Determination 227812

Denial of storm-related indemnity for faulty repairs under lifetime guarantee

FirmFinancial Firm (Unknown - Insurer)
Decided2011-04-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$20,000
SourceAFCA PDF

Summary

The applicants' storm repairs to their home decking were cash settled, and the decking later leaked due to faulty builder workmanship; the FSP declined indemnity. AFCA found the applicants could rely on the lifetime guarantee and ordered indemnity for rectification, subject to a written quote and scope of works.

The insurer's loss assessor advised the insured to appoint their own builder without follow-up, so the FSP failed to act with utmost good faith and cannot rely on the strict guarantee conditions.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 227812 Determination Page 1 of 11 Case number: 227812 General Insurance - Domestic Insurance - Home Building – Storm damage – repair rectification – Lifetime Guarantee – Utmost Good Faith 01 April 2011 Background 1. The Applicants insured their home building against loss or damage caused by insured events for $566,000. There was no policy excess. 2. On 11 June 2007, the Applicants reported that their home had suffered damage due to a storm on 8 June 2007. There was extensive damage including damage to the decking/veranda (decking) at the rear of the house. 3. The Applicants were authorised by the Financial Services Provider (FSP) to have the damage to the decking repaired by their own appointed builder and the FSP cash settled the Applicants for the cost of repairs 4. The Applicants reported that some time after the repairs had been completed, they discovered water leaking down from the decking. They contacted the building contractor who had carried out the repairs but in spite of promises to inspect the decking he failed to do so. The damage caused by leaking water over a period of twelve to eighteen months has resulted in the decking having to undergo extensive repairs where the Applicants have been informed that the estimated cost of repairs will be $20,000. 5. On 1 June 2010, the Applicants notified the FSP of storm damage to their home. They informed the FSP that they were of the opinion that the builder they engaged to carry out repairs from the 2007 storm was responsible for the latest damage due to faulty workmanship as the decking had leaked since the repair had been completed. 6. The FSP reviewed the storm claim from June 2007 and found that it had not arranged, authorised or paid the building contractor directly for the repairs. Due to this, the FSP contends that the Applicants are not entitled to receive the benefit under the “lifetime guarantee” of the policy. 7. As the damage to the decking had not been caused by a storm but was the result of faulty workmanship and gradual deterioration over at least twelve months, the FSP denied indemnity to the Applicants. Determination Case No: 227812 Determination Page 2 of 11 Summary of Applicants ’ Position The Applicants received the assistance of the Insurance La w Service in preparing their submission. 8. At the time of the 2007 storm event, in view of the wide spread storm damage, the FSP sent a loss assessor, who was from New Zealand, to inspect the damage to their home. The assessor advised them that it would be best to arrange their own builder because it would take months for the FSP to find a builder. The assessor also stated that their home was a health hazard due to escaping sewerage and to get it repaired straight away. 9. I n order to mitigate their loss, and relying on the assessor‟s advice, they arranged for the repairs to be carried out. They contacted a builder, „M‟, by way of a newspaper advertisement, who agreed to carry out the repair work. 10. They contacted the FSP and provided it with a detailed quotation dated 20 July 2007 for the proposed work. The FSP did not make any enquiries of the proposed work by M and provided a cheque for the quoted repair cost in the amount of $5,210. 11. In about 2008/2009, they noticed water leaking from the ceiling below the decking that had been repaired by M. They were unsuccessful in their attempts to contact M who they understand is no longer working. 12. They submitted a claim on the FSP for the cost of repairs to the decking but it has declined to indemnify them. 13. They contend that the FSP is estopped from relying on the policy exclusions to deny liability for the repair work as they relied upon the advice provided by the FSP‟s assessor in good faith to their detriment. In particular:  The FSP intended for them to act on their assessor‟s advice and it was reasonable for them to act on that advice;  If they had not done as the FSP‟s assessor had advised, according to the assessor, they would have suffered greater damage. They tried to mitigate the ir loss on the assessor‟s advice.  They would suffer a loss or detriment if the FSP is allowed to deny what was stated at the time. In the circumstances, the behaviour of the FSP is such that it would be unconscionable to allow the FSP to deny the claim and leave them with a loss. It would also be a breach of the FSP‟s duty of utmost good faith. They have recently received a quote from a builder for the amount of about $20,000 plus GST to carry out the repairs. They have also been told that the decking is not safe and could collapse at any time. Case No: 227812 Determination Page 3 of 11 14. They consider that a reasonable outcome to settle the matter is for the FSP to accept their claim, and the repair work is carried out within a reasonable time frame. Summary of FSP’s Position 15. The onus lies with the Applicants to establish that an insured event has occurred which has led to the claimed damage. It is the belief of the FSP that the Applicants have failed to demonstrate that the decking has sustained any damage related to the storm event as required by the relevant policy. 16. However, it has obtained a report from a building specialist, „TK‟, who has provided its opinion as to the condition of the decking and the cause of the resulting water damage to the fibro cladding on the ceiling below. 17. TK has confirmed that the repairs conducted by the Applicant s‟ repairer in 2007 were substandard in that the builder failed to waterproof the decking while completing repairs. This has resulted in water leaking into the decking cavity each time it rained, gradually resulting in the damage that is clearly evident. 18. Its policy of insurance states that it will not fix a fault that existed before the loss or damage occurred. 19. The Applicants have attempted to argue that the rule of estoppel applies and that because the FSP paid them money to repair the damage then it should be liable for any costs incurred to rectify that damage should it be found to be faulty. It disagrees with this opinion. 20. It contends that the Applicant s‟ policy that was active in 2007 stated that the lifetime guarantee only applied to repairs that the FSP had arranged, authorised and paid the builder directly for. 21. On review of the 2007 claim, it notes that the Applicants submitted a quotation for repairs to their home to the FSP. It then cash settled the Applicants directly for those costs incurred to repair the home. After which the Applicants arranged, authorised and paid the repairer directly for his services. 22. On this basis it refutes that it is required to rectify any faulty repairs or works uncompleted at the insured premises in 2007. 23. In addition, it notes that the Applicants noticed water leaking through the decking soon after the repairs had been completed. The Applicants assert that after they discovered the leaking water they had attempted to contact the repairer over a period of twelve to eighteen months to have him re-attend and rectify the damage. 24. It was only after this period of time that they elected to contact the FSP to obtain assistance by lodging a claim. However, over the 12 to 18 month period the resulting water damage had deteriorated to such an extent that the estimated costs of rectifying such damage are now in the vicinity of $11,656. Case No: 227812 Determination Page 4 of 11 25. It submits that whilst it would not have paid to rectify the defective decking membrane, had the Applicants contacted it when the damage was first noticed, it would have accepted the resulting damage which would have been minimal in the early stages. 26. Due to the Applicant s‟ failure to mitigate their loss early, the extent of the damage has deteriorated substantially. Therefore, it is not in the position to ascertain exactly what the extent of its liability would have been had the Applicants alerted it to the problems when they first occurred. The policy specifically excludes gradual deterioration and damage resulting from a defect the Applicants knew about. 27. As the resulting water damage to the decking is clearly due to a defect, the absence of waterproofing, which the Applicants knew about over a 12 to 18 months period, this has led to the gradual deterioration of the fibro ceiling lining and is excluded from the cover provided by the policy. 28. Pre-existing defect or imperfection – Section 46 of the Insurance Contracts Act 1984 (the Act) Section 46 of the Act provides that if a claim is made in respect of a loss that occurred in whole or in part as a result of a defect, and that the Applicants were not aware of such a defect, then the FSP is only entitled to deny the claim in so far as the defect itself. Given that the Applicants have stated that the water damage had been occurring for some 12 to 18 months prior to the claimed damage, it submits that the Applicants were clearly aware of the defect and failed to mitigate their loss by having a suitably repairer attend to rectification of the defect after attempts to contact the builder M had failed. Their failure to act promptly exacerbated the problem resulting in the damage that now exists. As the defect was one that the Applicants were aware of, the FSP submits that under section 46 of the Act, it is not required to rectify the damage subject to the claim. 29. The FSP relies on the following policy/contract provisions: Policy wording in force on 8 June 2007 “Types of cover you can choose ... Home Cover When we insure your Home, we will cover it for loss of or damage which:  is caused by an Insured Event and  happens in the period of insurance. ... Case No: 227812 Determination Page 5 of 11 How claim are paid Home, Contents, Personal effects or Landlord’s Fixtures and Fittings claims We choose how your claim is settled. If we agree to pay a claim for loss, theft or damage to your Home, Contents, Personal effects, Landlord‟s Fixtures and Fittings, we will decide if we will: √ repair damage new for old or √ replace Home, Contents, Personal effects, Landlord‟s Fixtures and Fittings new for old or √ pay you what it would cost us to repair or replace Home, Contents, Personal effects or Landlord‟s Fixtures and Fittings new for old.” Supplementary Product Disclosure Statement (SPDS) Applied to the Policy wording in force on 8 June 2007 “Before the section „Making a Claim‟ the following section is inserted: Our guarantee on home repairs We guarantee the quality of materials and workmanship of repairs that we authorise and arrange for the lifetime of your home. This guarantee applies to work to repair, build or rebuild your home where we:  Authorise  Arrange and  Pay the builder or repairer directly for this work. We guarantee the materials used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your home as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. This guarantee does not apply:  To repairs you authorise or make yourself  To loss, damage or failure of any electrical or mechanical appliance or machines  To wear and tear consistent with normal gradual deterioration at your home (e.g. paint peeling off after its expected life cycle, wood rotting from moisture in the air or ground, or roofs weathering) or  Where we agree with the repair quote and we give to you, or the builder or repairer, a cheque for the cost of the repairs and you arrange the repairs.” PDS and Policy wording applying from 28 January 2008 Case No: 227812 Determination Page 6 of 11 “What we cover We cover loss or damage caused by insured events 1 to 12 When we insure them, your home and contents are covered for loss or damage by the insured events 1 to 12 at the insured address. ... We do not cover loss or damage ... Defect, structural fault or design fault Caused by a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (eg. If there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defect) ... We do not cover ... Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot unless this is covered under: - insured event 1 (storm and flood) - ... ... Making a claim When to make a claim Contact us as soon as possible if you suffer loss or damage, or there is an incident that could result in a claim. ... How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home, contents or landlord‟s fixtures and fittings, we will decide if we will: - repair damage new for old or Case No: 227812 Determination Page 7 of 11 - replace home and contents new for old or - pay you what it would cost us to repair or replace home or contents new for old. The meaning new for old is defined on the next page. We will not - pay extra to replace your home, contents or landlord‟s fixtures and fittings to a better standard, specification or quality than it was before the loss or damage occurred except as stated in „new for old‟ on the next page. - fix a fault that existed before the loss or damage occurred. ... Dealing with defects If a known defect is the cause of the damage We do not pay for loss or damage caused by a defect, structural fault or design fault at your home that you knew about (or should reasonably have known about) and did not fix the loss or damage occurred. ... Lifetime guarantee on home repairs When we repair or rebuild your home, we guarantee the quality of materials and workmanship of that work for the lifetime of your home if we: - authorise and - arrange and - pay the builder or repairer directly for this work. What we guarantee We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your home as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. This guarantee does not apply: - to repairs your authorise or make yourself - ... Terms explained ... incident or event A single occurrence which is not intended or expected to happen by you.” Case No: 227812 Determination Page 8 of 11 Issues 30. The Applicants submitted a claim for storm damage to the decking of their home that initially was caused on 8 June 2007. On the advice o f the FSP‟s loss assessor, the Applicants had to arrange for a builder to attend to repairs and the FSP paid the Applicants for the cost of the repairs. 31. Sometime after the repairs had been completed, the Applicants discovered that when it rained the decking leaked. They attempted to have the builder return to their home to rectify the problem but he failed to return to assess his repairs. 32. Over a period of 12 to 18 months they followed up the builder where he would state that he would check his work but never did so. As the damage to their home was increasing they contacted the FSP and submitted a claim for the storm damage. 33. The FSP has denied indemnity for the recurring damage due to it not having appointed the builder and it reimbursed the Applicants for the cost of repairs which resulted in its lifetime guarantee not applying to the faulty repairs. 34. Further, the FSP has stated that it would have accepted the claim for the additional damage, but not the installation of a membrane, if the Applicants had reported the damage in a timely manner. It contends that the delay of 18 months before the Applicants contacted it resulted in the gradual deterioration of the Applicant s‟ home which is an exclusion of the policy of insurance. Reasons for Decision Lifetime Guarantee on Repairs 35. As a result of the widespread storms on or about 8 June 2007, the FSP was not able to handle the additional work load from its normal resources. In this case, it had a loss assessor from New Zealand assess the Applicant s‟ property. 36. The Applicants have informed FOS that the storms caused their sewerage system to overflow and the assessor advised them to attend to the problem immediately because it was a health hazard. The assessor also advised them to arrange for a builder to attend to the repairs to their home because it would take months for the FSP to find a builder. 37. The Applicants contacted a builder through a newspaper advertisement who prepared a scope of works and quotation for repairs. 38. The FSP contends that the builder for the c laim was arranged, authorised and paid directly by the Applicants and the FSP cash settled the Applicants directly for that part of the claim. 39. At the date of the storm damage, the Applicant s‟ policy had been extended to „lifetime guarantee‟ on repairs that the FSP had arranged, authorised and paid Case No: 227812 Determination Page 9 of 11 the builder directly for. In view of its contention that the Applicants arranged, authorised and paid the builder directly for the repairs it states that the lifetime guarantee on the repairs carried out by builder M did not apply. 40. However, in a Claim File note recorded by the FSP on the 18 September 2007 in relation to repairs to the Applicant s‟ front fence, it was stated: “...Insd has fence cover on their policy so is covered for this, called Insd and advised I will be sending her cheque out for the amount and she needs to call [Builder M] to arrange repairs, [Builder M] has previously done work on this claim for us as appointed by [loss assessor] for building repairs.” My emphasis 41. This file note contradicts the F SP‟s contention that the Applicants authorised the repair work to their house. In fact, builder M had submitted his quote to the loss assessor who authorised the repairs to proceed because it agreed with his assessment of the damage. 42. Therefore, although, a t the instigation of the FSP‟s loss assessor the Applicants had gone to the trouble of finding a builder, it was the loss assessor who had authorised his appointment and accepted the builder‟s quote which tacitly arranged for the builder to proceed with repairs. 43. There is no dispute that the FSP paid the Applicants for the cost of repairs who then paid the builder. Therefore, on a strict interpretation of the requirements for the lifetime guarantee to apply, the Applicants fail because they paid the builder direct and not the FSP. 44. However, the FSP has chosen to ignore its actions, through its loss assessor, who advised the Applicants to appoint their own builder because it would be months before the FSP could do so. The FSP has not disputed this statement submitted by the Applicants. 45. Section 14 of the Act provides that if reliance by a party to a contract of insurance on a provision of the contract would be to fail to act with the utmost good faith, the party may not rely on the provision. In deciding this issue the court shall have regard to any notification of the provision that was given to the insured, whether a notification is required by section 37 or otherwise. 46. At time the Applicant s‟ property suffered storm damage there was such widespread damage that the FSP external loss assessor company had to transfer its loss assessors from other parts of Australia and New Zealand. The loss assessor who attended Applicant s‟ property was from New Zealand. 47. The loss assessor was of the opinion that the Applicants should make their own arrangements for repairs to be carried out. However, other than authorising the repairs and builder to complete those repairs, there was no follow up as to whether the repairs had been completed to a satisfactory standard. To leave the acceptance of the repair work to the Applicants, who are not qualified to make such a judgement, was to abrogate the responsibility of the FSP to ensure that the Applicant s‟ property was repaired to the condition it was in prior to the storm event. Case No: 227812 Determination Page 10 of 11 48. I consider that this was a failure on the part of the FSP to act with the utmost good faith towards the Applicants and accordingly it cannot abrogate its responsibility towards them. 49. The lifetime guarantee also carries an exclusion that the guarantee does not apply if the Applicant s had authorised the repairs. As stated above, the FSP‟s loss assessor had authorised the repairs. 50. Accordingly, I find that the Applicants can rely upon the lifetime guarantee on the repairs carried out by builder M. Policy exclusion applying to a fault that existed before the damage occurred 51. The FSP submits that the damage subject to the claim must result from an insured event under the terms and conditions of the policy. It states that its repairer, TK, confirmed that the cause of the water ingress into the Applicant s‟ home occurred from faulty workmanship by builder M. 52. However, the damage to the Applicant s‟ home was caused by the insured event „storm‟ in June 2007 and the Applicants have now submitted a claim for the rectification of the faulty work performed by builder M in carrying out repairs to the storm damage. 53. As mentioned above, I have found that the Applicants can rely upon the contract of insurance lifetime guarantee on the repairs carried out by builder M. Therefore, the FSP cannot rely upon the policy exclusion in respect to a pre- existing fault to deny liability. Policy exclusions in respect to defect, structural fault, wear, tear, gradual deterioration, rust or mould 54. The foundation of the Applicant s‟ claim arises from defects, structural fault and wear and tear to their home. 55. The Applicants have informed FOS that it was some months after the repairs had been completed that water began to leak into their home. They found that the cause of the leak was a breakdown in the waterproof membrane. They then spent the next 12 to 18 months trying to contact builder M. During this time they did speak with the builder but he continually failed to honour his promises to return to inspect the problem. 56. The FSP contends that the Applicants failed to mitigate their loss early and it has relied on the above mentioned policy exclusions to deny liability. 57. However, the Applicants would have been able to mitigate the damage if builder M had returned to rectify the faulty repairs. If the Applicants had done nothing to investigate the cause of the water leak, I would have agreed that the policy exclusions would apply and the FSP would be entitled to deny liability. 58. However, they were thwarted by the inaction of builder M and in desperation reported the water damage problem to the FSP. Case No: 227812 Determination Page 11 of 11 Determination 59. In weighing up the evidence submitted to me, I consider that the Applicants have been caught up in a series of unfortunate incidents. First , the FSP‟s loss assessor advised them to find their own builder because of the demand on builders and repairers; secondly, they chose a builder of doubtful repute, and thirdly, they did not receive any assistance from the FSP to ensure that the repair work the FSP was paying for was of an acceptable standard. 60. Accordingly, I determine that the Applicants are entitled to rely on the policy of insurance lifetime guarantee and to be indemnified for the rectification of the faulty workmanship and resultant damage caused b y the faulty workmanship. 61. The Applicants have stated that they have received a quote for $20,000 plus GST to carry out the necessary repairs. However, the Applicants are to obtain a written quote and detailed scope of works for the repairs to be completed and a copy is to be submitted to the FSP for its consideration. If there is any dispute as to any aspect of the quote and scope of works the matter may be referred back to the service for determination.