Bushfire home building claim: repair quality, scope and compensation disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$66,818
Non-financial loss—
Amount claimed$128,690
SourceAFCA PDF

Summary

The applicants disputed the quality, scope and cost of bushfire repairs to their home over two years, claiming about $128,690 across the disputed heads. AFCA ordered cash payments totalling $66,817.50 for several items and specialist fees, declined compost bin replacement and works management costs, and limited the footbridge contribution to 50%.

The insurer must make good insured fire and contractor damage, with apportionment and a fair-in-all-the-circumstances settlement given the prolonged dispute.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 227037 Determination Page 1 of 13 Case number: 227037 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 22 September 2011 Background 1. The Applicants held a home building and contents policy with the Financial Services Provider (FSP). 2. In February 2009, the Applicants‟ property suffered damage as a result of the Victorian Black Saturday bushfires. The FSP accepted the claim and authorised repairs to the property; however, a number of issues with the quality of the repairs and the scope of works developed. 3. Following a number of assessments and meetings in relation to the repair issues, the Applicants remained dissatisfied with a number of aspects of the repairs. They also sought compensation for building report fees, work management fees, telephone calls and travel costs incurred as the result of the FSP‟s poor handling of the claim over two years. 4. The FSP‟s Internal Disputes Resolution department reviewed the claim at the request of the Applicants. It agreed to cover or rectify a number of the repair issues raised by the Applicants. It also offered $1,000 towards phone calls; however, it refused to cover a number of the items raised. Summary of Applicants’ Position 5. The FSP‟s repairers have undertaken a number of substandard repairs and in some cases, have not used the correct materials. 6. The ongoing issues with the claim since February 2009 have resulted in four return flights from an overseas work posting, months of managing and organising repairs and expert reports and a number of expenses including local and international phone calls. 7. The FSP‟s handling of the claim has resulted in a great deal of stress on top of the actual bushfire itself. „NS‟ (the female Applicant) has been hospitalised as a result of the stress. 8. The FSP has continued to deny several aspects of the claim and attempted to offload its obligations by making an offer of $48,000 to „ NS ‟ over the phone. Determination Case No: 227037 Determination Page 2 of 13 Summary of FSP’s Position 9. It acknowledges there have been repair issues over the life of the claim; however, it submits it has continued to address the issues as they arise. 10. It notes the Applicants have received several upgrades on what existed prior to the event. 11. While it has made an allowance of $1,000 for telephone calls, it notes the policy does not provide for costs associated with the handling of a claim. It notes the Applicants nominated „ NS ‟ as the contact and if they were overseas, they could have nominated a local contact. 12. The FSP relies on the following policy provisions: “ Peace of mind with [FSP] Peace of mind with Complete Replacement Cover for your home building [FSP] home building insurance with Complete Replacement Cover gives you absolute peace of mind. On top of the protection we normally provide, we cover insured damage or loss to your home buildi ngs for whatever it costs to repair or rebuild them. [FSP] home building insurance with Complete Replacement Cover repairs or rebuilds insured damage or loss to your home buildings or pays the cost of repairing or rebuilding them: with new materials, to th e same size and standard of your current home. … The building includes: outbuildings and permanent structural improvements, fixtures and fittings that: are permanently attached to the home building or the site, are stored at the site in a building capable of being locked while awaiting installation. that form part of the building used for performing office work, services, whether above or below ground, that are your property or for which you are liable, any jetty at your site owned by you and used only for domestic purposes. The building excludes: Case No: 227037 Determination Page 3 of 13 fixed wall and floor coverings such as carpets, internal blinds, drapes, and curtains, any part of the home building or the site used for conducting a business, trade, professional services, or farming of any descr iption, any part of the building or other structures at the site that cannot be locked because that building or structure or part of it is being altered, renovated or rebuilt, a temporary building or structure or a building or structure in the course of co nstruction, houseboats, watercraft, caravans, mobile buildings (fixed or free - standing), motorised vehicles of any type and the parts and accessories of any of these items, the loose surfaces of tennis courts, driveways and paths, hedges (whether or not they form a fence), lawns, trees, shrubs, plants, flowers, garden beds or any other living material. … Repairing your building When we establish that your home building can be properly repaired, we will decide to: repair it, or pay the cost of repairing it. When we repair your building, we will use new materials. We will make reasonable endeavours to match materials. Where this does not achieve an exact match, materials that in our opinion match the damaged or lost materials as near as reasonably practicable will be used. We will not pay to replace undamaged materials or any undamaged part of them to achieve a match. … Repairing or rebuilding your building We ordinarily obtain independent, competitive quotes from repairers and suppliers recommended by [FSP]. I f you want, you can choose a repairer and/or supplier to provide one of the quotes. We review the quotes, including any quote from a repairer and/or supplier you choose, and what is necessary to properly repair or rebuild your building. We choose the repai rer and/or supplier who submitted the more competitive and complete quote and that will be the repairer and/or supplier who repairs or rebuilds your building. We will enter into any building contract with the selected repairer and/or supplier on your behal f. We will oversee the repairs and keep you informed of their progress. Changes to your building You can have changes made to the design and structure of your building before repair or rebuilding. Any extra cost of such changes will be your responsibility. Case No: 227037 Determination Page 4 of 13 We may decide to pay you the cost of repairing or rebuilding your building without the changes you require.” Issues 13. Whether the FSP has met its obligations under the terms and conditions of the policy. 14. Whether the Applicants are entitled to compensation for repair management, communication costs and travel costs. Reasons for Decision 15. Due to the nature and relative complexity of the dispute, it has been referred to the Panel for determination, in line with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 16. There are a number of issues in dispute. For clarity, the Panel will address each matter under a separate heading. The Panel is also aware a number of issues have already been settled between the parties. The Panel will only address the issues that are outstanding, although may make reference to settled matters where relevant. Greenhouse Roof Vent 17. The Applicants submit the new greenhouse replaces an asbestos shed and a greenhouse. The asbestos shed was never replaced. Rather, the FSP agreed to build a larger custom greenhouse to replace both original structures. They note the FSP‟s replacement struc ture does not include a vent, which was a feature of the original greenhouse and a usual feature of such structures. They are unable to provide the proof requested by the FSP because the original structures were burnt and removed. 18. The FSP submits it replaced the asbestos shed and metal structure with a larger custom greenhouse, as requested by the Applicants. It notes the original structures were basic and there is no evidence either had a roof vent. It submits the new structure is also a significant upgrade on the structures it replaced. 19. In considering the submissions of the parties, the Panel notes there appears to be no dispute there was an agreement to replace the two original structures with a single larger greenhouse. The issue is whether the new structure should have included a vent. 20. The FSP submits there is no evidence that either of the original structures had a vent. The Applicants submit the greenhouse did have a vent and it is a standard feature of a greenhouse. 21. It is clear the Applicants are unable to provide proof of a vent in the original greenhouse structure, as it was damaged in the fire and removed. In the Case No: 227037 Determination Page 5 of 13 Panel‟s opinion, it is not unreasonable to conclude the original structure had ventilation. 22. In the circumstances, the Panel determines the FSP is to cover the costs of ventilation. The Applicants have provided a quotation from „S&SL‟ of $1,460 for a manually operated vent. The Panel determines the FSP is to settle $1,460 in this regard. Compost Bins 23. The Applicants submit the bins have concrete bases and therefore they are building items. Their contents insurer also noted them as fixed items and therefore did not cover them as contents. The Applicants provide a report from S&SL which states the bins are “fixed in place on concrete foundations”. 24. The FSP submits the bins are not fixed items and therefore they are not building items as defined by the policy. The FSP‟s assessment reports notes the bins were movable and in a deteriorating state due to wear and tear. 25. The Panel has reviewed th e photographs of the bins and the FSP‟s assessment notes. The notations from a site meeting in May 2010 state the bins are contents items and had “severe rust” and were past their use by date prior to the event. Photographs dated September 2009 and May 2010 show the bins are in a deteriorated state with severe rust evident. 26. In the circumstances, the Panel is unable to determine whether the items are fixed to the concrete foundations or not as the evidence is contradictory. The Applicants‟ report indicates they are fixtures, while the FSP‟s assessments indicate they are not fixed. In any case, the Panel is persuaded the bins were in a severely deteriorated state and were effectively at the end of their serviceable life. 27. The Panel has reviewed the „JB‟ report ed dated 17 October 2010, which states the fire damage has contributed to the deterioration; however, given the deterioration already noted in the 2009 photographs, it is persuaded the bins were already in a deteriorating state. 28. In the circumstances, the Panel determines the FSP is not obligated to replace the bins as even if they were considered to be building items, the exclusion for wear, tear, deterioration and corrosion in the policy would exclude them from cover. Driveway Brick Retaining Wall 29. The Applicants submit the wall was damaged by the fire. They note the fire was hot enough to burn the roots of 100 year old pine trees and caused the wall to crack and crumble. 30. They also note the removal of nearby trees caused additional damage. The wall needs to be replaced to ensure the driveway does not crumble down the slope, and this is especially important noting the recent torrential rain events. Case No: 227037 Determination Page 6 of 13 31. The Applicants provide a report from S&SL, dated 22 February 2011, which states: “Close inspections of this pro perty have been made and these inspections show the original brick wall was damaged by the fires. Severely cracked and blackened bricks still remain on site. Subsequent damage may have occurred due to machinery but the initial damage has been caused by heat and falling trees due to fire. As there is a change in ground height at the driveway edge (low side) a new retaining wall is required.” 32. The FSP submits there is no evidence to indicate the wall was damaged during the fire event; however, there is evidence to indicate it was impacted by machinery operated by „G‟ when the property was cleared following the fire. It notes „G‟ was acting under the Applicants‟ authority and was not authorised as part of the claim. 33. The FSP submits the Applicants are entitled to lodge a separate impact claim for the wall. 34. The FSP also notes the quotation of $26,320 does not include a scope of works or details as to the size and design of the proposed structure. 35. The Panel has considered the evidence. It notes in the „Snag List‟ it states “fix driveway retaining wall broken during fire cleanup” . It would appear this relates to the FSP‟s submission that impact by „G‟ caused the noted damage. 36. In the circumstances, the Panel considers it is likely fire and impact damage have contributed to the loss. In the circumstances, the Panel determines a fair and reasonable outcome would be for the FSP to pay for 75% of the loss under the existing fire claim, resulting in a figure of $19,740. Broken Driveway Footing 37. The Applicants note the concrete driveway surface at the entrance to the main road was damaged by heavy trucks and machinery involved in the clean up and the works. They note traffic continued for two years as the result of the repair issues. The FSP has denied liability on the basis the area is outside the property boundary. When they raised the issue with the Council, it was advised the matter was not the Council‟s responsibility. 38. The Applicants also note an agricultural pipe begins within the boundary of the property and should also be included. 39. The FSP submits that „G‟ first had heavy trucks and machinery on the property. It also submits the damage has been caused by impact and therefore the Applicants are invited to lodge an impact claim. The FSP notes it may have recovery rig hts against „G‟ and therefore a separate impact claim is required. 40. The Panel notes there is no dispute the damage to the driveway has in fact been caused by impact, rather than as the direct result of the fire. However, the Panel also observes this dispute has been protracted in nature and particularly stressful for the Applicants. In the interests of bringing finality to both parties to Case No: 227037 Determination Page 7 of 13 the dispute and mindful of what would constitute „fairness in all of the circumstances‟, it directs the FSP to cash sett le the Applicants $5,000 in respect of the broken driveway footing and the agriculture pipe. Top Dressing of Lawn Trenches 41. The Applicants submit the FSP‟s plumber dug trenches to install irrigation pipes and the trenches were filled in with no regard for the surrounding levels of the lawn or garden. They submit this caused indentations and „humps‟ in the lawn that were not there prior to the loss. 42. The Applicants want the FSP to cover the costs associated with rectifying the problem and bring the lawn back to ground level. They provide a quotation of $965 from S&SL to rectify the problem. 43. The FSP submits the Applicants have not provided evidence to prove its contractors caused the noted damage and therefore it will not provide cover. 44. The Panel has considered the submissions of the parties and notes the FSP does not deny the issue exists. Rather, it submits the Applicants have not proven its contractors caused the problem. 45. Given the FSP contractors have done extensive works on the property and the FSP does not deny trenches were dug or provide any substantive evidence to indicate the damage occurred in some other way the Panel is persuaded the FSP should cover the loss. 46. Accordingly, the Panel directs the FSP to pay the Applicants $965, as per the quotation from S&SL. North Boundary Fence 47. The Applicants submit the fence installed by the FSP‟s contractor does not follow the boundary of the property and is of poor quality. They submit the fence cannot be repaired and requires replacement. They provide expert reports in support of their submission the fence needs to be replaced. 48. The Applicants provide a quotation from S&SL of $54,685. 49. The FSP concedes the fence requires rectification to correct the work of its contractor; however, it does not believe the fence needs to be completely replaced. It notes the quotation provided by S&SL does not include details as to the type of materials to be used, the length of the fence or any details to indicate S&SL quoted to replace the fence with a similar fence that existed prior to the event. 50. The FSP submits it will consider a quotation in accordance with the scope of works prepared by „H‟, a building consultant who has prepared reports on behalf of the Applicants. 51. The Panel has considered the evidence. The Applicants pro vide a report from „AJ‟, dated 30 November 2010, which states: Case No: 227037 Determination Page 8 of 13 “The conclusion is the workmanship is not of an acceptable standard for the following reasons. - The farm fence is not straight and has been constructed around stumps and trees. - The fence has not been strained to the correct tension. - The fence does not follow the correct surveyed boundary line. - The sleepers between the posts have not been fully replaced along the length of the fence. … The remedy for the farm fence; - Pull it down, resurvey the boundary and peg all blind spots. - Remove all stumps, trees and vegetation matter as to allow a clear fence line. - Reconstruct fence using the correct fencing material.” 52. The Applicants have also provided a report from S&SL, dated 22 February 2011, which states: “Due to the poor quality of tradesmanship (sic) provided by the previous contractors this fence needs to be completely removed and rebuilt using entirely new materials. The boundary line needs to be prepared accordingly (removal of old stumps and fence posts etc) and the new posts need to be spaced appropriately to suit the sleeper plinth. New wire will be properly tensioned and the new fence needs to be re- positioned accurately on the boundary.” 53. The Applicants have provided an engineering report by „BDCG‟, dated 09 May 2011, which states the following: “The Northern Boundary Fence: The northern boundary fence is not straight and the wires are not tensioned adequately. The original wire fence comprised of posts at 2700mm spacing within full length sleeper along the bottom of the wire to protect against wombats entering the property. The new fence has posts 3600mm spacing and two (2) sleepers are joined end to end between the posts. Wombats can push the sleepers apart at the join. Apparently the original fence comprised of sleepers along the entire northern boundary, the new fence sleepers from the frontage to just west of the „hot house‟. … 5.0 Recommendations: … 5. The Northern Boundary Fence :  Engage a land surveyor to carry out a „Title Re -establi shment Survey‟.  Relocate posts to make the fence straight and reduce the post spacing to 2700mm. Install once full length sleeper (2700mm) along the bottom of the wire and use a metal plate connection to each post. Tension all fence wires.  Extend the slee pers along the entire northern boundary.” Case No: 227037 Determination Page 9 of 13 54. In considering the evidence presented, the Panel notes S&SL and AJ state the fence needs to be replaced, while reports from H and BDCG indicate the fence works can be rectified. 55. The quotation from S&SL does not include a full scope of works and in the Panel‟s opinion, the FSP is entitled to question whether the $54,685 quotation reflects a fair and reasonable replacement of what existed prior to the loss. 56. However, the FSP itself has provided little evidence in re lation to the issues with the northern fence. It has not provided a report outlining what it proposes to do to rectify the issues with the fence, rather relying on broad recommendations in the report from H. In the circumstances, the Panel is left in the difficult position of trying to ensure the Applicants receive due coverage under the policy, while also having regard for ensuring the rectification is reasonable in the circumstances. 57. In consideration of all the evidence presented, the Panel determines the FSP is to pay 50% of the Applicants‟ quotation to have the fence replaced. Based on the quotation of $54,685, the Panel determines the FSP pay the Applicants $27,342.50 towards the northern fence rectification. Tank Retaining Wall 58. The Applicants submit a building inspector found discarded concrete/bricks from the original wall and it was at that point they became aware of its original construction. They did not request a wall be installed as submitted by the FSP, and they question why the FSP would install a wall if one did not exist previously. 59. The Applicants have provided a quotation from S&SL to build a new masonry wall on concrete foundations for $15,260. 60. The FSP submits it has been established there was no retaining wall prior to the event; however, it agreed to install a wall. In reviewing the issue of the construction of the wall, it agreed to pay the Applicants an additional $2,740 to bring the new wall within the relevant building requirements. 61. The FSP argues the fact the Applicants have provided a more expensive quotation is not evidence there was an original wall. It notes that while it agreed to install a retaining wall to the area even though there was no evidence of a wall, it is not required to upgrade the Applicants‟ property. 62. The Panel has considered the evidence. There is an indication that a concrete or brick wall existed and was not noted as rubble that had been moved from the area. The FSP maintains there was no wall and it has installed one, despite the fact it was not required to do so under the policy. When issues with the wall it installed were noted, the FSP agreed to pay an additional sum to have the issues rectified. The Applicants now request a new wa ll at a quoted cost of $15,260. 63. In the S&SL report dated 11 February 2011, the fo llowing comments are made: Case No: 227037 Determination Page 10 of 13 “Tank retaining Wall After visiting this property I have noted that the previous contractors undertook excavation that where not required around the rainwater tanks. After close inspections I have found that the original retaining wall (before the fires) was constructed from brick on steel reinforcement concrete foundation. This wall was unnecessarily removed, portions of it still remain on site. As construction of the replacement wall (the current treated pine sleeper wall) has not been satisfactory (sic) finished it is appropriate that the current wall be dismantled and removed and replaced with a masonry wall on a steel reinforced concrete foundation.” 64. In the circumstances, the Panel accepts there is now evidence to support the Applicants‟ submission a wall did exist and it was constructed with brick and concrete. Despite the FSP‟s submissions on the issue, it does not provide any evidence to indicate the S&SL‟s findings as to the origin al construction are incorrect. 65. While the Panel accepts the FSP and Applicants were not originally aware of the original wall and the FSP‟s original decision to build a wall was an act of good faith the Panel determines the FSP has an obligation to install a wall constructed the same as the noted original. 66. In the circumstances, the Panel emphasises, as outlined in paragraph 41 above, the need for finalising these proceedings and in consideration of „fairness in all the circumstances‟ the FSP is to cash settle the Applicants 50% of the S&SL quote namely, $7,630. Theft of Items 67. The Applicants note a number of items have been stolen from the property and they attribute this to the large number of contractors on site as the result of inadequate repairs. 68. The FSP submits that any claim for theft of items would need to be considered under a separate theft claim on its own merits. 69. The Panel is satisfied any claim for the theft of items would need to be a separate claim and considered as a separate matter. Without specific evidence linking the FSP‟s contracto rs to a theft of items, the Panel is not in a position to make any determination as part of the current claim. Other Compensation 70. The Applicants are seeking compensation for overseas travel, communication costs and work management costs ($30,000) required as the result of the FSP‟s and its contractors‟ handling of the claim. 71. The FSP submits it has provided $1,000 for communication costs. It concedes there have been issues with the claim; however, notes it has made every effort to address the issues as they arise. Case No: 227037 Determination Page 11 of 13 72. It also notes the female Applicant was in Australia dealing with the claim for much of the time and the Applicants could have nominated a representative to handle the claim while they were overseas. 73. The FSP also notes the policy excludes expenses incurred by an insured during a claim. It provides a copy of determination 27522 in support of its submission. 74. The Panel has considered the evidence. It notes there is no doubt there have been ongoing issues with the claim and aspects of the repairs. However, at the same time, the Panel considers the FSP has made efforts to address the issues as they arose and has acted in good faith in offering to provide items such as the tank retaining wall, despite it being understood at the time that no such wall existed prior to the fire event. 75. The Panel also notes the FSP offered counselling services, alternative accommodation and agreed to settle many of the issues raised at the internal dispute resolution stage. 76. However, it is clear the claim has taken an unusually long time and there are still issues outstanding. The Panel also notes determination 27522, raised by the FSP relates to a completely different policy and a different set of circumstances. 77. In the circumstances, the Panel accepts the Applicants have incurred additional expenses; however, it is not persuaded the Applicants are entitled to the full sums claimed and it does not accept the Applicants are entitled to works‟ management costs. 78. In the circumstances, having full regard for the evidence presented, in accordance with Section 9.3 of the Terms of Reference, the Panel determines the FSP should pay an additional $1,000 towards the costs incurred by the Applicants. Footbridge 79. The Applicants note they installed the footbridge between their property and the neighbouring property and therefore the FSP should pay the full costs of replacing the bridge. 80. In its Internal Dispute Resolution letter, the FSP argues the bridge spans two properties and therefore it is only liable for 50% of the replacement. 81. The Panel has considered the issue and determines the FSP‟s liability should be limited to 50% given the bridge spans two properties. In keeping with paragraph 41 above, namely the need to bring finality to these issues and considering what is fair in all the circumstances, the Panel determines an amount of $1,500 constitutes the limit of the FSP‟s 50% contribution to the footbridge replacement. Case No: 227037 Determination Page 12 of 13 Specialist Report Fees 82. The FSP has indicated it is willing to consider the Applicants‟ specialist report fees. The Applicants have provided invoices for $2,180 from BDCG (two invoices) and an invoice for $475 from „HHGC‟ for the inspection of the pond. 83. The Panel determines the FSP is to reimburse the Applicants for these costs (if it has not already done so prior to this determination). 84. If the Applicants have further specialist report invoices, they should forward them to the FSP for review. It is noted the FSP is only liable for the fair and reasonable costs of such reports. Determination 85. On the basis of the available information the Panel determines the following:  The FSP is to pay $1,460 for the greenhouse vent.  The FSP is entitled to decline to indemnify replacement of the compost bins.  The FSP is to cover 75% of the brick driveway retaining wall under this claim, in the sum of $19,740.  The FSP is to cash settle the Applicants $5,000 in respect of the broken driveway footing and the agriculture pipe.  The FSP to pay the Applicants $965 towards the rectification of the lawn.  The FSP is to pay 50% of the S&SL quotation for the northern boundary fence, being $27,342.50.  The FSP is to pay 50% towards the replacement of the tank retaining wall, in the sum of $7,630.  The Applicants may choose to lodge a separate theft claim for the reported theft of items. Any theft claim is to be assessed on its own merits.  The FSP is to pay the Applicants a further $1,000 compensation towards their costs.  The FSP is entitled to limit its liability for the footbridge to 50%, in consideration of which the Panel determines a sum of $1,500 will discharge the FSP‟s obligation in this respect.  The FSP is to reimburse the Applicants the sum of $2,180 for specialist report fees (if it has not done so already). 86. The Panel trusts the parties will cooperate in good faith resolving the outstanding issues and reiterates that in assessing figures payable by the FSP it has been mindful of the prolonged nature of this dispute, the need to bring finality wherever possible while, at the same time, keeping faith with the overarching principle of „fair in all the circumstances‟. Case No: 227037 Determination Page 13 of 13 87. The Panel is also aware there are ongoing issues in relation to plumbing works. As these did not make up part of the dispute before the Panel, the plumbing issue has not been considered. The Panel is aware the parties are currently working through the issues. If a dispute develops that cannot be resolved, the Panel notes the Applicants may bring the issue to the Financial Ombudsman Service as a separate dispute. 88. The Panel notes that if the Applicants accept this determination, they are accepting the decision as outlined in paragraph 85 in full.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.