrane. They then
spent the next 12 to 18 months trying to contact builder M. During this time they
did speak with the builder but he continually failed to honour his promises to
return to inspect the problem.
56. The FSP contends that the Applicants failed to mitigate their loss early and it
has relied on the above mentioned policy exclusions to deny liability.
57. However, the Applicants would have been able to mitigate the damage if
builder M had returned to rectify the faulty repairs. If the Applicants had done
nothing to investigate the cause of the water leak, I would have agreed that the
policy exclusions would apply and the FSP would be entitled to deny liability.
58. However, they were thwarted by the inaction of builder M and in desperation
reported the water damage problem to the FSP.
Case No: 227812 Determination Page 11 of 11
Determination
59. In weighing up the evidence submitted to me, I consider that the Applicants
have been caught up in a series of unfortunate incidents. First , the FSP‟s loss
assessor advised them to find their own builder because of the demand on
builders and repairers; secondly, they chose a builder of doubtful repute, and
thirdly, they did not receive any assistance from the FSP to ensure that the
repair work the FSP was paying for was of an acceptable standard.
60. Accordingly, I determine that the Applicants are entitled to rely on the policy of
insurance lifetime guarantee and to be indemnified for the rectification of the
faulty workmanship and resultant damage caused b y the faulty workmanship.
61. The Applicants have stated that they have received a quote for $20,000 plus
GST to carry out the necessary repairs. However, the Applicants are to obtain a
written quote and detailed scope of works for the repairs to be completed and a
copy is to be submitted to the FSP for its consideration. If there is any dispute
as to any aspect of the quote and scope of works the matter may be referred
back to the service for determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.