Determination 227593

Storm water damage claim refused under design and construction exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2011-04-06
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata policy claim for storm water damage to internal areas was refused under exclusions for faulty design and construction. AFCA found the FSP had not established the exclusion applied, ordered it to indemnify the fair and reasonable internal repair costs with statutory interest on agreed sums, and found the assessment excessively slow.

An insurer relying on an exclusion bears the onus of establishing that it applies to the circumstances of the claim, and the FSP's expert reports did not establish that the blockage was caused by the design issues.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 227593 Determination Page 1 of 7 Case number: 227593 General Insurance - Domestic Insurance - Home Building – Overflow of roof gutters - FSP Decision - Denial of claim 23 March 2011 Background 1. The Applicant is represented. For clarity and convenience in the determination, I will hereafter refer to the Applicant and rep resentative as “the Applicant”. 2. The Applicant has held a Strata insurance policy with the Financial Services Provider (FSP) since March 2010. 3. In May 2010, a unit at the insured property suffered water damage (4) following storm activity. A claim form was completed on 30 June 2010. The claim was subsequently assessed, with the FSP eventually refusing the claim on 27 October 2010 on the basis that the loss occurred as the result of a failure in the design and construction of the roof. The Applicant maintained the loss was the result of tennis balls being lodged in the guttering system. 4. The FSP’s internal disputes resolution department reviewed the claim at the request of the Applicant. It maintained the claim was not covered as the result of the exclusion in the policy. Summary of Applicant’s Position 5. The loss occurred as the result of tennis balls getting lodged in the guttering system and there would have been no issue had the guttering not been blocked. This is proven by the fact there were no overflows in other sections of the complex. 6. The FSP has referred to the tennis balls as the “catalyst” for the loss, which means it was the proximate cause. There is no exclusion with relation to a blockage in the gutters. 7. The FSP has argued there was a failure to install debris protection to the guttering system, yet it is not a requirement of the building standards and is actually recommended against. The Applicant provides an email from the engineer involved in the construction, which states the building is to standards and the FSP’s hydraulics engineer has not assessed the design and drawings. Determination Case No: 227593 Determination Page 2 of 7 8. The building construction was approved by the Council with the relevant certification issued. 9. If it was deemed there was a fault with the roof, section 46 of the Insurance Contracts Act 1984 (the Act) would apply to the circumstances of the claim to prevent the FSP from relying on the exclusion. 10. The FSP has not acted with utmost good faith and has failed to comply with the General Insurance Code of Practice with relation to timely assessment of the claim. Summary of FSP’s Position 11. Its experts report the loss was the result of faulty roof design and construction, which was not sufficient to handle the flow of water. There was no debris protection installed to the guttering system, which allowed the blockage to occur and it argues the balls were merely a catalyst and not the proximate cause of the loss. 12. Regulation 30 of the Insurance Contracts Regulations 1985 , stipulates section 46 of the Act does not apply to broad form policies and the policy in question is a broad form policy. 13. It concedes the assessment of the claim was delayed as the result of the available assessor living some distance from the property and accordingly it requested quotations. When it became apparent the claim was sizable, it engaged a building consultant. 14. The fact the Council approved the building does not dictate the construction was adequate. 15. Reliance on a policy exclusion cannot reasonably be considered a failure to act in utmost good faith. 16. The FSP relies on the following policy provisions: “ Section 1 – Property Insured … 6. Exclusions We will not be liable for any physical loss or damage caused directly or indirectly to: … 6.8 he (sic) Building(s) by Rainwater or Storm water seeping or percolating through walls, roofs or floors or entering as a result of structural defects, faulty design or faulty workmanship in the Buildings(s). We will not be liable in respect of any physical loss, destruction or damage directly or indirectly caused by or arising out of or in consequence of or contributed to by: … 6.17 error or omission in design, plan or specification or failure of design; Case No: 227593 Determination Page 3 of 7 6.18 faulty materials or faulty workman ship;” Issue 17. Whether the FSP is entitled to refuse indemnity under the terms and conditions of the policy. Reasons for Decision 18. There has been an exchange of information between the parties and I am satisfied each party has had an opportunity to address the issues raised. 19. Due to the nature of the dispute, it has been referred for a determination in accordance with the Operational Guideli nes to the Terms of Reference. 20. The parties discuss the application of section 46 of the Act to the dispute in their submissions: Section 46 of the Insurance Contracts Act 1984 provides that if a claim is made in respect of a loss that occurred in whole or in part as a result of a defect or imperfection in a thing and the insured was not aware of the defect or a reasonable person in the circumstances could not be expected to have been aware of the defect or imperfection the insurer may not rely on an exclusion clause that refers to the condition of the thing before the contract was entered into. 21. I have reviewed the submissions of the parties in accordance with the terms and conditions of the policy and section 46 of the Act. The Applicant submits the loss was caused by tennis balls blocking the guttering system while the FSP argues the loss was the resulting of design and construction faults with the roof. 22. Having reviewed the policy, I am satisfied it excludes loss resulting from faulty design or construction. 23. There is an invoice on file, from a roof plumber indicating the estate agent paid $66 to “ Remove balls f rom blocked gutter” . 24. The FSP argues the tennis balls were merely a “catalyst” and the underlying design and construction issues were the proximate cause of the loss. It provides a report prepared by a hydraulic engineer, dated 11 October 2010, which states: “…Using the roof are a in sq m calculated and applying the rainfall intensity, a box gutter drain of 238831.29 sq mm is required to drain safely a roof area of 105.91 sq m. … The box gutter appears to be undersized for a 1:100 year storm intensity event. Eave gutters required to accommodate a 1:20 year storm event under the code – but box gutters due to its construction within a building, require calculation applicable to a 1:100 years storm event. Case No: 227593 Determination Page 4 of 7 An allowance must also be made above the maximum calculated water flow level of twice the maximum flow depth plus at least 25mm at the longest drainage distance along the box gutter. Debris protection should be installed as raised domed wire grates to at least enable drainage around an obstruction. This apparently was not installed. An overflow arrangement should be installed to allow unusually heavy rainfall events so that debris and blockages that may occur can be passed and discharge can occur freely at a volume equivalent to the maximum box gutter discharge. The overflow should have a maximum allowance terminating below the box gutter pan. Conclusion Calculations from the records provided conclude the box gutter on this premises is undersized by approximately 75%. The box gutter will be required to be upgraded and replaced allowing for the maximum volume /flow as calculated above plus an allowance at the longest or highest point from the outlet with a safety margin of a minimum of 25mm over the gutter length. Raised domed debris protective grating will be required at the rain water head and downpipe entrance. Adequate overflow provisions are required in the system but in this scenario possibly at the rainwater head.” (sic) 25. The FSP also provides a building consultant’s report dated 20 October 2010, which states: “Care must be taken when constructing a “butterfly roof” because the water collected by the box gutter system is capable of draining in all weather conditions and its construction must meet the AS 3500 standard. The average recurrence for internal gutters to accommodate is one in 100 years rainfall event. The rainfall in intensity for Bermagui at the time in questions is given as 270mm in one hour. … Conclusion I am of the opinion that the drainage system installed in this building contains a major design flaw and does not meet the AS3500 standards (see additional supporting report by [company] Hydraulic Engineer and I conclude that major rectification works are needed to ensure that flooding via the inadequate box gutter and roof drainage does not reoccur. ” 26. A further report from the same building consultant, dated 08 November 2010, states: “…Of major con cern was the mechanical blockage of a downpipe, box gutter and rainwater head. If the construction of these faculties do not have emergency overflows along the length, especially where the maximum depth occurs at a far end, the system will suffer from severe overflow along the gutter length. The further allegation made of this project was that a ball had blocked the outlet of the gutter. This predicament must always be catered for in a simplistic common sense manner, by installing domed mesh outlets, to prevent such a blockage causing failure of the system and allowing a calculated cross-section area to cater for maximum flow possible away from the building to satisfy this event Case No: 227593 Determination Page 5 of 7 Another area of concern was an upturned walls and flashing that acts as an extra area for rainfall capture of driving rain, and increases the area to be calculated for sizing and gutter run-off. The area of rainfall was measured on site. The rainfall volumes were drawn from statistics and local maps. Measurements of box gutter Length x Depth x Width were supplied. Outlet parameters to outside walls, photographs of box gutter and existing overflow arrangement in case of blockages or surcharge were supplied. The roof drainage areas were calculated in accordance with the Code (AS 3500). The rainfall intensity applied to obtain the “litres per second discharge” from the roof area was calculated - again using the Code (AS 3500, CSIRO and Weather Bureau Statistics documented and ARI). The formula applicable to open channel flow was applied. All of the above was then compared to the existing site sizes and provisions of drainage to arrive at the estimated conclusions and the result documented. In short, the construction of the roof drainage was inadequate under the Code and it was not properly safeguarded to prevent blockages.” (sic) 27. The Applicant submits the building was inspected and certified by the Council after construction. The Applicant submits the proximate cause of the loss was the blockage from the tennis balls, which is proven by the fact no other area of the complex experienced water inundation as the result of the event. The Applicant notes there is no requirement under AS 3500 to have guards on gutters. AS 3500 even suggests that it may be better not to install guards. 28. I have considered s ection 46 of the Act. I note the exclusion in the FSP’s PDS does not refer to the state of a thing prior to the inception of the policy. For section 46 to have application, the insurer is required to rely on a provision in the contract that has the effect of limiting or excluding the insurer’s liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing which is being considered. In this case, the FSP is not relying on any such provision. 29. In any case, the Applicant does not accept there is a defect. 30. In considering the evidence, I note there appears to be evidence to indicate the roof guttering system is not sufficient for requirements. However, I am also mindful that either tennis balls or a small football (as noted in the original assessment report) were removed from the guttering system. The roof plumbing report notes “balls” were removed; indicating it is likely that more than one ball was blocking the system. 31. In essence, this dispute relates to whether the loss was caused by the faulty design and construction of the roof and plumbing or blockages by the balls in the guttering system. 32. The FSP appears to largely ignore the blockage issue, stating the blockage was a “catalyst” rather than the proximate cause. The argument as to the meaning of the terms “catalyst” and “proximate cause” has been discussed by the parties; I do not regard the distinction as significant. Case No: 227593 Determination Page 6 of 7 33. The Applicant submits that no other area of the complex suffered water inundation as the result of the storm event. It would therefore seem the loss only occurred in the area where there was a blockage in the guttering. The FSP’s expert has noted that a “ simplistic common sense” approach should always be adopted and domed mesh outlets installed to prevent such blockages. The Appl icant correctly notes that “common sense” is a relatively subjective area and such a statement cannot be relied upon to defeat a claim. In any event, the relevant Australian Standard specifically negatives the mandating of domed mesh. I also note the absence of reports of any earlier events leading to overflowing water. Whilst the incident of 25 May 2010 was extreme, I believe that within the previous 18 months, there must have been some incidents of heavy rain. 34. In the circumstances, while I accept there is evidence the roof may have some design issues, I am not persuaded that the loss in question was the result of the issues identified. I pay particular regard to the fact the only reported area of damage to the complex occurred in the area of the blockage. 35. At law, when an insured lodges a prima facie claim and the insurer wishes to deny the claim on the basis of an exclusion in its policy, it bears the onus to establish the exclusion applies to the circumstances of the claim. 36. In this instance, I am not persuaded the FSP has established the loss in question was the result of the reported design and construction issues. 37. The time taken to assess (and then deny) this claim was excessive. The file indicates that this may have lead to a loss of rent. But the material on the file does not permit me to determine the issue of quantum. Determination 38. On the basis of the available information, I determine the FSP has an obligation to indemnify the Applicant for the fair and reasonable costs of the internal repairs. 39. There is a submission indicating the Applicant was in the process of attending to the required repairs. If the repairs are progressing or have been completed, I direct the Applicant to provide the FSP with documentation outlining the costs incurred, and details of any claim in respect to lost rent. 40. In the event that payment has been made for the repairs (and subject to agreement between the parties as to the reasonableness of the repair costs), I direct the FSP to pay interest at the statutory rate upon the agreed sum, from 30 August 2010 until settlement of the claim. 41. While not specifically relevant to this dispute, I note the Applicant may also wish to further investigate the reported issues with the guttering system on the roof to ensure it meets all requirements so there are no further issues in the future. Case No: 227593 Determination Page 7 of 7 42. I trust the parties will co-operate in good faith to ensure the claim is resolved in a timely manner.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.